This document is a Statement of Work (SOW) for a federal contract opportunity to provide three 40ft freezer reefer boxes to the USS TRIPOLI (LHA-7) on Pier 13 at Naval Base San Diego. The contract period is from July 26, 2024 to March 31, 2025, with the government reserving the right to end the lease early. The contractor must deliver the reefer boxes to the pier by 0800 on July 26, 2024 and pick them up at 0900 on March 31, 2025. The contractor is required to provide all maintenance and transportation support as needed throughout the contract period.

The related federal contract opportunity is a Notice of Intent to Award a Sole Source contract to Arctic Containers for the rental of three 40' freezer reefer boxes under NAICS code 532490. This will be a Firm-Fixed Price contract utilizing Simplified Acquisition Procedures. The government is allowing 1 day for responsible sources to submit capability statements, proposals, or quotations for consideration.

View the file

Other files

File Type Posted
1.02 J&A_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USS TRIPOLI (LHA-7)

Reefers on Pier

Statement of Work (SOW)

Objective:

USS TRIPOLI (LHA 7) requires 3 40ft freezer reefer boxes due to ongoing repair to ship’s main freezer. 3 freezer reefer boxes shall be provided via long term rental to TRIPOLI on Pier 13, Naval Base San Diego. The contract will run from 26 July 2024 to 31 March 2025.

Scope:

Contractor shall accomplish all requirements in accordance with the Statement of Work.

Period of Performance:

Reefer boxes shall be delivered to TRIPOLI on Pier 13 at Naval Base San Diego.

Delivery shall begin at 0800 on 26 July 2024 and shall be returned via pick-up at 0900 on 31 March 2024. The Contractor shall meet the Primary POC on the pier at 0800 on 26 July 2024 to deliver the reefer boxes and shall meet the Primary POC on the pier at 0900 on 31 March 2025 for pick up and return. Ship reserves the right to end period of performance lease early and coordinate pick up from pier with the Contractor.

Delivery Note: The Contractor must provide all support necessary to transfer all requirements to and from Pier 13 at Naval Base San Diego.

Tasks:

Company shall deliver all reefer boxes as stated in the Period of Performance (POP).

Contractor shall respond in a timely manner for all maintenance related issues that may arise to correct as soon as possible. Company shall provide transport and maintenance as needed through the duration of the POP, and shall provide the following items per the specifications below.

Specification Required:

Type: 3 Freezer Conex Boxes that maintains a constant temperature of 0 degrees Fahrenheit.

Length: 40ft