Somerset ISD Welding Lab Project Manual Summary
This Project Manual and Drawings/Specifications document pertains to the Somerset Independent School District's High School Welding Lab construction project (RFCSP No. 26-100) in Somerset, Texas. The comprehensive specifications encompass multiple construction divisions including concrete forming and accessories, concrete reinforcing, cast-in-place concrete, HVAC insulation, facility water distribution, HVAC common work results, and air distribution systems. The project requires qualified construction firms to provide full construction services meeting specifications for structural concrete work (including formwork, shoring, and reinforcement per ACI standards), mechanical systems installation (piping, ductwork, and equipment), and supporting trades coordination. Key material requirements specify Type I or III Portland cement, ASTM-compliant reinforcing steel grades (primarily Grade 60 with some Grade 75 bars), copper water tubing for potable water systems, galvanized steel ductwork, and various mechanical equipment from acceptable manufacturers. The specifications mandate compliance with Texas state codes, Bexar County, and City of Somerset ordinances, along with industry standards from ACI, ASHRAE, NFPA, and SMACNA.
The contract requires extensive submittals including shop drawings, mill certificates, product data, mix designs for concrete, and certified compliance documentation prior to construction commencement. Testing and inspection protocols are mandatory throughout construction, including concrete strength verification through field-cured cylinders or maturity methods, hydrostatic pressure testing of water piping at 125 psi for 24 hours, and manufacturer's representative verification during critical installations such as fiber-reinforced concrete and mechanical anchors. All work must be performed by licensed contractors and skilled mechanics in accordance with manufacturer's instructions and applicable codes. The contract period extends one year from final construction payment with full warranty coverage on all equipment and systems. Contractor responsibilities include providing all labor, materials, equipment, and coordination necessary for a complete, operable installation; managing quality control; maintaining weather protection; conducting field testing; and delivering record documents and owner's manuals upon completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Concrete Forming and Accessories 03- 10-00 - 1
SOMERSET ISD WELDING LAB SPECIFICATIONS
03 -10-00– CONCRETE FORMING AND ACCESSORIES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General and Supplementary Conditions apply to work of this section.
1.2 DESCRIPTION OF WORK
A. The work of this section includes all labor, materials and equipment required to form all cast-in-place concrete shown on the drawings including but not limited to all slabs, joists, beams, columns, walls, stairs, and equipment pads.
1.3 CODES AND STANDARDS
A. Comply with the provision of the current version of the following codes, specifications and standards except where more stringent requirements are shown or specified:
1. ACI 301 "Specifications for Structural Concrete for Buildings"
2. ACI 318 "Building Code Requirements for Reinforced Concrete"
3. ACI 117 "Specifications for Tolerances for Concrete Construction and Materials".
4. ACI 347 “Guide to Formwork for Concrete”
5. Concrete Reinforcing Steel Institute " Manual of Standard Practice"
1.4 RESPONSIBILITY
A. The design, construction and safety of all formwork shall be the responsibility of the General Contractor. All forms, shores, backshores, falsework, bracing, and other temporary supports shall be engineered to support all loads imposed including the wet weight of concrete, construction equipment, live loads, lateral loads due to wind and wet concrete imbalance. The Contractor shall also be responsible for determining when temporary supports, shores, backshores, and other bracing may be safely removed.
1.5 DESIGN RESPONSIBILITY
A. The design of all concrete formwork, formwork removal, shoring, and back-shoring requirements shall be performed by a responsible person with experience in the design of concrete formwork. A Calculations shall be issued for Owner's record but will not be reviewed or returned.
Concrete Forming and Accessories 03- 10-00 - 2
1.6 ACTION SUBMITTALS
A. Design Calculations: Submit for record calculations of all concrete formwork and the shoring plan.
B. Formwork Drawings: Formwork Drawings, shall be submitted for Owners record and shall be reviewed by the Engineer for conformance to structural layout only. Such shop drawings shall indicate types of materials, sizes, lengths, connection details, design allowance for construction loads, anchors, form ties, shores, braces, construction joints, reveals, camber, openings, formwork coatings and all other pertinent information.
C. Pan Form Shop Drawings: The Contractor shall submit pan shop drawings for Engineer's review and approval. Approval will be for conformance to structural layout only.
D. Shoring Plan: Submit drawings to indicate the number of levels of shoring, proposed time and sequence of formwork and shore removal, minimum concrete strength for stripping of forms and shore removal, assumed construction loads, amount and layout of shores (specify whether backshores or re-shores), and length of time shores are to be left in place. This plan shall be strictly followed by the Contractor. Shoring plans are to be submitted for Owner's record and reviewed for impact to structure.
PART 2 - PRODUCTS
2.1 PAN FORMS-NOT USED
2.2 FORM-FACING MATERIALS
A. Smooth-Formed Finished Concrete: Unless otherwise specified, formwork for exposed concrete surfaces as defined by the Surface Finish Class noted on the drawings, shall consist of plywood, metal, metal framed plywood, or other acceptable surface.
Formwork shall provide a continuous straight and smooth surface conforming to the joint system as specified on the Architect's drawings. Form material shall have sufficient thickness to withstand pressure of concrete without bow or deflection. Plywood shall be exterior grade plywood panels, suitable for concrete forms, complying with U.S. Product Standard PS-1, each piece bearing a legible inspection trademark, and as follows:
1. Phenolic Surface Film Overlay over Hardwood Face, Class 1 or better.
2. High Density Overlay (100/30 min. rating) on Hardwood Face, Class 1or better.
3. High Density Overlay (100/30 min. rating) on Softwood Face, Class 1 or better
4. Medium Density Overlay on Hardwood Face, Class 1 or better, mill-release agent treated and edge sealed.
Concrete Forming and Accessories 03- 10-00 - 3
5. Medium Density Overlay on Softwood Face, Class 1 or better, mill-release agent treated and edge sealed.
6. Structural 1, B-B, or better, mill oiled and edged sealed.
7. "B-B (Concrete Form) Plywood", Class 1, or better, mill-oiled and edge sealed.
B. Non-specific formed concrete: Unless otherwise specified, the default finish for formed surfaces shall be rough-form finish constructed with plywood, lumber, metal or other acceptable material. Lumber shall be dressed on at least two edges and one side for tight fit. The minimum grade shall be B-C, exterior grade.
C. Textured-form finished concrete: For exposed surfaces as noted on the drawings provide units of form face design, size, arrangement and configuration that matches Architect's control sample. Provide solid backing and form supports to ensure stability of textured form liners. See Architect's drawings, specifications and control sample for special form textured finish concrete.
2.3 CYLINDRICAL COLUMNS AND SUPPORTS
A. Round section members shall be formed with metal or fiberglass, unless otherwise specified. Units shall have sufficient wall thickness to resist loads imposed by wet concrete without detrimental deformation.
2.4 FORMWORK COATINGS
A. Formwork coatings shall be a commercial formulation that will not bond with, stain, nor adversely affect concrete surfaces or impair subsequent treatment of concrete surfaces requiring bond or adhesion, nor impede curing with water or curing compounds. Provide a product that has a maximum VOC (Volatile Organic Compounds) of 50 g/l but not greater than that permitted by the local government agency having jurisdiction in the area where the project is located.
Products: Subject to compliance with requirements, provide one of the following:
"Bio-Release EF", Dayton Superior “Farm Fresh”, Unitex “Form-Eze Natural”, The Euclid Chemical Company, Inc.
“Bio-Form”, Universal Form Clamp “Aqua Blue”, US Spec
2.5 NAILS AND FASTENERS
A. Use only galvanized nails and fasteners for securing formwork in structures exposed to weather or unconditioned spaces such as garages, canopies and porte-cocheres.
Concrete Forming and Accessories 03- 10-00 - 4
2.6 FORM TIES
A. Factory-fabricated, removable or snap-off metal or glass-fiber-reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to minimize spalling of concrete on removal.
1. Exposed Surfaces: For surfaces designated with Surface Finish Class SF-2.x or SF- 3.x , furnish units that will leave no portion of the tie closer than 3/4 inch to the plane of the concrete surface and that will leave holes not larger than 1 inch in diameter in concrete surface when the ends or end-fasteners have been removed.
2. Dampproofed Surfaces: Furnish ties with integral water-barrier plates to walls indicated to receive dampproofing or waterproofing.
3. Exposed to Weather or Unconditioned Space: Provide removable, glass-fiber-reinforced plastic, stainless steel, or galvanized form ties that will leave no corrodible metal closer than 1 1/2 inches in surfaces that will be exposed to weather or in an unconditioned space in the final structure. The ties shall leave holes no larger than 1 inch in diameter in concrete surfaces when the ends or end-fasteners are removed.
2.7 CHAMFER STRIPS
A. Provide wood, metal, PVC, or rubber strips, ¾ by ¾ inch, minimum.
PART 3 - EXECUTION
3.1 FABRICATION AND CONSTRUCTION
A. Design, erect, support, brace and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic construction loads that might be applied until the concrete structure can support such loads.
B. Construct forms to sizes, shapes, lines and dimensions shown, and to obtain accurate alignment, location, grades, level and plumb work in finished structures. Provide for openings, offsets, sinkages, keyways, recesses, moldings, rustications, reglets, chamfers, blocking, screeds, bulkheads, anchorages and inserts and other features required in work.
Use selected materials to obtain required finishes. Solidly butt joints and provide back-up at joints to prevent leakage of cement paste.
C. Fabricate forms for easy removal without hammering or prying against concrete surfaces.
Provide crush plates or wrecking plates where stripping may damage cast concrete
Concrete Forming and Accessories 03- 10-00 - 5 surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.
Kerf wood inserts for forming keyways, reglets, recesses, and the like, to prevent swelling and for easy removal.
D. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces. Provide and secure units to support screed strips; use strike-off templates or compacting-type screeds.
E. Provide temporary openings where interior area of formwork is inaccessible for cleanout, for inspection before concrete placement, and for placement of concrete. Securely brace temporary openings and patch forms to prevent loss of concrete mortar. Locate temporary openings on forms at inconspicuous locations.
F. Chamfer exposed corners and edges as indicated, using specified chamfer strips fabricated to produce uniform smooth lines and tight edge joints.
G. Provisions for Other Trades: Provide openings in concrete formwork to accommodate work of other trades. Coordinate size and location of openings, recesses and chases from trades providing such items. Accurately place and securely support items built into forms.
3.2 CLEANING AND TIGHTENING
A. Thoroughly clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and all other debris just prior to concrete placement. Retighten forms and bracing prior to concrete placement as required to prevent mortar leaks and maintain proper alignment.
3.3 CLEANING AND RE-USE OF FORMS
A. Forms reused in the work shall be repaired and cleaned. Split, frayed, delaminated, or otherwise damaged facing material will not be acceptable for exposed surfaces. Forms intended for successive concrete placement shall have surfaces cleaned, fins and laitance removed, and joints tightened to avoid surface offsets. New form coating compound shall be applied to reused forms. Thin form-coating compounds only with thinning agent of type, and in amount, and under conditions of form-coating compound manufacturer's directions. Do not allow excess form-coating material to accumulate in forms or to come into contact with in-place concrete surfaces against which fresh concrete will be placed.
Apply in compliance with manufacturer's instructions. Coat steel forms with a non-staining, rust-preventative form oil or otherwise protect against rusting. Rust-stained steel formwork is not acceptable.
3.4 TOLERANCES
A. Unless specified otherwise, all tolerances for concrete formwork shall conform to ACI Standard 117, "Standard Tolerances for Concrete Construction and Materials". Before
Concrete Forming and Accessories 03- 10-00 - 6 concrete placement the Contractor shall check lines and levels of erected formwork and make any corrections and adjustments as required to ensure proper size and location of concrete members and stability of forming systems. During concrete placement the Contractor shall check formwork and supports to ensure that forms have not displaced and that completed work will be within specified tolerances.
B. Construct forms so as to limit the offset between adjacent pieces of formwork facing material in accordance with the surface tolerance class as defined in ACI 117 corresponding to the surface finish class noted on the drawings. The offset limits shall apply to both abrupt and gradual variations in the surface.
C. Pan Construction Surface Tolerance: Discontinuities in the concrete surface formed by pan construction shall be limited to the values noted in the surface tolerance classes of ACI 117 corresponding to the surface finish classes noted on the drawings.
D. Prior to each concrete pour, the Contractor shall engage a qualified surveyor to verify that work is within specified tolerances.
3.5 SHORES AND SUPPORTS
A. Definitions
1. Shores: Vertical or inclined support members designed to carry the weight of formwork, concrete, and construction loads above.
2. Re-shores: Shores placed snugly under a stripped concrete structural member after the original forms and shores have been removed from the member, thus requiring the member to carry its own weight and superimposed construction loads at the time of installation. Re-shores are assumed to carry no load at the time of installation. After the installation of re-shores, superimposed construction loads are assumed to be distributed among all members connected by re-shores.
3. Backshores: Shores placed snugly under a stripped concrete structural member after the original formwork and shores have been removed from a small area without allowing the structural member to deflect or support its own weight or superimposed construction loads. It is assumed that backshores carry the same load as that carried by the original shores they replace.
Comply with requirements of ACI 301 for shoring, reshoring and back-shoring in concrete construction and as herein specified where more stringent.
B. Design: Shores and re-shores or backshores must be designed to carry all loads transmitted to them. A rational analysis should be used to determine the number of floors to be shored, re-shored, or back-shored, subject to the minimums stated in the following
Concrete Forming and Accessories 03- 10-00 - 7 paragraph, and to determine the loads transmitted to the floors, shores and re-shores or backshores as a result of the construction sequence. The analysis should consider, but should not necessarily be limited to, the following:
1. Structural design load of the slab or member including live load, partition loads, and other loads for which the engineer designed the slab. The live load reduction factors for the design of certain members are shown on the structural drawings.
The reduced live load and an allowance for construction loads shall be taken into consideration when performing the analysis.
2. Dead load weight of the concrete and formwork.
3. Construction live loads, such as placing crews and equipment or stored materials.
4. Design strength of concrete specified.
5. Cycle time between placement of successive floors.
6. Strength of concrete at time it is required to support shoring loads from above.
7. The distribution of loads between floors, shores, and re-shores or backshores at the time of placing concrete, stripping formwork, and removal of re-shoring or back-shoring.
8. Span of slab or structural member between permanent supports.
9. Type of formwork systems, i.e., span of horizontal formwork components, individual shore loads, etc.
10. Minimum age where appropriate.
11. Alignment of shores. Where possible, Shores for any floor shall be placed directly above previously placed shores so that load will be transferred directly to such shores.
3.6 REMOVAL OF FORMS AND SUPPORTS
A. Determination by Contractor's Registered Engineer: The Contractor's registered engineer shall determine and submit for Owner's record the time and sequence of formwork and shore removal subject to the criteria as specified below. The submittal shall clearly distinguish between reshoring and back-shoring procedures.
B. Determining in situ Strength of Concrete: The General Contractor shall be responsible for making and curing concrete cylinders, cured under field conditions, for the purpose of determining concrete strength at time of form and shore removal. Such cylinders shall be made by the Contractor and tested by his testing laboratory. Alternatively, the in situ
Concrete Forming and Accessories 03- 10-00 - 8 strength of concrete may be determined by the Maturity Method following the requirements of ASTM C 1074. An acceptable system for this method is the “intelliRock” system manufactured and supplied by Engius Constructive Intelligence of Stillwater, OK.
C. Records of Weather Conditions: The General Contractor shall be responsible for keeping records of weather conditions to be used in the decision on when to remove forms.
D. Formwork Not Supporting Concrete: Formwork not supporting concrete such as sides of beams, walls, columns and similar parts of the structure, may be removed after cumulatively (not necessarily consecutively) curing at a concrete temperature not less than 50°F for 12 hours after placing concrete, provided the concrete is sufficiently hard so as not to be damaged by form removal operations and provided curing and protection operations are maintained. If ambient air temperatures remain below 50°F, if retarding agents are used, or if Type II and Type V Portland cement is used, then this specified minimum period should be increased as required to safely remove the forms without damage to the concrete. Where such forms also support formwork for slab or beam soffits, the removal times of the latter shall govern.
E. Formwork Supporting Weight of Concrete: Formwork supporting weight of concrete such as beam soffits, joists, slabs and other structural elements shall not be removed until concrete has attained at least the following percentages of the design compressive strength, while cured following the specified requirements, including hot or cold-weather concreting, where applicable:
Joists, Beam Bottoms - 70%, but not less than 2800 psi Slabs - 70%, but not less than 2800 psi
F. Placing Re-shores and Backshores:
1. All shoring operations shall be carried out in accordance with a planned sequence as determined by the Contractor's shoring engineer.
2. Shoring operations shall be performed so that at no time will areas of new construction be required to support combined dead and construction loads in excess of the available strength as determined by the design loads (as specified in the General Notes) and the developed concrete strength (as determined by field cured cylinders) at the time of stripping and re-shoring or back-shoring.
3. Shores (backshores or re-shores) shall not be removed until the structural member supported has sufficient strength to support all applied loads.
4. For back-shoring operations, the forms shall be removed in such a manner that individual structural members are not allowed to deflect and carry load.
Concrete Forming and Accessories 03- 10-00 - 9
5. Reshoring operations require that the structural members be strong enough to safely support their own weight before stripping of formwork.
6. For reshoring operations, no structural member shall be overstressed under its own dead weight plus the weight of the floors above and construction loads assigned to the structural member by a rational analysis that accounts for the relative stiffness of each floor with due consideration of concrete age and strength. While reshoring is underway, no construction loads shall be permitted on the new construction unless it can safely support the construction loads.
7. Where possible, shores shall be located in the same position on each floor so that they will be continuous in their support from floor to floor.
G. Post Tension Construction: Formwork supporting post-tensioned floor construction, including shores, re-shores and backshores shall be designed to support any additional loads produced by the stressing operation.
END OF SECTION 03-10-00
Concrete Reinforcing 03-20-00 - 1
SECTION 03-20-00 – CONCRETE REINFORCING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions apply to work of this section.
1.2 DESCRIPTION OF WORK
A. The work of this section includes labor, materials, hardware, equipment, transportation and services required to fabricate and place all reinforcement for cast-in-place concrete including bars, welded wire fabric, ties and supports shown on the drawings and as specified. Prestressing reinforcement is specified in Division 03 Post-Tensioned Concrete and/or Precast Concrete sections of the specifications.
1.3 QUALITY CONTROL
A. The Contractor is responsible for management of quality control on the Project, including verification of the compliance of the workmanship and materials furnished by his subcontractors and suppliers.
B. Codes and Standards: Comply with all provisions of the following codes, specifications and standards except where more stringent requirements are shown or specified:
1. ACI 301 - "Specifications for Structural Concrete for Buildings".
2. ACI 117 - 'Specifications for Tolerances for Concrete Construction and Materials."
3. Concrete Reinforcing Steel Institute (CRSI), "Manual of Standard Practice".
4. ANSI/AWS D1.4 “Structural Welding Code – Reinforcing Steel”
1.4 ACTION SUBMITTALS
A. Shop Drawings: Submit shop drawings for all reinforcing steel and related accessories for the Engineer's approval complying with the ACI 315 “Guide to Presenting Reinforcing Steel Design Details”. Shop drawings shall show arrangement and layout, bending and assembly diagrams, bar schedules, stirrup spacing, splicing of bars, laps of bars, and layout/configuration of all necessary miscellaneous support bars in accordance with CRSI Standards.
B. Mill Certificates: Submit, for record, mill certificates, and tensile and bend test results signed by Contractor and Producer, for all reinforcement.
Concrete Reinforcing 03-20-00 - 2
C. Product Data: Submit manufacturer’s product data with application and installation instructions for proprietary materials and items, including mechanical splices, hooked anchorage systems, large-headed stud punching shear reinforcement, dowel bar substitute systems, and dowel bar sleeves.
D. International Code Council (ICC) Evaluation Service Reports: Submit evaluation service reports of approval from ICC Evaluation Service, Inc. for mechanical splice, hooked anchorage systems, large-headed stud punching shear reinforcement and dowel bar substitute systems.
1.5 PREINSTALLATION CONFERENCE
A. The Reinforcing-Placing subcontractor shall attend the Pre-Concrete Conference conducted by the Concrete Contractor as described in Division 03 Section “Cast-in-Place Concrete”.
1.6 TESTING AND INSPECTION
A. In advance of fabrication and shipment to the project, the fabricator shall have performed all tests and inspections of reinforcing steel as specified herein.
B. Any testing laboratory retained to run tests required by this specification shall meet the basic requirements of ASTM E 329.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Reinforcement:
1. Reinforcing materials shall be delivered from the mill in bundles that are identified as to heat number and manufacturer and accompanied with mill and analysis test reports and an affidavit from the fabricator/supplier stating that the material conforms to the requirements of the governing ASTM specification listed herein.
2. Deformed bar material that is not identifiable according to the criteria listed above shall be tested for tensile strength and bend tests according to ASTM A 615 on a sample of 2 bars for each ten tons or fraction thereof of unidentified material for each bar size. The bars shall be a minimum of 24 inches long. Bend tests are not required for #14 and # 18 bars. Fabricator/supplier shall submit the results of such tests for record.
Concrete Reinforcing 03-20-00 - 3
3. Reinforcing Bars: Reinforcing bars shall conform to ASTM A 615, Grade 75 as noted on the drawings.
4. Reinforcing Bars: Reinforcing bars shall conform to ASTM A 615 Grade 60 as noted on the drawings.
5. Special Requirements for Grade 60 Reinforcing Bars: ASTM A 615 Grade 60 Reinforcing bars used as longitudinal reinforcing in locations as noted on the drawings shall additionally comply with the following requirements.
a. The actual yield strength based on mill tests shall not exceed the nominal yield strength fy by more than 18,000 psi.
b. The ratio of the actual tensile strength to the actual yield strength is not less than 1.25.
6. Reinforcing Bars: Reinforcing bars used as longitudinal reinforcing in locations as noted on the drawings shall conform to ASTM A 706.
7. Reinforcing Steel: Reinforcing steel used as transverse reinforcing or as spiral reinforcing as noted on the drawings shall conform to ASTM A 1035.
8. Weldable Reinforcing Bars: All reinforcing bars noted on the drawings as being required to be welded shall conform to ASTM A 706.
9. Galvanized Reinforcing Steel: Provide galvanized reinforcing bars at the locations indicated on the drawings. Galvanized reinforcing bars shall conform to ASTM A 767 Class II (2.0 oz. zinc PSF), hot dipped galvanized after fabrication and bending.
Bars that are to be galvanized shall conform to the type of steel required for the given situation as noted on the drawings.
10. Epoxy-Coated Reinforcing Steel: Provide epoxy coated reinforcing bars at the locations indicated on the drawings. Epoxy coated reinforcing bars shall conform to ASTM A 775. Bars that are to be epoxy coated shall conform to the type of steel required for the given situation as noted on the drawings.
11. Epoxy-Coated Fabricated Reinforcing Steel: Provide reinforcing bars that are epoxy-coated after fabrication at the locations indicated on the drawings.
Reinforcing bars that are epoxy-coated after fabrication shall conform to ASTM A
934. Bars that are to be epoxy-coated shall conform to the type of steel required for the given situation as noted on the drawings.
12. Use Reinforcing steel made from 90% recycled material, 2/3 of which shall be post-consumer material. A minimum of 50% of the material in the reinforcement must have been extracted, harvested, or recovered as well as manufactured, within 500 miles of the project site.
Concrete Reinforcing 03-20-00 - 4
13. Plain Steel Welded Wire Reinforcement: ASTM A 185 with a yield strength of 65,000 PSI. Provide in flat sheets only.
14. Deformed-Steel Welded Wire Reinforcement: ASTM A 497 with a yield strength of 70,000 PSI. Provide in flat sheets only.
15. Galvanized Plain-Steel Welded Wire Reinforcement: ASTM A 185, fabricated from galvanized steel wire into flat sheets.
16. Epoxy Coated Plain-Steel Welded Wire Reinforcement: ASTM A 884, Class A, plain steel.
17. Epoxy Coated Deformed-Steel Welded Wire Reinforcement: ASTM A 884, Class A, deformed steel.
18. Strands: Uncoated seven wire, one half inch diameter, stress relieved 270 ksi strand low relaxation type, ASTM A 416 "Specification for Uncoated Seven Wire Stress Relieved Strand for Prestressed Concrete" and "Specification for Unbonded Single Strand Tendons” as published by the Post-Tensioning Institute.
19. Prestressing Bars: All prestressing bars shall be deformed thread-bars conforming to ASTM A 722 "Specification for Uncoated High Strength Steel Bar for Prestressing Concrete", with a minimum ultimate tensile strength of 150 KSI and other properties as specified on page 11-21 of the PCI Design Handbook, fifth edition. Thread-bars, plate anchorages and couplings shall be furnished by Dywidag Systems International or Williams unless approved otherwise in writing by the Engineer.
20. Wire: Smooth wire for spiral reinforcement shall conform to ASTM A 82 with a minimum yield strength of 70,000 PSI.
21. Epoxy-Coated Plain-Steel Wire: ASTM A 884,Class A, plain-steel wire.
22. Joint Dowel Bars: Smooth bars used to dowel across slab-on-grade construction joints shall conform to ASTM A 615, Grade 40 or ASTM A 36, plain-steel bars. Cut bars true to length with ends square and free of burrs
23. Epoxy-Coated Joint Dowel Bars: Smooth epoxy-coated bars used to dowel across slab-on-grade construction joints shall conform to ASTM A 775 with ASTM A 615, Grade 40 or ASTM A 36 plain-steel bars. Cut bars true to length with ends square and free of burrs.
24. Dowel Bar Sleeves: Plastic or gage metal (26 ga. min.) sleeves with an inside diameter of 1/16 inch greater than the dowel bar that it encases, that have the
Concrete Reinforcing 03-20-00 - 5 strength, durability, and design to provide free movement of the dowel relative to the concrete slab and that are specifically manufactured for this purpose.
25. Alternate Slab-on-Grade Joint Load Transfer Systems: A system that consists of flat, ASTM A 36 plate that is saw cut into a square or rectangular shape and is embedded into or encased by a plastic sleeve that allows movement in both lateral directions but not in the vertical direction. Acceptable systems are manufactured by PNA Construction Technologies with products known by the names “Diamond Dowel System” and “PD3 Basket” and Greenstreak Group Inc.
with products known as “Speed Plate’ and “Double-Tapered Basket”.
26. Tie Wire: Tie wire shall be annealed steel tie wire, minimum 16 gauge.
a. Tie wire in architecturally exposed concrete shall be plastic coated or stainless steel.
b. Tie wire for epoxy-coated reinforcement shall be epoxy-coated.
c. Tie wire for galvanized reinforcement shall be galvanized.
27. Headed Steel Stud Punching Shear Reinforcement: Punching shear reinforcement using headed studs welded to flat bars shall be manufactured in conformance with ASTM A1044 and approved by the ICC Evaluation Service, Inc.
as expressed in an ICC Evaluation Report for use as punching shear reinforcement for slabs and footings designed in accordance with ACI 421.1. The following are acceptable products:
“Decon Studrails”, Decon “Dayton Shear Resistance System (DSR) D-140”, Dayton Superior Corporation “Suncoast Stud Reinforcement System”, Suncoast Post-Tension, Ltd.
28. Supports for Reinforcement: Provide supports for reinforcement including bolsters, chairs, spacers and other devices for spacing, supporting and fastening reinforcing bars and welded wire fabric in place. Use wire bar type supports complying with CRSI recommendations.
a. Slabs-on-Grade: Use precast concrete bar supports (dobies) or supports with sand plates or horizontal runners designed for use on ground.
b. Spread Footing Bottom Reinforcement: Use precast concrete bar supports (dobies) or chairs designed for soil-supported slabs.
c. Mat Foundation: Use precast concrete bar supports (dobies), chairs designed for soil-supported slabs, or poured-in-place concrete curbs.
d. Exposed to View Concrete: Provide supports with legs which are plastic protected stainless steel protected (CRSI, Class 2).
Concrete Reinforcing 03-20-00 - 6
e. Support of Epoxy-Coated Reinforcement: Provide epoxy-coated or other dielectric-polymer-coated wire bar supports to support epoxy-coated reinforcement.
f. Support of Galvanized Reinforcement: When NOT exposed to view, provide galvanized wire bar supports to support galvanized reinforcement. In all exposed to view conditions provide supports with legs which are plastic protected stainless steel protected (CRSI, Class 2).
B. Coating Repair Materials: Repair damaged areas of epoxy-coated or galvanized reinforcement using the following products.
1. Epoxy Repair Coating: Liquid, two-part, epoxy repair coating compatible with epoxy coating on reinforcement and complying with ASTM A 775.
2. Zinc Repair Material: ASTM A 780, zinc-based solder, paint containing zinc dust, or sprayed zinc shall be used to repair damaged areas of galvanized reinforcement.
2.2 SPLICES
A. End Bearing Compression Splices: Members with end bearing compression splices shall have vertical bars saw cut or otherwise finished for true bearing. Bar ends shall terminate in flat surfaces within 1 1/2 degrees of a right angle to the axis of the bars and shall be fitted within 3 degrees of full bearing after assembly. Splice bars shall be held in concentric contact by a suitable device. The following are acceptable end bearing compression devices:
"Speed Sleeve", Erico Products, Inc.
"G-Loc", BarSplice Products, Inc.
or other Engineer-approved product.
B. Mechanical Tension Splices:
1. Mechanical splices shall conform to Type 1 and Type 2 splices.
a. Type 1 splice shall develop 1.25 times the specified yield strength of the splice bar.
b. Type 2 splice shall meet the requirements of Type 1 splice and, in addition, develop the full tensile strength of the splice bar.
2. Splices shall be approved by the ICC-Evaluation Service, Inc and shall have the Evaluation Report submitted for Engineer review.
3. The bar ends that are to attach to the splice shall be prepared and installed in accordance with the manufacturer’s requirements.
Concrete Reinforcing 03-20-00 - 7
4. The following are acceptable mechanical tension splices (splices qualified for use with grade 75 bars are parenthetically noted):
“BarLock, S-Series”, Dayton Superior.
“US/MC-SAE Mechanical Coupler”, Dayton/Richmond, Inc.
“DB Grout Sleeve”, Dayton/Richmond “ZAP Screwlok”, BarSplice Products, Inc. (qualified for use with grade 75 bars) “BPI Grip XL System”, Barsplice Products, Inc.
“Taper Threaded Grip Twist System”, Barsplice Products, Inc.
"Lenton Coupler", Erico Products, Inc. (for grade 75 bars, use only “Standard Coupler”) "NMB Splice Sleeve", Splice Sleeve North America” (qualified for grade 75 #7 bars and higher) “BarLock, L-Series”, Dayton Superior “Taperlok Couplers”, Dayton Superior “Lenton Interlok”, Erico Products, Inc.
“Griptec”, Dextra Manufacturing Co.
or other Engineer-approved product.
C. Dowel Bar Replacement: All grade 60 reinforcing steel dowel bars shown on the drawings crossing concrete construction joint surfaces with inserts cast flush against the form and having reinforcing bars connected to the insert in a subsequent concrete pour shall conform to the following:
1. Splice connection to the insert shall develop the 1.25 times the specified yield strength and the full tensile strength of the spliced bar.
2. Splices shall be approved by the ICC Evaluation Service, Inc. as expressed in an ICC Evaluation Service Report which shall be submitted for review.
3. The following are acceptable products (for use only with grade 60 bars):
"Lenton Form Saver", , Erico Products, Inc.
"DB-SAE Dowel Bar Splicer", Dayton/Richmond, Inc.
or other Engineer-approved product.
D. Hooked Anchorage Replacement: Reinforcing bar terminations shall be manufactured out of ASTM A 576 material and shall develop the full tensile strength of the bar when installed at the manufacturer’s recommended depth.
1. The anchorage shall be approved by the ICC Evaluation Service Inc. as expressed in an ICC Evaluation Service Report which shall be submitted for review.
2. The following are acceptable products (for use only with grade 60 bars):
Concrete Reinforcing 03-20-00 - 8
“Lenton Terminator”, Erico Products, Inc.
or other Engineer-approved product.
PART 3 - EXECUTION
3.1 FABRICATION AND DELIVERY
A. Bending and Forming: Fabricate bars of indicated sizes and accurately form to shapes and lengths indicated and required, by methods not injurious to materials. Do not heat reinforcement for bending. Bars shall be free from injurious defects, have a workman-like finish with no excessive rust and/or pitting and have no unusual kinks or bends.
B. Marking and Shipping: Bundle reinforcement and tag in accordance with Section 7.4.5 of the CRSI “Manual of Standard Practice”. Transport and store at site so as not to damage material. Keep sufficient supply of tested, approved and proper reinforcement at the site to avoid delays. Maintain reinforcing bars free of mud, dirt, grease, or other coating.
C. Repair of Epoxy-Coated Reinforcing: Repair cut and damaged epoxy coatings on fabricated reinforcing before delivery with epoxy repair coating according to ASTM D
3.2 PLACING REINFORCEMENT
A. Comply with CRSI recommended practice for "Placing Reinforcing Bars", for details and methods of reinforcement placement and supports and as herein specified.
B. Before placing reinforcement and again before concrete is placed, clean reinforcement of loose rust and mill scale, earth, ice and other materials which reduce or destroy bond with concrete.
C. Accurately position, support and secure reinforcement against displacement by formwork, construction, or concrete placement operations. Locate and support reinforcing by chairs, runners, bolsters, spacers and hangers, as required. Exercise particular care to maintain proper distance and clearance between parallel bars and between bars and forms. Provide spreaders and spacers to hold steel in position. Support steel at proper height upon approved chairs.
D. Place reinforcement to obtain at least minimum coverages for concrete protection.
Arrange, space, and securely tie bars and bar supports to hold reinforcement in position during concrete placement operations. Set tie wires so ends are directed into concrete, not toward exposed concrete surfaces.
E. Support of Spread Footing Reinforcing Steel
Concrete Reinforcing 03-20-00 - 9
1. Bottom Steel: Support bottom reinforcing mat to provide the specified clearance to the bars. Spacing between supports shall not exceed 4'-0" centers each way.
2. Top Steel: Support top reinforcing on steel angle frames braced in both directions or on special standee support bars. Spacing between supports shall not exceed 4'-0" centers each way. The depth of the supports shall provide the specified clearance from the bars to the top of the concrete. The design of the support steel shall be the responsibility of the Contractor in accordance with Concrete Reinforcing Steel Institute (CRSI), “Manual of Standard Practice”.
F. Support of Mat Foundation Reinforcing Steel
1. Bottom Steel: Support bottom reinforcing mat to provide the specified clearance to the bars. Spacing between supports shall not exceed 4'-0" centers each way.
2. Top Steel: Support top reinforcing on steel angle frames braced in both directions or on special standee support bars. Spacing between supports shall not exceed 4'-0" centers each way. The depth of the supports shall provide the specified clearance from the bars to the top of the concrete. The design of the support steel shall be the responsibility of the Contractor in accordance with Concrete Reinforcing Steel Institute (CRSI), “Manual of Standard Practice”.
G. Install welded wire reinforcement in as long lengths as practicable. Lap adjoining pieces at least one full mesh plus two inches and lace splices with wire. Offset end laps in adjacent widths to prevent continuous laps in either direction.
H. Coordinate with other trades and expedite materials and labor to avoid omissions and delay.
I. Install waterproof membrane or vapor barrier as specified prior to placing steel for concrete slabs-on-grade.
J. Extend reinforcement continuous through construction joints unless otherwise shown on the drawings.
K. Slab-on-Grade Joint Dowel Bars: Support slab-on-grade joint dowel bars independently of support for slab reinforcement on soil supported slab bolsters or specially manufactured cradles such that dowel bar remains parallel to slab surface and at right angles to joint during concreting operations. Lightly coat the exposed end of the dowel with a paraffin-base lubricant, asphalt emulsion, form oil, or grease or use a dowel bar sleeve.
Concrete Reinforcing 03-20-00 - 10
L. Alternate Slab-on-Grade Joint Load Transfer Systems: Install the alternate load transfer system in accordance with the manufacturer’s instructions such that the largest plane of the flat plate is parallel to the plane of the subgrade on which the slab is bearing.
M. Provide and place additional reinforcing steel at all sleeves and openings in beams, slabs and walls as specified on the drawings. Where sleeves or openings not shown on the drawings interrupt the reinforcement, consult with Engineer for instructions for placing and splicing of bars. Provide required additional reinforcing steel at no additional cost to the Owner.
N. Epoxy-Coated Reinforcement: Use epoxy-coated steel tie wires to fasten epoxy-coated reinforcement. Repair cut and damaged epoxy coatings with epoxy repair coating according to ASTM D 3963.
O. Galvanized Reinforcement: Use galvanized steel tie wires to fasten galvanized reinforcement. Repair cut and damaged zinc coatings with zinc repair material.
3.3 SPLICING REINFORCING STEEL
A. Provide splice as indicated on the drawings. Splice reinforcing bars only at locations shown on the structural drawings and approved shop drawings. Unauthorized or unscheduled splices not approved by the Engineer in writing will not be accepted.
B. All lap splices in reinforcing steel shall be contact lap splices unless detailed otherwise on the drawings.
C. Maintain proper cover between reinforcing bars at splices.
D. Lap unscheduled reinforcing bars not otherwise specified a minimum of 30 bar diameters at splices. Lap welded wire fabric a minimum of one full wire mesh plus two inches.
E. Reinforcing Steel Placement in Mat Foundations
1. Size, length, spacing, and location of all mat reinforcing steel is shown on the mat plans and details. See details on the drawings for required stagger pattern of top and bottom bar splices and for sequence of placing mat reinforcing steel layers.
2. The number of splices shall be minimized by using bar runs of 60'-0" as much as possible. Unless noted otherwise, continuous top reinforcing bars shall be spliced along column centerlines. Continuous bottom reinforcing bars shall be spliced mid-way between columns.
3. Provide Class B tension lap splices for all bars #11 and smaller. Stagger splices as shown in the typical details.
Concrete Reinforcing 03-20-00 - 11
4. Avoid splices of #14 and #18 bars where possible. Where required, a mechanical tension splice as specified shall be provided. No more that 50% of such bars shall be spliced in any 5'-0" width of mat cross-section. Spliced bars shall be staggered with un-spliced bars.
F. Manufacturer of mechanical tension splice shall be present for first day's installation.
3.4 WELDING REINFORCING STEEL
A. Welding reinforcing steel is permitted only where specifically shown on the drawings. All welding shall conform to AWS D1.4. Only weldable reinforcing steel conforming to ASTM A 706 or deformed bar anchors conforming to ASTM A 496 shall be permitted. ASTM A 615 bars may not be welded for structural use.
B. Tack welding of reinforcement shall only be allowed for preassembled mats and cages.
3.5 SHRINKAGE AND TEMPERATURE REINFORCEMENT
A. Provide shrinkage and temperature reinforcement as indicated on the drawings at right angles to main top and bottom bars for all structural slabs unless detailed otherwise on the drawings.
3.6 PLACEMENT OF WELDED WIRE REINFORCEMENT
A. Wherever welded wire reinforcement is specified as reinforcement in pan-formed beams or slabs, it shall be continuous and properly lapped one full wire spacing plus 2" across the entire concrete surface and not interrupted by beam or girders.
3.7 REINFORCEMENT IN JOIST DISTRIBUTION RIBS
A. Provide reinforcement in ribs, minimum one - #5 continuous top and bottom unless indicated otherwise on the drawings.
3.8 REINFORCEMENT IN COMPOSITE METAL DECK SLAB
A. Composite metal deck slabs shall be reinforced as indicated on the drawings.
B. Extra Reinforcement Over Girders: Provide additional reinforcing steel over interior girders as shown on the drawings.
C. Placement of Slab Reinforcement: Provide bolsters, high chairs, and/or additional reinforcing as shown in details on the drawings to support the reinforcing with the clear cover shown on the drawings.
Concrete Reinforcing 03-20-00 - 12
3.9 FIBER-REINFORCED CONCRETE IN TOPPING SLABS, SIDEWALKS, AND DRIVEWAYS
1. Provide fibers of the type and at the dosage rate shown on the drawings.
2. The fiber-reinforced concrete shall be produced in accordance with ASTM C 1116 and have a residual strength of 80 psi when tested in accordance with ASTM C 1399.
3.10 REINFORCEMENT AROUND OPENINGS IN COMPOSITE METAL DECK SLABS
A. For all openings in metal deck not framed with structural steel and greater than 10" in width in either direction, provide additional reinforcing steel as shown in details on the drawings.
3.11 REINFORCEMENT IN PAN-FORMED BEAM SLABS
A. Reinforcement: Provide reinforcing in pan-formed beam slabs as shown on the drawings.
B. Placement of Slab Reinforcement: Provide required bar supports and additional reinforcing as shown in details on the drawings to support slab reinforcing with the clear cover shown on the drawings.
3.12 REINFORCEMENT IN GRADE BEAMS
A. Provide reinforcing in grade beams as shown on the drawings.
B. Bar Support for Grade Beam Cages: Grade beam bottom steel shall be supported at 5'-0" maximum centers using beam bolsters that provide 3" bottom cover to the reinforcing steel. Beam bolsters used shall be designed and manufactured for support on soil.
3.13 REINFORCEMENT IN TOPPING SLABS
A. In addition to fiber reinforcing, provide welded smooth wire reinforcement minimum 6 x 6 W1.4 x W1.4 in all topping slabs unless specified otherwise on the drawings.
3.14 REINFORCEMENT IN HOUSEKEEPING PADS
A. In addition to fiber reinforcing, provide welded smooth wire reinforcement 6 x 6 W2.9 x W2.9 minimum in all housekeeping pads supporting mechanical equipment unless detailed otherwise on the drawings.
3.15 REINFORCEMENT IN SIDEWALKS
A. In addition to fiber reinforcing, provide welded smooth wire reinforcement minimum 6 x 6 W1.4 x W1.4 in all sidewalks unless detailed otherwise in the Contract Documents.
Concrete Reinforcing 03-20-00 - 13
3.16 MECHANICAL AND PLUMBING REQUIREMENTS
A. Refer to Mechanical and Plumbing Drawings for concrete requiring reinforcing steel. Such reinforcement shall be furnished as part of the work of this section.
3.17 QUALITY ASSURANCE TESTING AND INSPECTION DURING CONSTRUCTION
A. See Testing Laboratory Services section of these Specifications for reinforcing inspection and testing requirements.
END OF SECTION 03-20-00
Cast-in-Place Concrete 03-30-00 - 1
SECTION 03-30-00- CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General and Supplementary Conditions apply to work of this section.
1.2 DESCRIPTION OF WORK
A. Extent of concrete work is shown on drawings, including schedules, notes and details which show size and location of members and type of structural concrete to be cast in place. Furnish all labor, materials, services, equipment and hardware required in conjunction with or related to the forming, delivery and pouring of all cast-in-place concrete Work.
1.3 QUALIFICATIONS
A. The concrete supplier shall have a minimum of five years of experience in manufacturing ready-mixed concrete products complying with ASTM C 94 requirements for production facilities and equipment. The supplier must be certified according to the National Ready Mixed Concrete Association’s Certification of Ready Mixed Concrete Production Facilities.
B. The concrete contractor shall have a minimum of five years of experience with installation of concrete similar in material, design and extent to that indicated for this Project and whose work has resulted in construction with a record of successful –service performance.
C. Any testing laboratory retained by the Contractor or Subcontractor to run tests required by this specification but not performed by the Owner’s testing laboratory shall meet the basic requirements of ASTM E 329.
1.4 QUALITY CONTROL
A. The Contractor is responsible for control of quality, including workmanship and materials furnished by his subcontractors and suppliers.
B. Codes and Standards: Comply with provisions of following codes, specifications and standards, except where more stringent requirements are shown or specified:
1. ACI 301 – “Specifications for Structural Concrete for Buildings”.
2. ACI 117 – ‘Specifications for Tolerances for Concrete Construction and Materials.”
3. ACI 318 – “Building Code Requirements for Reinforced Concrete”.
4. ACI 311 – “Guide for Concrete Inspection.”
Cast-in-Place Concrete 03-30-00 - 2
5. ACI 347 – “Guide to Formwork for Concrete.”
6. ACI 304 – “Guide for Measuring, Mixing, Transporting, and Placing Concrete.”
7. Concrete Reinforcing Steel Institute (CRSI), “Manual of Standard Practice”.
8. Steel Construction Manual, 14th edition, American Institute of Steel Construction
C. Document Conflict and Precedence: In case of conflict among Contract Documents and Contract Specifications, request clarification from the Architect/Engineer through “Request for Information” (RFI) process before proceeding with the Work. In case of a conflict between and/or among the structural drawings and specifications, the strictest interpretation shall govern, unless specified otherwise in writing by the Architect/Engineer.
D. Inspection and Testing of the Work: Materials and installed work may require testing and retesting, as directed by the governing building code, the Architect/Engineer, or the Owner at any time during progress of work.
1. The Contractor shall provide forty-eight (48) hours notification to the Owner’s Testing Laboratory of construction operations including the project schedule to allow the Testing Laboratory to schedule inspections. Failure to sufficiently notify may result in additional costs incurred by the Testing Laboratory that may be back-charged to the Contractor by the Owner.
2. The Contractor shall cooperate with laboratory personnel and provide access to the work.
3. The Contractor shall make arrangements with and for the Owner’s Testing Laboratory for off-site inspection of material stockpiles, concrete delivery vehicles, concrete material storage facilities, and concrete-batching facilities.
4. If required, the Contractor shall furnish casual labor, equipment, and facilities as required for sampling and testing by the laboratory and otherwise facilitate the required inspections and tests.
5. Inspection or testing by the Owner does not relieve the Contractor of his responsibility to perform the Work in accordance with the Contract Documents.
Tests not specifically indicated to be done at the Owner’s expense, including retesting of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .