This is a Job Specification document for repair work on the USS TRIPOLI (LHA-7) naval vessel, with an anticipated award date of September 11, 2026, and a production completion date of December 18, 2026. The work is being prepared by the Sasebo activity and involves replacing a grab rod (top entryway handhold) inside the exhaust duct of the No. 2 Gas Turbine, which was discovered broken at the weld during an inspection. The work location is Main Machinery Room No. One (6-65-0-E), and the grab rod is specified as 3/4 inch OD by 36 inches long, manufactured from Inconel 625 per ASTM B446.
The Performance Period of Performance runs from October 13, 2026, to January 29, 2027. Key requirements include cleaning affected areas to gas/oil-free condition per 29 CFR 1915 Subpart B, obtaining a Marine Chemist certificate, removing and installing the replacement grab rod using detailed technical drawings, conducting visual inspection by Ship's Force, and witnessing an operating pressure test of the exhaust duct with zero allowable leakage. Government-furnished materials include the Inconel 625 rod, MIL-RN625 welding rod, gasket sheets, glass cloth, insulation materials, adhesives, sealing compounds, and fasteners (screws, nuts, washers) for manhole cover contingency repairs. The work includes FOD (Foreign Object Damage) protection procedures for the No. 2 GTM exhaust collector with strict safety protocols, requiring verification by Code S211/285 representatives and compliance with multiple reference standards including Joint Fleet Maintenance Manual and Marine Gas Turbine Operating Instruction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - N6264926Q0523.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ShipIHULL NO. Ship/HULL NAME ICN: Rev: Key Op:
LHA -7 USS TRIPOLI
JON. 380JA25901 AOl
TITLE:
Grab Rod Inside Exhaust Duct of No.2 Gas Turbine; replace
JOB SPECIFICATION
Anticipated Award Date: Production Completion Date: PREPARING ACTIVITY:
SASEBOPOP Start Date: POP End Date:
PREPARED BY: CODE DATE
M.HISATOMI P_HI 1/17/2026
APPROVED BY: ( A CODE
S.MURAKAMI S225
CONCURRED BY: CODE
T.TAKAMASU S234
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
'?*)I E7&X B1 <:vc) Ai US Navy
Marine Gas Turbine Inspector
DESCRIPTION:
JSN(S): EMDI -1173 CASREP
SIF CONTACT: BARBER GSMI I ACOSTA GSCS CWP # CCNS #
0. PERKINS
Approved by S3001S900 Date: 7' /' AVL: 6A1
LWC:
Work Completed
SlForce: Rate: Date:
Ship Supt: Date: SRF CONTROL NO.:________________________
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
Sakura.Yamaguchi.ja Typewritten Text 09/11/2026
Sakura.Yamaguchi.ja Typewritten Text 10/13/2026
Sakura.Yamaguchi.ja Typewritten Text 12/18/2026
Sakura.Yamaguchi.ja Typewritten Text 01/29/2027
Sakura.Yamaguchi.ja Cross-Out
Sakura.Yamaguchi.ja Typewritten Text 7J1
Sakura.Yamaguchi.ja Cross-Out
Sakura.Yamaguchi.ja Typewritten Text
38DJ225901
Sakura.Yamaguchi.ja Typewritten Text All pages of this documents will change ICN from 38DJA25901 to 38DJ225901 written as shown on this cover sheet. All Pages of this documents will change avail from 6A1 TO 7J1 where written as shown on this cover sheet.
Sakura.Yamaguchi.ja Typewritten Text 1301398190
1. SCOPE:
1.1 Title: Grab Rod Inside Exhaust Duct of No.2 Gas Turbine; replace
1.2 Location of Work:
1.2.1 Main Machinery Room No. One (6-65-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), Top Entryway Grab Rod Inside the Exhaust Duct of No.2 Gas Turbine Located in 1.2.1, 3/4 Inch OD by 36 Inches Long (FN-23 of 2.2), Inconel 625, ASTM B446, See DET 3-F and 5-B of Sheet-16 of 2.2.
2. REFERENCES:
2.1 Standard Items (FY26)
2.2 259-8503003 Rev-A, Gas Turbine Comb Air Exhaust Machinery Room No.1 and Above
2.3 LM2O-DJA25901-EM011173, No.2 GTM Exhaust Collector FOD Protection for Grab Rod Repair in Exhaust Duct (Enclosed)
3. REQUIRENTS:
3.1 Prior to starting this work item, consult Ship's Force to verify ship's operating condition if each reusable cover installation is required when Ship's Force operate each affected component for "OPERATING PRESSURE TEST" specified in 3.3.4.
(V) "REPORT"
3.1.1 Submit one legible condition report listing result of the requirement in 3.1 to SUPERVISOR.
3.2 Clean each area affected by this work item to a gas/oil free condition, in accordance with 29 CFR 1915 Subpart B.
CV) !IREPORT!I
3.2.1 Submit one legible condition report of the Marine Chemist certificate to SUPERVISOR, including certified location.
3.3 Remove each existing grab rod and install each grab rod to replace each grab rod listed in 1.3.1, using DET 3-F and 5-B of Sheet-16 of 2.2 for guidance.
3.3.1 Accomplish the requirements of 2.3. (See.4.2.)
III L.
Grab Rod Inside Exhaust Duct of No.2 Gas Turbine; replace
Sakura.Yamaguchi.ja Typewritten Text
FY27
Sakura.Yamaguchi.ja Typewritten Text S.Yamaguchi
Sakura.Yamaguchi.ja
07/28/2026
Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:
LHA-7 USS TRIPOLI
JON. 380JA25901 AOl
TITLE:
Grab Rod Inside Exhaust Duct of No.2 Gas Turbine; replace
3.3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column 5, Lines One through 7.
3.3.3 Witness visual inspection of replaced grab rod listed in 1.3.1 to be conducted by Ship's Force.
(V) "REPORT"
3.3.3.1 Submit one legible condition report listing results
of the requirements of 3.3.3 to SUPERVISOR.
(V) (G) "OPERATING PRESSURE TEST"
3.3.4 Witness an operating pressure test of exhaust duct of No.2 Gas Turbine to be conducted by ship's force to verify tightness of each mechanical joint of manhole cover, until the specified criteria is verified. Allowable leakage: None. - S130
4. NOTES:
4.1 Initial Condition - Top entryway grab rod inside the exhaust duct of No.2 gas turbine had been broken at the weld.
4.2 Point of Contact of Gas Turbine Inspecter is S280 (Former S21l) Mr.
C.Ellis, Extension 252-3294 for Paragraphs A.2, C-1.1, D.3 and P.1.2 of 2.3.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 SRF will provide following material.
MATERIAL_LIST
M
QTY
ITEM PC REF I STOCK I-IAZ DOC REQD/ PARA
NO. NO NO C DESCRIPTION NUMBER MA1 NO. UNIT NO.
001 M ROD,3/4"OD, INCONEL625,ASTM -B446GR-1 9B9530 N 6013E221 10/FT 3.3
SA4921318
002 M
WELDING ROD, MIL-RN625, 1/16 X 12, MIL-E- 9B 3439 N
2/BX
3.3
21562, BX/1OLB SAPTAOO65
003 M GASKET SHEET, THERMICULITE, CRES 316 9B 5330 N
2/SH
3.3
CORE, MAX SVCE TEMP 1450 F, FLEXITALLIC, SAPKIO521
STYLE 815, 1/8"THKX6O"X60"
FOR MANHOLE GASKET
004 M GLASS CLOTH, HIW, MIL-C-20079 (5OYD/RO)
9B 8305 N
6009B008
1/RO
001487364
005 M
INSULATION FELT, 1"THK, MIL-DTL-32585 9B 5640 N
6009E900
1/RO
TYPE-I FORM-3 (FORMER MIL-I-16411 5A9607458
TYPE2), 5'W X 45'
006 M ADHESIVE WHITE, MIL-A-3316 CL-i GRADE A
9B 8040 Y
1IGL
002738708
007 M
SEALING COMPOUND, MIL-C-i 9565 TY-Il, 9B 8030 Y
6014B822 iIGL
VAPOR BARRIOR 001742588
008 M INSULATION CEMENT, FINISH, SS-C-160 9Q 5640 Y
6009B800
2IBG
(45LB/BG) 002264540
VA
Ship/HULL NO. Sfflp/HULL NAME ICN: Rev: Key Op:
LHA-7 USS TRIPOLI JON. 380JA25901 AOl
TITLE:
Grab Rod Inside Exhaust Duct of No.2 Gas Turbine; replace
MATERIAL_LIST
M
QTY
ITEM PC REF I STOCK HAZ DOC REQDI PARA
NO. NO NO C DESCRIPTION NUMBER MA1 NO. UNIT NO.
009 M INSULATION CEMENT, HIT, SUPERTEMP 1900, 9Q 5640 Y 6009E950 2IBG -
MIL-C-2861, 45LB/BG LLN047969
010 M WIRE NETTING (HEXAGONAL POULTRY 9B 5335 N
1/RO
NETTING), 1" MESH SPACING, 20 GAUGE, SAPH10214
48"WIDE X 50' ROLL, GALVANIZED STEEL,
ASTM-A-390, DEACERO PIN 6424
011 M GLASS THREAD, MIL-C-20079, SLI3000YD
9B 8310 N
6009B009
1ISL
000851711
012 M
WIREMESH, CRES(4'XlOO'/EA) 9B5335 N
6009B011
1/EA
005989404
CONTINGENCY MATERIAL FOR MANHOLE
FASTENER
013 C SCREW, 1/2-13X 1 -1/4"LG, HEX HEAD,
9B 5306 N
6008E206
30/El
INCONEL 718 5APH10489
014 C NUT, 1/2-13, HEX HEAD, INCONEL 718 9B 5310 N
6008E205
30/El
SA492 1280
015 C
WASHER, FLAT, 1/2", CRES 316 9B 5310 N
6009B021
30/EA
015367272
'A
GAS TURBINE MAINTENANCE PROCEDURE
TITLE
NO.2 GTM EXHAUST COLLECTOR FOD PROTECTION FOR GRAB ROD REPAIR
IN EXHAUST DUCT
NUMBER
LM2O-DJA25901-EM011173
ORIGiNATOR SAITO
APPROVAL
DATE ,'/Yy/, SHIP / HULL USS TOBJPOLI LHA-7
COMPONENT
NO.2 GAS TURBINE MODULE (GTM) EXHAUST
COLLECTOR
WORK ORDER 38DJA25901/EM01 -1173
TEAM LEADER N/A
C285 REPRESENTATIVE
(a) COMUSFLTFORCOM1NST 4790.3 JOINT FLEET MAINTENANCE MANUAL
REVISION D CH-5
(b) NAVSHIPREPFACINST 9222.1E MARINE GAS TURBINE OPERATING
INSTRUCTION
(c) NAVSHIPREPFACINST M-5100.8 CH-3 SAFET AND HEALTH PROGRAM MANUAL
(d) LM2500 GAS TURBINE BULLETIN MIL-L-23699 GAS TURBINE SYNTHETIC LUBE
(GTB) NO.32 OIL GUIDANCE
(e) S9234-DN-MMC-030 REV 3 LM2500+ GAS TURBiNES CORRECTIVE
SHIPBOARD MAINTENANCE
ENCLOSURE
NONE
LM2O-DJA25901-EM011173 Page 1 of4 i"g JON: 38DJA25901 -AOl
A GENERAL INFORMATION:
A. 1. This Gas Turbine work item requires a Maintenance Procedure (MP) in accordance with references (a) and(b).
A.2. If discrepancies between the TWD and MP are identified or you would like to modify this MP, contact Code S21 1/285 for resolution prior to proceeding.
A.3. If this work item is contractor work, the contractor's supervisor or SRF-JRMC Work Integration Manager (WIM) can sign off the Work Center Supervisor (WCS) steps.
B. WARNINGS:
B. 1. Extreme caution shall be taken during all operations inside or around intake trunk, engine module and exhaust trunk to prevent personal injury. Ensure safety precautions outlined in the applicable technical manual and SRF-JRMC instruction in accordance with reference (c) to all personnel working inside or around intake trunk, engine module and exhaust trunk.
B.2. MIL-PRF-23 699 synthetic lube oil is toxic and may cause severe health problems if handled improperly.
Use reference (d) as guidance for proper handling.
B.3. Do not use markers that contain graphite or fluorocarbon for marking. Use MARKS-A-LOT blue or black markers.
B.4. Ground arc welding equipment to the component being welded as close as possible to the weld area to prevent damage Gas Turbine Engine (GTE) bearing and races.
B.5. Objects left in the module can cause severe damage to the gas turbine. Comply with all precautions outlined in reference (e) paragraph WP_002.
C. CAUTIONS:
C. 1. Prerequisites:
C. 1.1. Code S2 11/285 will assign a representative. Code S21 1/285 will enter his/her name on the cover page of this MP and assigned person will sign acknowledging the assignment.
C. 1.2. Code S2 11/285 representative will brief the work center on the SAFETY requirements outlined in accordance with reference (e) prior to starting work.
C.2. Module/inlet plenunilintake/exhaust entering, exiting and working precautions.
C.2.1. Prior to entering the Gas Turbine Engine (GTE) module, comply with the following items.
a. Ensure GTE is tagged out to starting work.
b. Notify CCS prior to entering GTE module.
c. Check fire extinguishing system is disabled.
d. List tools and materials taken into the module.
e. Do not leave module open and unattended.
C.2.2. Prior to exiting the GTE module, comply with the following items.
a. Clean the GTE module.
b. Ensure no foreign materials and tools are left inside module.
C.2.3. During work inside the GTE module, comply with the following items.
a. Do not step on items within the module.
b. Cover appropriate area to prevent from dust and damage.
c. Wear safety equipment.
LM2O-DJA25901-EMO11 173 Page 2 of4
JON: 38DJA25901-AO1
d. Empty pockets and take off wristwatches, rings and any loose items.
C.2.4. Prior to entering the inlet plenum and intake, comply with following items.
a. Empty pockets and take off wristwatches, rings and any loose items.
b. List tools and materials taken into the intake.
c. Do not leave intake access open and unattended.
C.2.5. Prior to exiting inlet plenum and intake, comply with following items.
a. Clean the intake system thoroughly.
b. Account for all tools, parts, and other material brought into the area.
C.2.6. Prior to entering exhaust, comply with following items.
a. Ensure conducting gas free inspection.
b. Wear and use PPE items.
c. Do not leave exhaust access open and unattended.
C.2.7. Prior to exiting exhaust, comply with following items.
a. Clean the exhaust system thoroughly.
b. Ensure no foreign materials and tools are left inside exhaust area.
D. PREPARATION:
D. 1. Open manhole cover plate at right above NO.2 Gas Turbine Module (GTM) for accessing exhaust collector inside.
D.2. Install Foreign Object Damage (FOD) protection on NO.2 GTM exhaust collector prior to starting work.
D.2 (V) WCS
D.2. 1. Cover or plug following component tightly with proper material.
a. Engine exhaust outer cone opening
b. Drain holes and vent holes of the collector casing
c. Air-oil separator drain opening
Date
d. Module cooling air ejector opening between exhaust duct and collector extension
D.3. Verify installed FOD protection on step D.2.
D.3(V) CodeS2ll/285
Date
E. ACCOMPLISHING WORK:
E.l. Perform subject work described on the TWD.
CAUTION
If any damage is found on installed protections, STOP all work and re-seal the covers.
CAUTION
Do not install scaffolding using exhaust collector gusset.
CAUTION
LM2O-DJA25901-EM011173 Page 3 of4 1/-) JON: 38DJA25901 -AOl /
Ground the welding equipment to the component as close as possible to the welding area to prevent damaging the engine bearings and races.
F. RESTORATION:
F. 1. Restore NO.2 GTM exhaust collector.
F.l(V) WCS Date
F.l.l. Clean work boundary by vacuuming and wiping.
a. Remove installed protections as necessary.
F.l.2. Conduct a closeout inspection ofNO.2 OTM exhaust collector inside with Ship's Chief Engineer or personnel designated by Chief Engineer.
P.1.2(S) Ship's Force
Date
F.1.2(V) CodeS2ll/285__________________ Date
F. 1.3. Close exhaust collector access manhole.
F. 1.4. Comply with reference (e) paragraph WP_002 for performance.
( CLOSE OUT OF MP AN]) WORK ORDER:
G. 1. Attach the completed MP to the associated TWD and route package for closure.
LM2O-DJA25901-EM011173 Page 4 of4 JON: 38DJA25901 -AOl
10/15/20257:23:13AM
2 Kilo Report START END
Ship: USSTR'OLI LHA 7 0/21 05/18/2026
Section I. Identification ¯ Ship's UIC 2. W/C 3. JSN 4. APL/AEL
27501 EMOI 1173 XCOMPARTMNT
Ship's Name 5. Noun Name 6. WD 7. ST 8. CS 9. DF 10. 2L 11. QA
USS TRIPOLI UPTAKE SPACE 4-6 4 0 7 6 0 0
¯ Hull No. 13. ldent/Ser 14. EIC
7 NONE A905000
5. Safety Hazard 16. Location 17. When Discovered Date
4-69-1-0 10/06/2025 12:00AM
Configuration Change * * For INSURV Use *
I. Alterations 19. 20. INSURV No. 21. Suf 22. U 23. S 24. P/F
Section II. Deferral Action S/F Mhrs Exp 26. Defl Dt 27. 5fF Mhrs Rem 28. Deadline Dt
25.00 10/6/2025 12:00:00AM 0.00 5/18/2026 12:00:00AM
Section III. Completion Action Act Tkn 30. S/F Mhrs 31. Compl Date 32. Mnt Time 33. TI 34. Mtr Rdg
Section IV. Remarks/Description Remarks/Description
WHILE CONDUCTING H&J INSPECTION OF NR2 GAS TURB[tlE--SIF DISCOVERED THAT THE TOP ENTRYWAY HANDHOLD INSIDE THE EXHAUST HAD BEEN BROKEN AT THE WELD. rrr In * PTh I_N PTfln fl T$4F MJ -1n --XXX REQUEST OUTSIDE ACTIVITY REPAIR HANDHOLD. SAFETY
CSMP Summary 37. Spec Pur A. B. C. D. E. F. G. H. I. J. K. L.
BROKEN ENTRYWAY HAND HOLD
First Contact 39. Rate 40. Second Contact 41. Pr 42. TA 43. IPN 44. IUC 45. TYC
BARBER GSM1 ACOSTA GSCS 4 1 1
Section V. Supplementary Information Blprnts, Tch Mnls, Plans (on board - y) 47. Pre-arrival/Arrival Conference Rmks rE ect Manager / Port Engineers comment:
IN : 259A10
For Official Use Only
ICN 38DJA25901-AO1
DATE
PR!
CASREP
SPEC DUE JAN
[ROLL-UP OF
S.YAMAGUCHI / S310
U 202fi
Sakura.Yamaguchi.ja Typewritten Text 7J1
Sakura.Yamaguchi.ja
38DJ225901-A01