This Request for Proposals (RFP) is issued by the City of Bethlehem, Pennsylvania, in partnership with Northampton County, seeking qualified third-party Electric Vehicle Supply Equipment (EVSE) developers, owner-operators, and technology vendors to evaluate, design, permit, finance, construct, own, operate, and maintain National Electric Vehicle Infrastructure (NEVI) Level 2 (L2) and Direct-Current Fast Charger (DCFC) stations at municipal properties. The City, representing over 75,000 residents, aims to expand public EV charging infrastructure across diverse municipal properties including downtown business corridors, public parks, street parking zones, and community facilities to support its goal of reducing community transportation emissions by at least 30% by 2030. Vendors are encouraged to propose optimal charging technologies and power levels that provide the best overall value, usability, and financial viability for each proposed site. The RFP document establishes the framework for evaluating and scoring proposals based on technical merit, financial structure, operational capability, and alignment with municipal sustainability objectives, though specific response deadlines, site visit schedules, bidders' conferences, and contract award dates are not detailed in the summary provided.
The City seeks vendors capable of assuming responsibility for project financing, permitting, construction, and long-term operation and maintenance of EVSE infrastructure, indicating a turnkey partnership model rather than traditional municipal procurement. As part of its climate action and sustainability planning strategy, Bethlehem is leveraging funding opportunities including the federal NEVI program to advance equitable public charging infrastructure accessible to residents, commuters, visitors, and commercial fleets. The initiative prioritizes financial viability and operational sustainability, with vendors expected to demonstrate experience in EV infrastructure development, regulatory compliance, community engagement, and ability to deliver robust charging networks across multiple municipal sites.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Bethlehem
REQUEST FOR PROPOSALS
For
Electric Vehicle Supply Equipment (EVSE) Infrastructure
Development, Investment, and Operations Partnership
(NEVI and Non-NEVI)
Issued: October 16th, 2026
Submittal Deadline: November 17th, 2026
Contact Person: Sarah DeGrendel
Sustainability Manager
City of Bethlehem
10 E. Church Street
Bethlehem PA 18018
1.0 INTRODUCTION
The City of Bethlehem, Northampton County, Pennsylvania (“the City”), is seeking formal, competitive proposals from qualified third-party Electric Vehicle Supply
Equipment (EVSE) project developers, owner-operators, and technology vendors
("Selected Vendor") to evaluate, rank, design, permit, finance, construct, own, operate, and maintain National Electric Vehicle Infrastructure (NEVI)- Level 2 (L2) and/or
Direct-Current Fast Charger (DCFC) stations at municipal properties.
The City, which is home to over 75,000 residents, is a vibrant, historically rich, and growing community spanning both Northampton and Lehigh counties. Known for its industrial heritage, dynamic commercial districts, higher education institutions, and dense residential neighborhoods, Bethlehem is committed to advancing sustainable urban infrastructure and improving community-wide quality of life.
As part of its long-term climate action, sustainability, and municipal planning goals, the
City is actively pursuing the expansion of Community Charging Infrastructure to address community transportation and mobility needs:
• By expanding robust public charging networks, the City aims to encourage residents, local commuters, visitors, and commercial fleets to transition to hybrid and electric vehicles (EVs). This initiative is a critical strategy to help Bethlehem reach its goal of reducing community transportation emissions by at least 30% by
2030.
• The City recognizes that widespread adoption of clean transportation requires equitable and accessible charging infrastructure across diverse municipal properties including downtown business corridors, public parks, street parking zones, and community facilities. To achieve this, Vendors are encouraged to propose the optimal charging technologies and power levels (such as Level 2 or
Direct-Current Fast Charging) that provide the best overall value, usability, and financial viability for each proposed site. The City will evaluate and score power levels and proposed technology models as part of the overall selection criteria to ensure all community members have reliable charging options.
The City seeks creative and thoughtful proposals from Respondents regarding charger type (L2 and/or DCFC), plug count, charger layout, and user experience. Respondents are encouraged to take into account parking lot use cases, total amount of parking, regional
EV usage patterns, and requirements of funding assistance programs such as NEVI.
Respondents’ designs should also be tailored to the strengths of their particular technology, customer service, and business models.
Under this Third-Party Owner/Operator model, the City of Bethlehem will not act as the primary grant applicant, facility owner, or capital financier:
• The Selected Vendor assumes full financial, technical, and legal responsibility for submitting grant applications to the Pennsylvania Department of Transportation
(PennDOT) NEVI Program (and/or relevant federal/state funding rounds), providing the mandatory minimum 20% non-federal cost match, paying all utility interconnection costs, and handling long-term operations and maintenance.
• The City’s administrative participation is strictly limited to providing site control through a formal Site Host / Lease Agreement and issuing official Letters of
Support to accompany the Selected Vendor’s grant applications. Zero municipal capital expenditures or ongoing administrative costs are anticipated or required.
• The Selected Vendor shall compensate the City through a structured commercial arrangement (Revenue Sharing Agreement, parking space lease, or other form of compensation from the Contractor to the City).
2.0 INQUIRIES
All questions or clarifications about the meaning or intent of the Request for Proposals are to be submitted electronically via the “Messages, Public Q&A” feature within
PennBid before November 3nd, 2026. Responses to all inquiries will be issued to all interested parties in PennBid by November 10th, 2026.
3.0 SCOPE OF WORK
The purpose of this RFP is to solicit project proposals for a charging station project utilizing the PennDOT East Region distribution of the National Electric Vehicle
Infrastructure (NEVI) Community Charging Funding Opportunity. The City desires to be a site host for this opportunity. The following list includes, but may not be limited to, the required tasks that the successful vendor will be expected to complete:
1) Environmental - Complete the NEVI environmental documentation required under NEPA. Conduct any additional environmental studies that may potentially be required (ex: environmental review, CE exception, etc.).
2) Utility- Utility coordination and required forms (commercial interconnection application form, single-line diagram, load schedule, etc.) as required.
3) Design – Any survey work/Federal Highway Administration NEVI requirements.
4) Reviews - Constructability, Contract Management, NEPA Compliance, NEVI reporting.
5) Permitting- Obtain any required permits (ex: electrical, zoning, etc.).
6) Meetings - Attend periodic virtual project status meetings with the City
Rather than locking into fixed sites prior to market evaluation, the City presents a broad slate of candidate city-owned locations. Responding vendors are required to evaluate, rank, and "filter" these candidate locations based on grid capacity, commercial viability, proximity to alternative fuel corridors/commercial nodes, and technical feasibility:
1. Stefko & E. Washington Ave Lot – Parking lot at Stefko Blvd & E. Washington
Ave.
2. 119–121 W. 3rd Street – Municipal parcel/parking area.
3. Spring Street Parking Lot – Public parking facility.
4. 920 Wyandotte Street – Property/parking lot, Bethlehem, PA 18015.
5. Skate Plaza Parking Lot – 1325 Steel Ave, Bethlehem, PA 18015.
6. Rose Garden Park Street Parking – Designated Street parking along 8th Avenue at
Rose Garden Park.
7. Kings Mansion Park – Designated parking/access area.
8. Memorial Pool Parking Lot – 345 Illick's Mill Rd, Bethlehem, PA 18017.
9. Easton Avenue Street Parking – Designated public street-side parking zones.
3.1 PROPOSAL FLEXIBILITY & SITE BIDDING OPTIONS
Respondents must identify a proposed charging station design for each of the locations listed in this RFP, with the option to explicitly identify a 'No Bid' response for any of these locations which Respondent proposes to omit from the charging station build-out.
For each location, Respondents should clearly identify whether the design for that location assumes a successful NEVI award. For those locations that do require NEVI, the
Respondent should identify the NEVI-compliant design features for that location.
Respondents are encouraged to propose Non-NEVI compliant stations for any or all of the suggested sites, if it were to result in a better value to the City (and a better ROI for the Vendor). There may be situations where a non-NEVI-compliant charging station project provides a better value for the City and better serves the Vendor’s business interests.
3.2 DESIGN/ENGINEERING FOR CONSTRUCTION
The Selected Vendor shall perform all necessary site evaluations, planning, design, and engineering activities required to prepare grant applications and execute turnkey construction:
• Site Evaluation & Ranking Analysis- Evaluate grid capacity with local electric distribution companies (PPL Electric Utilities / Met-Ed), traffic volume, accessibility, and site geometry across all candidate locations to determine optimal sites for NEVI submittals.
• Electrical & Utility Engineering- Prepare complete load calculations, transformer sizing, utility point-of-interconnection plans, and service upgrade requests.
• Civil & Structural Design- Develop comprehensive engineering construction documents, including equipment pad placement, conduit routing, ADA compliance, lighting, striping, physical protection (bollards), and signage.
• Technical & NEVI Compliance Guidelines - Ensure all station designs meet 23
CFR Part 680 federal guidelines and PennDOT requirements:
o Connector compatibility including CCS1 and/or NACS (SAE J3400) as mandated by grant guidelines.
o Integration of contactless payment infrastructure and accessible pay options.
• Permitting & Environmental Approvals- Prepare and submit all applications for municipal land development, zoning, building, electrical, and highway occupancy permits, as well as necessary NEPA environmental clearances.
• Respondents are encouraged to consider how the EVSE proposed for the identified locations will fill the voids in the available EVSE infrastructure throughout the City. The City also seeks to further the equitable distribution of charging plugs throughout the greater community. As applicable, respondents should ensure that their designs appropriately serve Environmental Justice Areas, historically underserved and overburdened populations, high climate change impact areas, or other disadvantaged communities. Additionally, it is desirable for designs to provide safe and comfortable access to charging for disabled drivers
(NEVI requirements may be more stringent).
3.3 GRANT REQUIREMENTS
Under this turnkey third-party framework, the Selected Vendor is responsible for procurement, grant application submission, and subcontractor bidding:
• Grant Application Bidding & Preparation- Prepare, assemble, and submit competitive grant applications directly to PennDOT for NEVI funding rounds, incorporating the City’s executed Site Host Agreement and Letters of Support.
• Capital Cost Security- Secure and guarantee 100% of the non-grant financing, including the mandatory 20% minimum local cost match and any utility/interconnection costs exceeding grant caps.
• Subcontractor Bidding & Procurement- Solicitation and procurement of qualified civil, structural, and electrical contractors.
• Compliance & Standards Verification- Ensure all bidding, contracting, and material sourcing comply with mandatory federal and state provisions:
o Build America, Buy America Act (BABA) requirements for iron, steel, manufactured products, and construction materials.
o EVITP Certification- Mandate that all electrical installation work is performed by licensed electricians certified through the Electric Vehicle
Infrastructure Training Program (EVITP).
o Prevailing Wage Rates- Adhere to federal Davis-Bacon Act wage rates or
PA State Prevailing Wage rates where applicable.
3.4 CONSTRUCTION TERM SERVICES
The Selected Vendor shall manage and execute all physical site construction, installation, commissioning, and operational handover:
• Turnkey Site Construction- Civil site work, trenching, conduit installation, concrete pad construction, bollard installation, accessibility route upgrades, line striping, and regulatory signage installation.
• Equipment Supply & Installation- Procurement, delivery, mounting, and interconnection of transformers, switchgear, charger cabinets, and dispenser heads.
• Utility Interconnection & Commissioning- Coordination with local utilities
(PPL/Met-Ed) for final service hookup, testing, inspection, safety checks, and network activation.
• Inspection & Acceptance- Secure final building and electrical inspection signoffs from the City of Bethlehem and applicable regulatory authorities.
3.4.1 CONTRACT TERM & OPERATIONAL REQUIREMENTS
The Operator must ensure that charging stations are operated and maintained in compliance with this RFP for a period of no less than five years from the initial commencement date of operation. The Respondent should identify their preferred contract term which may be needed in order to provide a suitable return on investment, which may be longer than five years. The length of the contract will be determined during negotiations with the successful Respondent(s). Additional options to renew the contract with the City may be offered at the City’s discretion.
3.4.2 OPERATIONAL DATA REPORTING
The Operator shall provide data to the City on charging station operations for each location identified in this RFP on a quarterly basis. Data to be reported on a location-by-location basis shall include the following: number of sessions, average kWh per session, average kW per session, average session time, total kWh dispensed, total amount collected from users, and total amount of time when all plugs were in use.
3.5 COMMUNITY ENGAGEMENT
The selected consultant shall assist with at least one (1) outreach event for the Bethlehem community, including creating collateral for residents, community organizations, schools, and businesses. This engagement should inform the public of progress prior to the project being constructed.
Translation Services – The selected consultant will have the ability to translate any public-facing materials from English to Spanish including the following, as necessary:
o Physical and digital materials (flyers, boards, graphics, etc.)
o WeBuildBethlehem webpage update content (platform GoVocal)1
4.0 PROPOSAL FORMAT AND CONTENT
To facilitate the review and evaluation of the proposals, all proposals should be organized using the following outline format:
4.1 STATEMENT OF QUALIFICATIONS AND EXPERIENCE
Include a brief resume of your firm’s background and expertise in projects of a similar nature. The resume shall also include names, special qualifications, and work assignments of your project staff. Include contact information for former clients for whom similar work has been performed.
Include the address and telephone number of your main office and regional or local offices from which the work is to be directed. Also list the names, addresses and telephone numbers of any sub-contractors you intend to use. State the names and
1 https://webuild.bethlehem-pa.gov/en qualifications of all persons to be assigned major project involvement, including identifying the project manager.
This letter should include:
I. a statement indicating your understanding of the work to be performed;
II. an affirmation of the firm's qualifications for professionally and expertly conducting the work as understood;
III. the firm's contact person concerning the proposal and a telephone number where that person can be reached; and, IV. a clear statement of the firm's, and/or the principals of the firm, relationship(s) with, or knowledge of any officials or employees of the City and the nature of this relationship or knowledge.
4.2 SCOPE AND SERVICES
Describe in detail your perception of the work required. Describe how your personnel, equipment, and services will be utilized to accomplish the scope of work.
4.3 TIME SCHEDULE
Provide a detailed time schedule to complete the proposed services, each major work element, target dates for necessary meetings, and dates for completion of draft and final documents including appropriate review time by the City.
4.4 FEE PROPOSAL
Submit a proposed compensation arrangement. This may include a Revenue Sharing
Agreement, parking space lease, or other form of compensation provided by the
Contractor to the City. For each location, provide the specific compensation structure proposed and the estimated revenue that will be generated for the City. Respondents should clearly delineate financial proposals for both NEVI-funded and non-NEVI deployment scenarios.
5.0 PROPOSAL EVALUATION
5.1 EVALUATION
The evaluation of all proposals will be based, but not limited to, the following criteria:
a. Completeness of the proposal, i.e., the degree to which it responds to all requirements, and requested information contained herein.
b. Project team qualification and professional experience with work of a similar character.
c. Technical approach to the project including suggested work outline and consultant’s understanding of the work scope.
d. Completion schedule and commitment to timely completion of the work.
e. Overall revenue to the City.
All proposals will be evaluated based on the technical and professional expertise and the experience of the firm, compliance with NEVI standards and requirements, community charging power level, the equipment quality, equipment uptime, and the proposed method and the procedures for completion of the work. The apparent ability of the firm to be independent and objective in performing the requested work will also be considered. All proposals will be evaluated against the minimum requirements of the National Electric
Vehicle Infrastructure (NEVI) Community Charging Funding Opportunity (if non-NEVI projects are proposed, explain how these provide better value than NEVI) as well as the following detailed evaluation criteria:
A. Technical Expertise and Experience
The technical expertise and experience of the firm will be determined by the following factors:
1. The overall experience of the firm in conducting similar work that is to be provided to the City - include any experience with City facilities and other municipalities.
2. The expertise and professional level of the individuals proposed to conduct the work for the City.
3. The clarity and completeness of the proposal and the apparent general understanding of the work to be performed.
4. The amount of and brief overview of successful installations through other NEVI or similar opportunities.
5. The number of customers and years in business conducting the type of work to be performed – include references.
B. Compliance with NEVI Standards and Requirements (Applies to NEVI
Projects Only)
Your proposal must meet the minimum requirements of NEVI. Compliance with NEVI standards and requirements will be determined by the following factors:
1. The list of previous projects successfully completed and still under operation under other rounds of NEVI funding opportunities.
2. The amount by which your proposal meets or surpasses the minimum requirements of the PennDOT East Region National Electric Vehicle
Infrastructure (NEVI) Community Charging Funding Opportunity.
C. Charger Technology & Community Charging Power Level
The project must include a detailed description of power requirements necessary to complete the work requested by the City. The community charging power level you propose will be determined by the following factors:
1. Evaluation of proposed charger type (L2 vs. DCFC) and power levels relative to site parking use cases, expected dwell times, and vendor ROI.
2. The clarity and completeness of how to provide sufficient power to the EV chargers.
3. The supported output voltage of each Charging Port and continuous power delivery rating.
D. Equipment Quality
The equipment quality of this project must meet the minimum requirements of NEVI. If a non-NEVI project is proposed that does not meet the requirements of NEVI, provide an explanation. The equipment quality will be determined by the following factors:
1. The technical specifications of each Charging Port.
2. The energy efficiency rating of the equipment.
3. The payment options accepted payment methods, and transparency of pricing display before, during, and at the conclusion of a charging session.
4. The cable management method to prevent damage and public hazards as well as all built-in safety and prevention measures to prevent and mitigate risks.
5. The quality, size, and readability of the electronic display.
6. The quality, reliability, usability, and updating frequency of the charger software as well as the Charge Point Management System (CPMS).
7. The network protocols utilized across backend, vehicle-to-charger, and roaming and interoperability protocols.
8. The listed certifications of the EV charger equipment, including NEVI technical standards, Buy America domestic content certification, safety certifications, and performance certifications.
E. Equipment Uptime (Applies to NEVI and Non-NEVI Projects)
Your equipment must meet the NEVI minimum 97% uptime per charging port. Uptime per individual charging port must be calculated using the Federal Highway
Administration’s NEVI formula: μ = (525,600 – (Toutage – Texcluded)/525,600) ✕ 100.
Equipment up time will be determined by the following factors:
1. The ability to provide detailed calculations of equipment per individual charging port.
2. The estimation of scheduled downtime per year and clear definitions of downtime and excluded downtime.
3. The reliability and maintainability of each individual charger port, provided as
Mean Time Between Failures and Mean Time to Repair respectively.
4. The proposed operational and maintenance timeframe for the project while meeting the NEVI required minimum of five (5)-years.
F. Procedures and Methods
The basis of award of a contract will be on the technical proposal and fee, oral presentation if required, and the firm that, in total, is in the best interest of the City of
Bethlehem. Based on the proposals received and the available budget, the City may decide not to execute a contract at all.
In performing the evaluation, only information contained within each firm's proposal will be considered. The City may reject any or all proposals or award the contract where it is found to be in the best interest of the City of Bethlehem.
5.2 ORAL PRESENATION
Firms who submit proposals may be required to make an oral presentation of their proposal. The City will schedule any presentations.
5.3 COST OF PREPARATION OF PROPOSAL
The consultant is responsible for the cost of this proposal. The City assumes no liability for any cost direct or indirect that a consultant may incur during the preparation of a response to the RFP. The City reserves the right to reject all proposals for any reason.
5.4 RESERVED RIGHTS AND OPTIONS
The City reserves and holds, at its sole discretion, the right to:
• Accept any Proposal;
• Reject any or all Proposals;
• Waive any technicalities, informalities, or irregularities;
• Not enter into any transaction;
• Terminate consideration or evaluation of any Proposal at any time, for any reason;
• Suspend, discontinue, and/or terminate the RFP process for any reason;
• Request and/or receive additional information regarding any Proposal;
• Revise, supplement, withdraw or cancel all or part of this RFP for any reason;
• Conduct investigations with respect to the qualifications and experience of
Organizations;
• Change the schedule for dates specified in this RFP;
• Request best and final offers; and
• Take any other action affecting the RFP or the RFP process that is in the City’s best interest.
No bid award, contract award or contract which is subject to City of Bethlehem
Ordinance 121.05 is enforceable or binding against the City without approval of
Bethlehem City Council by Resolution under Article 121.05 and furthermore without execution in accordance with the requirements of the Third-Class City Code and the
Optional Charter Law, 53 P.S. §§ 41101-41625.
6.0 PROPOSAL SUBMITTAL
All Proposals shall be submitted exclusively in electronic format through PENNBID at https://pennbid.bonfirehub.com/ no later than November 17th, 2026, at 4:00 PM.
https://pennbid.bonfirehub.com/
Proposals provided by any other means will not be accepted. Incomplete proposals and those received after the specified date and time will not be considered. Hand delivered, mailed, courier, faxed and/or emailed responses will not be accepted.
The City will handle proposals confidentially during the pre-award period.
APPENDIX A
DESCRIPTION AND LOCATION OF PROPOSED EV CHARGING HUB:
1. Stefko & E. Washington Ave Lot – Parking lot at Stefko Blvd & E. Washington Ave.
This municipal parking facility is situated at the intersection of Stefko Boulevard and East Washington Avenue. The site features a long, rectangular surface parking lot bounded by Stefko Boulevard to the southeast and residential properties along Cayuga Street to the northwest.
It offers strong commercial corridor visibility and direct street access along a key arterial roadway in East Bethlehem.
2. 119–121 W. 3rd Street – Municipal parcel/parking area.
Located along West 3rd Street in South Bethlehem, this municipal parcel and parking area sits directly south of the Lehigh Riverport
Condominium complex and the Fahy Bridge. The site provides strategic access near the Hill to Hill Bridge interchange and Pulaski Park, positioning it close to major transit routes, Southside commercial districts, and ongoing waterfront redevelopments.
3. Spring Street Parking Lot – Public parking facility.
This large public surface parking facility is situated between Conestoga Street and Main Street, directly underneath the Route 378 overpass and adjacent to the Waterworks Pedestrian Bridge. Its central location serves visitors accessing Historic Downtown Bethlehem, the Colonial
Industrial Quarter, and nearby commercial corridors along Main and Spring Streets.
4. 920 Wyandotte Street – Property/parking lot, Bethlehem, PA 18015.
Situated at 920 Wyandotte Street (Route 378), this municipal property features a designated surface parking lot bordered by Sassafras Street, Fiot Avenue, and Ullman Park. The site benefits from high traffic volumes along the Wyandotte Street corridor, offering accessible charging potential for both local Southside neighborhood residents and regional commuters.
5. Skate Plaza Parking Lot – 1325 Steel Ave, Bethlehem, PA 18015.
Located at 1325 Steel Avenue, this parking lot serves the South Bethlehem Skateplaza and the adjacent South Bethlehem Greenway. Bounded by East 3rd Street, Daly Avenue, and Mechanic Street, the location provides excellent connectivity to Route 412 industrial and commercial corridor as well as nearby residential neighborhoods.
6. Rose Garden Park Street Parking – Designated Street parking along 8th Avenue at Rose Garden Park.
This location consists of designated public street-side parking zones stretching along 8th Avenue adjacent to the historic Bethlehem Rose
Garden Park. Spanning between West Broad Street and West Union Boulevard, this site offers curbside charging opportunities for park visitors, local event attendees, and surrounding residential streets.
7. Kings Mansion Park – Designated parking/access area.
Situated within a residential area off Catasauqua Road, this designated parking lot and access area directly serves Kings Mansion Park.
Bounded by Allwood Drive and Grove Road, the site provides dedicated off-street parking capability intended to serve community park users and surrounding West Bethlehem neighborhood residents.
8. Memorial Pool Parking Lot – 345 Illick's Mill Rd, Bethlehem, PA 18017.
Located at 345 Illick's Mill Road, this expansive surface parking lot serves the Memorial Pool, Monocacy Park, the Bethlehem Municipal Ice
Rink, tennis courts and nearby Municipal Golf Course. The high-capacity lot offers significant space for charging infrastructure placement catering to recreational visitors and municipal facility users.
9. Easton Avenue Street Parking – Designated public street-side parking zones.
This site encompasses designated public street-side parking zones along Easton Avenue, extending across a major East Bethlehem residential and commercial thoroughfare between Snyder Street and Stefko Boulevard. The location provides high-visibility curbside charging options for nearby local businesses, dense residential blocks, and daily corridor commuters.