Sonestown Sewer System Investigation Project - Contract Documents
This is a comprehensive bid package for the Sonestown Sewer System Investigation Project issued by Sullivan County in conjunction with the Davidson Township Sewer Authority and designed by Larson Design Group. The project scope consists of closed-circuit television (CCTV) inspection of approximately 6,500 linear feet of 2-inch through 4-inch sanitary sewer lines, along with installation of cleanouts as necessary to facilitate the televising process. Additional work includes site restoration activities such as yard areas, paved street base course and wearing course, and gravel area restoration. Sealed bids will be received electronically through PennBid until 4:00 P.M. local time on Friday, August 21, 2026, with public bid opening and reading scheduled for Tuesday, August 25, 2026, at 10:00 A.M. at the Sullivan County Courthouse in Laporte, Pennsylvania. A pre-bid meeting is scheduled for Monday, August 10, 2026, at 10:00 A.M. at the Davidson Township Building in Muncy Valley, Pennsylvania, with attendance encouraged but not mandatory. Bids will be awarded to the lowest responsible bidder, with the bid acceptance period set at 60 days from the date of bid opening. The contract will include a one-year warranty on all parts and labor with no cost to the owner for travel, parts, or labor during the warranty period.
The project is funded through Community Development Block Grant (CDBG) federal funds, which necessitates compliance with Davis-Bacon wage rates and numerous federal requirements including Executive Order 11246 for Equal Employment Opportunity. Bidders must submit bid security equal to 10 percent of the total bid amount in the form of a certified check, bank draft, or bid bond payable to Sullivan County. Contractors must establish a 6.9 percent goal for female participation and a 1 percent goal for minority participation in the on-site construction workforce for contracts exceeding $10,000, along with a Minority and Women's Business Enterprise (MBE/WBE) participation goal of 5 percent for MBEs and 3 percent for WBEs for contracts of $25,000 or more. Section 3 requirements apply, requiring that 25 percent or more of total labor hours be performed by Section 3 workers and 5 percent or more by Targeted Section 3 workers for projects where HUD or CDBG funding exceeds $200,000. Contractors must also comply with Build America, Buy America (BABA) Act requirements and Pennsylvania Steel Products Procurement Act provisions. Upon contract award, the successful contractor must provide Performance and Payment Bonds each for 100 percent of the contract price and complete a W-9 Form and BABA Certification prior to issuance of the Notice to Proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-5614-014 2026.07.02 CCTV Rebid Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .