1.03_CDRLS - R-114 Compressor_21YRA38.pdf
PDF 106 KB Posted
- Attached to
- Repair of QTY 2EA, R-114 A/C Compressor
- Solicitation number
- N0010421QF019
About this file
This document is a Contract Data Requirements List (CDRL) for refurbishment of R-114 air conditioner compressors under solicitation number N0010421QF019. The CDRL specifies ten data items to be delivered by the contractor, including receipt inspection reports, condition reports, welding procedures, non-destructive testing procedures and reports, reassembly quality assurance reports, operational test data reports, noise test data reports, certification of compliance, final inspection reports, and welding procedures. The Navy seeks repair and overhaul of two R-114 air conditioner compressors used on Ohio-class submarines. Delivery of required certification documentation must be submitted via WAWF. The sole-source solicitation is being conducted with Johnson Controls Navy Systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3.01_RFQ_21QF019_21YRA38.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFURB INST. NO. 5020-012-0002 Rev A CHG 3
CONTRACT DATA REQUIREMENTS LIST
A. CONTR. LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM R-114 AC
Compressor/Motor
E. CONTRACT/PR NO.
RI No. 5020-012-0002 Rev A CHG 3
F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Item Descript)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF
FIRST
SUBMISSION
14. DISTRIBUTION
DR - DRAFT
8. APP CODE 11. AS OF
DATE
13. SUBSEQUENT
SUBMISSION
RG - REGULAR
RP - REPRO
16. REMARKS
1. A001 2. Receipt Inspection Reports 3. SUBMEPP RECEIPT INSPECTION
4. DI-MGMT-80389C (SUB-RIR) 5. RI 5020-012-0002 Rev A CHG 3 6. SUBMEPP
7. LT 9. Dist
Statement required
10. AS REQ 12. AS REQ 14. DISTRIBUTION
a. ADDRESSEE b. Copies
8. N/A
11.
N/A
13. AS REQ
D R
R G
RP
16. REMARKS SUBMEPP CODE 1831 1
NAVSUP WSS N97121 1
Certification documentation must be submitted via WAWF (Wide Area Work Flow) to the maximum extent possible. See Enclosure 1.
NAVSUP WSS N743 1
15. TOTAL 3
1. A002 2. SUBMEPP CONDITION REPORT 3. N/A
4. DI-MGMT-82048 (SUB-CR)
5. RI No. 5020-012-0002 Rev A CHG 3 6. SUBMEPP
7. LT 9. Dist
10. 12. AS REQ
14. DISTRIBUTION
Required
AS REQ a. ADDRESSEE b. Copies
D 11. N/A 13. AS REQ
D
R G
R P
16. REMARKS SUBMEPP CODE 1831 1
Certification documentation must be submitted via WAWF (Wide Area Work NAVSUP WSS N97121 1 Flow) to the maximum extent possible. Contractor own format is acceptable. NAVSUP WSS N743 1
15. TOTAL 3
G. PREPARED BY
//s// S. C. Syrek 1846SS
H. DATE
I. APPROVED BY
//s// Stacy Woodley
J. DATE
DD Form 1423, JUN 90 Previous editions are obsolete Encl (5) Page 1 of 3 Pages
DD Form 1423, JUN 90Previous editions are obsolete Encl (5) Page 2 of 3 Pages
D. SYSTEM/ITEM R-114 AC
Compressor/Motor
E. CONTRACT/PR NO.
RI No. 5020-012-0002 Rev A CHG 2
1. A003 2. SUBMEPP WELDING PROCEDURES 3. N/A
4. DI-MISC-80875A (SUB-WP)
7. DD 9. Dist
10. 12. Acceptance required prior 14. DISTRIBUTION
AS REQ to welding. a. ADDRESSEE b.Copies
D 11. N/A
13. AS REQ DR RG
P
SUBMEPP CODE 1831 1
Certification documentation must be submitted via WAWF (Wide Area Work NAVSUP WSS N97121 1 Flow) to the maximum extent possible. Weld procedures are required to meet
NAVSUP WSS N743 1
requirements within NAVSEA S9074-AR-GIB-010/278. 15. TOTAL 3
1. A004 2. SUBMEPP TEST PROCEDURE 3. N/A
4. DI-MISC-80678 (SUB-NDT)
5. RI No. 5020-012-0002 Rev A CHG 3
6. SUBMEPP
10. 12. Acceptance req’d 14. DISTRIBUTION
AS REQ prior to NDT. a. ADDRESSEE b.Copies
D 11.
N/A
13. AS REQ D
R
R G
RP
16. REMARKS SUBMEPP CODE
Flow) to the maximum extent possible. NDT procedures are required to meet NAVSUP WSS N743 1 requirements within NAVSEA T9074-AS-GIB-010/271. 15.TOTAL 3
1. A005 2. SUBMEPP TEST INSPECTION REPORT
3. N/A
4. DI-NDTI-80809B (SUB-NDTR) 5. RI No. 5020-012-0002 Rev A CHG 3 6. SUBMEPP
10. 12. Prior to shipment of 14. DISTRIBUTION
AS REQ each unit. a. ADDRESSEE b. Copies
D 11. N/A 13. AS REQ D
R G
Flow) to the maximum extent possible. NAVSUP WSS N743 1
15. TOTAL 3
1. A006 2. SUBMEPP REASSEMBLY QUALITY
ASSURANCE REPORT
4. DI-QCIC-81890 (SUB-RQAR)
5. RI No. 5020-012-0002 Rev A CHG 3. 6. SUBMEPP
10. 12. 14. DISTRIBUTION
AS REQ AS REQ a. ADDRESSEE b. Copies
R G
SUBMEPP Code 1831 1
Flow) to the maximum extent possible. NAVSUP WSS N743 1 Contractor own format is acceptable. 15. TOTAL 3
G. PREPARED BY
H. DATE
I. APPROVED BY
//s// Stacy Woodley
1. A007 2. SUBMEPP OPERATIONAL TEST DATA REPORT 3. N/A
4. DI-MISC-80678 (SUB-OTDR)
R G
R
Flow) to the maximum extent possible. NAVSUP WSS N743 1 Contractor own format is acceptable. 15. TOTAL 3
1. A008 2. SUBMEPP NOISE TEST DATA REPORT
4. DI-MISC-80678 (SUB-NTDR) 5. RI No. 5020-012-0002 Rev A CHG 3 6. SUBMEPP
10. 12. 14. DISTRIBUTION
AS REQ AS REQ a. ADDRESSEE b. Copies
R G
R
Flow) to the maximum extent possible. NAVSUP WSS N743 1 Contractor own format is acceptable. 15. TOTAL 3
1. A009 2. SUBMEPP CERTIFICATION OF COMPLIANCE 3. N/A
4. DI-MISC-80678 (SUB-CC)
R G
R
Flow) to the maximum extent possible. Contractor own format is acceptable. NAVSUP WSS N743 1 Copy in Crate 1
15. TOTAL 4
1. A010 2. SUBMEPP FINAL INSPECTION REPORT 3. N/A
4. DI-QCIC-81068 (SUB-FIR)
R G
R
Flow) to the maximum extent possible. See Enclosure 2. NAVSUP WSS N743 1 Copy In Crate 1
15. TOTAL 4
DD Form 1423, JUN 90 Previous editions are obsolete Encl (5) Page 3 of 3 Pages
D. SYSTEM/ITEM R-114 AC
Compressor/Motor
E. CONTRACT/PR NO.
RI No. 5020-012-0002 Rev A CHG 3
G. PREPARED BY
H. DATE
03/05/19
I. APPROVED BY
//s// Stacy Woodley
03/05/19
File details come from the government source that posted it. Updated .