1_Airmunition_Specification.pdf
PDF 2 MB Posted
- Attached to
- Wing Ordnance Cartridges Federal contract opportunity
- Solicitation number
- FA821323R1342
About this file
This document is a coordination sheet and specification for a federal contract solicitation to procure wing ordnance cartridges. The solicitation is issued by the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base. The contractor must provide 50,000 units of wing ordnance cartridge part number 50-8264-5/30910-1. The specification outlines requirements for item marking, lot acceptance testing, quality assurance plans, hazardous materials handling, and other technical requirements. It also includes numerous data item descriptions for contract deliverables such as test plans, reports, and engineering change documentation. Coordination is required from various government stakeholders including program management, engineering, safety, and configuration management specialists.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 1.pdf | ||
| 6_CADPAD_Item_Marking.pdf | ||
| 3_JQR.pdf | ||
| 12a_Item Description_1336015197200.pdf | ||
| 9_SOW_for_Packaging_and_Preservation.pdf | ||
| 5_REPSHIP_of_HAZMAT.pdf | ||
| 11b_EDL_1336011184636.pdf | ||
| 4_ES7034.pdf | ||
| 12b_Item Description_1336011184636.pdf | ||
| 10_Special_Packaging_Instructions.pdf | ||
| 2_Ammunition_Data_Card.pdf | ||
| Solicitation.pdf | ||
| 7_AFMC_Form_158_Packaging_Requirements.pdf | ||
| 8_CDRLs.pdf | ||
| 11a_EDL_1336015197200.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR/MIPR AIR MUNITIONS SPECIFICATION COORDINATION SHEET
Item Manager
OR
Program Manager
FD2020- Package is: PR MIPR
Special Instructions
NSN: DODIC: QTY:
NOUN: P/N:
Is this item in the Commodity Council Compliance Database (CCCD)? If Yes:
Reason for PR/MIPR?
Is GFM required?
If Yes, provide: NSN: P/N: QTY:
Hard copy of PR/MIPR Attached Coordination Start Date:
CSI? Contract Cost Completion Date:
Program Manager
Program Manager Name Initials Date Completed
Is Section 806 Determination completed (PRs Only)?
If no, reason:
Equipment
Specialist Equipment Specialist Name Initials Date Completed
Engineer
Engineer Name Initials Date Completed
AFMC Form 807 Completed? Remarks:
Market Research Required? Remarks:
DD Form 254 Required? Note: Only Applicable to a PR
Safety Safety Name Initials Date Completed
PQM
Engineering
Supervisor
Program Quality Manager Name Initials Date Completed
Engineering Supervisor Name Initials Date Completed
Data Manager Data Manager Name Initials Date Completed
EBE Control #
Item Manager
Item Manager Name Phone # Select Branch:
STATEMENTS REQUIRED ON THIS PURCHASE REQUEST/MILITARY INTERDEPARTMENTAL PURCHASE
REQUEST (PR/MIPR)
“AIRMUNITIONS SPECIFICATION” January 17, 2023
IM: PR/MIPR# FD2020-
Please initial each item. If you want the statement on the PR/MIPR, initial “YES”! If you do not want the statement on the PR/MIPR, initial “NO”! Please ensure all PRs and MIPRs containing Foreign Military Sales (FMS) requirements are coordinated with the appropriate Case Funded Country Program Manager.
OPR YES NO STATEMENTS (Information for “Airmunitions Specification”)
Note: Blocks shown on right of CDRLs are for DM use only – “☐“
TRANS JDO
The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with ATTACHMENT 1.
CDRL Required CDRL (DI-SESS-82098)
CDRL Not Required
IM
Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of
Availability (NOA) including FMS case and requisition numbers by mail to:
AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or
Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil
IM Department of Defense Identification Code (DODIC)
IM
One copy of all shipping documents shall be furnished to 429 SCMS/GUMAB, by mail to: 6038
Aspen Ave, Hill AFB, Utah 84056-5805 or F requisition number, MIPR number and line item.
(MIPRS ONLY)AX to: (801)777-5545, or Email: hill.outgoing.mipr@us.af.mil and shall identify requisition number, MIPR number and line item. (MIPRS ONLY)
IM
All SF 1080 billings shall show complete fund citation, MIPR and line item number. (CAT I
OUTGOING MIPRS ONLY)
IM
Government Furnished Material:
Stock Number Part Number Noun Qty
IM
Contractor shall provide a Government Furnished Material (GFM) consumption report as described in CDRL (DI-MGMT-80438B) - this applies to new production. GFM shall be identified by NSN, lot number, and serial number where possible.
Reporting to commence upon receipt of GFM and then every days (reporting frequency)
Item Manager email address: @us.af.mil
CDRL (DI-MISC-80438B
ES
Ammunition lot numbering shall be accomplished. Reference MIL-STD-1168C for guidance.
Each energetic ingredient and component used in production lot(s) shall be from a single material lot.
ES
Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work - Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block.
One hard copy of the ADC shall accompany shipments to each shipping location.
CDRL (DI-MISC-80043B)
ES
Items shall be marked using accepted practices for marking (reference MIL-STD- 130N for guidance). Minimum item marking shall include Government / Manufacturer Part Number, Lot
Number (reference MIL- STD-1168C), and Serial Number if applicable.
Please Select:
ES
Serial numbers are required for each item, and should be listed individually in the remarks of a
LOT Ammunition Data Card, when ADCs are required.
ES
The vendor shall serialize items sequentially for this (each) part number. Do not repeat serial numbers unless approved by the government. Serial numbers shall be a minimum of 4 digits.
ES
Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.6, 6 March 2023, and reference attachment.
ES
Shelf Life Code marking required per MIL-STD-129R.
ES Items are Inert.
ES
Physical Security of Arms, Ammunition & Explosive (AA&E) items shall be safeguarded as sensitive in accordance with DoDM 5100.76, April 17, 2012, 28 February 2014, DFARS
252.223-7007 and the following sensitivity/category code:
If Yes, select one of the following: If GFM is used, select SRC applicable to GFM
ES
Hazard Class/Division:
Compatibility Group:
DOT Marking/EX Number:
DOT Shipping Labels:
UN Number:
Proper Shipping Name:
Net Explosive Weight (NEW):
NEW Unit of Measurement:
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or
IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation
ES
Contractor shall perform testing and shall acquire data necessary to support compliance with the
Performance Oriented Packaging (POP) requirements of hazardous materials as defined in Title
49, Code of Federal Regulations (CFR), the International Maritime Organization’s International
Maritime Dangerous Goods (IMDG) Code, and the International Civil Aviation Organization
(ICAO) Technical Instructions for the Safe Transport of Hazardous Goods. The contractor shall document the results of the testing and data acquisition.
CDRL (DI-PACK-81059C)
ENG
Classified Data up to level is required, generated or both, as a part of this procurement effort
(If Yes, a DD-254 Security Classification Specification Package is required)
Additional Requirements (Mark if Needed) COMSEC CUI TEMPEST OPSEC
ENG
The contractor shall comply with TB 700-2, DoD Explosive Hazard Classification Procedures and shall submit Explosive Hazard Classification Data sufficient for the USAF to obtain a final
DoD Hazard Classification.
(PLEASE NOTE: ANY QUESTIONS WHETHER THIS ITEM IS NEEDED MAY BE
ANSWERED BY COGNIZANT ES or SAFETY, ALCMC/EBHE (801-586-6963).
CDRL (DI-SAFT-81299C)
ENG
All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For
Variances (RFVs, formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-1A. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.
Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the
Government Engineer
ACO
Contractor (Check Applicable CDRLs Below)
ECPs - CDRL (DI-SESS-80639E)
NORs - CDRL (DI-SESS-80642E)
RFVs - CDRL(DI-SESS-80640E)
Distribution Reason:
Statement: (ref. DoDI 5230.24)
CDRL (DI-SESS-80639E)
CDRL (DI-SESS-80642E)
CDRL (DI-SESS-80640E)
ENG
Contractor shall submit a Configuration Management Plan based upon EIA-649-1A and EIA-
649C to ensure product identification and traceability, product/production baselines, change management (tracking, reporting, and implementation accountability), data management systems, interface management, and maintenance of the USAF technical data packages.
Contractor Configuration Management (CM) system (including sub-contractors) that establishes initial baseline for hardware, software, processes and procedures to meet the requirements as reflected by the Specification and Data List.
CDRL (DI-SESS-80858D)
ENG
(Note : Item(s) requiring ATP submittal with updated Gross Leak Check requirement) Item(s) must pass both gross and fine leak checks. MIL-STD-883L, Method 1014.18 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same.
Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.
CDRL (DI-QCIC-80553A)
ENG
(Note: Item(s) requiring ATP submittal but NOT requiring updated Gross Leak Check procedures) The contractor shall provide the Lot Acceptance Test Plan (LATP/ATP) for this item(s) in accordance with the contractual data requirements. No changes to previously approved government Acceptance Test Plans shall be made without prior government approval.
The Lot Acceptance Test Plan provided must be approved by HAFB engineering at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.
CDRL (DI-QCIC-80553A)
Electronic Systems to encompass system, subsystem, pieces parts and assemblies shall not contain any substitutes for Tin-Lead solder and finishes. The use of any Tin-Lead solder substitutes requires approval through PCO and cognizant engineer, REFERENCE:
“Airworthiness Advisory (AA-08-02)Lead- Free Electronics” and GEIA-STD-0005-1 & 2
CDRL Required
CDRL Not Required CDRL (DI-MGMT-81772)
ENG
Special Munitions Specifications are applicable
ENG
Lot Acceptance Test Requirements are:
USAF
Army
Navy
Contractor
ENG
The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following System
(s):
CDRL (DI-NDTI-80809B)
ENG
LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the
PCO/ACO and Air Force Engineering Organization within 1 business day
Air Force Engineering Organization:
E-mail: @us.af.mil
ENG
In the event of test failure(s), a Failure Summary and Analysis Report with proposed corrective actions/recommendations is required
CDRL (DI-SESS-80255B)
ENG
If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase
Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.
ENG
The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121
(http://www.pmddtc.state.gov/regulations_laws/itar.html).
ENG
Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed months since date of manufacture and comply with original manufacture’s
Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the variance and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of
Analysis/ Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan.
Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and121
Percussion primers shall have been certified /recertified by performing sensitivity (all-fire/no fire) and dud testing per applicable specification within the past months unless they are Navy certified and have a 2 year certification. Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item.
All primers shall be X-rayed in top and side views for critical defects prior to use.
ENG
This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.
MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA:
ENG
The contractor shall comply with MIL-STD-1171B for propellants, explosives and/or chemical materials used in the end item(s) or component(s) on this contract. Acceptance and description sheets shall be submitted in WARP (see Attachment #3).
(Engineer shall provide ATTACHMENT #3, ES7035 to Item Manager)
CDRL (DI-MGMT-81978)
ENG
A detailed end item component listing for Ammo Data Card reporting is required (see
Attachment #4).
(Engineer must attach item/component list and provide ATTACHMENT #4, ES6200 to
Item Manager)
ENG
The contractor is allowed to pre-select no more than 30% of the required production lot test samples per lot which have external cosmetic defects such as nicks, dings, scratches, paint blemishes, plating blemishes, and small burrs. These units can be used as pre-selected production lot test samples as long as the units do not create an interference with the test fixture. The selection of those samples shall be noted in a discrepancy report that shall identify the item part number, DODIC, contract, lot number, serial numbers of the pre-selected units, and the cosmetic defect of each serial number. DCMA shall be notified in advance by submission of the discrepancy report of the preselected production lot test samples with external cosmetic defects prior to submission of the production lot for random sample selection. LAT units preselected under this premise shall be noted in the Lot
Acceptance Test Report.
ENG
Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment #5).
(Engineer shall provide ATTACHMENT #5, ES7034 to Item Manager)
ENG
DoD Preferred Methods for Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and
ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916.
Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.
ENG
First Article Test/Inspection Report IAW AFMC Form 260
Select FAT below if required:
CDRL (DI-NDTI-80603A)
ENG
First Article Test Plan and Procedures
CDRL (DI-NDTI-81307A)
ENG
The contractor shall provide a Quality Assurance Program Plan (QAPP) which meets the requirements of ISO 9001:2015. The QAPP shall include a corrective action and disposition system for nonconforming material. The contractor QA requirements shall flow down to all tiers of subcontracts and assure subcontractor/vendor supplies conform to the requirements of this contract. The Contractor’s quality program shall focus on the prevention and detection of discrepancies to assure delivered products satisfy the life cycle and performance requirements. This deliverable will be a living document and therefore revisions may be periodically required and resubmitted for approval. Upon request, the contractor shall supply
Quality Manuals, Operating Procedures, or Work Instructions as referenced in the QAPP or as referenced in the contractor's ISO 9001:2015 Quality Management System.
CDRL (DI-QCIC-81794A)
The Contractor shall prepare and submit an MSE/AIE package to the Government for review and approval.
(Engineer shall provide a tailored ATTACHMENT #9 MSE to Item Manager)
CDRL (DI-QCIC-81960)
ENG
The Contractor shall submit the gauge studies, MSAs for the systems identified in paragraph
(h) in ATTACHMENT #9. This MSA package shall consist of the Assessment plan, associated data and analyses, and requires Government review and approval.
CDRL (DI-QCIC-81960)
ENG
The Contractor shall submit a Critical Characteristics Control Plan , CCCP. (Choose yes only if: 1- The TDP has at least one critical characteristic AND 2- The MSE Attachment is used for procurement.)
(Engineer shall provide ATTACHMENT #10 to Item Manager)
CDRL (DI-MGMT-80004A)
ENG
The Contractor may voluntarily submit Critical Plans of Actions (CPOAs). (Choose yes only if the CCCP option above is activated, otherwise choose no)
CDRL (DI-MGMT-80004A)
ENG
The Contractor shall submit a Critical Item Characteristics List; Notification of Occurrence of a Critical Defect; Root Cause and Corrective Action; Segregated Suspect Material Use;
and Request to Restart Operations. (If the CCCP option above is activated choose yes, otherwise choose no).
CDRL (DI-SAFT-80970A)
ENG
The Contractor shall prepare and submit a Technical Data Package Review Report.
CDRL (DI-MISC-80750)
ENG
The Contractor shall prepare and submit a Quality Assessment Report.
CDRL (DI-QCIC-81187)
ENG
The contractor shall provide all Technical Data Package (TDP) information as required in the
Data Item Description (DID).
CDRL (DI-SESS-80776B)
IAW DoDI 4245.15, Section 3, para. f, DMSMS provisions will be placed in contracts and requests for proposals requiring the execution of the DMSMS Management Plan. As a minimum, include a contractor DMSMS Management Plan, Obsolescence Alert Notices, and
Health Assessment Report. All other DMSMS deliverables/language will be at the discretion of the Program Team. Refer to SD-22 DMSMS Guidebook and SD-26 DMSMS Contract
Guidebook for other contract language options that does not have an associated CDRL.
PM
Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan
CDRL (DI-MGMT-81948)
PM
Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management
Implementation Plan.
CDRL (DI-MGMT-81949)
PM
The contractor shall provide a Diminishing Manufacturing Sources and Material Shortages
(DMSMS) Parts Management Plan IAW MIL-STD-3018, Parts Management, Requirement
5.1 (parts management elements).
CDRL (DI-SDMP-81748)
PM
Contractor shall submit a Bill of Materials (BOM) for Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management.
CDRL (DI-PSSS-81656B)
PM
Contractor shall provide an Obsolescence Alert Notice that a pending and/or emergent obsolescence issue exists.
CDRL (DI-MGMT-81941)
PM
Contractor shall provide a Diminishing Manufacturing Sources and Material Shortages
(DMSMS) Health Assessment Report to support DMSMS management activities as a part of the Department of Defense (DoD) Total System Life Cycle Management responsibilities.
CDRL (DI-MGMT-82273)
PM
Contractor shall provide Diminishing Manufacturing Sources and Material Shortages
(DMSMS) Life Cycle Management Data to support DMSMS management activities.
Those activities may require collecting Bill of Materials, DMSMS notifications. DMSMS case data, DMSMS health information, DMSMS cost and budgeting information, and
DMSMS case mitigation data as a part of the Department of Defense's (DOD) Total
System Life Cycle Management responsibilities.
CDRL (DI-MGMT-82274)
PM
Contractor shall provide Diminishing Manufacturing Sources and Material Shortages
(DMSMS) Metrics Data to support reporting on DMSMS management activities as a part of the Governments’ Total System Life Cycle Management responsibilities.
CDRL (DI-MGMT-82275)
PM
Contractor shall provide a Diminishing Manufacturing Sources and Material Shortages
(DMSMS) Operations Transfer Plan to assess program risk when transitioning DMSMS operations and management to the Government.
CDRL (DI-MGMT-82276)
PM
Counterfeit Mitigation-DFARS Title 48 252.246-7007 Applies
CDRL (DI-MISC-81832)
PM
Item unique identification (IUID) marking is required.
If required, marking shall be in accordance with MIL-STD-130N and DoD 5000.64.
PM
The contractor shall host a post award meeting at the contractor’s facility no later than days after contract award and provide minutes of the meeting.
PM email: @us.af.mil
CDRL (DI-ADMN-81505)
PM
Contractor shall plan and provide a Conference Agenda for all Program Reviews
(PRs)/Technical Reviews (TRs) at their facilities and/or subcontractors facilities.
PM email: @us.af.mil
CDRL (DI-ADMN-81249C)
PM
Contractor shall prepare and deliver conference minutes for all PRs and TRs.
PM email: @us.af.mil
CDRL (DI-ADMN-81505)
PM
Contractor shall prepare and submit monthly progress reports documenting program status of milestones, schedule, cost objectives, and technical performance requirements.
PM email: @us.af.mil
CDRL (DI-MGMT-81928)
PM
Contractor shall provide a report of GFP inventory and end-item transactions as described in CDRL (DIMGMT-80442).
Applies to all inventories that are intended to be returned to the government after repair or use. Excluded are new production and items intended for disposal or expenditure.
CDRL (DI-MGMT-80442)
PM
PLEASE NOTE: THE SECTION ABOVE PERTAINS TO EXPLOSIVE AND HAZARDOUS ITEMS
ONLY. PLEASE INITIAL FOR CONCURRENCE WITH HAZARD CLASSIFICATION DATA LISTED IN
BLOCK. SAFETY TO CONTACT ES IF ANY DISCREPANCIES NOTED.
SAF
Contracts involving ammunition and explosives (AE) will contain:
-DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives
-DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and
Explosives.
Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:
-AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments
PQM Program Quality Manager Review
SER Supervisory Engineer Review
NOTE TO IM – FOR PRs PLEASE CHECK THE 761/762 SCREENING PACKAGE TO ENSURE IT IS CURRENT AND
COMPLETE. IF (FAT) IS REQUIRED, BE SURE THE AFMC FORM 260 IS ACCURATELY AND COMPLETELY FILLED OUT
BY ENGINEER FOR CURRENT REQUIREMENTS.
This document supersedes 19 May 2022, same title.
| PRMIPR AIR MUNITIONS SPECIFICATION COORDINATION SHEETRow1: |
| OPR: |
| YES: |
| Note Blocks shown on right of CDRLs are for DM use only: Off |
| PR: Choice1 |
| SP Instr: |
| DODIC: V780 |
| Text11: 128 |
| NOUN: Wing Ordnance Cartridge |
| P/: |
| N: 50-8264-5 / 30910-1 |
| Reason PR/MIPR: |
| CCCD: [No] |
| NSN: 1336011184636ES/1336015197200ES |
| QTY1: |
| Hard Copy PR/MIPR: Off |
| GFM Required: [No] |
| Contract Cost: |
| Start Date_af_date: |
| NSN1: |
| P/N1: |
| Completion Date_af_date: |
| CSI: [Yes] |
| 806 No Reason: No special materials required |
| PM Name: Kyle Fox |
| PM INIT: KHF |
| PM Comp Date_af_date: 06/12/2023 |
| ES Name: Colton Russell |
| ES INIT: CMR |
| ES Comp Date_af_date: 06/20/2023 |
| 806 Determination: [No] |
| Form 807: [Yes] |
| 807 Remarks: |
| Market Research: [Yes] |
| ENG Name: Alyson Weber |
| ENG INIT: AKW |
| ENG Comp Date_af_date: 06/26/2023 |
| Safety Name: Travis C. Madden |
| SAF INIT: TCM |
| SAF Comp Date_af_date: 06/28/2023 |
| PQM Name: N/A |
| PQM INIT: |
| PQM Comp Date_af_date: |
| ENG SUP INIT: TT |
| ENG SUP Comp Date_af_date: 07/14/2023 |
| DM Comp Date_af_date: 06/27/2023 |
| DM Name: Terry McCurdy |
| EBE Control: 23-178-001 |
| ENG SUP Name: Travis Thom |
| DM INIT: TM |
| IM Phone: 777-5484 |
| DD 254 Req: [No] |
| Branch: [EBHJ] |
| CDRL: Choice2 |
| IM2: RV |
| IM3: RV |
| IM4: |
| IM5: |
| IM6: RV |
| DODID: V780 |
| IM7: |
| IM8: RV |
| IM9: |
| IM1: |
| Stock Number: |
| Nomenclature: |
| Part Number: |
| Quantity: |
| 82098: Off |
| IM11: |
| IM10: RV |
| IM12: RV |
| ES1: |
| ES2: CMR |
| ES3: CMR |
| 80438B: Off |
| ES5: |
| ES4: |
| Acceptance: [Select] |
| ES7: |
| ES8: CMR |
| ES9: |
| ES10: CMR |
| ES11: CMR |
| ES12: |
| ES13: |
| ES14: CMR |
| ES15: |
| ES6: CMR |
| AA&E: [Select] |
| GFM: [Select] |
| Comp Group: |
| DOT Marking: |
| DOT Ship Labels: |
| UN Number: |
| Proper Ship Name: |
| HAZ Class/Div: SEE ATTACHED JHCS/IHC RECORDS |
| NEW: |
| ES17: |
| ES16: CMR |
| ES19: CMR |
| ES20: |
| ES21: |
| ES18: CMR |
| 80043B: Yes |
| Unit of Measurement: [Select] |
| Classified Data: [Select] |
| CUI: Off |
| TEMPEST: Off |
| COMSEC: Off |
| OPSEC: Off |
| ES22: CMR |
| 81059B: Off |
| ACO: Off |
| NOR: Yes |
| ECP: Yes |
| Distro Statement: [B] |
| Distro Reason: [Controlled Technical Information] |
| RFV: Yes |
| 80642E: Yes |
| 80639E: Yes |
| 80640E: Yes |
| 80858D: Off |
| 81299C: Off |
| 80553A: Yes |
| CDRL Lead Free: Choice1 |
| 80553A1: Off |
| Special Munitions Specification: |
| GOV ENG: Yes |
| Contractor: Off |
| Contractor LAT: Yes |
| USAF LAT: Off |
| Army LAT: Off |
| Navy LAT: Off |
| 81772: Off |
| LAT/Insp Rpt: [WAWF] |
| IM Email: |
| AF ENG ORG Email: alyson.weber.ctr |
| 80809B: Yes |
| Age of Energetic: 24 |
| ENG1: |
| ENG2: AKW |
| ENG3: |
| ENG4: AKW |
| ENG5: AKW |
| ENG6: |
| ENG7: |
| ENG8: AKW |
| ENG9: AKW |
| ENG10: |
| ENG11: |
| ENG12: AKW |
| ENG13: AKW |
| ENG14: |
| ENG15: |
| ENG16: AKW |
| ENG17: AKW |
| ENG18: |
| ENG19: AKW |
| ENG20: |
| ENG21: AKW |
| ENG22: |
| ENG23: AKW |
| ENG24: |
| ENG25: AKW |
| ENG26: |
| ENG27: AKW |
| ENG29: AKW |
| ENG30: |
| ENG31: AKW |
| ENG28: |
| Raw Materials: 24 |
| Primers: 24 |
| ENG33: AKW |
| ENG34: |
| ENG35: |
| ENG32: |
| 80255B: Yes |
| ENG37: |
| ENG38: AKW |
| ENG39: AKW |
| ENG40: |
| ENG41: AKW |
| ENG42: |
| ENG43: |
| ENG36: AKW |
| FAT Form 260: [Select] |
| 81978: Off |
| ENG45: |
| ENG46: AKW |
| ENG47: |
| ENG48: AKW |
| ENG49: |
| ENG44: |
| 80603A: Off |
| 81307A: Off |
| ENG51: |
| ENG52: AKW |
| ENG53: |
| ENG50: AKW |
| 81960: Off |
| 80004A: Off |
| 81794A: Off |
| 819601: Off |
| ENG55: |
| ENG56: AKW |
| ENG57: |
| ENG58: AKW |
| ENG59: |
| ENG54: AKW |
| 80970A: Off |
| 80750: Off |
| 81187: Off |
| 80004A1: Off |
| ENG61: |
| ENG62: AKW |
| ENG63: |
| ENG64: AKW |
| ENG65: |
| ENG66: AKW |
| ENG60: AKW |
| PM2: KHF |
| PM3: |
| PM4: KHF |
| PM5: |
| PM6: KHF |
| PM7: |
| PM8: KHF |
| PM9: KHF |
| PM1: |
| 81948: Off |
| 81949: Off |
| 81748: Off |
| 81656B: Off |
| 80776B: Off |
| PM11: KHF |
| PM10: |
| 82273: Off |
| 82274: Off |
| 82275: Off |
| 82276: Off |
| 81832: Off |
| 81505#1: Off |
| 81249B: Off |
| 81505#2: Off |
| 81298: Off |
| 81941: Yes |
| 80442: Off |
| PM13: |
| PM14: KHF |
| PM15: |
| PM16: KHF |
| PM17: |
| PM18: KHF |
| PM19: |
| PM20: KHF |
| PM21: |
| PM22: KHF |
| PM23: |
| PM24: KHF |
| PM25: |
| PM26: KHF |
| PM27: |
| PM28: KHF |
| PM29: |
| PM30: KHF |
| PM31: |
| PM32: KHF |
| PM33: KHF |
| PM34: |
| SAF1: TCM |
| SAF2: |
| PM12: |
| PQM2: |
| SER1: TT |
| PQM1: |
| SER2: |
| Email3: |
| PQM Comments: |
| SER Comments: |
| FD2020: 23-51342 |
| IM Name: Rick Vigeant |
| LOTR Notes: IAW latest government approved ATP. |
| AF ENG Org: AFLCMC/EBHJ |
| DCMA: § SECTION E – PRODUCTION LOT TEST SAMPLES AND CONTRACTOR TESTING |
□ Test samples are required from each production lot and are to be tested in accordance with the approved test plan. The production lot(s) must be manufactured and presented to the Government Quality Assurance Representative (QAR) with all production documentation. The documentation accompanying the production lot test samples shall contain the contract number, item, lot number identification, DODIC, NSN, and serial numbers. The samples shall be selected, at random, from each production lot, by the Government QAR within 2 workdays for resident QARs, or 7 workdays for non-resident QARs after presentation of the lot.
□ Production lot testing shall be witnessed by a representative of the Government engineering activity and/or the cognizant Government QAR and shall be in accordance with the latest Government approved Lot Acceptance Test Procedure.
§ SECTION E – CAD/PAD INSPECTION AND ACCEPTANCE
□ The Contractor shall provide and maintain a quality program acceptable to the Government and modeled on ISO 9001:2015 or an equivalent quality system such as AS9100. This quality system along with program specific production documentation shall be made available for review by the Government’s representative upon request, at the Contractor’s facility at no cost to the Government.
□ Radiographic equipment and procedures shall meet the standards stipulated in the latest revisions of ASTM E1742, ASTM E748, and ASTM E545. Radiographers shall be qualified and certified Level II or Level III in accordance with the requirements described in specification NAS 410.
□ Due to the critical nature and safety application of these items, the Contractor and Government QARs are cautioned that it is mandatory to ensure the correct identification and nomenclature are assigned for all items and shipping containers prior to shipment including CAGE codes.