1.02 38KFA86314_00_A01.pdf
PDF 63 KB Posted
- Solicitation number
- N6264926QE006
About this file
This is a Job Specification document for USS NEW ORLEANS (LPD-18) detailing requirements for a temporary stowage container to support deck work operations. The specification was prepared by N. Kuwahara on January 5, 2026, and approved by S. Murakami and A. Oka, with work to be completed at Sasebo.
The contractor must provide one lockable, weatherproof metal storage container (CONEX) with 1,280 cubic feet capacity (20 feet by 8 feet by 8 feet) to be located adjacent to the ship within 500 feet of the vessel. The container must include 160 square feet of floor space and 200 square feet of shelving space meeting local fire prevention codes. The contractor shall provide five sets of keys to the supervisor, deliver the storage space five days prior to availability start, and install a fully charged 15-pound CO2 fire extinguisher within four feet of each access. The container must feature 28 foot-candles minimum lighting with explosion-proof lights, one non-sparking electric exhaust vent fan, one 115 VAC 15-amp power receptacle, a minimum 7-foot ceiling height, and a floor load limit of 100 pounds per square foot. The contractor shall remove the container upon notification by the supervisor and accomplish requirements for new and disturbed surfaces per Standard Item 009-32. No government-furnished material is provided. The work supports Repair Two deck operations during 6A1 CMAV requiring temporary storage for equipment and materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:
LPD-18 USS NEW ORLEANS
JON: 38KFA86314 A01 -
TITLE:
Temporary Stowage Container for DC Equipment; provide
JOB SPECIFICATION
Anticipated Award Date Production Completion Date: PREPARING ACTIVITY:
/3,fl~k')(~ 0§5UN 2C POP Start Date: POP End Date: SASEBO
0/Af ;t)-£ yo:FvAl2£
PREPARED BY: CODE DATE
N. KUWAHARA E KU 1/05/2026
APPROVED BY: Q:'A CODE
S. MURAKAMI S225
CONCURRED BY: /j//J CODE
A.OKA A/·~ S233
ASSIST PLANNER'S NAME:
CODE
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
DESCRIPTION:
JSN(S): SERV-L038 CASREP#
S/F CONTACT: ROGERS J. / EMERSON K. CWP# CCNS#
Approved by S300IS90~ ~18: D£T,4fl )6 Avl: 6A1
~· u-.,f/""'Jo} J~oc;., LWC:
Work Completed
S/Force: Rate: Date:
Ship Supt: Date: SRF CONTROL NO.:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
1301325584
Ship/HULL NO. Ship/HULL NAME ICN: Rev:
LPD-18 USS NEW ORLEANS
JON: 38KFA86314 -
TITLE:
Temporary Stowage Container for DC Equipment; provide
1. SCOPE:
1.1 Title: Temporary Stowage Container for DC Equipment; provide
1.2 Location of Work:
1.2.1 Adjacent to Ship
1.3 Identification:
Key Op:
A01
1.3.1 Quantity (One EA), Metal Storage Container (CONEX), 1280 cubic feet capacity (20 Feet by 8 Feet by 8 Feet), located in 1.2.1
2 . REFERENCES:
2.1 Standard Items (FY26)
3. REQUIREMENTS:
3.1 Provide each lockable, weatherproof storage container listed in 1.3.1, containing 160 square feet of floor space, 200 square feet of shelving space that meets local fire prevention codes.
3.1.1 Provide 5 sets of keys to the SUPERVISOR.
3.1.2 Provide storage space 5 days prior to start of availability.
3.1.3 Install each fully charged 15-pound CO2 fire extinguisher within 4 feet of each access.
3.1.4 Provide stowage space with 28 foot-candles minimum of lighting with explosive-proof lights, one non-sparking electric exhaust vent fan and one 115 VAC, 15-amp power receptacle.
3.1.5 Ensure ceiling has a minimum height of 7 feet.
3.1.6 Ensure floor load limit is a minimum of 100 pounds per square foot.
3.1.7 Locate each stowage space within 500 feet of the vessel.
3.2 Remove each storage container listed in 1.3.1 upon notification by the SUPERVISOR.
3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 Initial Condition - DECK WORK WILL BE PERFORMED IN REPAIR TWO DURING 6Al CMAV REQUIRING TEMPORARY STORAGE FOR ALL EQUIPMENT AND MATERIAL IN REPAIR
TWO.
Ship/HULL NO. Ship/HULL NAME 'ICN: Rev: Key Op:
LPD-18 USS NEW ORLEANS JON: I 38KFA86314 - A01
TITLE:
Temporary Stowage Container for DC Equipment; provide
5. GOVERNMENT FURNISHED MATERIAL (GEM) :
5 .1 None.