This document contains a Contract Data Requirements List (CDRL) and related federal contract opportunity for the repair and overhaul of three R-114 compressor units used in Ohio-class submarines. The CDRL outlines ten data items required to be submitted by the contractor at various stages of performance, including receipt inspection reports, condition reports, welding and non-destructive testing procedures, test reports, reassembly quality assurance reports, operational and structureborne noise test data, certifications of compliance, and final inspection reports. The related federal contract opportunity is a solicitation issued by the Department of the Navy Naval Supply Systems Command seeking proposals for the overhaul of the three compressor units in accordance with the specifications provided. Interested parties may submit proposals by the response date given in the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 3.01_RFQ_20QF032_20YRA59.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFURB INST. NO. 5020-012-0002 Rev A CHG 2
CONTRACT DATA REQUIREMENTS LIST
A. CONTR. LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
XX TDP TM OTHER
D. SYSTEM/ITEM R-114 AC
Compressor/Motor
E. CONTRACT/PR NO.
RI No. 5020-012-0002 Rev A CHG 1
F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Item Descript)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10.
FREQUENCY
12. DATE OF
FIRST
SUBMISSION
14. DISTRIBUTION
DR - DRAFT
8. APP CODE 11. AS OF
DATE
13. SUBSEQUENT
SUBMISSION
RG - REGULAR
RP - REPRO
16. REMARKS
1.
A001
2. Receipt Inspection Reports 3.
4. Para 7.a.(1)
5. Para 7.a.(1)
6. SUBMEPP
7. SD 9. 10. 12. 14. DISTRIBUTION
As Req’d See 13 b. Copies
8.
11.
See 13
13. 30 days after receipt of hardware.
D R
R G
R P
16. REMARKS
The receipt inspection will consist of the completion of Enclosure (2) SUBMEPP Code 1831 1
TOTAL 1
1.
A002
2. Condition Report 3.
4. Para 7.a.(2) 5. Para 7.a.(2)
13. Acceptance required prior to hardware delivery
R G
R P
16. REMARKS
Report to include Contingency Parts to be repaired/replaced & any Unplanned
SUBMEPP Code 1831 1
Parts/Repairs required.
TOTAL 1
G. PREPARED BY
//s// S. C. Syrek 1846SS
H. DATE
03/05/19
I. APPROVED BY
//s// Stacy Woodley
J. DATE
03/05/19
DD Form 1423, JUN 90 Previous editions are obsolete Encl (5) Page 1 of 3 Pages
D. SYSTEM/ITEM R-114 AC
Compressor/Motor
E. CONTRACT/PR NO.
1.
A003
2. Welding Procedures & Welding Procedure Qual. Test Report
3.
4. DI-MISC-80875 and DI-MISC-80876 5. Para 7.a.(3)
7. DD 9. 10. 12. 14. DISTRIBUTION
0 Time See 13 b. Copies
8. A
13. Acceptance required prior to welding.
R G
R P
16. REMARKS Prior to welding, the vendor’s Welding Procedures and welding procedure qual. test report reports must be submitted and approved. This SUBMEPP Code 1831 1 . includes procedures for foundry repairs to castings and tack welds. Identify . the specific comp/application, contract no., facility, & Refurb Inst/. TOTAL 1 1.
A004
2. Test Procedures
3. NDT Procedures
4. DI-NDTI-80603 5. Para 7.a.(4)
7. DD 9. 10. 12. 14. DISTRIBUTION
0 Time See 13 b. Copies
8. A performing NDT
R G
R P
16. REMARKS Approval required prior to accomplishment of NDT. Applicable to
MT, RT, UT or Eddy Current, as required. Vendors own format is acceptable.
TOTAL 1
1.
A005
2. Test/Inspection Reports
3. NDT Reports
4. DI-NDTI-80809 5. Para 7.a.(5) hardware delivery
R G
R P
16. REMARKS NDT Reports shall reflect approved procedure no. & rev, Reports shall be identifiable to each unit by a unique S/N. SUBMEPP Code 1831 1 Copy in crate 1
TOTAL 4
A006
2. Reassembly Quality Assurance Report
(RQAR)
4. Para 7.a.(6) 5. Para 7.a.(6)
R G
R P
16. REMARKS Hand mark-up of Reference (p).
If welding or NDT were accomplished, the RQAR shall include a copy of SUBMEPP Code 1831 1 the government procedure approval. Copy in crate 1
TOTAL 4
G. PREPARED BY
//s// S. C. Syrek 1846SS
H. DATE
03/05/19
I. APPROVED BY
//s// Stacy Woodley
J. DATE
DD Form 1423, JUN 90Previous editions are obsolete Encl (5) Page 2 of 3 Pages
DD Form 1423, JUN 90 Previous editions are obsolete Encl (5) Page 3 of 3 Pages
D. SYSTEM/ITEM R-114 AC
Compressor/Motor
E. CONTRACT/PR NO.
A007
2. Operational Test Data Report
4. Para 7.a.(7)
5. Para 7.a.(7)
R G
R P
16. REMARKS
Reports shall be identifiable to each compressor/motor by a unique serial number. SUBMEPP Code 1831 1 Copy in crate 1
TOTAL 2
1.
A008
2. Structureborne Noise Test Data Report
4. Para 7.a.(8) 5. Para 7.a.(8)
R G
R P
16. REMARKS
Reports shall be identifiable to each compressor/motor by a unique serial number. SUBMEPP Code 1831 1 Copy in crate 1
TOTAL 2
1. A009 2. Certification/Test Report
3. Certificate of Compliance
4. DI-MISC-80678
5. para 7.a.(9)
13. NLT 10 days prior to hardware acceptance
D R
R G
R P
16. REMARKS Certifying that each Item has been refurbished per Para 5 and tested per Para 6 of this RI. One report for each Item, identifiable to the unique unique Ser. Nos. Include a positive statement indicating if welding or NDT were
Copy in Crate 1 accomplished identify the procedures used & identify any welding accomplished that did not require weld procedure qualification tests per reference (m) para 4.2.1.1.
TOTAL 2
1.
A010
2. Final Inspection
4. Para 7.a.(10)
5. Para 7.a.(10)
As Req’d
R G
R P
16. REMARKS SUBMEPP Code 1831 1 The Final inspection will consist of the completion of Enclosure (3) Copy in Crate 1
TOTAL 2
G. PREPARED BY
//s// S. C. Syrek 1846SS
H. DATE
03/05/19
I. APPROVED BY
//s// Stacy Woodley
J. DATE