This document contains a Contract Data Requirements List (CDRL) and related federal contract opportunity for the repair of CO-H2 burners. The CDRL outlines seven data items required from the contractor, Cepeda Associates, including receipt inspection reports, welding procedures, non-destructive testing reports, unplanned parts usage reports, operational test data reports, certification of compliance, and final inspection reports. The federal contract opportunity is a sole source solicitation from the Department of the Navy Naval Supply Systems Command to evaluate and repair two CO-H2 burners in support of the TRIPER program. The burners will support operations on an Ohio-class submarine. The contractor must submit all required certification documentation through WAWF.

View the file

Other files

File Type Posted
3.01_SolicitationN0010422QF035_22YRA55,22YRA56.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REFURB INSTRUCTION NO. 5320-012-0724 Rev F CHG 6

CONTRACT DATA REQUIREMENTS LIST

A. CONTR. LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX TDP TM OTHER

D. SYSTEM/ITEM

CO-H2 Burner

E. CONTRACT/PR NO.

RI 5320-012-0724 Rev F CHG 5

F. CONTRACTOR

Cepeda Assoc.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUHORITY (Data Item Descript)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250

REQ.

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF

FIRST

SUBMISSION

14. DISTRIBUTION

DR - DRAFT

8. APP CODE 11. AS OF

DATE

13. SUBSEQUENT

SUBMISSION

RG - REGULAR

RP - REPRO

15. REMARKS

1. A001 2. SUBMEPP RECEIPT INSPECTION 3. N/A

4. DI-MGMT-80389C (SUB-RIR) 5. RI 5320-012-0724 6. SUBMEPP

7. LT 9. Dist 10. 12. AS REQ 14. DISTRIBUTION Statement required

AS REQ a. ADDRESSEE b. Copies

8. N/A D 11. N/A 13. AS REQ. D

R

R G

R P

16. REMARKS See Enclosure 1. SUBMEPP CODE 1831 1 Certification documentation must be submitted via WAWF (Wide Area Work NAVSUP WSS N97121 1

Flow) to the maximum extent possible. NAVSUP WSS N743 1

15. TOTAL 3

1. A002 2. SUBMEPP WELDING PROCEDURES 3. N/A

4. DI-MISC-80875A(SUB-WP) 5. RI 5320-012-0724 6. SUBMEPP

7. DD 9. Dist 10. 12. Acceptance required prior 14. DISTRIBUTION Statement Required

AS REQ to welding. a. ADDRESSEE b.Copies

8. N/A D 11. N/A N/A

13. AS REQ D

R

R G

R P

16. REMARKS SUBMEPP CODE 1831 1

Certification documentation must be submitted via WAWF (Wide Area Work NAVSUP WSS N97121 1

Flow) to the maximum extent possible. Weld procedures are required to meet the NAVSUP WSS N743 1 requirements within NAVSEA S9074-AR-GIB-010/278. 15. TOTAL 3

1.

A003

2. . SUBMEPP TEST PROCEDURE 3. N/A

4. DI-MISC-80678 (SUB-NDT) 5. RI 5320-012-0724 6. SUBMEPP

7. DD 9. Dist 10. 12. Acceptance required 14. DISTRIBUTION Statement Required

As Required prior to NDT. ADDRESSEE b. Copies

8. N/A D 11. N/A 13. As Req D R

R G

R P

Certification documentation must be submitted via WAWF (Wide Area Work SUBMEPP Code 1831 1 Flow) to the maximum extent possible. NDT procedures are required to meet NAVSUP WSS N97121 1 requirements within NAVSEA T9074-AS-GIB-010/271. NAVSUP WSS N743 1

15. TOTAL 3

G. PREPARED BY

J. Bouchard, 1846JB

H. DATE

8/27/20

I. APPROVED BY

S. Bishop, 1831SB

J. DATE

8/27/20

DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (2) Page 1 of 3 Pages

DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (2) Page 2 of 3 Pages

CONTRACT DATA REQUIREMENTS LIST

A. CONTR. LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX TDP TM OTHER

D. SYSTEM/ITEM

CO-H2 Burner

E. CONTRACT/PR NO.

RI 5320-012-0724 Rev F CHG 5

F. CONTRACTOR

Cepeda Assoc.

1. A004 2. SUBMEPP NDT REPORTS 3. N/A

4. DI-NDTI-80809B (SUB-NDTR) 5. RI 5320-012-0724 6.

SUBMEPP

7. 9. Dist 10. 12. Prior to shipment of each 14. DISTRIBUTION DD Statement

Required As Required unit b. Copies

8. N/A D 11.

N/A

13 As Required

D R

R G

R P

16. REMARKS

Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible.

SUBMEPP CODE 1831 1

NAVSUP WSS N97121 1

NAVSUP WSS N743 1

15. TOTAL 3

1. A005 2. SUBMEPP UNPLANNED PARTS

USAGE REPORT

3. N/A

4. DI-MISC-80678 (SUB-UPUR) 5. RI 5320-012-0724 6. SUBMEPP

7. 9. Dist 10. As 12. As required 14. DISTRIBUTION DD Statement Required b. Copies

8.

N/A

Required D 11.

N/A

13. As required D R

R G

R P

16. REMARKS SUBMEPP CODE 1831 1

Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible.

Contractor own format is acceptable.

NAVSUP WSS N97121 1

NAVSUP WSS N743 1

15. TOTAL 3

1. A006 2 SUBMEPP OPERATIONAL TEST DATA

REPORT

3. N/A

4. DI-MISC-80678 (SUB-OTDR) 5. RI 5320-012-0724 6. SUBMEPP

7. 9. Dist 10. 12. 14. DISTRIBUTION DD Statement As required Prior to shipment of each unit b. Copies

8. N/A Required D 11.

N/A

13. As required D R

R G

R P

15. REMARKS SUBMEPP Code 1831 1 Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible. Contractor own format is acceptable.

NAVSUP WSS N97121 1

NAVSUP WSS N743 1

15. TOTAL 3

G. PREPARED BY

J. Bouchard, 1846JB

H. DATE

8/27/20

I. APPROVED BY

S. Bishop, 1831SB

J. DATE

CONTRACT DATA REQUIREMENTS LIST

A. CONTR. LINE ITEM NO. B. EXHIBIT C. CATEGORY:

XX TDP TM OTHER

D. SYSTEM/ITEM

CO-H2 Burner

E. CONTRACT/PR NO.

RI 5320-012-0724 Rev F CHG 5

F. CONTRACTOR

Cepeda Assoc.

1. A007 2. SUBMEPP CERTIFICATION OF

COMPLIANCE

3. N/A

4. DI-MISC-80678 (SUB-CC) 5. RI 5320-012-0724 6. SUBMEPP

7. DD 9. Dist 10. 12. 14. DISTRIBUTION Statement Required D

As required Prior to shipment of each unit b. Copies

8.N/A 11. /A 13. As required D R

R G

R P

16. REMARKS Area Work SUBMEPP Code 1831 1 Certification documentation must be submitted via WAWF (Wide Area Work NAVSUP WSS N97121 1 Flow) to the maximum extent possible NAVSUP WSS N743 1 Contractor own format is acceptable Copy in Crate 1

15. TOTAL 4

1. A008 2. SUBMEPP FINAL INSPECTION

REPORT

3. N/A

4. DI-QCIC-81068 (SUB-FIR) 5 RI 5320-012-0724 6. SUBMEPP

7. 9. Dist 10. 12. 14. DISTRIBUTION DD Statement As Required Prior to shipment of each unit b. Copies

8. N/A Required D 11. N/A 13. As Required D R

R G

R P

16. REMARKS Certification documentation must be submitted via WAWF (Wide SUBMEPP Code 1831 1 Flow) to the maximum extent possible. NAVSUP WSS N97121 1 See Enclosure 2. NAVSUP WSS N743 1

Copy In Crate 1

15. TOTAL 4

1. 2. 3.

4. 5. 6.

7. 9. 10. 12. 14. DISTRIBUTION

b. Copies

8. 11. 13. D R

R G

R P

15. REMARKS

TOTAL

G. PREPARED BY

J. Bouchard, 1846JB

H. DATE

8/27/20

I. APPROVED BY

S. Bishop 1831SB

J. DATE

DD Form 1423, JUN 90 Previous editions are obsolete Enclosure (2) Page 3 of 3 Pages