About this file

This is a Job Specification document for a federal contract involving wastewater management on the USS CHIEF (MCM-14). The specification covers pumping out wastewater generated by hydroblasting operations from the Auxiliary Machinery Room (3-41-O-E) and India Basin Berth locations aboard the vessel. The anticipated award date is July 5, 2026, with a production completion date of September 3, 2026. The Period of Performance begins August 4, 2026, and ends October 31, 2026. The preparing activity is SASEBO, with the ICN number 38KM252401.

The scope requires the contractor to pump out wastewater from hydroblasting operations at identified locations and establish proper waste liquid conveyance procedures. Key requirements include: contacting the SRF-JRMC Detachment Sasebo Environmental Branch prior to waste liquid transfer; providing spill containment kits (absorbent pads, booms, etc.) at affected areas with immediate action protocols for spills; identifying transfer hoses with company name and tank/space location; and inspecting piping, hoses, and valve alignments prior to pumping operations. The contractor must also conduct hourly walkthroughs to inspect for leaks throughout the operation. No government-furnished material is provided. The specification identifies no references and notes that the government will provide a waste liquid conveyance to accumulate waste liquids.

View the file

Other files

File Type Posted
Solicitation - N6264926Q0420.pdf PDF
1.02 SPEC 38KM252401_00_A01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hiroki.Sato1.ja Typewritten Text 7/5/2026

Hiroki.Sato1.ja Typewritten Text 8/4/2026

Hiroki.Sato1.ja Typewritten Text 9/3/2026

Hiroki.Sato1.ja Typewritten Text 10/31/2026

Hiroki.Sato1.ja Typewritten Text 1301386204

File details come from the government source that posted it. Updated .