1-Documents to be submitted with Bid.pdf
PDF 372 KB Posted
- Solicitation number
- Not on record
- Issued by
- York County, Pennsylvania
About this file
This document is a bid submission package for the City of York, Pennsylvania, containing instructions to bidders, proposal forms, certifications, and special provisions for a public works construction project. The City of York seeks sealed bids submitted electronically via the PennBid Program by 10:00 AM on August 11, 2026, with public opening and electronic reading occurring simultaneously. The project involves bituminous paving work with approximate quantities subject to change based on field conditions, to be completed within a contract period of three calendar days from the notice to proceed. Bidders must examine all plans, specifications, and the project site prior to submission. A certified check or bid bond equal to 10% of the proposal amount, made payable to the City of York, must accompany each bid as a proposal guarantee and will be forfeited if the contractor fails to comply with proposal requirements. Contractor James Gross of the City of York's Department of Public Works serves as the municipal contact, with offices located at 101 South George Street, York, PA 17401.
The contractor must provide performance and payment bonds in accordance with the Public Works Contractors' Bond Law of 1967, comply with prevailing wage requirements and non-discrimination laws, and furnish materials including Form CS-4171 Certificate of Compliance and TR-465 Daily Bituminous Mixture Certification. Special provisions require the contractor to provide traffic control and safety devices, submit oil samples from each distributor truck witnessed by municipal representatives, provide stone samples for testing, obtain design approval five days prior to work commencement, notify residents of pending work, and complete all testing in accordance with PennDOT Specification Form 408. The contractor is responsible for defects occurring within one year of application. Bidders must complete a Public Works Employment Verification Form confirming E-Verify compliance, submit an Anti-Collusion Affidavit, and comply with all Commonwealth of Pennsylvania and United States laws regarding human relations, equal opportunity, and non-discrimination in employment. Liquidated damages apply at a rate of $500 per calendar day for work not completed by the deadline, and municipality reserves the right to limit work completed and procure materials best suited to project requirements.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MS-944 (7-09)
TIME
, on the above Letting Date.
TIME
PROPOSALS MUST BE SUBMITTED
ELECTRONICALLY VIA PENNBID, THE ELECTRONIC
BID MANAGEMENT SYSTEM.
and specifications on file at as well as the supplements
The contractor proposes to furnish and deliver all materials ( including Form CS-4171, CERTIFICATE OF COMPLIANCE and/ or TR-465 DAILY BITUMINOUS MIXTURE CERTIFICATION ) and to do and perform all work on the following project as more specifically set forth in the Schedule of Prices (Attachment), in accordance with drawings and special requirements contained herein and/ or attached hereto and current PennDOT Specifications (Publication 408), except (a) bidders need not be prequalified by PennDOT
INSTRUCTIONS ON PAGE 4
Bids will be electronically opened and read at
DATE
THIS PROPOSAL INCLUDES
INSTRUCTIONS TO BIDDERS
ADDRESS
A. DEPOSIT OF PROPOSALS.
Electronic Proposals will be received on or before
All bids shall be submitted electronically via the PennBid Program for letting on
PROPOSAL AND CONTRACT
( WHEN EXECUTED )
calendar days.complete all work within
3 Accompanying this proposal is a certified check or bid bond in the amount of made payable to the municipality as a proposal guarantee which, it is understood, will be forfeited in case the contractor fails to comply with the requirements of the proposal.
B. PROPOSAL OF:
The only person interested in the proposal as principal (s) is (are):1
2 None of the above persons are employees of the municipality.
3 This proposal is made without collusion with any other person, firm or corporation.
p ( ), p ( ) p q y (Sec.102.01), and (b) Volumetric testing of bituminous paving materials is not required (Sec. 409).
If designated as the successful bidder, the contractor will begin work on the date specified in the notice to proceed, or as otherwise provided in the special requirements, and will see attachment 1-A
-1-
It is hereby certified as follows:
NAME / ADDRESS OF CONTRACTOR
CONTRACTORS CERTIFICATION
All plans and specifications referred to above and the site of the work have been examined by the contractor. The contractor understands that the quantities indicated herein are approximate and are subject to change as may be required; and that all work is payable on the basis of the unit price listed on the Schedule of Prices. (Attachment 1).
Director of Public Works
MUNICIPALITY (NAME & TYPE)
City of York
James Gross
101 South George Street York, PA 17401
10:00 AM
10:00 AM
ten (10%)
August 11, 2026
5 The contractor will comply with all requirements of the laws and implementing regulations of the Commonwealth of Pennsylvania and the United States relating to human relations equal opportunity and non discrimination in employment and will human relations, equal opportunity and non-discrimination in employment, and will pay to workmen employed in the performance of the contract the wages to which they may be entitled.
The contractor will provide the municipality with a performance bond, conditioned th f ithf l f f th t t i d ith th lupon the faithful performance of the contract in accordance with the plans, specifications and conditions thereof, and a payment bond, conditioned on the prompt payment of all material furnished and labor supplied or performed in the prosecution of the work, in accordance with the Public Works Contractors’ Bond Law of 1967; and an affidavit accepting the provisions of the Workmen’s Compensation Act of 1915, as amended.
BY: DATE:
TITLE:
CONTRACTOR
DATE:
TITLE:
TO BE EXECUTED ONLY IN THE EVENT THE ABOVE PROPOSAL IS ACCEPTED
WITNESSED OR ATTESTED BY:
MUNICIPALITY
BY:
ACCEPTED ON :
DATE
TITLE:
BY:
TITLE:
BY:
TITLE:SEAL
TITLE:
ATTESTED BY:
-2-
SEAL
City of York
Traffic Control and Safety Devices to be provided by the Contractor.
Delivery tickets for all materials.
CS-4171 Certificate of Compliance and/ or TR-465 Daily Bituminous Mixture Certification required for all materials.
five working days prior to start of project.
. After per calendar day.the rate of $ )prior to start of project.municipalityRoadway to be power broomed by (contractor .)municipalityExcess material to be removed by (contractor
Municipality to inspect project.
Need Bill of Lading for each shipment of bituminous material per Section 702.1(c) of Specifications 408.
Tack Coat required per Section 460, or 409 for superpave, of Specifications 408 and is incidental to paving item unless noted otherwise.
Prime Coat required per Section 461 of Specifications 408.
Bituminous Seal on all abutting pavement and curbs required.
Saw cut or Milled Paving Notch required and incidental to paving item unless noted otherwise.
Scratch/ Leveling Courses to be placed at the discretion of appointed inspector(s).
Municipality reserves the right to limit work completed.
Taper pavement the last 3 feet to curb.
For FOB Source bids, hauling distance will determine selection of bid award.
Municipality reserves the right to procure material which best suits their requirements after all bids and items are reviewed.
Incidental Preparation and clean up required. ( Project Construction Materials ) The municipality reserves the right to make an award on the basis of the aggregate total for all like items on which quotations are received.
Provide design, which meets Specifications Form 408 to the municipality 5 days prior to start of work.
Contractor responsible for defects that occur within one year of applications.
Contractor required to review proposed project with Municipality’s Representative prior to bidding.
Oil Samples required from each distributor truck by contractor (1) one quart : A.M. & P.M. and witnessed by municipality and retained by municipality. (Oil samples must be placed in an approved type container that is compatible with oil sample.)
At least three random stone samples to be taken by contractor on project site witnessed by municipality and retained by municipality.
Complete all testing in accordance with Specification Form 408 Section 409 except for superpave volumetric testing.
Notice to Proceed will be the date of Contract acceptance.
Final Completion Certificate & Notice of Completion required.
Future award of Contract will be based on quality of work as determined by the municipality.
Contractor, notify all residents of pending work to be performed.
My signature signifies that I have read and understand the above special provisions to this contract, and by being authorized by this company to act as their authorized representative, and on their behalf hereby agree to adhere to any and all of the provisions pertaining to this contract.
Date
Notify the Municipality
(5-06) SPECIAL PROVISIONS TO CONTRACT MS-944 ( Attachment 1-A )
CONTAINS IMPORTANT INFORMATION FOR THE CONTRACTOR
The Prime Contractor and subcontractors must comply with all of the following provisions that are marked with an "X".
( Maintenance and Protection of Traffic to comply with current MUTCD, Publication 212 and Publication 213.)
Company Municipality
Contractor's Representative Municipality's Representative Date
Work to be completed on or before Liquidated damages apply at
Full width pavement with one pass required.
x x x x x x x x x x x x x x x x x x
D-7126 ( 7-09 )
County
Municipality
Project Number
State of Fed. Project No.
( If Applicable )
The undersigned deponent deposes and says that he is the of the
County of
ANTI-COLLUSION AFFIDAVIT
competitive bidding in connection with such contract.
into any agreement, participated in any collusion, or otherwise taken any action in restraint of free
Company; that he is authorized to make this
Publication 408, as amended and that the said company has not, either directly or indirectly, entered affidavit on behalf of said company in compliance with section 102.06 (e) of Department Specifications, BY
Sworn to and subscribed before me the undersigned notary public this day of , .
Notary Public
My Commission expires
(Contractor)
York
City of York
113.083.24
Street Address 2
City State Zip Code
Doing Business As:
(if different from Legal Name)
Commonwealth of Pennsylvania Public Works Employment Verification Form
Complete and return the form to the contracting Public Body prior to the award of the contract.
Company Legal Name: ___________________________________________________________
Mailing Address: ______________________________________________________
Check one: Contractor Subcontractor
Contracting Public Body: _________________________________________________________
Contract/Project Number: ________________________________________________________
Project Description: _____________________________________________________________
Project Location: _______________________________________________________________
Date Enrolled in E-Verify (MM/DD/YYYY): ___________________________________________ As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of today’s date, __________________________, our company is in compliance with the Public Works Employment Verification Act (‘the Act’) through utilization of the federal E-Verify Program (EVP) operated by the United States Department of Homeland Security. To the best of my/our knowledge, all employees hired are authorized to work in the United States.
It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.
I,____________________________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.
Authorized Representative Signature Date of Signature
Printed Name: _________________________________________________________________
Phone Number: ______________________ Email: ____________________________________
Street Address 1
BB-1
BID BOND
KNOW ALL MEN BY THESE PRESENTS that we, (hereinafter called the “Principal”) as Principal, and a corporation authorized to transact business in Pennsylvania, and having its principal office at
(hereinafter called the “Surety”) as surety, are held and firmly bound unto
(hereinafter called the “Obligee”) as Obligee, in the sum of
DOLLARS ($ ),
lawful money of the United States of America; for the payment of which we bind ourselves, and each of our respective heirs, legal representatives, successors, and assigns, jointly and severally, by these presents, on this day of , 20 .
WITNESSETH THAT:
WHEREAS, said principal is herewith submitting to the Obligee a proposal to perform the contract work for the Obligee’s, proposed pursuant to plans, specifications and other Contract Documents incorporated into said proposal by reference; and it is a condition of the Obligee’s receipt and consideration of said proposal that the proposal be accompanied by bid security to be held by the Obligee on terms embodied herein.
THEREFORE, the condition of this obligation is that if said principal shall furnish a performance bond, payment bond, and insurance certificates to the Obligee upon the Obligee’s delivery to the principal of fifteen days notice of intention to accept his proposal and to make a formal award of contract to him, and shall enter into such contract in all respects as required by said Contract Documents, then this obligation shall be void; but otherwise it shall remain in full force, and the principal and surety will pay to the Obligee the difference between the amount of the Principal’s accepted bid(s) and any higher amount for which the
Obligee may contract for the required work, plus any advertising, architect’s, legal and other expenses
BB-2
incurred by the Obligee by reason of the default; provided, however, that the obligations of the Surety hereunder shall not exceed the amount of this bond together with the interest.
IN WITNESS WHEREOF, the Principal and Surety, intending to be legally bound, have executed this bond the day and year aforementioned.
(Individual Principal)
(SEAL)
Witness: (Signature of Individual)
Trading and doing business as
(Partnership Principal)
(SEAL)
(Name of Partnership) Witness:
By:
(SEAL) (Partner)
(Corporation Principal)
(Name of Corporation)
ATTEST:
Title or (if appropriate)
*By:
(Authorized Representative) Witness or Attest:
*Attach appropriate proof, dated as of the same date as the Bond, evidencing authority to execute in behalf of the Corporation.
(Corporation Surety)
Witness or Attest:
**By:
Title
BB-3
the Bond, evidencing the authority of the Attorney-In-Fact to act in behalf of the Corporation.
**Attach an appropriate power of attorney, dated as of the same date as
(CORPORATE SEAL)
| Company Legal Name: |
| Doing Business As: |
| Street Address 1: |
| Street Address 2: |
| City: |
| State: |
| Zip Code: |
| Contractor: Off |
| Subcontractor: Off |
| Contracting Public Body: |
| ContractProject Number: |
| Project Description: |
| Project Location: |
| MM/DD/YYYY: |
| Today's Date: |
| Name of Authorized Representative: |
| Printed Name: |
| Phone Number: |
| Email: |
File details come from the government source that posted it. Updated .