REFURBISHMENT INSTRUCTION
NO. 3140-012-0697 Rev C Chg 1
CONTRACT DATA REQUIREMENTS LIST
A. CONTR. LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM
70 KW MG
E. CONTRACT/PR NO.
RI NO. 3140-012-0697 Rev C Chg 1
F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUHORITY
(Data Item Descript)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF
FIRST
SUBMISSION
14. DISTRIBUTION
DR - DRAFT RG
- REGULAR RP
- REPRO
8. APP CODE 11. AS OF
DATE
13. SUBSEQUENT
SUBMISSION
15. REMARKS
1. A001 2. SUBMEPP RECEIPT INSPECTION 3. N/A
4. DI-MGMT-80389C (SUBRIR) 5. CSD REF. IN PARA. 7.1 6. SUBMEPP
7. LT 9. Dist 10. 12. AS REQ 14. DISTRIBUTION Statement required
AS REQ a. ADDRESSEE b. Copies
8. N/A D 11. N/A 13. AS REQ. D
R
R G
RP
16. REMARKS SUBMEPP CODE 1831 1
Certification documentation must be submitted via WAWF (Wide Area Work NAVSUP WSS N97121 1 Flow) to the maximum extent possible. See Enclosure 1. NAVSUP WSS N743 1
15. TOTAL 3
1. A002 2. SUBMEPP CONDITION REPORT 3. N/A
4. DI-MGMT-82048 (SUBCR) 5. CSD REF. IN PARA. 7.2 6. SUBMEPP
7. LT 9. Dist 10. 12. AS REQ 14. DISTRIBUTION Statement Required
AS REQ a. ADDRESSEE b. Copies
8. N/A D 11. N/A 13. AS REQ D
R
R G
RP
16. REMARKS SUBMEPP CODE 1831 1
Certification documentation must be submitted via WAWF (Wide Area Work NAVSUP WSS N97121 1
Flow) to the maximum extent possible. Contractor own format is acceptable. NAVSUP WSS N743 1
15. TOTAL 3
1. A003 2. SUBMEPP WELDING PROCEDURES 3. N/A
4. DI-MISC-80875A (SUBWP) 5. CSD REF. IN PARA. 7.3 6. SUBMEPP
7. DD 9. Dist 10. 12. Acceptance required prior 14. DISTRIBUTION Statement Required
AS REQ to welding. a. ADDRESSEE b.Copies
8. N/A D 11. N/A N/A
13. AS REQ D
R
R G
RP
16. REMARKS SUBMEPP CODE 1831 1
Certification documentation must be submitted via WAWF (Wide Area Work NAVSUP WSS N97121 1
Flow) to the maximum extent possible. Weld procedures are required to meet the NAVSUP WSS N743 1 requirements within NAVSEA S9074-AR-GIB-010/278. 15. TOTAL 3
G. PREPARED BY
//s// Matt Porter 1843MP
H. DATE
12/7/2020
I. APPROVED BY
//s// Stacy Woodley 1831SW
J. DATE
12/7/2020
DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (1) Page 1 of 3 Pages
XX TDP TM OTHER
D. SYSTEM/ITEM
70 KW MG
E. CONTRACT/PR NO.
RI NO. 3140-012-0697 Rev C Chg 1
F. CONTRACTOR
1. A004 2. SUBMEPP REASSEMBLY QUALITY
ASSURANCE REPORT
3. N/A
4. DI-QCIC-81890 (SUBRQAR) 5. CSD REF. IN PARA. 7.4 6. SUBMEPP
7. DD 9. Dist 10. 12. 14. DISTRIBUTION Statement Required
AS REQ AS REQ a. ADDRESSEE b. Copies
8. N/A D 11. N/A 13. AS REQ D
R
R G
RP
16. REMARKS SUBMEPP Code 1831 1
Certification documentation must be submitted via WAWF (Wide Area Work NAVSUP WSS N97121 1 Flow) to the maximum extent possible. NAVSUP WSS N743 1 Contractor own format is acceptable. 15. TOTAL 3
1. A005 2. SUBMEPP TEST PROCEDURE 3. N/A
4. DI-MISC-80678 (SUBNDT) 5. CSD REF. IN PARA. 7.5 6. SUBMEPP
7. DD 9. Dist 10. 12. Acceptance req’d 14. DISTRIBUTION Statement Required
AS REQ prior to NDT. a. ADDRESSEE b.Copies
8. N/A D 11.
N/A
13. AS REQ D
R
R G
RP
16. REMARKS SUBMEPP CODE 1831 1
Certification documentation must be submitted via WAWF (Wide Area Work NAVSUP WSS N97121 1
Flow) to the maximum extent possible. NDT procedures are required to NAVSUP WSS N743 1 requirements within NAVSEA T9074-AS-GIB-010/271. 15.TOTAL 3
1. A006 2. SUBMEPP TEST INSPECTION REPORT 3. N/A
4. DI-NDTI-80809B (SUBNDTR) 5. CSD REF. IN PARA. 7.6 6. SUBMEPP
7. DD 9. Dist 10. 12. Prior to shipment of 14. DISTRIBUTION Statement Required
AS REQ each unit. a. ADDRESSEE b. Copies
8. N/A D 11. N/A 13. AS REQ D
R
R G
RP
16. REMARKS SUBMEPP CODE 1831 1
Certification documentation must be submitted via WAWF (Wide NAVSUP WSS N97121 1 Flow) to the maximum extent possible. NAVSUP WSS N743 1
15. TOTAL 3
G. PREPARED BY
//s// Matt Porter 1843MP
H. DATE
12/7/2020
I. APPROVED BY
//s// Stacy Woodley 1831SW
J. DATE
DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (1) Page 2 of 3 Pages
XX TDP TM OTHER
D. SYSTEM/ITEM
70 KW MG
E. CONTRACT/PR NO.
RI NO. 3140-012-0697 Rev C Chg 1
F. CONTRACTOR
1. A007 2. SUBMEPP CERTIFICATION OF COMPLIANCE 3. N/A
4. DI-MISC-80678 (SUBCC) 5. CSD REF. IN PARA. 7.7 6. SUBMEPP
7. DD 9. Dist 10. 12. Prior to shipment of 14. DISTRIBUTION Statement Required
AS REQ each unit. a. ADDRESSEE b. Copies
8.
N/A
D 11. N/A 13. AS REQ D
R
R G
RP
16. REMARKS SUBMEPP Code 1831 1 Certification documentation must be submitted via WAWF (Wide Area Work NAVSUP WSS N97121 1
Flow) to the maximum extent possible. Contractor own format is NAVSUP WSS N743 1 Copy in Crate 1
15. TOTAL 4
1. 2. 3.
4. 5. 6.
7. 9. 10. 12. 14. DISTRIBUTION
b. Copies
8. 11. 13. D R
R G
15. REMARKS
TOTAL
1. 2. 3.
4. 5. 6.
7. 9. 10. 7. 9.
8. 11. 8.
15. REMARKS
G. PREPARED BY
//s// Matt Porter 1843MP
H. DATE
12/7/2020
I. APPROVED BY
//s// Stacy Woodley 1831SW
J. DATE
DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (1) Page 3 of 3 Pages