1.04 Sole Source Brand Name Justification SAT_fully executed_Redacted.pdf

PDF 1 MB Posted

Attached to
Notice of Intent to Sole Source FM Broadcast System Service for AFN
Solicitation number
N6817124Q0070
Issued by

About this file

This document includes a sole source justification and notice of intent to sole source an FM broadcast system service contract. The Naval Supply Systems Command intends to enter into a sole source contract with RAI Way SPA to provide engineering, installation, operation, and maintenance services for the Armed Forces Network radio broadcast system in Naples, Italy. RAI Way SPA is identified as the only source able to meet the requirement due to owning and operating the only broadcast tower that provides the necessary line of sight and elevation to transmit signals to U.S. military personnel in the area. Responses to the notice of intent must be received within 10 days by the contracting officer and demonstrate the ability to meet the requirement, however the government reserves sole discretion in determining whether to pursue competition.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FAR 13.106-1(b) 2 of 3

The Market Survey determined that Monte Camaldoli area, owned and maintained by RAI Way, is the only area that meets the requirements of location and elevation necessary to provide line-of-site transmissions to service members living in the Naples area and meets the requirements of the broadcast license for AFN Naples provided by the Italian Ministry of Communications. The Market Survey concluded that the RAI Way site is the only site that has the necessary location/elevation, security, availability, functionality, and the owner is willing to provide all necessary site preparation work on our time schedule to ensure uninterrupted broadcast service, and will maintain the AFN broadcasting equipment, tower and site.

The Electromagnetic Field Strength survey conducted in 2009 excluded other potential relocation sites on Camaldoli except for Punto Belvedere; inadequate due to location and height restrictions. Relocating to any site beyond the immediate area would severely risk the ability to broadcast, as the RAI Way site on Camaldoli was the only site in an otherwise Electromagnetic Field (EMF) saturated climate to receive authorization and/or allowances to broadcast from the ARPAC (Regional Agency for Environmental Protection in Campania), Comune and Province of Naples, in addition to the Italian Ministry of Economic Development. Further, relocating is not possible due to indefensible change and loss in coverage area, in addition to the lengthy approval process by various local, regional, and national entities. Therefore, the property to be leased is the only existing antenna site meeting the established criteria for location, security, availability and functionality of the approved transmission parameters granted to AFN Naples by the Italian Government.

__X__ The requested material or service represents the minimum requirements of the government.

The RAI antenna has the necessary elevation required to provide line of site transmission to Capodichino, Agnano, Lago di Patria, Gricignano di Aversa, and to other U.S. Forces team members living throughout the Naples Bay area. For the above reasons, RAI is the only company capable to perform the required services at the operating conditions required by the US Government.

CHECK & FILL IN ALL APPLICABLE BLANKS BELOW

__X__ The material/service must be compatible in all aspects (form, fit and function) with existing systems presently installed/performing. Describe the equipment/function you have now and how the new item/service must coordinate, connect, or interface with the existing system.

RAI has credentials in all the various elements associated with installation and hosting of the services required by AFN. RAI will perform the electromagnetic survey, antenna calibration, and set up the required multiplexer. The tower, antenna, support structures and utility connections already exist and will continue to be maintained at a quality standard. RAI has established adequate security for this site. The site is equipped with a generator and is thermally controlled. RAI is recognized and endorsed by the Italian Government and is not subject to Mixed Commission Approval, which would be required for new operators. RAI can implement lease requirements within a minimum of time while dealing with Government approvals.

____ A patent, copyright or proprietary data limits competition. The proprietary data is

___ These are “direct replacements” parts/components for existing equipment.

__X__ Other information to support a sole source buy:

File details come from the government source that posted it. Updated .