1.03 FCB SOW Manlift Rental.pdf

PDF 289 KB Posted

Attached to
USS Frank Cable Aerial Platform/Manlift Rental
Solicitation number
N62649_USSFCB_Manlift
Issued by

About this file

This is a Statement of Work (SOW) for the provision of commercial aerial work platform/manlift support to the USS FRANK CABLE (N23950).

The contractor shall provide one (1) aerial work platform with a working height of 120 feet, delivered in clean, safe, and fully operational condition with a full fuel tank. Service requirements include obtaining on-base and pier access, delivering and retrieving equipment at times and locations specified by the point of contact, and providing a safety and operational demonstration to designated personnel upon delivery. The contractor must provide equipment support and replacement, with a replacement unit required within three (3) hours of notification in the event of equipment breakdown or safety discrepancy. The period of performance is 12 June 2026 at 0800 through 24 June 2026 at 1630. Primary points of contact are Herbert Jhommel Mendoza, MSC Supply Officer (Herbert.mendoza@as40.navy.mil, (671) 343-2545 x 7829), and Elly Mercado, Logistics Support Rep at NAVSUP Fleet Logistics Center Yokosuka Site Marianas ((671)-339-3259 or (671) 488-4615).

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PROVIDE COMMERCIAL AERIAL WORK PLATFORM /MANLIFT SUPPORT, USS

FRANK CABLE (N23950)

1. Scope of Work:

This Statement of Work outlines the requirements for a vendor to provide ONE (1) commercial Aerial Work Platforms (man-lift) for the USS FRANK CABLE.

2. Requirements:

The Contractor shall provide the following:

2.1 Equipment:

One (1) aerial work platform, with a working height of 120 feet.

All equipment must be delivered in a clean, safe, and fully operational condition.

Equipment must be delivered to the customer with a full fuel tank.

2.2 Service:

The Contractor is required to have on-base and pier access.

The Contractor must deliver and retrieve the equipment at the times and location specified by the Point of Contact.

Upon delivery to the customer, the Contractor must provide a safety and operational demonstration for designated personnel.

2.3 Equipment Support and Replacement:

In the event of an equipment breakdown or safety discrepancy, the Contractor is required to provide a replacement unit within four (3) hours of notification.

3. Period of Performance:

12 JUNE 2026 @ 0800 to 24 JUNE 2026 @ 1630

4. Point of Contact:

Herbert Jhommel Mendoza MSC Supply Officer USS Frank Cable (AS-40) Unit 100105 Box 2501

FPO AP 96657

Email/NIPR: Herbert.mendoza@as40.navy.mil Office: (671) 343-2545 x 7829

Elly Mercado Logistics Support Rep (LSR) NAVSUP Fleet Logistics Center Yokosuka Site Marianas PSC 455, Box 170 FPO

AP

96540-1700

DSN: (315) 339-3259

COM: (671)-339-3259

Cell: (671) 488-4615

File details come from the government source that posted it. Updated .