PWS
12/07/2022
PERFORMANCE WORK STATEMENT (PWS)
PREVENTIVE/CORRECTIVE MAINTENANCE OF GALLEY EQUIPMENT
IN SUPPORT OF
COMMANDER NAVY REGION SOUTHWEST (CNRSW)
1. GENERAL: This is a non-personal services contract to provide Preventive Maintenance (PM) and Corrective Maintenance (CM) to Government Owned Galley Equipment located at Naval Base San Diego (NBSD), Naval Base Point Loma Harbor Drive Annex(NBPL-HDA), Naval Base Point Loma (SUBASE), Naval Base Coronado (NAB), Naval Air Station North Island (NASNI) and Naval Air Facility (NAF) El Centro. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services: The contractor shall provide qualified personnel, equipment, supplies, tools, materials, supervision, and other items and non-personal services necessary to perform Preventive Maintenance (PM) and Corrective Maintenance (CM) to Government Owned Galley Equipment as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: Galley equipment located in Metro-San Diego and El Centro Naval Bases require preventive maintenance to keep them in good working order for military personnel use. The equipment also requires corrective maintenance when unscheduled repair is needed due to breakage or malfunction as they occur or as detected (to occur) during PM performance. CNRSW does not have organic capability to provide services, and therefore, contractual support is necessary.
1.3 Objectives: The general objective of the contract is to maintain galley equipment within manufacturer and Government specifications by having a scheduled preventive maintenance (PM), and the performance of corrective maintenance (CM). PM schedule shall also be used in identifying potential problems and rendering CM before the equipment becomes inoperable. CM will also be used for inoperable equipment deemed not beyond economical repair (BER) by the Contracting Officer Representative (COR).
1.4 Scope: The contractor shall provide PM and CM to Government Owned Galley Equipment located at Naval Base San Diego (NBSD), Naval Base Point Loma Harbor Drive Annex (NBPL-HDA), Naval Base Point Loma (SUBASE), Naval Base Coronado (NAB), Naval Air Station North Island (NASNI) and Naval Air Facility (NAF) El Centro as listed in Attachments 1 through 6 to ensure equipment are in good working order when needed.
1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years. The Period of Performance reads as follows:
PERIOD OF PERFORMANCE BEGIN DATE END DATE
BASIC 1 OCTOBER 2023 30 SEPT 2024
OPTION YEAR 1 1 OCTOBER 2024 30 SEPT 2025
OPTION YEAR 2 1 OCTOBER 2025 30 SEPT 2026
OPTION YEAR 3 1 OCTOBER 2026 30 SEPT 2027
OPTION YEAR 4 1 OCTOBER 2027 30 SEPT 2028
1.6 General Information
1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on ensuring that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the performance thresholds.
1.6.3 Recognized Holidays: No Preventive Maintenance (PM) will be scheduled or performed by contractor during following Holidays:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Day Christmas Day Independence Day
1.6.4 Hours of Operation: The contractor may schedule PM/CM services between the hours of 7 am through 4 pm PST Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at Naval Base San Diego (NBSD), Naval Base Point Loma Harbor Drive Annex (NBPL-HDA), Naval Base Point Loma (SUBASE), Naval Base Coronado (NAB), Naval Air Station North Island (NASNI) and Naval Air Facility (NAF) El Centro.
1.6.6 Type of Contract: The government will award a combination of a Firm Fixed Price (FFP) and Time & Materials (T&M) contract for PM and CM services respectively.
1.6.7 Security Requirements: UNCLASSIFIED
1.6.7.1 Base Access: The contractor shall maintain proper security protocol in accordance with all base regulations. Security approval for all contractor personnel will be obtained through base security office.
Identifications furnished for approved employees shall be returned to the COR by the contractor immediately when such employees are no longer employed under this contract. The contractor is responsible for the cost of their personnel Rapid Gate access.
1.6.8 Special Qualifications: The contractor is responsible for ensuring all employees possess and maintain required State and/or Federal certifications (see Section L) during the execution of this contract.
1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
These meetings shall be at no additional cost to the government.
1.6.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: ensure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance;
maintain written and oral communications with the Contractor concerning technical aspects of the contract;
issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. An appointment letter issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.
1.6.11 Alternate Contracting Officer Representative (ACOR) Alternate Contracting Officer Representative (ACOR) may be identified and appointed to perform duties in the absence of the COR. ACOR will perform the same functions as the COR and will be designated in writing by the Contracting Officer.
1.6.12 Technical Assistant (TA). Technical Assistants (TA) are assigned on-site to provide technical assistance and support to the COR in the administration of the contract. TA may assist the COR in executing assigned inspection and monitoring duties. However, TAs may not provide any technical direction or clarification directly to the contractor. TA is not authorized to take any action, either directly or indirectly, that could result in a change in the cost/price, quantity, and quality, place of performance, delivery schedule, or any other terms or conditions of the contract.
1.6.13 Key Personnel: None
1.6.14 Other Direct Costs. This category includes round trip travel cost as result of providing CM service between contractor facility and Government facility.
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. BER EQUIPMENT. Beyond-economic-repair-equipment - inoperable equipment for which repair cost is estimated to exceed acquisition cost by 25% or more.
2.1.2. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.3. CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: KO is the only individual who can legally bind the government.
2.1.4. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.5. CORRECTIVE MAINTENANCE (CM). Unscheduled repair required to restore equipment to operational condition within manufacturer predetermined tolerances and limitations. CM evolves from equipment failure or indications of equipment degradation making equipment failure likely. CM includes, but not limited to adjustment, alignment, and/or replacement of malfunctioning part or component.
2.1.6. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.7. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured items such as meeting minutes or reports.
2.1.8. EMERGENCY SITUATION. Equipment malfunction that may cause complete shutdown of galley operation.
2.1.9. MAINTENANCE. Set of actions taken to ensure that equipment perform their intended function when required.
2.1.10 PERIODICITY. Frequency of performance of Manufacturer prescribed maintenance service for the specific equipment; expressed in Monthly (M), Quarterly (Q), Annually (A), and Every Other Month
(EOM).
2.1.11. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.12. PREVENTIVE MAINTENANCE (PM). Scheduled maintenance performed on equipment to keep it in good working condition and operating within manufacturer predetermined tolerances and limitations.
PM may include inspection, cleaning, lubricating, calibrating, adjusting or replacing “Bench Stock” – i.e.
nuts, bolts, screws, electrical fittings, refrigerant gases, solder and/or flux, oil grease, cleaning supplies.
2.1.13. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.14. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.15. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.16. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.17. WORK DAY. Monday through Friday except Holidays;
2.1.18. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative BER Beyond Economical Repair CM Corrective Maintenance COR Contracting Officer Representative DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation KO Contracting Officer NLT No-Later -Than ODC Other Direct Costs PM Preventive Maintenance POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Plan TA Technical Assistant TE Technical Exhibit
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: NONE
3.2 Facilities: PM and CM services shall be performed at Government facilities where equipment are located.
3.3 Utilities: The Government will provide basic utilities to include electrical power and water for tools needed for contract performance. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish PM or CM maintenance.
3.4 Equipment: NONE
3.5 Materials: NONE
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Materials. The Contractor shall furnish materials, supplies, and equipment necessary to meet the requirements under this PWS.
5. SPECIFIC TASKS:
5.1 Contract Award/Acceptance.
5.1.1 Initial Inspection of Equipment. The Contractor shall perform the initial inspection of all equipment at each galley location listed in Attachments 1 through 6 within 30 days after contract award date. The inspection result shall be submitted to the COR in the form of Equipment Status Report – Initial described as follows:
5.1.1.1 Equipment Status Report. The contractor shall provide results of the equipment evaluation/analysis in the form of a report to the Contracting Officer’s Representative (COR) within 5 days after the initial inspection period. The report shall identify the equipment by location (galley), serial, and model number, operable or not operable, required parts and labor (when necessary), to restore equipment to working condition as specified in the manufacturer’s manual.
5.1.1.2 Government Action. The COR will provide a written response within 15 days from receipt of the report. The Government reserves the right to determine if replacement or recommended repairs will be accomplished. Equipment determined to be beyond economical repair (BER) will be deleted from attached listings (Attachments 1 through 6) and shall not be included in the PM schedule. Government reserves the right to replace the equipment (with similar function/capacity equipment) removed from list as result of contract acceptance inspection result during the life of the contract at no additional cost. Repair of equipment determined eligible for repair shall be accomplished in accordance with the requirements set forth in the manufacturer manual.
5.1.1.3 PM Schedule. The contractor shall submit to the COR a written PM schedule for all the equipment listed in Attachments 1 through 6 within thirty (30) days after contract award. The schedule shall address following: equipment location, description, manufacturer, model name/#, quantity, periodicity, and PM schedule date.
5.1.1.4 Addition and deletion of equipment during POP. There will be no change in the Firm Fixed Price portion of the contract during POP for as long as the change is within plus or minus five percent (i.e. ± 5%) of the total number of pieces of equipment in specific galley recorded at the time of contract award.
Government replacement of equipment will be performed one for one of similar form, fit, and function – e.g. remove one oven, add one oven of similar size and capacity with the one removed. Contractor shall be responsible for identifying variances greater than 5% and shall forfeit any claim for equitable adjustment should it fail to notify the COR within 60 days from date the additional equipment (that exceeded the 5% limit) was put in service.
5.2 Basic Services. The contractor shall provide fully qualified and accredited technicians to provide PM and CM services as required in this PWS. PM is performed as scheduled, while CM may be performed during PM performance, it may also be performed during separate visit as requested by the COR. PM and CM shall be performed with the main objective of having ALL equipment to be in operational status when needed.
5.2.1 Preventive Maintenance (PM). PM shall be performed as scheduled for each piece of equipment listed in Attachments 1 through 6 in accordance with prescribed government manuals/instructions/ directives and individual equipment manufacturer manuals to keep them in good working order.
5.2.1.1 PM Frequency. PM Schedule as shown in Table 1below:
Table 1 - PREVENTIVE MAINTENANCE (PM) SCHEDULE
Equipment Type Periodicity (Frequency)
Convection Ovens Monthly, Quarterly
Combination Ovens Monthly, Quarterly
Fryers Monthly, Quarterly
Steam Kettles Quarterly, Annually*
Electric Kettles Monthly, Annually
Tilt, Skillet Monthly, Quarterly
Mixer Quarterly
Soup Wells Quarterly
Heat Lamps Quarterly
Dish machines (except Leased Machines) Monthly, Quarterly
Cook and Hold (warming Cabinet) Monthly Quarterly
Disposal Quarterly
Slicer Quarterly
Griddles Monthly, Quarterly
Range's Monthly, Quarterly
Grills Monthly, Quarterly
Ice Machines/Ice dispensers Monthly
Reach in Coolers Every other month
Reach in Freezers Every other month
Milk Coolers Every other month
Cold rails (including Salad Bars) Every other month
Notes:
1. Equipment calibration will be performed during the PM schedule.
2. For kettles, in addition to the scheduled PM, hydrostatic testing will be performed once a year.
3. Attachments 1 thru 6 show periodicity abbreviations as follows:
M – MONTHLY; EOM – EVERY OTHER MONTH; Q – QUARTERLY; A - ANNUALLY
5.2.1.2 Equipment Operating and Maintenance Parameters. PM shall be conducted to maintain equipment operating in accordance with NAVMED P-5010-1 Tri-Service Food Code and NAVSUP P-486 Vol 2, Food Service Management operating parameters. Strict compliance to these guidelines is mandatory to avoid the transmission of disease producing microorganisms, infectious disease, and growth of harmful bacteria or development of toxins formed by bacteria. As such, the contractor shall ensure that equipment being serviced during PM is operating at their respective temperatures listed in Table 2 and 3 below.
Table 2 – Operating Temperatures of Refrigerated Equipment
Refrigerated Equipment Operating Temperatures
Freezers 0˚ or below
Dairy Box 32˚ 34˚ F
Chilled Bulk Storage Refrigerators 32˚ 38˚ F
Thaw Box—Refrigerators 36˚ 38˚ F
Reach– in Refrigerator 32˚ 41˚ F
Refrigerated Display Cabinets 32˚ 41˚ F
Milk Dispensers 32˚ 41˚ F
Table 3 – Dishwashing Equipment
Equipment Nomenclature Wash Rinse Final Rinse
Dish Washing Machine 150˚ - 160˚ F 160˚ - 180˚ F 180˚ - 194˚ F
Pots and Pans Washing Machine 150˚ - 160˚ F N/A 180˚ - 194˚ F
5.2.2 Corrective Maintenance (CM). CM is repair service required to restore equipment to its good working condition and operating within Government and Manufacturer predetermined tolerances and limitations. The Government predetermined equipment tolerances and limitations supersede the Manufacturer. Services shall be completed within three (3) working days, unless, as determined by COR, is not feasible due to event or situation beyond the control of the contractor. In such a case, contractor shall provide a reasonable target date of completion for COR approval. If in the COR’s opinion that provided target date will create emergency situation (see definition), and the contractor refused to change proposed target date to an earlier date COR deemed necessary to prevent emergency situation, the Government reserves the right to enter into a contract with another contractor to complete the CM. CM performance shall be performed on equipment when triggered by one of the following:
5.2.2.1 Routine COR request. Contractor shall provide a written cost estimate for all repairs within 2 business days from the date request is submitted by COR. The cost estimate shall include equipment description, number of hours required to effect the repair and the associated labor cost, replacement parts name and cost, and the grand total cost of the CM. CM shall be performed no more than three (3) working days from date cost estimate is approved by the COR. All cost estimates for CM or repairs must be approved by the COR. Communication will be by Email for routine requests.
5.2.2.2 CM requirement identified during PM. When CM requirement is identified on an equipment undergoing PM service, CM shall be performed by the contractor to the equipment as long as: (a) it can be performed during normal working hours (see section 1.6.4), and (b) can be accomplished without deviating from the original scheduled equipment PM (i.e. all equipment originally scheduled are serviced). When CM cannot be completed during the PM day for whatever reason, additional time for a separate visit maybe communicated to the COR for approval. Otherwise, the CM may be continued during the next scheduled PM day (where the equipment is located). COR approval is not required when required CM is discovered during performance of scheduled PM and ONLY when there is no associated additional cost to the Government. All other CM requiring parts and/or labor cost must be approved by the COR.
5.2.2.3 Emergency COR request. Under emergency situation, CM shall be performed within one (1) working day (24 hours) from date request is communicated by the COR and received by the contractor.
Cost estimate as described in 5.2.2.1 above may be performed via phone conversation between COR and contractor, but confirmed and approved via Email before CM performance.
5.2.2.4 The contractor shall provide a CM report of performed CM services to the COR within 2 business days following CM of inoperable or malfunctioning equipment. A CM equipment log will be utilized and maintained by the contractor to record all services rendered.
5.2.3 Parts. The contractor shall acquire brand new OEM only parts needed to complete performance of CM using the most economic means to ensure equipment is repaired with minimal downtime. Re-conditioned or re-furbished components or parts may be used if can be shown that use of such component or part is customary commercial practice - subject to COR approval. Fair and reasonable pricing shall be demonstrated to the COR by showing that price is within plus or minus 5% of Commercial item pricing.
Proof of Commercial item pricing can be from: Internet sources to include manufacturer, distributor and other reseller website, or any other sources where price is shown to Government buyers and/or the general public; manufacturer pricing schedule. All procurement of replacement parts must be approved by the COR. No additional material handling charges may be assessed in the T&M contract line item.
5.2.4 Reports and Deliverables. The contractor shall provide written documentation of any performed PM and CM service in a written report to the COR within 2 business days following performance. A repair equipment log will be utilized and maintained by the contractor to indicate all services rendered. See Technical Exhibit 2.
6. APPLICABLE PUBLICATIONS. Government will have available at each galley the Original Equipment Manufacturer (OEM) Manuals, NAVMED P-5010-1, and NAVSUP P-486 Vol 2.
6.1. The Contractor must abide by, but not limited to: NAVSUP P-486 Vol 2 and NAVMED P-5010-1.
(The NAVMED instruction may be found on website http://navalmedicine.med.navy.mil.) Specific instructions as follows:
6.1.2 DISHWASHING AND POTS AND PANS MACHINES: Must operate IAW NAVMED P-5010-1, Chapter 4 and NAVSUP P-486 Vol 2.
6.1.3 MANUAL DISHWASHING: (Backup equipment) IAW NAVMED P-5010-1, Chapter 4.
6.1.4 REFRIGERATED STORAGE EQUIPMENT, REFRIGERATED DISPLAY CABINETS, AND
MILK DISPENSERS: Maintain temperatures IAW NAVMED P-5010-1, Chapter 4.
6.1.5 BULK AND ICE DISPENSING MACHINES: Monthly cleaning at a minimum shall be accomplished IAW NAVMED P-5010-1, Chapter 4.
Attachment/Technical Exhibit List:
7.1. Technical Exhibit 1 – Performance Requirements Summary
7.2. Technical Exhibit 2 – Deliverables Schedule
7.3. Attachment 1 List of Equipment for Naval Base San Diego (NBSD)
7.4. Attachment 2 List of Equipment for Naval Base Point Loma, Harbor Drive Annex (NBPL HDA)
7.5. Attachment 3 List of Equipment for Navy Base Point Loma (SUBASE)
7.6. Attachment 4 List of Equipment for Naval Air Station Island (NASNI)
7.7. Attachment 5 List of Equipment for Navy Base Coronado (NAB)
7.8. Attachment 6 List of Equipment for Naval Air Facility El Centro (NAFEC)
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective PWS Performance Threshold Method of Surveillance
1. Preventive Maintenance - Equipment status
5.2 95% Operational Monthly Inspection by TA or COR
2. Preventive Maintenance 5.2.1 PM performance on 100% of the equipment *
Monthly Inspection by TA or COR
3. Corrective Maintenance 5.2.2 95% of equipment is repaired within 3 working days**
100% Inspection by TA or COR when completed
4. Response Time for Emergency COR request (i.e.
After Normal Working Hours and Weekends)
5.2.2.2 95% Within 24 Hours of Notification by TA or COR
100% Inspection by TA or COR
5. Deliverable reports 5.2.4 100% on time submission IAW Due Dates listed in TE-
100% Inspection by COR
*Situations that are beyond the control of the contractor that prevent PM performance to equipment will not count against the 100% requirement (e.g. un-scheduled base closure, acts of nature, etc.).
**Delay caused by parts availability will not count against the contractor provided the situation is communicated to the COR the day of the knowledge of the situation, and the COR is also provided the target of CM completion.
TECHNICAL EXHIBIT 2
Schedule of Deliverables
Deliverable Frequency # of Copies Medium/Format Submit To
Quality Control Plan
(QCP)
PWS 1.6.1
Submit with proposal package on or before Solicitation Close date
1 Original MS Word or MS Excel Spreadsheet
KO
Equipment Status Report –
PWS 5.1.1.1
NLT 35 Days After Contract award
1 Original and 1 Copy
MS Word or MS
COR with copy to
PM Schedule -
PWS 5.1.1.3
30 Days After Contract Award
1 Original and 1 Copy
MS Word or MS
COR with copy to
CM Cost Estimate
PWS 5.2.2.1/5.2.2.2
Within 2 business days upon receipt of routine CM request from COR
1 Original Email COR
CM Cost Estimate
PWS 5.2.2.3
Within 24 hours upon receipt of emergency CM request from COR
1 Original Email COR
CM Report/Log
PWS 5.2.2.4
2 Working Days After CM performance
1 Original MS Word or MS
COR
ATTACHMENT 1 – Naval Base San Diego (NBSD) Mercer Hall – Equipment list
ATTACHMENT 2 – NB Point Loma (HDA) – Equipment List
ATTACHMENT 3 – NB Point Loma (SUBASE) – Equipment List
ATTACHMENT 4 – NAS North Island – Equipment List
ATTACHMENT 5 – NAB Coronado – Equipment List
ATTACHMENT 6 – NAF El Centro – Equipment List
ATTACHMENT 1 – Naval Base San Diego (NBSD) Mercer Hall Equipment List
Location
BLDG#
Equipment # Description Manufacturer Model # Serial # PM Periodicity
3202 N00242DB6Y COMBI OVEN CLEVELAND OGS - 20.20 1011230001120 M, Q
3202 N00242DBFH COMBI OVEN CLEVELAND OGS - 10.20 1011230001066 M, Q
3202 N00242DBFK COMBI OVEN CLEVELAND OGS - 10.20 1009230000653 M, Q
3202 N00242DB6T COMBI OVEN CLEVELAND OGS - 10.20 1009230000658 M, Q
3202 N00242D0H7 COMBI OVEN RATIONAL LM100CG.AXXXX G626J21122938655 M,Q
3202 N00242D0H8 COMBI OVEN RATIONAL LM100CG.AXXXX G626J21122938215 M,Q
3202 N00242D0H9 COMBI OVEN RATIONAL LM100CG.AXXXX G626J21052889835 M,Q
3202 N00242D0HA COMBI OVEN RATIONAL LM100CG.AXXXX G626J21052889948 M,Q
3202 N00242D0HB COMBI OVEN RATIONAL LM100CG.AXXXX G626J21052889951 M,Q
3202 N00242D0HC COMBI OVEN RATIONAL LM100CG.AXXXX G626J21052889838 M,Q
3202 N00242CMXN COMBI OVEN RATIONAL SCC WE 102 E12SH15072467902 M,Q
3202 N00242CMXP COMBI OVEN RATIONAL SCC WE 102 E12SH15072468726 M,Q
3202 N00242CMXM COMBI OVEN RATIONAL SCC WE 102 E12SH15072467901 M,Q
3202 COMBI OVEN RATIONAL SCC WE 62 E62SI17052589230 M,Q
3202 COMBI OVEN RATIONAL SCC WE 62 E62SI17052594086 M,Q
3202 N00242D0H4 TILT SKILLET GROEN BPM-40EC V2154991-1 Q
3202 N00242CMWB KETTLES GROEN EE-80 91515 Q, A
3202 N00242CMWD KETTLES GROEN EE-80 91496 Q, A
3202 N00242CMWA KETTLES GROEN EE-80 91490 Q, A
3202 N00242CMW9 KETTLES GROEN EE-80 91502 Q, A
3202 N00242CMWC KETTLES GROEN EE-40 91505 Q, A
3202 N00242c289 KETTLES GROEN DEE/4-40 100197 Q,A
3202 N0024C288 KETTLES GROEN DEE/4-40 100195 Q,A
3202 N00242D0H5 KETTLES GROEN EE-40 105535 Q,A
3202 N00242c2ar FRYERS BELSHAW 618L 5168938 M,Q
3202 N00242CMWP MIXERS HOBART HL 662 31-1458-001 Q
3202 N00242C8T1 MIXERS HOBART HL 600 31-1365-130 Q
3202 N00242CMWR MIXERS HOBART HL 662 31-1458-002 Q
3202 MIXERS AXIS AX-M40 412100388 Q
3202 N00242D6H6 MIXER HOBART M802 5003 Q
3202 N00242CMWT DOUGH DIVIDER DUTCHESS JN-3 2686 / 082012 Q,
3202 ICE MACHINE SCOTSMAN C0530MA-1C 13061320014114 M
3202 ICE MACHINE SCOTSMAN C0530MA-1C 13061320014092 M
3202 ICE MACHINE SCOTSMAN C0330MA-1C 12101320014523 M
3202 ICE MACHINE HOSHIZAKI KML-451MAH B02955J M
3202 ICE MACHINE SCOTSMAN C0530MW-1D 17011320015836 M
3202 ICE MACHINE SCOTSMAN C0530MW-1C 12081320014087 M
3202 ICE MACHINE SCOTSMAN C0530MW-1C 12081320014045 M
3202 GRIDDLES VULCAN 972RX-1 659061316 M, Q
3202 N00242C2BA GRIDDLES ACCUTEMP EGF2083A4850 18111 M,Q
3202 GRIDDLES ACCUTEMP EGF2083A3650 26043 M,Q
3202 N00242CKDR GRIDDLES GARLAND GTGG72-GT72M 1810100100702 M,Q
3202 Active GARLAND GTGG72-GT72M 1810100102374 M,Q
3202 Active ACCUTEMP EGF2083A4850 17705 M,Q
3202 Active ACCUTEMP EGF2083A3650 26044 M,Q
3202 BREAD
WARMERS
HATCO HDW-2 3936791335 M, Q
3202 BREAD
WARMERS
HATCO HDW-2 3936781335 M, Q
3202 BREAD
WARMERS
HATCO HDW-1 5328001432 M,Q
3202 MICROWAVES PANASONIC NE-1064F 6HO8200191 M
3202 MICROWAVES AMANA RCS10TS P02002415M M
3202 MICROWAVES AMANA RC10TS 1306601950 M
3202 FOOD WELL DUKE EP4DLSSM 10093272 M
3202 FOOD WELL DUKE EP4DLSSM 10093275 M
3202 FOOD WELL DUKE E5D6SSM 11123725 M
3202 FOOD WELL DUKE E5D6SSM 11123488 M
3202 FOOD WELL DUKE E5D6SSM No information M
3202 FOOD WELL VOLRATH WELL HOT FOOD F33200810498001 M
3202 FOOD WELL VOLRATH WELL HOT FOOD F33200810498002 M
3202 FOOD WELL VOLRATH WELL HOT FOOD F33200810498003 M
3202 FOOD WELL VOLRATH WELL HOT FOOD F33200810498004 M
3202 BREAD
TOASTER
HATCO TQ400 7779791029 M
3202 BREAD
TOASTER
APW WYOTT AT-EXPRESS 0909N0177 M
3202 BREAD
TOASTER
APW WYOTT AT-EXPRESS 0909N0178 M
3202 N00242CMX5 WARMER CONTINENTAL DL1WI-SA-RT 15464316 M
3202 N00242CMXH COOLER CONTINENTAL DL2RI-SS-RT 15464834 M
3202 N00242CMX6 WARMER CONTINENTAL DL1WI-SA-RT 15464319 M
3202 N00242CMX7 WARMER CONTINENTAL DL2WI-SA-RT 15464837 M
3202 N00242CMX8 WARMER CONTINENTAL DL1WI-SA-RT 15464318 M
3202 N00242CMX9 WARMER CONTINENTAL DL2WI-SA-RT 15464836 M
3202 N00242CMXA WARMER CONTINENTAL DL1WE-SA-RT 15464320 M
3202 N00242CMXB WARMER CONTINENTAL DL2WI-SA-RT 15466096 M
3202 N00242CMXC WARMER CONTINENTAL DL1W-SA-RT 15464315 M
3202 N00242CMXJ COOLER CONTINENTAL DLRI-SS-RT 15464835 M
3202 N00242CMXD WARMER CONTINENTAL DL1WI-SA-RT 15464317 M
3202 N00242CMXE WARMER CONTINENTAL DL2WI-SA-RT 15464838 M
3202 N00242CMXF WARMER CONTINENTAL DL2WI-SA-RT 15466097 M
3202 N00242CMXK COOLER CONTINENTAL DL2RI-SS-RT 15464833 M
3202 N00242D0H3 REACH-IN
FREEZER
EVEREST ESF3 BSF322020006 EOM
3202 N00242D0H2 REACH-IN
FREEZER
EVEREST ESF3 BSF322020002 EOM
3202 REACH-IN
FREEZER
EVEREST ESF3 BSF315090013 EOM
3202 REACH-IN
REEFER
EVEREST ESF3 BSF315090009 EOM
3202 REACH-IN
REEFER
EVEREST ESF3 BSR315090015 EOM
3202 REACH-IN
REEFER
COSPOLICH R41-2M-SN-MLR 10054-12 EOM
3202 REACH-IN
REEFER
COSPOLICH R50-2M-SN-MLR 2229-13 EOM
3202 REACH-IN
REEFER
COSPOLICH R41-2M-SN-MLR 10053-12 EOM
3202 MILK
DISPENSER
SILVER KING SKMJ1 NBCJ09035A EOM
3202 MILK
DISPENSER
SILVER KING SKMJ1 NBCJ09036A EOM
3202 MILK
DISPENSER
SILVER KING SKMAJ2 SAJJ78253A EOM
3202 MILK
DISPENSER
SILVER KING SKMAJ3 SBEG165968A EOM
3202 N00242CMX3 SALAD BAR VOLRATH 36426 C291-00665675-003 M
3202 SALAD BAR DELFIELD N8156B 1002150001921 M
3202 SALAD BAR DELFIELD N8143B 1002150001977 M
3202 SALAD BAR DELFIELD N8143B 1002150001583 M
3202 SALAD BAR DELFIELD N8156B 1003150000300 M
3202 SALAD BAR DELFIELD N8156B 1601150000600 M
3202 SALAD BAR DELFIELD N8143B 1602150000012 M
3202 SALAD BAR DELFIELD N8143B 1602115000183 M
3202 SALAD BAR DELFIELD N8156B 1601150002239 M
3202 N00242C2B3 MOBILE COLD
PAN COUNTER
RANDALL RAN SCA-5S W 186151-1-4 M
3202 N00242C2B4 MOBILE COLD
PAN COUNTER
RANDALL RAN SCA-5S W 186151-1-5 M
ATTACHMENT 2 – NB Point Loma (HDA)
Bldg. # Equipment # Equipment Manufacturer PM
Periodicity
ASWSD-55 M401114 OVEN, SELF COOKING CENTER (GAS) RATIONAL M, Q
ASWSD-55 M401134 OVEN, SELF COOKING CENTER (GAS) RATIONAL M, Q
ASWSD-55 M401138 OVEN, SELF COOKING CENTER (GAS) RATIONAL M, Q
ASWSD-55 M401813 WARMER, ELECTRIC TRUE M
ASWSD-55 M401814 REFRIG, RI, COMMERCL HOSHIZAKI EOM
ASWSD-55 M401815 REFRIG, RI, COMMERCL HOSHIZAKI EOM
ASWSD-55 M401816 MILK DISPENSER,REMOTE,STATION SILVER KING EOM
ASWSD-55 M401819 MILK DISPENSER,REMOTE,STATION SILVER KING EOM
ASWSD-55 M401822 WASHER,DISH,1 COMPARTMNT HOBART M, Q
ASWSD-55 M401836 WASHER, DISH, CONVEYOR ECOLAB M, Q
ASWSD-55 M401840 OVEN, CONVECTION, GAS RATIONAL M, Q
ASWSD-55 M401843 KETTLE, STEAM GROEN Q, A
ASWSD-55 M401844 KETTLE, STEAM GROEN Q, A
ASWSD-55 M401846 HEATER, DEEP, SINK HATCO M
ASWSD-55 M401848 ICE MACHINE/BIN CLEANING HOSHISAKI M
ASWSD-55 M401849 ICE MACHINE/BIN CLEANING HOSHISAKI M
ASWSD-55 M401850 WARMER, ELECTRIC TRUE M, Q
ASWSD-55 M401855 WARMER, ELECTRIC TRUE M, Q
ASWSD-55 M401857 CURTAIN,AIR W/SERVICE MARS Q
ASWSD-55 M401858 CURTAIN,AIR W/SERVICE MARS Q
ASWSD-55 M401859 CURTAIN,AIR W/SERVICE MARS Q
ASWSD-55 M401865 TOASTER, ELECTRIC STANDEX M
ASWSD-55 M401867 CURTAIN,AIR W/SERVICE MARS Q
ASWSD-55 M401933 SLICER GLOBE Q
ASWSD-55 M401936 GRILL, ELECTRIC HOBART M, Q
ASWSD-55 M401943 REFRIG, RI, COMMERCL TRAULS EOM
ASWSD-55 M401945 CHOPPER LAN EL Q
ASWSD-55 M402588 FREEZER,REACH IN CONTINENTAL EOM
ASWSD-55 M402591 MIXER, FOOD,FLOOR MOUNTED HOBART Q
ASWSD-55 M403749 OVEN,SELF COOKING CENTER GAS RATIONAL M, Q
ASWD-55 SRM80 ONE PLANETARY MIXER UNIVEX Q
ASWD-55 G4SM-23PT DESSERT DISPLAY CABINET TRUE EOM
ATTACHMENT 3 – NB Point Loma (SUBASE)
Location/
Bldg. # Equipment # Description Manufacturer PM
Periodicity
NBPL-500 M750112 ICE MAKER ( DISPENSER ) SCOTSMAN M
NBPL-500 M751014 WARMER, ELECTRIC TRAULSEN M
NBPL-500 M751020 WASHER, DISH, CONVEYOR HOBART M, Q
NBPL-500 M752124 DISPOSAL, GARBAGE ISE Q
NBPL-500 M753601 ICE MAKER, (BIN TYPE) SCOTSMAN M
NBPL-500 M753843 DISPENSER,BEV.REF.PACKAGE SILVER EOM
NBPL-500 M753844 DISPENSER,BEV.REF.PACKAGE SILVER KING EOM
NBPL-500 M754253 KETTLE, STEAM GROEN Q, A
NBPL-500 M754254 KETTLE, STEAM GROEN Q, A
NBPL-500 M754259 SLICER HOBART Q
NBPL-500 M754272 HEATER, DEEP, SINK HATCO M
NBPL-500 M754290 OVEN, SELF COOKING CENTER (GAS) RATIONAL M, Q
NBPL-500 M754294 OVEN, SELF COOKING CENTER (GAS) RATIONAL M, Q
NBPL-500 M754296 OVEN, SELF COOKING CENTER (GAS) RATIONAL M, Q
NBPL-500 M754297 OVEN, SELF COOKING CENTER (GAS) RATIONAL M, Q
NBPL-500 M755229 CHOPPER HOBART Q
NBPL-500 M755233 ICE MAKER ( DISPENSER ) SCOTSM M
NBPL-500 M755297 PEELER INSING Q
NBPL-500 M755440 GRILL, ELECTRIC HOBART M, Q
NBPL - 500 STEAM KETTLE, GAS GROEN Q, A
NBPL - 500 MIXER UNIVEX Q
ATTACHMENT 4 – NAS North Island
Equipment # Description Manufacturer Model # Serial # PM Periodicity
NBC-794 REFRIGERATOR VICTORY FS-1D-S1 E131037 EOM
NBC-794 REFRIGERATOR TRUE STA2RPT-25-
7842190 EOM
NBC-794 REFRIGERATOR TRUE STA2RPT-25-
7842191 EOM
NBC-794 REFRIGERATOR TRUE TRIRPT-IS-IS 7208504 EOM
NBC-794 MIXER UNIVEX SRM60+ M11030242 Q
NBC-794 TILT SKILLET VULCAN 126848 46-3039819 M, Q
NBC-794 TOASTER, ELECTRIC MERCOSAVORY STI14500 CT1020730HS M
NBC-794 KETTLE, STEAM SOUTHBEND A
MIDDLEBY. CO
KSLG-40E 88653-5JJ-1506 Q, A
NBC-794 KETTLE, STEAM SOUTHBEND A
MIDDLEBY. CO
KSLG-40E 85613-12GG-
Q, A
NBC-794 KETTLE, STEAM CROWN GL-40E N00242CFRY Q, A
NBC-794 KETTLE, STEAM CROWN GL-40E N00242DHC7 Q, A
NBC-794 SLICER AXIS AX-SGLM12/N 003160 Q
NBC-794 MILK DISPENSER SILVER KING SK3IMP SA1C49332A EOM
NBC-794 MILK DISPENSER SILVER KING SK18MAJ SAIJ61045A EOM
NBC-794 DISPOSAL, GARBAGE SALVAJOR 500 21074 Q
NBC-794 DISPOSAL, GARBAGE SALVAJOR 150 153409 Q
NBC-794 MILK DISPENSER SILVER KING SK18MAJ SAIJ61047A EOM
NBC-794 WARMER, ELECTRIC TRUE TRI-HRT-IS-IS 7178960 M, Q
NBC-794 WARMER, ELECTRIC TRUE TRI-HRT-IS-IS 7178958 M, Q
NBC-794 WARMER, ELECTRIC TRUE TRI-HRT-IS-IS 7178936 M, Q
NBC-794 WARMER, ELECTRIC TRUE TRI-HRT-IS-IS 7178961 M, Q
NBC-794 WARMER, ELECTRIC METRO C569-SDC-UA C56003166 M, Q
NBC-794 GRIDDLE, GAS IMPERIAL IMGA-72281 06109211 M, Q
NBC-794 GRIDDLE, GAS IMPERIAL IMGA- M, Q
NBC-794 OVEN, COMBI, RATIONAL SCC62G G62SH160425
11951
M, Q
NBC-794 OVEN, COMBI RATIONAL SCC62G G62SH160325
10183
M, Q
NBC-794 OVEN, COMBI. RATIONAL SCC62G G62SH160425
11550
M, Q
NBC-794 OVEN, COMBI RATIONAL SCC62G G62SH160321
M, Q
NBC-794 OVEN, COMBI,TALL RATIONAL SCC202G G22SI1909277
M, Q
NBC-794 OVEN, COMBI,TALL RATIONAL SCC202G G22SI1909277
M, Q
NBC-794 ICE MAKER, (BIN
TYPE)
MANITWOC B970 110862868 M
NBC-794 ICE MAKER MANTIWOC B970 M
NBC-794 BOOSTER HEATER HATCO C-30 9400952204 M
NBC-794 BOOSTER HEATER HATCO C-36 6576692002 M
NBC-794 SOUP WELL,BAY1 M
NBC-794 SOUP WELL,BAY2 M
NBC-794 SOUP WELL,BAY3 M
ATTACHMENT 5 – NAB Coronado
Equipment #
MODEL #
Description Manufacturer
PM
PERIODICITY
NAB-300 HS8
MEAT SLICER S/N
31-1569 911
HOBART
Q
NAB-300 300
DISPOSAL, GARBAGE 47582 SALVAJOR
NAB-300 750 DISPOSAL, GARBAGE 7345 SALVAJOR
NAB-300 GL60E KETTLE, STEAM 7482-9PP-3650
SOUTHBEND/
CROWN
Q, A
NAB-300
GL60E
KETTLE, STEAM 7482-9PP-3649
SOUTHBEN/
NAB-300 GL60E KETTLE, STEAM 7482-9PP-3651
NAB-300 GL40E KETTLE, STEAM 7439-7PP-2548
NAB-300 C569-SDC-U WARMER, ELECTRIC C56E009266
METRO
M
NAB-300 C569-SDC-U WARMER, ELECTRIC C56E009265
NAB-300 C569-SDC-U WARMER, ELECTRIC C5CE009262
NAB-300 C569-SDC-U WARMER, ELECTRIC C56E009254
NAB-300 C569-SDC-U WARMER, ELECTRIC C56E009260
NAB-300 C569-SDC-UA WARMER, ELECTRIC C56003198
NAB-300 C569-SDC-U WARMER, ELECTRIC C56E009264
NAB-300 C569-SDC-U WARMER, ELECTRIC C56E009263 METRO M
NAB-300 C569-SDC-U WARMER, ELECTRIC C56E009261 METRO M
NAB-300 MSA72-201
GRILL, BROILERS, GAS 65054880 VULCAN
GRILL, BROILERS, GAS 650051333 VULCAN
GRILL, BROILERS, GAS 650051335 VULCAN
NAB-300 CHECK ETS
GRILL, BROILERS, GAS WOLF
NAB-300 SCCWE202G
COMBI/FULL G22SH15072468073
RATIONAL
COMBI/FULL G22SH15072469791
COMBI FULL G22SH15082470872
COMBI FULL G22SH150724699
NAB-300 SCCWE62G
COMBI STACK G62SI17062599432 RATIONAL
NAB-300 SCCWE62G
COMBI STACK G62SI1062598643 RATIONAL
NAB-300 SCCWE62G COMBI STACK G62SI17072603974 RATIONAL
NAB-300 SCCWE62G COMBI STACK G62SI17072603971 RATIONAL
NAB-300 SCCWE62G COMBI STACK G62SI17072603973 RATIONAL
NAB-300 SCCWE62G COMBI STACK G62SI17072603977 RATIONAL
NAB-300 SCCWE62G COMBI STACK G62SI18032655437 RATIONAL
NAB-300 SCCWE62G COMBI STACK G62SI18032655434 RATIONAL
NAB-300 HL600 MIXER 311365129
NAB-300 L800D MIXER 11349596
NAB-300 8HBW23
POWERED PALLET JACK
8HBW233936
TOYOTA
NAB-300 NIS POWERED PALLET JACK
VESTIL
NAB-300 NIS FRYER, DEEP FAT, GAS
FRYMASTER
NAB-300 NIS FRYER, DEEP FAT, GAS
VULCAN
M,Q
NAB-300 NIS TOASTER
X-TREME
NAB-300 NIS TOASTER X-TREME
NAB-300 NIS TOASTER X-TREME
NAB-300 SKMAJ3 MILK DISPENSER
SAJM83233A
SILVER KING
EOM
NAB-300 SKMAJ3
MILK DISPENSER
SAJL82347A
NAB-300 SKMAJ3
MILK DISPENSER
NBAD00163A
NAB-300 NIS MILK DISPENSER
NAB-300 RCS10MPA
MICROWAVE
1001300710
AMANA
NAB-300 HDC12A2
2108111252
NAB-300 HDC12A2
2108111254
NAB-300 RCS10MPA
1007301246
NAB-300 VW2S-1
BREAD WARMER NOT
LEGIBLE
NAB-300 VW2S-1 BREAD WARMER
NAB-300 NIS BREAD WARMER
NAB-300 NIS BREAD WARMER
NAB-300 FR-4
BREAD DISPENSER
F0709
SERV-A-SLICE
NAB-300 NIS BREAD DISPENSER
SERV-A-SLICE Q
NAB-300 NIS BUFFALO FOOD CHOPPER
NAB-300 NO INFO BUFFALO FOOD CHOPPER UNIVEX Q
NAB-300 ESF2
REFRIGERATOR, REACH-IN, UP-RIGHT
(VEG PREP ROOM) BSF218120007
EVEREST EOM
NAB-300 ESF2
REFRIGERATOR, REACH-IN FOOD
CAROUSEL (Speed Line) BSF219010065
EVEREST EOM
NAB-300 T-49-HC
REFRIGERATOR, REACH-IN FOOD
(INSIDE GALLEY) 9586609
TRUE EOM
NAB-300
REFRIGERATED SALAD BAR (SERVING
LINES 1 & 2)
ATLAS EOM
NAB-300
REFRIGERATOR, REACH-IN, UP-RIGHT
(SERVING LINE 1)
HOBART EOM
NAB-300
REFRIGERATED SALAD BAR (EAST
WALL)
<Null> EOM
NAB-300
REFRIGERATED SALAD BAR (SERVING
LINE 1)
DUKE EOM
NAB-300
FREEZER, REACH-IN, UP-RIGHT
(BUTCHER SHOP)
TRAULS EOM
NAB-300
REFRIGERATED SALAD BAR (SERVING
LINE 1&2)
ATLAS EOM
NAB-300 SY1404A ICE MAKER, (BIN TYPE) 110916589 MANITOWOC
NAB-300 SY1404A ICE MAKER, (BIN TYPE) 110892082 MANITOWOC
NAB-300 NIS ICE MAKER, (BIN TYPE) MANITOWOC
NAB-300 C0530MA-1E
ICE MAKER ( DISPENSER
)17081320014355
SCOTTSMAN M
NAB-300 C0530MA-1E
ICE MAKER ( DISPENSER )
17081320014356
SCOTTSMAN M
NAB-300 C0530MA-1E
ICE MAKER ( DISPENSER )
17081320014621
SCOTTSMAN M
NAB-300 C0530MA-1E
ICE MAKER ( DISPENSER )
17081320014682
SCOTTSMAN M
ATTACHMENT 6 – NAF El Centro
Bldg. # Equipment # Description Manufacturer PM
Periodicity 436 STR1HPT-1S-1S Food Warmer True Q
436 2ER85CF-1 Fryer, Double Vulcan M, Q
436 WEG72D Grill, Back Up Hobart M, Q
436 72C36FRTTR Grill, Serving Line Keating M, Q
436 N104-78751 Kettle, Steam 60GL Greon Q, A
436 KDLS-40 Kettle, Steam 40GL (2ea) Southband Q, A
436 KDLT-20 Kettle, Steam 20GL (3ea) Southband Q, A
436 HEC5 Oven, Dual Convention Hobart M, Q
436 SCC WE 62
Combination Oven (6ea) Rational Q
436 CCF212-02-09 Steam Table, Electric Hatco
436 TWT-60 Reach-in Counter Freezer 2-Door True Q
436 M2000 Food Processor Berkel Q
436 TWT-60 Reach-in Reefer 2-Door, Counter True Q
436 EPBR1 Food Preps Reefer w/ cold bar Everest Q
436 C713-27 Ice Cream Dispenser Taylor Q
436 SCC-62 Combi Oven (6ea) Rational M, Q
436 Q2 Reach-in Reefer 4 Door #1 Hobart EOM
436 G30010 Reach-in Reefer 3 Door #2 Traulsen EOM
436 G30010 Reach-in Reefer 3 Door Traulsen EOM
436 QF2 Reach-in Freezer 3 Door #3 Traulsen EOM
436 G31010 Reach-in Freezer 3 Door #4 Traulsen EOM
436 G20010 Reach-in Reefer 2 Door Traulsen EOM
436 HS9 Meat Slicer Hobart Q
436 SL-SL-
EF6DRS2OJB
Hot/Cold Serving Line Table Low Temp Industries Q
436 CC576 Steam Table in back room Hatco M
436 MDT5N40A-1J Ice Machine Large Bev. Line Scotsman M
436 SN12A Ice Machine Small Bev. Line Manitowoc M
436 CIR4 Salad Bar Small Wasserstorm EOM
436 CIR3 Salad Bar Large Wasserstorm EOM
436 CIR-01 Salad Bar Table Top Type Wasserstorm EOM
436 T47841I13 Show Case, Upright Traulsen EOM
436 MSF41 Ice Cream Freezer Box Metalfrio EOM
436 SK11MP Milk Dispenser Small Silver King EOM
436 ET-27/4 Toaster 4 Slot Hobart EOM
436 30SBCD Hot Dog Grill Star Q
436 32FP20 Food Processor Waring Q
436 3F Reach-in Reefer 3 Door (2 Ea) Continental Q
436 DPAH-2BCM Carve Station w/ Lamps, Steam well Duke Q