This document is a Justification for Sole Source (Simplified Acquisitions) for the United States Naval Observatory (USNO) Clock Development Division. The procurement involves purchasing specific electronic components from Stanford Research Systems (SRS) to build two new fountain atomic clocks, including 4 SIM900 mainframes with RS-232 computer interface, 4 rack mount kits, 8 PID controllers, 2 analog summing amplifiers, 8 single-wide and 8 double-wide SIM modules, 4 function/arbitrary generators, and 2 double rack mount kits. The total estimated contract value is redacted, with a required delivery date of four months from the purchase order award. The sole source justification is based on SRS being the only vendor capable of providing these specialized components, which must exactly match the design of six previous clock builds, and that using alternative components would require additional research and development, potentially compromising the project's technical specifications and increasing costs.

View the file

Other files for this federal contract opportunity

Other files attached to Combine Synopsis Solicitation for Atomic Clock for USNO, newest first.
File Type Posted
4.02 SAP Combined Synopsis Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source Selection Information – See FAR 2.101 and 3.104

6. SRS SIM9B2

Blank double-wide SIM module Quantity: 8

7. SRS DS345/1

30 MHz function/arb generator (w/ opt. 01) Quantity: 4

8. SRS O345RMD

Double rack mount kit for DS3XX Quantity: 2

This requirement represents the minimum requirements of the Government with an estimated price of

The required delivery date is four (4) months from the date of purchase order award.

Describe in detail why only this source can furnish the requirements to the exclusion of other sources. (what specific characteristics of the supplies or services limit the availability to a sole source (e.g., unique features, function of the item, etc.)?)

The USNO Clock Development Division (within the Precise Time Department) maintains and advances an ensemble of high-performing rubidium fountain atomic clocks that are used to generate precise time. Due to the lack of commercial vendors capable of supplying for the highest performing clocks, stocking the clock ensemble with systems based on cutting-edge technology requires that these systems be designed and built in-house at the USNO. The required components are solely manufactured by Stanford Research Systems (SRS). SRS is the only vendor capable of providing the original components as there are no authorized dealers and the current rubidium fountain atomic clocks are designed and built by USNO engineers using SRS components. Attempting to use components from a different vendor would take additional research and development costing the Government additional unnecessary time and funding. In addition, using new components would not be in accordance with the design used in the original fountain builds.

The following are provided as potential examples of reasons to support soliciting from a single source. If these items do not apply, the check-a-blocks may be deleted from the document. The user should include the appropriate rationale for the selected item(s).

The supplies or services must be compatible in all aspects (form, fit and function) with existing systems presently installed/performing. Describe the equipment/function you have now and how the new item/service must coordinate, connect, or interface with the existing system.

The Clock Development Division (within the Precise Time Department) are building two (2) new atomic fountain clocks using the exact same design as used for six (6) previous builds. The required parts must be as identical as possible to the original fountain builds. SRS supplied the parts for the original clocks and can manufacture new parts according to the exact design previously used.

Source Selection Information – See FAR 2.101 and 3.104

Document number:

I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS COMPLETE AND ACCURATE TO THE BEST OF

MY KNOWLEDGE. I UNDERSTAND THAT THE PROCESSING OF THIS SOLE SOURCE JUSTIFICATION

PRECLUDES THE USE OF FULL AND OPEN COMPETITION.

Signature Date

Activity Title

I HEREBY DETERMINE THAT THE CIRCUMSTANCES OF THE CONTRACT ACTION DEEM ONLY ONE

SOURCE REASONABLY AVAILABLE IN ACCORDANCE WITH FAR 13.106-1(b)(1)(i).

Contracting Officer Signature Date

NAVSUP Fleet Logistics Center, Norfolk Contracting Department, Fleet Directorate

File details come from the government source that posted it. Updated .