REFURB INST. NO. 5130-012-0729 Rev E Chg-2
DD Form 1423, JUN 90 Previous editions are obsolete Encl (4) Page 1 of 4
CONTRACT DATA REQUIREMENTS LIST
A. CONTR. LINE ITEM NO. B. EXHIBIT A C. CATEGORY: XX TDP TM OTHER
D. SYSTEM/ITEM HPAC
REFURBISHMENT
E. CONTRACT/PR NO. F. CONTRACTOR DRESSER-
RAND
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUHORITY (Data Item Descript) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ. 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF
FIRST
SUBMISSION
14. DISTRIBUTION
DR - DRAFT
RG - REGULAR
RP - REPRO
8. APP CODE 11. AS OF
DATE
13. SUBSEQUENT
SUBMISSION
16. REMARKS
1. A001 2. SUBMEPP INSPECTION REPORTS 3.
N/A
4. DI-MGMT-80389C (SUBRIR) 5. RI 5130-012-0729 Rev E Chg -2 6. SUBMEPP
7. DD
9. DIST
STATEMENT
REQUIRED
D
10. AS
12. AS REQUIRED
14. DISTRIBUTION
b.
Copies
8. N/A
11. 0 13 AS REQUIRED D
R
R G
R P
16. Remarks: Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible See Enclosure 1.
DODACC N45404 1
NAVSUP WSS N743
NAVSUP WSS N97121 1
TOTAL 3
1. A002 2. SUBMEPP CONDITION REPORT
3. N/A
4. DI-MGMT-82048 (SUBCR) 5. RI 5130-012-0729 Rev E Chg -2 6. SUBMEPP b.
Copies
11. 13. AS REQUIRED D
R G
R P
16. REMARKS Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible. Contractor own format is acceptable.
TOTAL 3
G. PREPARED BY
//s// T. C. Chan 1846TC
H. DATE
4/27/21
I. APPROVED BY
//s// Stacy Woodley 1831SW
J. DATE
4/27/21
A. CONTR. LINE ITEM NO. B. EXHIBIT A C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM HPAC REFURBISHMENT E. CONTRACT/PR NO. F. CONTRACTOR
DRESSER-RAND
1. A003 2. SUBMEPP UNPLANNED PARTS USAGE REPORTS 3. N/A
4. DI-MISC-80678 (SUBUPUR) 5. RI 5130-012-0729 Rev E Chg -2 6. SUBMEPP
7. DD
9. DIST
STATEMENT
Required
b. Copies
11. 0
13. AS REQUIRED D
R G
R P
16. REMARKS Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible. Contractor own format is acceptable. Report data to be traceable to Rotatable Pool Serial No. Unplanned parts listed shall include prices
DODACC N45404 1
NAVSUP WSS N743 1
NAVSUP WSS N97121 1
TOTAL 3
1. A004 2. REASSEMBLY QUALITY ASSURANCE REPORT (RQAR). 3. N/A
4. DI-QCIC-81890 (SUBRQAR) 5. RI 5130-012-0729 Rev E Chg -2 6. SUBMEPP
7. DD
9. DIST
STATEMENT
11.
13. AS REQUIRED D
R
R G
R P
16. REMARKS Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible. Contractor own format is acceptable.
TOTAL 3
1. A005 2. SUBMEPP WELDING PROCEDURES &
WELDING PROCEDURE QUAL. TEST REPORT
3. N/A
4. DI-MISC-80875A (SUBWP) 5. RI 5130-012-0729 Rev E Chg -2 6. SUBMEPP
7. DD 9. . DIST
10. AS REQUIRED 12. AS REQUIRED
b Copies 8.
Acceptance required prior to welding
11.
13. AS REQUIRED D
R
R G
R P
16. REMARKS Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible. Weld procedures are required to meet the requirements within NAVSEA
S9074-AR-GIB-010/278.
NAVSUP WSS N743 1
NAVSUP WSS N97121 1
COPY IN CRATE 1
TOTAL 4
G. PREPARED BY
//s// T. C. Chan 1846TC
H. DATE
4/27/21
I. APPROVED BY
//s// Stacy Woodley 1831SW
J. DATE
DD Form 1423, JUN 90 Previous editions are obsolete Encl (4) Page 2 of 4
A. CONTR. LINE ITEM NO.
B. EXHIBIT A C. CATEGORY: XX TDP TM OTHER
D. SYSTEM/ITEM HPAC REFURBISHMENT E. CONTRACT/PR NO.
F. CONTRACTOR DRESSER-RAND
1. A006 2. SUBMEPP TEST PROCEDURE 3. Certification of Compliance
4. DI-MISC-80678 (SUB-NDT) 5. RI 5130-012-0729 Rev E Chg -2 6. SUBMEPP
REQUIRED
D
R G
R P
16. REMARKS Certification documentation must be submitted via WAWF (Wide Area Work
Work Flow) to the maximum extent possible. NDT procedures are required to meet the requirements within NAVSEA T9074-AS-GIB-010/271.
DODACC N45404 1
NAVSUP WSS N743 1
NAVSUP WSS N97121 1
TOTAL 3
1. A007 2. SUBMEPP REPAIR PROCEDURE 3. MAGNETIC PARTICLE TEST PROCEDURES
4. DI-MGMT-81580 (SUB-RP) 5. RI 5130-012-0729 Rev E Chg -2 6. SUBMEPP
R G
R P
16. REMARKS Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible. Contractor own format is acceptable.
TOTAL 3
1. A008 2. SUBMEPP TEST INSPECTION REPORT 3. N/A
4. . DI-NDTI-80809B (SUB-NDTR) 5. RI 5130-012-0729 Rev E Chg -2 6. SUBMEPP
7.DD
R G
R P
16. REMARKS Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible.
NAVSUP WSS N743 1
NAVSUP WSS N97121 1
TOTAL 3
1. A009 2. SUBMEPP Operational Test Data Reports 3.
4. DI-MISC-808678 (SUBOTDR) 5. RI 5130-012-0729 Rev E Chg -2 6. SUBMEPP
9. . DIST
REQUIRED
D
14 . DISTRIBUTION
11. 0 13. AS REQUIRED D
R G
R P
16. REMARKS Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible. Contractor own format is acceptable.
SUBMEPP CODE 1831 1
NAVSUP WSS N743 1
NAVSUP WSS N97121
TOTAL 3
G. PREPARED BY
//s// T. C. Chan 1846TC
H. DATE
4/27/21
I. APPROVED BY
//s// Stacy Woodley 1831SW
J. DATE
DD Form 1423, JUN 90 Previous editions are obsolete Encl (4) Page 3 of 4
A. CONTR. LINE ITEM NO.
B. EXHIBIT A C. CATEGORY: XX TDP TM OTHER
D. SYSTEM/ITEM HPAC REFURBISHMENT E. CONTRACT/PR NO.
F. CONTRACTOR DRESSER-RAND
1. A010 2. SUBMEPP Noise Test Data Report 3.
4. DI-MISC-80678 (SUBNTDR) 5. RI 5130-012-0729 Rev E Chg -2 6. SUBMEPP
REQUIRED
D
R G
R P
16. REMARKS Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible. Contractor own format is acceptable. DODACC N45404 1
NAVSUP WSS N743 1
NAVSUP WSS N97121 1
COPY IN CRATE 1
TOTAL 4
1. A011 2. SUBMEPP Certification of Compliance 3. Certification of Compliance
4. DI-MISC-80678 (SUBCC) 5. RI 5130-012-0729 Rev E Chg -2 6. SUBMEPP
R G
R P
16. REMARKS Certification documentation must be submitted via WAWF (Wide Aera Work Flow) to the maximum extent possible. Contractor own format is acceptable Certifying that each Item has been refurbished per para 5 & tested per para 6. One report for each Item, identifiable to the unique Ser. Nos.
Include a positive statement indicating if welding or NDT were accomplished, identify the procedures used used & identify any welding accomplished that that did not require weld procedure qualification tests
COPY IN CRATE 1
TOTAL 4
1. A012 2. SUBMEPP Final Inspection Report 3.
4. DI-QCIC-81068 (SUBFIR) 5. RI 5130-012-0729 Rev E Chg -2 6. SUBMEPP
9. . DIST
REQUIRED
D
14 . DISTRIBUTION
11. 0 13. AS REQUIRED D
R G
R P
16. REMARKS Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible. Use Enclosure (2)
SUBMEPP CODE 1831 1
NAVSUP WSS N743 1
NAVSUP WSS N97121
COPY IN CRATE 1
TOTAL 4
G. PREPARED BY
//s// T. C. Chan 1846TC
H. DATE
4/27/21
I. APPROVED BY
//s// Stacy Woodley 1831SW
J. DATE
DD Form 1423, JUN 90 Previous editions are obsolete Encl (4) Page 4 of 4