This is a mechanical drawing set for the Building Technologies Center Addition & Interior Renovations project located at 1201 West 3rd Street, Williamsport, Pennsylvania, prepared by BRIX Design Group, LLC for Pennsylvania College of Technology. The project scope includes the installation of a new dust collection system with associated ductwork, as well as demolition of existing dust collection infrastructure. The drawings contain mechanical legends, schedules, abbreviations, specifications, automatic temperature controls, and first-floor demolition and installation plans for the dust collection system. Key specifications require 10 feet of straight ductwork per non-return valve requirements and 20 feet of unobstructed straight ductwork per spark detection system requirements. All duct branches must be side connections, and dust cleanout must be air and light tight. The drawings indicate work is to be installed per manufacturer's recommendations, with the dust collector shop drawings to be provided by others. The permit set was issued on November 22, 2024, with revisions dated May 22, 2026 for RTU duct modifications and May 29, 2026 for dust collection work. The project number is 231641 with a certificate number of 3869.

The mechanical drawing set serves as the technical documentation for contractors bidding on the dust collection system installation contract. The specifications emphasize compliance with SMACNA standards for ductwork construction, proper sizing and slope for piping systems, and coordination with other trades to avoid conflicts. Installation requirements include flexible duct connectors with minimum 3-inch spacing from equipment, concealment of ductwork and piping in chases or above ceilings where indicated, and provision of adequate clearance for equipment operation and maintenance. All work shown is to be considered new unless specifically indicated as existing. The drawings establish the technical baseline for the solicitation and would guide contractors in preparing accurate bids and ensuring compliant installations of the new dust collection system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AB ABOVE

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AHJ AUTHORITY HAVING JURISDICTION

ARCH ARCHITECTURAL

BDD BACK DRAFT DAMPER

BEL BELOW

BFF BELOW FINISH FLOOR

BFG BELOW FINISH GRADE

BJ BETWEEN JOISTS

BOD BOTTOM OF DUCT

BTM BOTTOM

BTU BRITISH THERMAL UNIT

CD CEILING DIFFUSER

CFM CUBIC FEET PER MINUTE

CLG CEILING

CO CLEANOUT

CONN CONNECT / CONNECTION

CONT CONTINUED / CONTINUATION

COORD COORDINATE

CW DOMESTIC COLD WATER

DB DRY BULB

DCO DUCT CLEANOUT

DEG,° DEGREE

DIA, ∅ DIAMETER

DISC DISCONNECT

DN DOWN

DWG DRAWING

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EDB ENTERING DRY BULB TEMPERATURE

EF EXHAUST FAN

EG EXHAUST GRILLE

ER EXHAUST REGISTER

ESP EXTERNAL STATIC PRESSURE

EWB ENTERING WET BULB TEMPERATURE

EWT ENTERING WATER TEMPERATURE

EX, (E) EXISTING

FD FIRE DAMPER / FLOOR DRAIN

FLA FULL LOAD AMPERES

FLEX FLEXIBLE

FLS FLOOR SWEEP

FPM FEET PER MINUTE

FT FOOT / FEET / FIN TUBE

FT HD FEET OF HEAD

GA GAUGE / GAGE

GAL GALLON

GC GENERAL CONTRACTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HC HVAC CONTRACTOR

HD HUB DRAIN

HORZ HORIZONTAL

HP HORSE POWER

HSTAT HUMIDISTAT

ID INSIDE DIAMETER

IN, " INCHES

INS INSULATION

INV INVERT

ISP INTERNAL STATIC PRESSURE

IWG INCHES WATER GAUGE

LAT LEAVING AIR TEMPERATURE

LF LINEAR FEET

LB, # POUNDS

LDB LEAVING DRY BULB TEMPERATURE

LWB LEAVING WET BULB TEMPERATURE

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH THOUSAND BTU PER HOUR

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPACITY

MOD MOTOR OPERATED DAMPER

MFR MANUFACTURER

MIN MINIMUM

MTD, MTG MOUNTED, MOUNTING

NC NOISE CRITERIA

NIC NOT IN CONTRACT

OA OUTSIDE AIR

OAC OPEN ABOVE CEILING

OAI OUTSIDE AIR INTAKE

OC ON CENTER

ORD OVERFLOW ROOF DRAIN

PC PLUMBING CONTRACTOR

PH PHASE

PRV PRESSURE REDUCING VALVE /

PRESSURE RELIEF VENT

PSI POUNDS PER SQUARE INCH

RA RETURN AIR

RD ROOF DRAIN

RG RETURN GRILLE

RPM REVOLUTIONS PER MINUTE

RWC RAINWATER CONDUCTOR

RX REMOVE EXISTING

SW STORMWATER

S&C STUB AND CAP

SA SUPPLY AIR

SAN SANITARY

SF SQUARE FEET

SG SUPPLY GRILLE

SPEC SPECIFICATIONS

SR SUPPLY REGISTER

TD TRANSFER DUCT

TEMP TEMPERATURE

TG TRANSFER GRILLE

THRU THROUGH

TJ THROUGH JOISTS

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL)

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THROUGH ROOF

W WATTS / WASTE

W/ WITH

W/O WITHOUT

WB WET BULB

WL WALL / WEATHER LOUVER

WPD WATER PRESSURE DROP

WTD WATER TEMPERATURE DROP

WTR WATER TEMPERATURE RISE

XFMR TRANSFORMER

CO

NO

CONNECT TO EXISTING

DISCONNECT FROM EXISTING

12x20

UP

T

S B

H

M

S

D

DL

DU

S R

NEW WORK

DEMOLITION WORK

EXISTING WORK

DOOR UNDERCUT, SEE ARCH. DWGS.

DOOR LOUVER, SEE ARCH. DWGS.

VERTICAL FIRE DAMPER

HORIZONTAL FIRE DAMPER

MANUAL VOLUME DAMPER

NITROGEN DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

DUCT SMOKE DETECTOR

CONTROL SWITCH

MOTOR OPERATED DAMPER

HUMIDISTAT

EMERGENCY BURNER SHUT-OFF SWITCH

THERMOSTAT

FLEXIBLE CONNECTION

MITERED ELBOW W/O TURNING VANES

(USE ONLY WHERE SHOWN)

MITERED ELBOW W/ TURNING VANES

INCLINED RISE (UP) OR DROP (DN) ARROW

IN DIRECTION OF AIR FLOW

STANDARD BRANCH FOR SUPPLY &

RETURN (NO SPLITTER)

DUCT (1ST FIGURE, SIDE SHOWN;

2ND FIGURE, SIDE NOT SHOWN)

3-WAY CEILING DIFFUSER

2-WAY CORNER CEILING DIFFUSER

2-WAY CEILING DIFFUSER

4-WAY CEILING DIFFUSER OR REGISTER

RETURN GRILLE OR REGISTER

EXHAUST GRILLE OR REGISTER

ROOFTOP RELIEF HOOD

ROOFTOP INTAKE HOOD

ROOFTOP EXHAUSTER

RETURN AIR DUCT RISER

SUPPLY AIR DUCT RISER

EXHAUST OR RELIEF AIR DUCT RISER

SW

PS

G

LP

CA

CD

140R

F

CHS

CHR

HS

HR

CS

CR

MPS

MPR

LPS

PCR

RS

RL

s

A

LPR

COLD WATER (CW)

HOT WATER (HW)

HOT WATER RECIRCULATION (HWR)

SOIL / WATER (SAN)

STORM WATER (SW)

PUMPED SEWAGE

VENT (V)

NATURAL GAS (G)

LIQUID PROPANE (LP)

COMPRESSED AIR (CA)

COIL CONDENSATE DRAIN (CD)

140°F HOT WATER (140)

140°F HOT WATER RECIRCULATION (140R)

FIRE (F)

CHILLED WATER SUPPLY (CHS)

CHILLED WATER RETURN (CHR)

CONDENSER WATER SUPPLY (CS)

CONDENSER WATER RETURN (CR)

HOT WATER HEATING SUPPLY (HS)

HOT WATER HEATING RETURN (HR)

MEDIUM PRESSURE STEAM SUPPLY (MPS)

MEDIUM PRESSURE CONDENSATE RETURN (MPR)

LOW PRESSURE STEAM SUPPLY (LPS)

LOW PRESSURE CONDENSATE RETURN (LPR)

PUMPED CONDENSATE RETURN

REFRIGERANT SUCTION (RS)

REFRIGERANT LIQUID (RL)

EXISTING WORK

DEMOLITION WORK

NEW WORK

FLOOR CLEANOUT (CO)

WALL CLEANOUT (CO)

OVERHEAD CLEANOUT (CO)

HOSE BIBB (HB)

WALL HYDRANT (WH)

ROOF DRAIN (RD)

FLOOR DRAIN (FD)

PIPE DROP

BRANCH (TOP CONNECTION)

PIPE RISE

BRANCH (BOTTOM CONNECTION)

CONTINUATION

STUB AND CAP

FLEXIBLE CONNECTOR

EXPANSION LOOP

THERMOSTATIC MIXING VALVE

2-WAY CONTROL VALVE

3-WAY CONTROL VALVE

FLOW ARROW

STEAM TRAP

AUTOMATIC AIR VENT

PUMP

SHUTOFF VALVE

BALANCING VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

GATE VALVE

GLOBE VALVE

STRAINER

PRESSURE REDUCING VALVE

SOLENOID VALVE

RELIEF VALVE

PLUG COCK VALVE

THERMOMETER

UNION

PRESSURE GAUGE

PIPE ANCHOR

PIPE GUIDE

WATER HAMMER ARRESTER

(SIZE A-F, SEE SCHEDULE)

• ALL WORK SHOWN IS TO BE CONSIDERED NEW AND PROVIDED UNDER THIS CONTRACT UNLESS SPECIFICALLY

INDICATED AS EXISTING.

• CONNECT ALL DUCTS TO MECHANICAL EQUIPMENT BY FLEXIBLE DUCT CONNECTORS WITH NOT LESS THAN 3"

SPACING BETWEEN DUCT AND EQUIPMENT.

• CONSTRUCT AND INSTALL ALL DUCTWORK IN ACCORDANCE WITH SMACNA.

• ALL DUCT DIMENSIONS ARE CLEAR INSIDE DIMENSIONS.

• INSTALL DUCT MOUNTED SMOKE DETECTOR(S) IN THE RETURN AIR STREAM OF AIR SYSTEM OVER 2000 CFM, PER MANUFACTURER'S RECOMMENDATIONS, DOWNSTREAM OF ALL BRANCH CONNECTIONS, UPSTREAM OF ANY OUTSIDE AIR CONNECTIONS OR FILTERS, AND PROVIDE WIRING FOR FAN SHUTDOWN. DETECTOR IS TO BE FURNISHED AND CONNECTED TOP THE FIRE ALARM SYSTEM BY OTHERS. IN OCCUPANCIES WHERE A FIRE ALARM SYSTEM IS NOT PRESENT AND/OR REQUIRED, THE DUCT SMOKE DETECTOR SHALL BE FURNISHED AND WIRED BY THE MECHANICAL CONTRACTOR TO A REMOTE TEST STATION MANUFACTURED BY SIMPLEX, MODEL 4098-9842.

• INSTALL DUCTWORK, EQUIPMENT, AND PIPING CONCEALED IN CHASES OR ABOVE CEILINGS WHERE CEILINGS ARE INDICATED, UNLESS NOTED OTHERWISE. WHERE DUCTWORK OR PIPING IS INDICATED TO BE EXPOSED, INSTALL AS HIGH AS POSSIBLE. ELEVATIONS SHOWN ARE TO THE LOWEST POINT, UNLESS NOTED OTHERWISE.

• ANY PIPING SHOWN TO BE INSTALLED WITHIN AN EXTERIOR WALL MUST BE INSTALLED ON THE INTERIOR SIDE

OF THE WALL INSULATION.

• WALL MOUNTED THERMOSTATS SHALL BE INSTALLED 44" ABOVE THE FLOOR AND HANDICAPPED ACCESSIBLE.

• INSTALL ROOFTOP EQUIPMENT NOT LESS THAN 10 FT FROM THE ROOF EDGE OR ANY CHANGE IN ROOF HEIGHT

GREATER THAN 2 FT.

• SEAL OR CAP OPENINGS IN PIPES OR DUCTS UNTIL FINAL CONNECTIONS ARE MADE.

• INSTALL SUFFICIENT UNIONS IN PIPING SYSTEMS TO ALLOW SERVICE OF ANY CONNECTED EQUIPMENT WITHOUT

BREAKING FITTINGS OR CUTTING PIPING CONNECTIONS.

• DIMENSIONS AND PIPE SIZES ARE IN INCHES UNLESS NOTED OTHERWISE.

• RUNOUTS TO EQUIPMENT SHALL BE RUN IN SIZES INDICATED ON PLANS OR SCHEDULES AND INCREASED OR

REDUCED AT POINT OF FINAL CONNECTION.

• DO NOT RUN PIPING OR DUCTWORK OVER ELECTRICAL EQUIPMENT.

• PROVIDE SUFFICIENT CLEARANCE FOR OPERATION AND MAINTENANCE OF MECHANICAL EQUIPMENT

ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS.

• PROVIDE SERVICE CLEARANCE FOR ELECTRICAL EQUIPMENT AS REQUIRED BY THE NATIONAL ELECTRICAL CODE

(NEC).

• CONNECT HW, CW, VENT, AND SAN LINES TO FIXTURES IN ACCORDANCE WITH SIZES INDICATED ON THE PLUMBING FIXTURE SCHEDULE WITH A 2" MINIMUM SIZE FOR SANITARY PIPING BELOW FLOOR.

• PIPING INSTALLED ABOVE CEILINGS SHALL BE BELOW THE ROOF INSULATION.

• SLOPE SANITARY PIPING SIZES 3" AND LARGER 1/8" PER FOOT, AND SMALLER PIPES 1/4" PER FOOT, UNLESS

NOTED OTHERWISE.

• ALL EXPOSED PLUMBING PIPING AND ACCESSORIES (VALVES, TRAPS, STRAINERS, ETC.) SHALL BE CHROME

PLATED.

• PROVIDE BACKFLOW PREVENTER OR AIR GAP FOR ALL DOMESTIC HOT AND COLD WATER CONNECTIONS TO

FIXTURES AND EQUIPMENT THAT DO NOT HAVE INTEGRAL AIR GAPS.

• PROVIDE SHUTOFF VALVES FOR ALL DOMESTIC WATER CONNECTIONS TO FIXTURES AND EQUIPMENT.

• COORDINATE LOCATIONS OF ALL PIPING, DUCTWORK, EQUIPMENT, AND DEVICES BEFORE INSTALLATION, WITH THE WORK OF OTHER TRADES. WHERE A CONFLICT IN CLEARANCES OCCURS, OBTAIN CLARIFICATION FROM THE ENGINEER, ARCHITECT, OR OWNER. INSTALL ALL NECESSARY PIPING, DUCTWORK, FITTINGS, ETC. THAT ARE

REQUIRED FOR A COMPLETE SYSTEM WITHOUT ADDITIONAL COST TO THE CONTRACT.

• TEST INSTALLATIONS IN ACCORDANCE WITH THE APPROPRIATE CODE REQUIREMENTS AS EACH PORTION IS INSTALLED. FLUSH NEW DOMESTIC WATER PIPING UNTIL IT RUNS CLEAR, FILL WITH 50 PPM CHLORINE FOR 24 HOURS, PURGE WITH FRESH WATER, TEST FOR BACTERIAL CONTENT, AND REPEAT IF NECESSARY.

• PROVIDE P-TRAPS FOR ALL SANITARY FIXTURE CONNECTIONS TO FIXTURES WITHOUT INTEGRAL P-TRAPS.

• PROVIDE CONDENSATE DRAINS WITH P-TRAPS FOR AIR HANDLING UNITS WITH COOLING COILS. DISCHARGE

CONDENSATE TO ROOF, GRADE, OR INDIRECT WASTE.

• FOR ANY COOLING EQIUPMENT ABOVE CEILING, PROVIDE CONDENSATE OVERFLOW PROTECTION WITH LIQUID

DETECTOR AT TOP OF DRAIN PAN, WIRED TO SHUT DOWN THE SYSTEM.

• VERIFY MOUNTING HEIGHTS OF EQUIPMENT AND FIXTURES WITH ARCHITECTURAL DRAWINGS, AUTHORITY

HAVING JURISDICTION, AND THE OWNER.

• FOR INDICATED DEMOLITION WORK: REMOVE EQUIPMENT, DUCTWORK, PIPING, AND RELATED DIFFUSERS, SUPPORTS, WIRING, CONTROLS IN THEIR ENTIRETY UNLESS NOTED OTHERWISE. REMOVE BRANCH PIPING TO

THE CONNECTION AT THE MAIN AND BEYOND THE SURFACE OF WALLS AND FLOORS.

• PATCH OPENINGS CREATED OR UNCOVERED DURING DEMOLITION WORK IN PORTIONS OF WALLS, ROOF, OR FLOORS THAT WILL REMAIN. REPAIR SURFACES TO MATCH ADJACENT OR ORIGINAL CONSTRUCTION. SEE

ARCHITECTURAL DRAWINGS AND SPECIFICATION FOR FINAL FINISH MATERICAL AND METHODS.

MECHANICAL ABBREVIATIONS HVAC SYMBOL LEGEND PIPING SYMBOL LEGEND MECHANICAL AND PLUMBING GENERAL NOTES

PEC Job Number:

Phone: 717-793-3997 York, PA 17403

1071 Edgar Street, Suite A

3 2 1456

A

215 East 3rd Street

Williamsport PA 17701

570 215 5660 www.BRIXDG.com

These Drawings and Specifications as instruments of service are, and shall remain, the property of BRIX Design Group, LLC whether the project for which they are made is executed or not. All rights reserved. Any other use requires the express written authorization of the Architect.

PROJECT NUMBER:

STAMP

REVISIONS

ISSUE DATE

DESCRIPTION DATE

3 2 1456

B

C

D

E

A

B

C

D

E

231641 Certificate Number: 3869

PERMIT SET 11.22.24

M001

BUILDING TECHNOLOGIES CENTER ADDITION & INTERIOR

RENOVATIONS

MECHANICAL LEGENDS, SCHEDULES, &

ABBREVIATIONS

231641

11.22.24

1201 WEST 3RD STREET

WILLIAMSPORT, PA 17701

PERMIT SET

# DESCRIPTION DATE

3 DUST COLLECTION 05/29/26

brt10 Rectangle

PEC Job Number:

Phone: 717-793-3997 York, PA 17403

1071 Edgar Street, Suite A

3 2 1456

A

215 East 3rd Street

Williamsport PA 17701

570 215 5660 www.BRIXDG.com

These Drawings and Specifications as instruments of service are, and shall remain, the property of BRIX Design Group, LLC whether the project for which they are made is executed or not. All rights reserved. Any other use requires the express written authorization of the Architect.

PROJECT NUMBER:

STAMP

REVISIONS

ISSUE DATE

DESCRIPTION DATE

3 2 1456

B

C

D

E

A

B

C

D

E

231641 Certificate Number: 3869

PERMIT SET 11.22.24

M003

BUILDING TECHNOLOGIES CENTER ADDITION & INTERIOR

RENOVATIONS

MECHANICAL SPECIFICATIONS

231641

11.22.24

1201 WEST 3RD STREET

WILLIAMSPORT, PA 17701

PERMIT SET

# DESCRIPTION DATE

2 RTU DUCT MODIFICATIONS 05/22/26

3 DUST COLLECTION 05/29/26

PEC Job Number:

Phone: 717-793-3997 York, PA 17403

1071 Edgar Street, Suite A

3 2 1456

A

215 East 3rd Street

Williamsport PA 17701

570 215 5660 www.BRIXDG.com

These Drawings and Specifications as instruments of service are, and shall remain, the property of BRIX Design Group, LLC whether the project for which they are made is executed or not. All rights reserved. Any other use requires the express written authorization of the Architect.

PROJECT NUMBER:

STAMP

REVISIONS

ISSUE DATE

DESCRIPTION DATE

3 2 1456

B

C

D

E

A

B

C

D

E

231641 Certificate Number: 3869

PERMIT SET 11.22.24

M005

BUILDING TECHNOLOGIES CENTER ADDITION & INTERIOR

RENOVATIONS

MECHANICAL AUTOMATIC TEMPERATURE

CONTROLS

231641

11.22.24

1201 WEST 3RD STREET

WILLIAMSPORT, PA 17701

PERMIT SET

# DESCRIPTION DATE

2 RTU DUCT MODIFICATIONS 05/22/26

3 DUST COLLECTION 05/29/26

DEMOLITION KEYED NOTES

1. REMOVE EXISTING DUST COLLECTOR AND ALL ASSOCIATED FITTINGS, DEVICES, HANGERS, AND SUPPORTS.

2. REMOVE EXISTING FLOOR SWEEP AND ALL ASSOCIATED FITTINGS, HANGERS, AND SUPPORTS, TO THE EXTENT INDICATED.

3. REMOVE EXISTING DUST COLLECTION DUCTWORK AND ALL ASSOCIATED FITTINGS, HANGERS, AND SUPPORTS TO THE EXTENT INDICATED IN THIS AREA.

PEC Job Number:

Phone: 717-793-3997 York, PA 17403

1071 Edgar Street, Suite A

3 2 1456

A

215 East 3rd Street

Williamsport PA 17701

570 215 5660 www.BRIXDG.com

These Drawings and Specifications as instruments of service are, and shall remain, the property of BRIX Design Group, LLC whether the project for which they are made is executed or not. All rights reserved. Any other use requires the express written authorization of the Architect.

PROJECT NUMBER:

STAMP

REVISIONS

ISSUE DATE

DESCRIPTION DATE

3 2 1456

B

C

D

E

A

B

C

D

E

231641 Certificate Number: 3869

PERMIT SET 11.22.24

MD201

BUILDING TECHNOLOGIES CENTER ADDITION & INTERIOR

RENOVATIONS

FIRST FLOOR DEMOLITION PLAN - DUST

COLLECTION SYSTEM

231641

11.22.24

1201 WEST 3RD STREET

WILLIAMSPORT, PA 17701

PERMIT SET

# DESCRIPTION DATE

3 DUST COLLECTION 05/29/26

3/4" = 1'-0"1

FIRST FLOOR DEMOLITION PLAN - DUST COLLECTION SYSTEM

KEYED NOTES

1. REFER TO DUST COLLECTOR SHOP DRAWINGS FOR EQUIPMENT DETAILS. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. 10'-0" OF STRAIGHT DUCTWORK PER NON-RETURN VALVE REQUIREMENTS. NON-RETURN VALVE SELECTED BY OTHERS.

3. 20'-0" UNOBSTRUCTED STRAIGHT DUCTWORK PER SPARK DETECTION SYSTEM REQUIREMENTS. SPARK DETECTION SYSTEM DESIGN BY OTHERS.

4. DUST CLEAN OUT TO BE AIR AND LIGHT TIGHT.

PLAN NOTES

1. ALL DUCT BRANCHES MUST BE SIDE CONNECTIONS. BOTTOM CONNECTIONS ARE NOT ACCEPTABLE.

PEC Job Number:

Phone: 717-793-3997 York, PA 17403

1071 Edgar Street, Suite A

3 2 1456

A

215 East 3rd Street

Williamsport PA 17701

570 215 5660 www.BRIXDG.com

These Drawings and Specifications as instruments of service are, and shall remain, the property of BRIX Design Group, LLC whether the project for which they are made is executed or not. All rights reserved. Any other use requires the express written authorization of the Architect.

PROJECT NUMBER:

STAMP

REVISIONS

ISSUE DATE

DESCRIPTION DATE

3 2 1456

B

C

D

E

A

B

C

D

E

231641 Certificate Number: 3869

PERMIT SET 11.22.24

M201

BUILDING TECHNOLOGIES CENTER ADDITION & INTERIOR

RENOVATIONS

FIRST FLOOR PLAN - DUST COLLECTION SYSTEM

231641

11.22.24

1201 WEST 3RD STREET

WILLIAMSPORT, PA 17701

PERMIT SET

# DESCRIPTION DATE

3 DUST COLLECTION 05/29/26

3/4" = 1'-0"1

FIRST FLOOR PLAN - DUST COLLECTION SYSTEM

File details come from the government source that posted it. Updated .