1-4496 Norwalk Life Safety Systems-Fire Alarm Sprinkler Inspections and Repairs FINAL.pdf
PDF 30 MB Posted
- Solicitation number
- 4496
- Issued by
- Fairfield County, Connecticut
About this file
This is an Invitation to Bid (ITB) document issued by the City of Norwalk's Purchasing Department for fire alarm and sprinkler/suppression system inspections and repairs across 19 municipal buildings. The scope of work includes biannual testing and inspection of fire alarm systems and quarterly testing and inspection of sprinkler/suppression systems, along with emergency and repair services available 24/7 with a four-hour response time. The project encompasses multiple facility types including fire stations, city hall, police headquarters, libraries, recreation centers, and other municipal buildings, with specific device inventories detailed for each location. The electronic submission deadline is April 14, 2026 at 2:00 PM, with hard copy submission due April 16, 2026 at 2:00 PM. A non-mandatory pre-bid walkthrough will be held on March 26, 2026 at 10:00 AM at Norwalk City Hall. The bid opening is scheduled for April 16, 2026 at 2:00 PM. The contract term begins July 1, 2026 and includes three base years with two optional renewal years. The City anticipates awarding up to two contracts, with separate awards possible for Fire Alarm systems and Sprinkler/Suppression Systems based on the lowest responsible bidder for each category.
Pricing is structured as lump sum costs by building for each year of service, with separate line items for normal and overtime emergency/repair hourly rates. No bid deposit, performance bond, or maintenance bond is required. All costs must include insurance premiums to satisfy specified coverage limits. The awarded contractor must follow NFPA standards and codes, obtain all required permits at their expense, provide yearly testing schedules to Building Management, and submit inspection reports on the day of service. The contractor must maintain workers' compensation insurance, commercial general liability insurance of $1,000,000 per occurrence and $2,000,000 aggregate, automobile liability insurance of $1,000,000, and professional liability insurance of $1,000,000 each claim and aggregate. All insurance carriers must be licensed in Connecticut with an AM Best rating of A-VII or better. Additional insureds must include the City of Norwalk, and the contractor must waive subrogation rights and provide certificates of insurance prior to commencing work.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF NORWALK
PURCHASING DEPARTMENT
08052025
SEALED BIDS MUST BE RECEIVED BY THE OFFICE OF THE PURCHASING AGENT, 125 EAST AVENUE
NORWALK, CT 06856 BY THE DATE AND TIME OF BID OPENING
PROJECT NUMBER: 4496
REQUESTING DEPARTMENT: Building Management
DATE OF BID ISSUANCE: 03/17/2026
TITLE OF BID: Norwalk Life Safety Systems – Fire Alarm/Sprinkler Inspections and Repairs
RFI/QUESTION DEADLINE: 2:00 PM 04/1/2026
ELECTRONIC SUBMISSION DEADLINE: 2:00 PM 04/14/2026
HARD COPY SUBMISSION DEADLINE: 2:00 PM 04/16/2026
MANDATORY WALKTHROUGH:
DATE, TIME, AND LOCATION OF
WALKTHROUGH
YES ( ) NO ( X )
March 26, 2026, 10:00AM, Norwalk City Hall
– Lobby, 125 East Ave. Norwalk, CT.
TIME/DATE OF BID OPENING: 2:00 PM 04/16/2026
BID DEPOSIT REQUIRED:
IF YES, AMOUNT REQUIRED
YES ( ) NO ( X )
SUCCESSFUL BIDDERS ONLY:
PERFORMANCE & PAYMENT BOND
REQUIRED:
IF YES, AMOUNT REQUIRED
YES ( ) NO ( X )
SUCCESSFUL BIDDERS ONLY:
MAINTENANCE BOND REQUIRED: YES ( ) NO ( X )
ALL TERMS AND CONDITIONS, SPECIFICATIONS AND BID FORMS ARE ATTACHED HERETO.
NOTE: THE FOLLOWING DOCUMENTS WILL BE REQUIRED FOR A BID TO BE COMPLIANT
1. SECTION 1 -1.5 FORMS ONLY BIDDER’S INFORMATION AND ACKNOWLEDGEMENT FORM,
INCLUDING PRICING SHEETS, EXCEPTIONS TAKEN, IF ANY, ADDENDA ACKNOWLEDGMENT
FORMS, ANY OTHER REQUIREMENTS INDICATED IN SPECIAL NOTES SECTION, AND BID
SECURITY IF REQUIRED (ONE ORIGINAL PLUS TWO (2) COPIES)
Page 1 of 105, 4496 Norwalk Life Safety Systems - Fire Alarm/Sprinkler Inspections and Repairs - FINAL
08052025
NOTICE TO BIDDERS
1. ALL BIDS WILL BE OPENED PROMPTLY AT THE ADVERTISED TIME OF OPENING. THERE WILL BE
NO DELAYS OR POSTPONEMENTS WHICH ARE NOT PUBLICLY ADVERTISED. ANY BID RECEIVED
AFTER THE ADVERTISED TIME OF OPENING WILL NOT BE ACCEPTED.
2. IF A BIDDER USES A COURIER SERVICE FOR BID DELIVERY, IT SHALL BE THE BIDDER’S
RESPONSIBILITY THAT THE BID REACHES THE PURCHASING DEPARTMENT BY THE DATE AND
TIME SPECIFIED HEREIN.
3. ALL BIDS SUBMITTED TO THE CITY MUST BE IN A CLEARLY MARKED AND SEALED ENVELOPE.
REFERENCE THE PROJECT NUMBER ON THE OUTSIDE OF THE ENVELOPE.
4. OBLIGATION OF BIDDERS:
a. AT THE TIME OF OPENING BIDS, EACH BIDDER SHALL BE PRESUMED TO HAVE
INSPECTED THE SITES AND TO HAVE MADE HIM/HERSELF THOROUGHLY FAMILIAR
WITH THE PLANS AND CONTRACT DOCUMENTS, INCLUDING ALL ADDENDA. THE
FAILURE OR OMISSION OF ANY BIDDER TO RECEIVE OR EXAMINE ANY FORM,
INSTRUMENT OR DOCUMENT SHALL IN NO WAY RELIEVE ANY BIDDER FROM ANY
OBLIGATION IN RESPECT TO THEIR BID.
b. EACH BIDDER MUST FULLY INFORM HIM/HERSELF OF THE CONDITIONS RELATING TO
THE WORK WHICH WILL BE PERFORMED. FAILURE TO DO SO WILL NOT RELIEVE THE
SUCCESSFUL BIDDER OF HIS/HER OBLIGATION TO FURNISH ALL LABOR AND
MATERIALS NECESSARY TO CARRY OUT THE PROVISIONS OF THE CONTRACT
DOCUMENTS AND TO COMPLETE THE CONTEMPLATED WORK. IN AS MUCH AS
POSSIBLE, THE CONTRACTOR MUST, IN CARRYING OUT HIS/HER WORK, EMPLOY SUCH
MEANS AND METHODS AS WILL NOT CAUSE ANY INTERRUPTIONS OR INTERFERENCE
WITH THE WORK OF ANY OTHER CONTRACTOR.
5. TIME IS OF THE ESSENCE (IF APPLICABLE):
a. IF THE PROJECT IS NOT COMPLETED BY THE DATE SPECIFIED AS THE SUBSTANTIAL
COMPLETION DATE IN THE CONTRACT ENTERED INTO BY THE CITY AND THE
CONTRACTOR, THE CONTRACTOR WILL BE SUBJECT TO CONSEQUENTIAL AND/OR
LIQUIDATED DAMAGES.
Page 2 of 105, 08052025
GENERAL INFORMATION
1.1 INTRODUCTION
The City of Norwalk is requesting bids for Norwalk Life Safety Systems – Fire Alarm/Sprinkler Inspections and Repairs. The requirements of this project are outlined in greater detail under Section 2 Scope of Work/Project Specifications.
1.2 BID DOCUMENTS
All Bid documents for this invitation are available over the internet at http://www.norwalkct.gov. Adobe Acrobat reader is required to view this document. If you do not have this software you may download it for free from Adobe.
1.3 ADDENDA
All addenda, if issued will be available over the internet at http://www.norwalkct.gov. We strongly suggest that you check for any addenda a minimum of forty-eight hours in advance of the bid deadline. It is the responsibility of the bidder to check for issuance of any addenda.
1.4 BIDDER’S LIST
Bidder’s list for this solicitation will not be published.
1.5 QUESTIONS CONCERNING THIS BID
All questions concerning this solicitation must be directed, via e-mail, to Carleen Megaro, Buyer at cmegaro@norwalkct.gov. The deadline for the submission of questions is 2:00 pm, April 1, 2026.
1.6 SUBMISSION OF BID
The City of Norwalk is requesting electronic submission along with hard copy submission.
All participants are required to submit both by the said date and time. Hard copy submission must match the electronic submission and will be the official accepted submission. The City of Norwalk has the right to reject any submission that does not meet this criteria.
All sealed electronic submissions must be submitted in Bonfire no later than April 14, 2026, at 2:00PM.
All sealed hard copy Bids should be submitted to the City of Norwalk’s Purchasing Department no later than April 16, 2026 at 2:00 PM at the address listed below:
City of Norwalk Purchasing Department 125 East Avenue, Room 211 Norwalk, CT 06856-5125
Page 3 of 105, 4496 Norwalk Life Safety Systems - Fire Alarm/Sprinkler Inspections and Repairs - FINAL http://www.norwalkct.gov/
08052025
1.7 SUMMARIES
A list of the proposing firms will be available any time after 5:00 pm on the day of the opening at Purchasing-Bid Postings. Results will not be provided over the phone.
SPECIAL NOTES:
1.) PROJECT SCHEDULE: Begin July 1, 2026.
2.) A Non-Mandatory pre-bid conference and walkthrough will be held at 10:00 am, March
26, 2026 meeting in the lobby of Norwalk City Hall, 125 East Avenue, Norwalk, CT 06851. If needed we will travel to the other sites listed in Section 2 Scope of Work/ Project Specifications.
i. Please note that no additional walkthroughs are planned for this facility.
Subcontractors are encouraged to attend the scheduled pre-bid conference.
3.) BUILDING PERMITS - Contractors shall obtain and pay for all required permit(s) for this project. Permit fees are NOT waived for this project.
4.) References to Department of Public Works, Director of Public Works, and Engineer in section 3 and section 4 are to be interpreted as "Owner's designated representative".
5.) Section 4, Item 109-04-2b, page 79, Contractor Charges is changed to read "...profit and overhead shall be figured at fifteen (15) percent unless some other basis is approved by the Director."
6.) Section 3.8, Liquidated Damages, change to read “Liquidated damages as defined in Article 27 of the Norwalk General Conditions for Construction will be $100.00 per day.
7.) Contractors are hereby reminded that all submitted bid amounts MUST include all costs/insurance premium required to satisfy the various insurance limits as identified in these documents.
8.) Vendors are hereby advised that the City of Norwalk anticipates the award to [up to two (2)] Contracts resulting from this ITB. If awarded as two (2) contracts, the determination of the lowest responsible bidder will be based on the Total lump sum of A. Fire Alarm and the lowest responsible bidder Total lump sum of B. Sprinkler/Suppression Systems.
The award of the individual contracts would be selected by the City in its best interest.
Said determination by the City would be final.
9.) IMPORTANT Submission Information: As of 08/10/2020, a new interior Customer Service window opened inside City Hall that will help serve the public during the COVID- 19 pandemic. The window is staffed by Customer Service representatives Monday – Friday from 9 a.m. – 3:00 p.m. If you are planning to use the Customer Service window to drop off your submission, it is recommended to drop off the submission as early as possible since the team will be serving other customers.
It is still recommended to use a courier service (i.e. FedEx, UPS, USPS, DHL, etc.) to deliver the submission to the above address by the due date and time.
Page 4 of 105, https://www.norwalkct.gov/Bids.aspx?CatID=showStatus&txtSort=Category&showAllBids=on&Status=open
08052025
10.) Public Opening: Per the City of Norwalk Purchasing Guidelines , Bids shall be opened publicly by the Purchasing Agent or his designee, in the presence of one or more witnesses at the time and place designated in the Invitation for Bids. The amount of each bid, and such other relevant information as may be specified by the bid, together with the name of each bidder shall be recorded; the record and each bid shall be open to public inspection. If you wish to hear the bid/RFP opening, please join us through a teleconference.
Access Number: (866) 640-4044 or (678) 302-3554
Participant Code: 968 704
Page 5 of 105, https://www.norwalkct.gov/DocumentCenter/View/334/City-Procurement-Guidelines?bidId=
08052025
SECTION 1 – FORMS OF PROPOSAL
Page 6 of 105, BIDDER’S INFORMATION AND ACKNOWLEDGMENT FORM
Bidder’s Name
Street Address
City State Zip
Business Telephone:
Email Address:
Printed Name and Title of Individual Submitting Bid
The undersigned acknowledges that the terms, conditions and specifications of this bid are understood and unconditionally accepted.
Signature Date
Page 7 of 105, 08052025
Exceptions: Note any vendor(s) responding to this proposal shall indicate any/all exceptions (if any) taken to language in this proposal. BIDDERS MAY NOT TAKE EXCEPTION TO
SUBSTANTIVE TERMS OF STANDARD CONTRACT FORMS PROVIDED IN THE RFP/RFQ/ITB.
Exceptions must be declared below in order to be considered by the City:
Page 8 of 105, 08052025
1.1 RESPONSE FORM
Vendor Name -
Address -
Phone -
Fax -
Email -
Manager -
Fed ID#
The undersigned hereby declares that they have carefully examined the plans, specifications and project site and has satisfied themselves as to all the quantities and conditions and understands that in signing this proposal they waives all right to plead any misunderstanding regarding the same.
The undersigned further understands and agrees that they will furnish and provide all the necessary material, machinery, implements, tools, labor, services, and other items of whatever nature, and to do and perform all the work necessary under the aforesaid conditions, to carry out the contract and to accept in full compensation therefore the amount of the contract as agreed to by the Contractor and the City.
The undersigned further agrees, in case of variations of quantities from those shown or specified, the following unit prices will be used in adjusting the contract price. If quantities are authorized by the City, the following amount will be added to the contract as required. Unless otherwise noted, each UNIT PRICE shall include all equipment, tools, labor, permits, fees, etc., incidental to the installation and completion of the work involved.
It is further understood and agreed that all the information included in, and attached to, or required by the Request for Bid shall become public record upon delivery to the City.
Page 9 of 105,
1. The following prices shall apply to this project:
A. FIRE ALARM
Building Year -1
July 1, 2026 Year – 2
July 1, 2027 Year – 3
July 1, 2028 Total
1 Animal Control $ $ $ $
2 City Hall $ $ $ $ 3 Dept. of
Public Works
4 Ely $ $ $ $ 5 Fire HQ’s
(Fire Station 2)
6 Fire Station 1 $ $ $ $
7 Fire Station 3 $ $ $ $
8 Fire Station 4 $ $ $ $
9 Fire Station 5 $ $ $ $
10 Fire Station 6/ Apparatus
Maintenance
11 Museum $ $ $ $
12 Police HQ’s $ $ $ $
13 Norwalk Public Library
14 Senior Center $ $ $ $
15 SoNo Library $ $ $ $
16 South Norwalk Recreation
Center
17 Norwalk Health
Department
18 Ben Franklin $ $ $ $
19 Lockwood- Mathews Mansion Museum
20 Total $ Total in Writing
See Project Specifications/Scope of Work for the Fire Alarm and Sprinkler/Suppression Systems devices and quantities by building
Page 10 of 105, A. FIRE ALARM
Building Option Year 1 –
July 1, 2029 Option Year 2 –
July 1, 2030 1 Animal Control $ $
2 City Hall $ $
3 Dept. of Public Works $ $ 4 Ely $ $
5 Fire HQ’s (Fire Station 2)
6 Fire Station 1 $ $
7 Fire Station 3 $ $
8 Fire Station 4 $ $
9 Fire Station 5 $ $
10 Fire Station 6/Apparatus Maintenance
11 Museum $ $
12 Police HQ’s $ $
13 Norwalk Public Library $ $
14 Senior Center $ $
15 SoNo Library $ $
16 South Norwalk Recreation Center
17 Norwalk Health Department
18 Ben Franklin $ $ 19 Lockwood-Mathews
Mansion Museum
Total
Page 11 of 105, B. SPRINKLER/SUPPRESSION SYSTEMS
Building Year -1
July 1, 2026 Year – 2
July 1, 2027 Year – 3
July 1, 2028 Total
1 Ben Franklin $ $ $ $
2 City Hall $ $ $ $
3 Dept. of Public Works
4 Fire HQ’s (Fire Station 2)
5 Fire Station 1 $ $ $ $
6 Fire Station 4 $ $ $ $
7 Fire Station 6/Apparatus Maintenance
8 Police HQ’s $ $ $ $
9 Norwalk Public Library
10 South Norwalk Recreation
Center
11 SoNo Library $ $ $ $
12 Lockwood- Mathews Mansion Museum
13 Total $
Total in Writing
Page 12 of 105, B. SPRINKLER/SUPPRESSION SYSTEMS
Building Option Year 1 –
July 1, 2029 Option Year 2 –
July 1, 2030 1 Ben Franklin $ $
2 City Hall $ $
3 Dept. of Public Works $ $
4 Fire HQ’s (Fire Station 2)
5 Fire Station 1 $ $
6 Fire Station 4 $ $
7 Fire Station 6/Apparatus Maintenance
8 Police HQ’s $ $
9 Norwalk Public Library $ $
10 South Norwalk Recreation Center $ $
11 SoNo Library $ $
12 Lockwood-Mathews Mansion Museum
Total $ $
C. EMERGENCY AND REPAIR SERVICE HOURLY RATES
Description Normal Hourly Rate Overtime Hourly Rate Fire Alarms $ $
Sprinkler/Suppression System $ $
Page 13 of 105, 08052025
2.
Submitted by:
Print Name of Authorized Agent of Company
Signature of Authorized Agent of Company
Date
The above signatory acknowledges receipt of the following addenda issued during the bidding period and understands that they are a part of the bidding documents (if applicable):
Addendum # Dated Addendum # Dated Addendum # Dated Addendum # Dated Addendum # Dated Addendum # Dated
Bid Security in the form of a (check one) is attached.
Bond Certified Check
Cost for performance bond included in lump sum
$ per thousand dollars
Page 14 of 105,
1.2 STATEMENT OF BIDDERS QUALIFICATIONS
Please answer the following questions regarding your company's past performance. Failure to reply to this instruction may be regarded as justification for rejecting a bid.
1. Number of years in business:
2.
Number of personnel employed: Part Time Full Time
3. List projects of this type/size your firm has completed within the last three (3) years:
Project
Date
Contact Person
Phone No.
4. SUBCONTRACTORS: If subcontractors are to be used, please list firm name, address, name of principal, and phone number below or on a separate sheet. Also, indicate the portion or section of work a subcontractor will be performing.
COMPANY NAME
ADDRESS
PRINCIPAL
PHONE
PORTION/SECTION OF
WORK
Page 15 of 105,
5. ORGANIZATIONAL STRUCTURE OF
BIDDER (check which applies) general partnership limited partnership limited liability corporation limited liability partnership, corporation doing business under a trade name individual doing business under a trade name other (specify)
6. STATUS OF THE BUSINESS AND ITS CURRENT
STANDING WITH THE SECRETARY OF STATE'S
OFFICE; e.g., are all required filings current and in good standing or has the entity been withdrawn or canceled
Connecticut corporations - Will the Secretary of State be able to issue a Certificate of Good Standing within 30 days of the bid opening?
Yes
No
Out-of-State corporations - Do you have a valid license to do business in the State of Connecticut? (Evidence in the form of a Certificate of Authority from the Connecticut Secretary of State will be required within 30 days of the bid opening.)
Yes
No
7. Provide CT eLICENSE (https://www.elicense.ct.gov) and Business Registration (https://business.ct.gov/?language=e n_US)
8. Is your local organization an affiliate of a parent company? If so, indicate the principal place of business of your company and the name of the agent for service if different from what has been indicated on the response form:
Business Name Address City State Zip
Name of Agent
Page 16 of 105, https://www.elicense.ct.gov/ https://business.ct.gov/?language=en_US https://business.ct.gov/?language=en_US
08052025
NOTE: In the case of a Limited Liability Corporation or a Limited Liability Partnership a certified copy of the Articles of Organization certified as valid and in effect as of the date of the bid opening will be required within 30 days of the bid opening. A listing of the corporate officers, in the case of a corporation; the general or managing partners, in the case of a partnership; or the managers and members in the case of either a limited liability partnership or company will be required within 30 days of the bid opening.
9. The awarded contractor may be required to submit one copy of the following information relative to its company's financial statements prior to contract signing. This information must represent the current circumstance which surrounds the financial position of the bidding organization. Note: This information will be kept confidential if provided in a separate envelop from your bid pricing.
All information should be supported with appropriate audited financials.
a. Book Value (Total Assets (-) Total Liabilities)
b. Working Capital (Current Assets (-) Current Liabilities
c. Current Ratio (Current Assets/Current Liabilities)
d. Debt to Equity Ratio (Long Term Debt/Shareholder's Equity)
e. Return on Assets (Net Income/Total Assets)
f. Return on Equity (Net Income/Shareholder's Equity)
g. Return on Invested Capital (Net Income/Long Term Debt = Shareholders' Equity)
All responses to this questionnaire are understood to be proprietary to the vendor, and will be considered confidential. Additional information may be requested subsequent to your responding to this bid request.
1.3 CITY OF NORWALK VENDOR RECORDS
If you have not done business with the City of Norwalk as a vendor, your business information needs updating or your vendor record has not been updated over three (3) years. Please complete and include the latest version of Internal Revenue Service (IRS) W-9 Form with your submission. Here is the URL to the IRS website: https://www.irs.gov/forms-pubs/about-form-w-9
1.4 INSURANCE
Insurance Agency Name: Tel:
Agency Address: Email:
Page 17 of 105, https://www.irs.gov/forms-pubs/about-form-w-9
1.5 CITY OF NORWALK VENDOR QUESTIONNAIRE – IT INFORMATION SECURITY
Page 18 of 105, City of Norwalk Vendor Questionnaire
IT Information Security
Rev 8.4.22
1. Third-Party Contact Information (please provide the POC for follow-up questions to this questionnaire):
Vendor Name, Address, Point-of-Contact Name, Phone Number and Email
2. Description of Services/Products: Please provide a detailed description of services/products your organization aims to provide to the City?
3. System and Equipment Access: Will your organization use your own systems and equipment to perform the services, or will your organization need access to the City’s systems, equipment and network? (Yes or
No, If Yes, please explain)
YES ☐ NO ☐
4. Description of Data: Are you using data from the City in order provide the services/product to the City
(Yes or No, if Yes proceed to 3.1)
a. What data is needed to provide the services/products to the City?
Example: Name, Social Security Number, Trade Information, Source Code, Payroll or Accounts Payable data, student or patient data, Law Enforcement data, any Personally Identifiable Information (PII), etc.
Page 19 of 105, If your answers to Questions 3 and 4 are BOTH “NO”, thank you for completing the IT
Information Security Questionnaire.
If one or both questions are “YES”, please complete the remaining questions.
5. Office Locations: How many office locations does your organization have? Please include the locations of your organization.
6. Data Center Locations: How many data centers does your organization utilize to provide services/products to the City? Please include the locations of the data centers utilized by your organization.
7. Business Entity: What is your business entity type?
*Example: Sole Proprietorship, Partnership, C Corporation, S Corporation, Limited Liability Corporation (LLC), Limited Liability Partnership (LLP)
8. How many employees and contingent workers do you have in your organization?
1-10 ☐ 10-50 ☐ 50-100 ☐ 100-500 ☐ 500-1000 ☐ 1000 or more ☐
9. Physical Access: Does your organization need to be onsite or offsite to provide services/products to the City?
YES ☐ NO ☐
Page 20 of 105,
10. Access to Data: How is your organization accessing City data?
*Example: Is the data supposed to be sent to your organization via email or will the data need to be uploaded to an application?
*Note: For third-parties that are providing an application to perform the services, please specify whether the application will be an internally hosted solution, cloud-based solution (i.e. SaaS, IaaS, PaaS), or a traditional web-based application (i.e. eBay, WebEx, online banking application)
11. Data Storage: Does your organization outsource data storage or does your organization utilize its own databases to store data? Does your organization store data outside of the United States?
YES ☐ NO ☐
12. Segregation of Data: Does your organization’s database structure allow segregation of sensitive client data?
YES ☐ NO ☐
13. Independent Attestations: Does your organization have independent attestations such as (i.e. ISO 27001, SSAE-18 SOC-1, SOC-2, PCI- DSS, ISO 9001)?
Page 21 of 105,
14. Information Security
a. Does your organization have written information security policies and procedures (WISP)?
b. How often are the information security policies and procedures reviewed and updated?
c. Who in the organization is responsible for reviewing and updating the information security policies and procedures?
d. Does your organization have privacy policies and procedures?
e. How often are the privacy policies and procedures updated?
f. Who in the organization is responsible for reviewing and updating the privacy policies and
g. What methods of encryption are utilized for data at rest and in transit?
Page 22 of 105,
h. Are the encryption methods utilized FIPS 140-2 approved?
i. Does your organization utilize firewalls to filter incoming data and information from the internet into your company network?
j. Does your organization perform penetration testing at least once per year to determine if unauthorized access to the computer network and malicious activity is possible externally?
k. Does your organization perform vulnerability testing at least once per year in order to identify vulnerabilities within the internal network?
l. Does your organization perform background checks on employees and contingent workers prior to onboarding them? Describe the nature of these background checks (i.e., criminal, credit, international, etc.).
Page 23 of 105,
m. Does your organization utilize multi-factor authentication?
n. Does your organization utilize scan cards or biometric scans to grant employees and contingent workers access to the building and data centers where data is stored?
o. If offering a technology product, does the organization utilize software development life cycle (SDLC) or
Agile to build and maintain technological product?
p. Does the technological product undergo information security testing and quality assurance testing prior to deployment?
q. Does the Vendor provide annual Cybersecurity Awareness training to their employee?
Page 24 of 105,
r. Does the Vendor provide annual phishing simulations for their employee?
s. Have users been educated on how to report suspected security violations or vulnerabilities?
t. Does the Vendor have an employee identified as the Chief Information Security Officer?
u. Are all the Vendor laptops encrypted?
v. Are all Vendor computers (workstations, notebooks) required to join the Company’s domain and receive Group Policies?
w. Does the Vendor meet the NIST 800-63 password guidelines?
Page 25 of 105,
15. Risk Management
a. Does your organization have an enterprise risk management framework implemented at your organization?
b. Does your organization have documented enterprise risk management policies and procedures?
c. Who in the organization is responsible for reviewing the enterprise risk management policies and
d. Does your organization utilize an outside third-party to provide services/products to the client?
e. Does your organization have a third-party risk management program (TPRM)?
Page 26 of 105,
f. Does your organization include right-to audit clauses in contracts with third parties?
g. Does your organization have a certificate of insurance (COI)? Please attach a copy of your COI.
Business Continuity/Disaster Recovery
a. Does your organization have a business continuity plan?
b. How often is the business continuity plan updated?
c. Does your organization conduct business continuity tests once per year?
Page 27 of 105,
d. Does your organization have a disaster recovery plan?
e. How often is the disaster recovery plan updated?
f. Does your organization conduct disaster recovery tests once per year?
g. Does your organization have business continuity and/or disaster recovery sites?
h. Are the business continuity/disaster recovery sites located in the United States or outside the
United States? Please include the locations of business continuity/disaster recovery sites?
Page 28 of 105, SECTION 2 – SCOPE OF WORK / PROJECT SPECIFICATIONS
Page 29 of 105, Norwalk Life Safety Systems – Fire Alarm/Sprinkler Inspections and Repairs 1)Awarded Vendor must follow the NFPA Standards/Codes
2)For work that needs to be done at the Police Headquarters, all on-site workers shall undergo a criminal history (background) check performed by the Norwalk Police Department. Allow enough time to accommodate the screening to avoid delays in the project schedule.
3)Awarded Vendor must verify the list of devices and quantities.
4)Awarded Vendor must provide an Emergency Contact list – Names, phone numbers and e-mails
5)Awarded Vendor must respond to an Emergency and Repair Service call within four (4) hours after receipt of such a call and must provide twenty-four (24) hours per day, seven (7)days per week, inclusive of all holidays response time.
6)Emergency and Repair Service shall be billed separately on a time and material basis. Please provide preferred Normal and Overtime hourly rates. Additional charges for travel time, mileage, fuel and travel expenses shall not be allowed. Labor hours shall accrue to the nearest quarter hour. Normal hours are 7:00AM-4:00PM Monday through Friday.
7)Reports to be provided to Building Management on the day of inspections (Fire Sprinkler Suppression).
8) The awarded vendor will be required to give a yearly testing and inspection schedule to Building Management for all buildings. The Fire Alarms will need to be tested and inspected biannually and the Sprinkler/ Suppression Systems will need to be tested and inspected quarterly.
2.0 Scope of Work
Page 30 of 105, FIRE ALARM
BUILDING DEVICE QTY
ANIMAL CONTROL BATTERY 2
13 SOUTH SMITH STREET HEAT DETECTOR 1
NORWALK, CT 06855 PANEL 1
PULL STATION 4
SMOKE DETECTOR 13
TELEPHONE DIALER 1
HORN/STROBE 4
STROBE 1
CITY HALL BACKUP COMMUNICATOR 1
125 EAST AVENUE BATTERY 5
NORWALK, CT 06851 HEAT DETECTOR 6
PANEL 1
PULL STATION 44
SMOKE DETECTOR 80
DEPT. OF PUBLIC WORKS ADMINISTRATION BLDG.
15 SOUTH SMITH STREET BATTERY 1
NORWALK, CT 06855 DUCT DETECTOR 4
HEAT DETECTOR 1
PANEL 1
PULL STATION 16
SMOKE DETECTOR 3
AUDIBLE / VISIBLE DEVICE 21
DISPATCH BLDG.
BATTERY 1
HEAT DETECTOR 20
PANEL 2
PULL STATION 7
SMOKE DETECTOR 20
AUDIBLE / VISIBLE DEVICE 6
ELY BATTERY 2-12V 35 Amp Hour 2
11 INGALLS AVENUE HEAT DETECTOR 10
NORWALK, CT 06851 DUCT DETECTOR 8
PANEL - Manufacturer : Notifier
NFS2-640
PULL STATION 32
SMOKE DETECTOR 68
Page 31 of 105, FIRE HQ'S
(Fire Station 2)
ANNUNCIATOR 1
121 CONNECTICUT AVENUE BATTERY 3
NORWALK, CT 06854 COMMUNICATOR 1
DUCT DETECTOR 17
HEAT DETECTOR 1
PANEL 4
PRESSURE SWITCH 1
PULL STATION 15
SMOKE DETECTOR 12
SUPERVISORY-LOW AIR
PRESSURE SWITCH
TAMPER SWITCH 4
WATER FLOW SWITCH 1
HORN/STROBE 26
STROBE 48
FIRE STATION 1 AUDIBLE DEVICE 1
90 NEW CANAAN AVENUE HEAT DETECTOR 10
NORWALK, CT 06850 HORN 1
PANEL 1
SMOKE DETECTOR 5
FIRE STATION 3 HEAT DETECTOR 7
56 VAN ZANT STREET HORN/STROBE 2
NORWALK, CT 06855 PANEL 1
BATTERY 1
SMOKE DETECTOR 4
FIRE STATION 4 HEAT DETECTOR 6
180 WESTPORT AVENUE HORN 5
NORWALK, CT 06851 HORN/STROBE 1
SMOKE DETECTOR 2
FIRE STATION 5 SMOKE/CO DETECTOR 1
23 MEADOW STREET HEAT DETECTOR 6
NORWALK, CT 06854 HORN/STROBE 4
PANEL 1
SMOKE DETECTOR 9
FIRE STATION 6/APPARATUS
MAINTENANCE
HEAT DETECTOR 5
Page 32 of 105, FIRE STATION 6/APPARATUS
MAINTENANCE (continued)
HORN 6
100 FAIRFIELD AVENUE PANEL 1
NORWALK, CT 06854 BATTERY 2
HORN/STROBE 1
SMOKE DETECTOR 11
PULL STATION 1
MUSEUM BATTERY 2
141 EAST AVENUE HEAT DETECTOR 1
NORWALK, CT 06851 PANEL 1
PULL STATION 2
SMOKE DETECTOR 3
TELEPHONE DIALER 1
POLICE HQ'S ANNUNCIATOR 2
1 MONROE ST. BATTERY 3
NORWALK, CT 06854 DOOR HOLDER 6
DUCT DETECTOR 11
HEAT DETECTOR 10
PANEL 4
PRESSURE SWITCH 3
PULL STATION 23
SMOKE DETECTOR 138
SUPERVISORY-LOW AIR
TAMPER SWITCH 8
WATER FLOW SWITCH 4
HORN/STROBE 85
NORWALK PUBLIC LIBRARY BATTERY 20
1 BELDEN AVE. HEAT DETECTOR 34
NORWALK, CT 06856 PANEL 1
PULL STATION 20
SMOKE DETECTOR 61
WATER FLOW SWITCH 2
SUPERVISORY SWITCHES 4
SPEAKER STROBES 23
SENIOR CENTER BATTERY 1
Page 33 of 105, SENIOR CENTER (continued) HEAT DETECTOR 9
11 ALLEN RD. PANEL 1
NORWALK, CT 06851 POINT OF CONTACT 2
PULL STATION 11
SMOKE DETECTOR 14
HORN/STROBE 5
SoNo LIBRARY BATTERY 1
10 WASHINGTON ST. HEAT DETECTOR 1
NORWALK, CT 06851 PANEL 1
PULL STATION 3
SMOKE DETECTOR 15
SPEAKER STROBES 16
STROBE 15
SOUTH NORWALK
RECREATION CENTER
DUCT SMOKE 16
98 SOUTH MAIN ST SMOKES 26
NORWALK, CT 06854 PULL STATIONS 11
NORWALK HEALTH
DEPARTMENT
BATTERY 1
137 EAST AVE. DUCT DETECTOR 4
Norwalk, CT 06851 HEAT DETECTOR 8
PANEL 1
PULL STATION 10
SMOKE DETECTOR 65
SPEAKER STROBES 11
STROBE 11
HORN/STROBE 9
BEN FRANKLIN BATTERY 2
165 FLAX HILL RD DUCT DETECTOR 2
NORWALK, CT 06851 HEAT DETECTOR 9
PANEL 2
PULL STATION 24
WATER FLOW SWITCH 1
SMOKE DETECTOR 60
HORN/STROBE 28
Page 34 of 105, LOCKWOOD-MATHEWS
MANSION MUSEUM
SMOKE 128
295 WEST AVENUE HEAT 4
NORWALK, CT 06850 BEAM 1
PULL STATIONS 18
WATER FLOW 3
Page 35 of 105, SPRINKLER/SUPPRESSION SYSTEMS
BEN FRANKLIN CITY CONNECTION CONTROL
VALVE
165 FLAX HILL ROAD DRY SYSTEM 1
NORWALK, CT 06851 FIRE DEPT. CONNECTION 1
HIGH PRESSURE WATER ALARM
SWITCH
INSPECTORS TEST VALVE 3
SUPERVISORY-LOW AIR
SYSTEM CONTROL VALVE 2
WATER FLOW SWITCH 4
MAIN DRAIN TEST 1
WATER MOTOR GONG 1
WET SYSTEM 1
CITY HALL CITY CONNECTION CONTROL
VALVE
125 EAST AVENUE FIRE DEPT. CONNECTION 1
NORWALK , CT 06851 INSPECTORS TEST VALVE 1
PIV 1
SECTIONAL CONTROL VALVE 19
SYSTEM CONTROL VALVE 1
TAMPER SWITCH 23
WATER FLOW SWITCH 13
MAIN DRAIN TEST 1
DEPT. OF PUBLIC WORKS CITY CONNECTION CONTROL
15 SOUTH SMITH STREET FIRE DEPT. CONNECTION 1
NORWALK, CT 06855 INSPECTORS TEST VALVE 1
SYSTEM CONTROL VALVE 1
TAMPER SWITCH 2
WATER FLOW SWITCH 1
MAIN DRAIN TEST 1
WATER MOTOR GONG 1
Page 36 of 105, FIRE HQ'S
(Fire Station 2)
CITY CONNECTION CONTROL
VALVE
121 CONNECTICUT AVENUE FIRE DEPT. CONNECTION 2
NORWALK, CT 06854 HIGH PRESSURE WATER ALARM
HOSE VALVE OUTLET 3
PRE-ACTION SYSTEM 1
SUPERVISORY-LOW AIR
SYSTEM CONTROL VALVE 2
WATER FLOW SWITCH 1
MAIN DRAIN TEST 1
WET SYSTEM 1
SUPPRESSION SYSTEM /
MFRS.: ANSUL MDL.: R-102
KITCHEN HOOD CYLINDER 1
KITCHEN HOOD SYSTEM 1
KITCHEN HOOD APPLIANCE 3
FIRE STATION 1 ANSUL SYSTEM 1
90 NEW CANAAN AVENUE
NORWALK, CT 06850
ANSUL PULL STATION 1
FIRE STATION 4 ANSUL SYSTEM 1
180 WESTPORT AVENUE
NORWALK, CT 06851
FIRE STATION 6/APPARATUS
MAINTENANCE
SPRINKLER SYSTEM 1
100 FAIRFIELD AVENUE
NORWALK, CT 06854
POLICE HQ'S CITY CONNECTION CONTROL
1 MONROE STREET DRUM DRIP / LOW POINT
DRAIN
NORWALK, CT 06854 DRY SYSTEM 1
Page 37 of 105, POLICE HQ'S (continued) FIRE DEPT. CONNECTION 1
HIGH PRESSURE WATER ALARM
INSPECTORS TEST VALVE 1
PRE-ACTION SYSTEM 2
PRESSURE SWITCH 3
SECTIONAL CONTROL VALVE 3
SUPERVISORY-LOW AIR
SYSTEM CONTROL VALVE 4
TAMPER SWITCH 8
WATER FLOW SWITCH 4
MAIN DRAIN TEST 4
SUPPRESSION SYSTEM
INDUSTRIAL/GAS STATION /
MFRS. PEMALL MDL:
WATCHMAN 3 CYL.
DISPATCH/DATA ROOM /
MFRS. CHEMETRON MDL:
MICRO 1002 12V
NORWALK PUBLIC LIBRARY CITY CONNECTION CONTROL
1 BELDEN AVENUE FIRE DEPT. CONNECTION 2
NORWALK, CT 06856 INSPECTORS TEST VALVE 1
SECTIONAL CONTROL VALVE 1
SYSTEM CONTROL VALVE 2
TAMPER SWITCH 4
WATER FLOW SWITCH 2
MAIN DRAIN TEST 1
WATER MOTOR GONG 1
WET SYSTEM 2
SOUTH NORWALK RECREATION
CENTER
SPRINKLER SYSTEM 1
98 SOUTH MAIN ST KITCHEN ANSUL 2
NORWALK, CT 06854
SoNo LIBRARY CITY CONNECTION CONTROL
Page 38 of 105, SoNo LIBRARY (continued) FIRE DEPT. CONNECTION 1
10 WASHINGTON ST. INSPECTORS TEST VALVE 1
NORWALK, CT 06851 SYSTEM CONTROL VALVE 1
TAMPER SWITCH 2
WATER FLOW SWITCH 1
MAIN DRAIN TEST 1
LOCKWOOD-MATHEWS
MANSION MUSEUM
SPRINKLER SYSTEM 1
295 WEST AVE
NORWALK, CT 06850
Page 39 of 105, Police HQs—FIRE ALARM PANEL
SILENT KNIGHT— IFP 1000
Page 40 of 105, Police HQs— FIRE SPRINKLER SYSTEM
Page 41 of 105, Police HQ - IT SERVER ROOM -
FIRE SUPPRESSION CONTROL BOX
Page 42 of 105, Police HQ - IT ROOM - 2ND FLOOR - SUPPRESSION
Page 43 of 105, Police HQ —GUN RANGE—EMERGENCY SPRINKLER SHUT OFF
Page 44 of 105, Police HQ —3RD FL. DRY SYSTEM
Page 45 of 105, Police HQ —GAS DEPOT— FIRE SUPPRESSION SYSTEM
Page 46 of 105, ANIMAL CONTROL - FIRE ALARM PANEL
EST-1
Page 47 of 105, PUBLIC LIBRARY - FIRE ALARM PANEL
SILENT KNIGHT—IFP 300 ECS
Page 48 of 105, PUBLIC LIBRARY—FIRE SPRINKLER SYSTEM
Page 49 of 105, PUBLIC LIBRARY—FIRE SPRINKLER SYSTEM
Page 50 of 105, SoNo LIBRARY - FIRE ALARM PANEL
EDWARDS EST
Page 51 of 105, SoNo LIBRARY - FIRE SPRINKLER SYSTEM
Page 52 of 105, DEPT. OF PUBLIC WORKS - FIRE ALARM PANEL
EDWARDS – EST—FIREWATCH
Page 53 of 105, DEPT. OF PUBLIC WORKS —ADMIN BUILDING
FIRE SPRINKLER SYSTEM
Page 54 of 105, DEPT. OF PUBLIC WORKS - DISPATCH BUILDING
AUXILARY FIRE ALARM PANEL
EST SUB PANEL
Page 55 of 105, BEN FRANKLIN—FIRE ALARM PANEL
SIMPLEX—4007 ES
Page 56 of 105, BEN FRANKLIN—FIRE SPRINKLER SYSTEM
Page 57 of 105, BEN FRANKLIN—CRYSTAL THEATER—FIRE ALARM SUB PANEL
SIMPLEX—4003 VOICE CONTROL PANEL
Page 58 of 105, FIRE HQ - FIRE ALARM PANEL
NOTIFIER—NFW2-100
Page 59 of 105, FIRE HQ—FIRE SPRINKLER SYSTEM
Page 60 of 105, FIRE STATION 1 ALARM PANEL
- FIRE-LITE U10
Page 61 of 105, FIRE STATION 1 - ANSUL SYSTEM
Page 62 of 105, FIRE STATION 3 ALARM PANEL - FIRE-LITE MS-5UD
Page 63 of 105, FIRE STATION 5 ALARM PANEL - FIKE 10-070 Series
Page 64 of 105, FIRE STATION 6/APPARATUS MAINTENANCE
ALARM PANEL - FIRE-LITE SENSISCAN 1000
Page 65 of 105, CITY HALL—FIRE ALARM PANEL
EDWARDS—EST3X
Page 66 of 105, CITY HALL—FIRE SPRINKLER SYSTEM
Page 67 of 105, NORWALK HEALTH DEPARTEMENT—FIRE ALARM
PANEL HONEYWELL—E3 SERIES– FCI HONEYWELL
Page 68 of 105, MUSEUM—FIRE ALARM PANEL
EDWARDS - 10 SERIES
Page 69 of 105, ELY—FIRE ALARM PANEL
NOTIFIER—NFS2-640
Page 70 of 105, SENIOR CENTER - FIRE ALARM PANEL
FIRELITE—UNIMODE SUD
Page 71 of 105, SOUTH NORWALK RECREATION CENTER
- FIRE ALARM PANEL- EDWARDS-10 SERIES
Page 72 of 105,
– FIRE ALARM PANEL
-EDWARDS - 10 SERIES
Page 73 of 105, Page 74 of 105, SOUTH NORWALK RECREATION CENTER–
KITCHEN ANSUL – FIRE SPRINKLER SYSTEM
Page 75 of 105, SOUTH NORWALK RECREATION CENTER –
KITCHEN ANSUL – FIRE SPRINKLER SYSTEM
Page 76 of 105, SOUTH NORWALK RECREATION CENTER –
FIRE SPRINKLER SYSTEM
Page 77 of 105, SOUTH NORWALK RECREATION
CENTER – FIRE SPRINKLER SYSTEM
Page 78 of 105,
– FIRE SPRINKLER SYSTEM
Page 79 of 105, LOCKWOOD-MATHEWS MANSION MUSEUM
– NOTIFIER - FIRE ALARM ANNUNCIATOR
Page 80 of 105,
– FIRE COMMUNICATOR
Page 81 of 105, LOCKWOOD-MATHEWS MANSION MUSEM
– FIRE ALARM PANEL - LUTRON
HOMEWORKS QS
Page 82 of 105, Page 83 of 105,
– SPRINKLER SYSTEM
Page 84 of 105, Page 85 of 105, Page 86 of 105,
2.1 Insurance Coverage Requirements
Page 87 of 105, {00075006.DOCX 1}
PROFESSIONAL SERVICES INSURANCE RIDER
The Professional Services Provider shall provide and maintain insurance coverage related to its services in connection with the Project in compliance with the following requirements.
The insurance required shall be written for not less than the scope and limits of insurance specified hereunder, or required by applicable federal, state and/or municipal law, regulation or requirement, whichever coverage requirement is greater. It is agreed and understood that the scope and limits of insurance specified hereunder are minimum requirements and shall in no way limit or preclude the City from requiring additional limits and coverage to be provided under the Professional Services Provider's policies.
The insurance obligations under this agreement shall be (1) all the insurance coverage and/or limits carried by or available to the Professional Services Provider; or (2) the minimum insurance coverage requirements and/or limits shown in this agreement, whichever is greater.
Minimum Scope and Limits of Insurance:
Workers' Compensation: With respect to all operations the Professional Services Provider performs, it shall carry workers' compensation insurance in accordance with the requirements of the laws of the State of Connecticut, and Employer's Liability limits of One Hundred Thousand Dollars ($100,000) coverage for each accident, One Hundred Thousand Dollars ($100,000) coverage for each employee by disease, Five Hundred Thousand Dollars ($500,000) policy limit coverage for disease.
Commercial General Liability: With respect to all operations the Professional Services Provider performs it shall carry Commercial General Liability insurance providing for a total limit of One Million Dollars ($1,000,000) coverage per occurrence for all damages arising out of bodily injury, personal injury, property damage, products/completed operations, and contractual liability coverage for the indemnification obligations arising under this Agreement. The Annual Aggregate limit shall not be less than Two Million Dollars ($2,000,000).
Automobile Liability: With respect to each owned, non-owned, or hired vehicles the Professional Services Provider shall carry Automobile Liability insurance providing One Million Dollars ($1,000,000) coverage per accident for bodily injury and property damage.
Professional Liability: The Professional Services Provider shall provide Professional Liability Insurance covering errors and omissions. Such insurance shall be in an amount no less than $1,000,000 each claim and $1,000,000 Aggregate. If such insurance is written on a claims-made basis, the Professional Services Provider shall maintain such coverage continuously throughout the term of work for a period of three (3) years following acceptance of the work by the City.
Page 88 of 105, {00075006.DOCX 1} 2
"Tail" Coverage: If any of the required liability insurance is on a "claims made" basis, "tail" coverage will be required at the completion of the Project for a duration of three (3) years, or the maximum time period reasonably available in the marketplace. Continuous "claims made" coverage will be acceptable in lieu of "tail" coverage, provided its retroactive date is on or before the effective date of this Agreement. If continuous "claims made" coverage is used, Professional Services Provider shall be required to keep the coverage in effect for a duration of not less than three (3) years following acceptance of the work by the City.
Acceptability of Insurers: The Professional Services Provider's policies shall be written by insurance companies licensed to do business in the State of Connecticut, with an AM Best rating of A-VII, or better. Additionally, all carriers are subject to approval by the City of Norwalk.
Subcontractors: The Professional Services Provider shall require all subcontractors to provide the same "minimum scope and limits of insurance" as required herein. All Certificates of Insurance shall be provided to the City's Corporation Counsel and to the City’s Finance Department (Attn: Risk Manager) as required herein
Deductibles and Self-Insured Retentions: Any deductible or self-insured retention must be declared to and approved by the City. All deductibles or self-insured retentions are the sole responsibility of the Professional Services Provider to pay and/or to indemnify.
Notice of Cancellation or Nonrenewal: Each insurance policy required shall be endorsed to state that coverage shall not be suspended, voided, cancelled, or reduced in coverage or in limits before the expiration date except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City.
Notwithstanding this requirement, the Professional Service Provider is primarily responsible for providing such written notice to the City thirty (30) days prior to any policy change or cancellation that would result in a change of the amount or type of coverage provided. In the event of any such change the Professional Service Provider shall provide comparable substitute coverage so that there is no lapse in applicable coverage or reduction in the amount of coverage available to the City related to the Professional Service Provider’s Services.
Waiver of Governmental Immunity: Unless requested otherwise by the City, the Professional Service Provider and its insurer shall waive governmental immunity as defense and shall not use the defense of governmental immunity in the adjustment of claims or in the defense of any suit brought against the City.
Additional Insured: The liability insurance coverage, (excluding Workers' Compensation & Professional Liability, if included) required for the performance of the Services shall include the City as an Additional Insured with respect to the Professional Services Provider's activities to be performed under this Agreement. Professional
Page 89 of 105, {00075006.DOCX 1} 3
Services Provider’s insurance shall be primary and shall not seek contribution from any other insurance carried by the additional insured in the payment of a claim.
Waiver of Subrogation: Professional Services Provider hereby waives the right to subrogate or seek recovery from City of Norwalk and its insurance carriers. This waiver of subrogation does not apply to Professional Liability coverage.
Certificate of Insurance: Prior to the commencement of services under this Contract, the Professional Services Provider shall furnish Certificate(s) of Insurance to the City. The Certificate(s) will specify all parties who are endorsed on the policy as Additional Insureds (or Loss Payees). The Certificates and endorsements for each insurance policy are to be signed by a person authorized by the insurer to bind coverage on its behalf. Renewals of expiring Certificates shall be provided prior to expiration but no more than fifteen (15) days after policy renewal.
All insurance documents required should be mailed to the City of Norwalk Corporation Counsel and Finance Department (Attn: Risk Manager), 125 East Avenue, P.O. Box 5125, Norwalk, CT 06856-5125.
Waiver of requirements: The Corporation Counsel may vary these insurance requirements at Corporation Counsel's sole discretion if Corporation Counsel determines that the City's interests will be adequately protected by the provision of different types or other amounts of coverage.
Page 90 of 105,
2.2 Sample Contract
Page 91 of 105, {00064733.DOC 1} 1
SAMPLE CONTRACT
The following document is the City’s standard Independent Contractor contract. Please be advised that the substantive terms and requirements outlined therein may be revised only with the approval of Norwalk’s Corporation Counsel. Additionally, the terms of the final contract may vary at the City’s option and, this sample agreement has been included to provide you with the general contract terms and conditions typically utilized by the City in the hiring of an independent contractor for consultant services
AGREEMENT WITH INDEPENDENT CONTRACTOR
BY AND BETWEEN
CITY OF NORWALK
AND
«VendorName» FOR «Project»
THIS AGREEMENT made and entered into this ________ day of ________________, 2020, by and between the CITY OF NORWALK, a municipal corporation organized and existing under the laws of the State of Connecticut (the “City”), acting herein by «ContractAuthorizer», its «ContractAuthorizerTitle», and «VendorName», a corporation authorized and licensed to do business in the State of «LicenseState», having a principal place of business at «VendorAddress1», «VendorAddress2», «VendorCity», «VendorState» «VendorZip», acting herein by «VendorAuthorizer», its «VendorAuthorizerTitle», duly authorized (the “Contractor”).
W I T N E S S E T H:
WHEREAS, the City is in need of «Notes» (the “Project”); and
WHEREAS, the City desires to retain the services of the Contractor based on the Contractor's representations that it is qualified and capable of performing the needed services in a professional and timely manner and in accordance with the goals and requirements of the Project;
WHEREAS, Contractor has agreed to perform the services described herein for the compensation and in compliance with the terms and conditions set forth in this Agreement;
NOW, THEREFORE, in consideration of the mutual covenants and agreements herein contained, the parties agree as follows:
1. ENGAGEMENT OF Contractor
A. Based on the representations of the Contractor set out in its proposal dated «ProposedDate», a copy of which is annexed hereto and incorporated herein as Exhibit
Page 92 of 105, {00064733.DOC 1} 2
2, the City hereby retains the Contractor to perform the services described herein in accordance with the terms and conditions and for the consideration set out in this Agreement.
B. The person in charge of administering this Agreement on behalf of the City shall be «DepartmentHead», Department of «Department», or such other person as may be designated in writing.
C. The person responsible for the services to be performed by the Contractor hereunder shall be «VendorAuthorizer», «VendorAuthorizerTitle».
2. SERVICES TO BE PERFORMED
A. The scope and details of the Services to be performed by the Contractor and the specifications to which such Services should conform are described in the City's Bid Invitation dated _______________, a copy of which annexed hereto and incorporated herein as Exhibits 1. The Contractor shall perform such Services as may be required by the Director in a professional and timely manner in accordance with the terms and requirements of this Agreement, in order to meet the City's needs. Services will be requested on an as needed basis with no minimum or maximum scope.
B. The parties understand that Contractor is retained solely for the purposes of performing the Services described herein. The Contractor's relationship to the City and its agencies shall, during the period(s) of this Agreement, be that of an independent contractor. The Contractor shall not be considered, under the provisions of this Agreement or for any purposes hereunder, as having an "employee" status or as being entitled to participate in any benefits accrued by or given to City employees.
C. In performing the Services and otherwise meeting its duties and obligations hereunder, Contractor shall ensure that its employees and subcontractors observe high standards of professional and business ethics observed by like professionals in the same or similar business, including, but not limited to, following the requirements, rules and regulations of the City, acting with integrity, and creating a workplace atmosphere free of discrimination and harassment.
D. The City may, from time to time, request changes in the Services to be performed hereunder. Such changes, including any increase or decrease in the amount of the Contractor's compensation, which are mutually agreed upon by and between the City and the Contractor, shall be valid only when incorporated in written amendments signed by both parties to this Agreement.
3. COMPENSATION
A. The Contractor shall be compensated for its performance of this Agreement, a maximum amount not to exceed the sum of «ContractBudgetInEnglish»($«ContractBudget») payable in accordance with the terms
Page 93 of 105, {00064733.DOC 1} 3 of the Contractor’s bid.
B. The compensation provided under this Agreement constitutes full and complete payment for all costs and expenses assumed by the Contractor in performing this Agreement including but not limited to labor, materials, product, tools and machinery, salaries, meetings, and all similar expenses. No costs in excess of this stated amount shall be paid or reimbursed by the City without specific prior written approval of the Director.
C. Payments to the Contractor under this Agreement shall be made by the City on approval of payment requisitions certified by the Contractor and submitted not more often than once a week. Each requisition shall be in a form acceptable to the City and shall set forth the hours of work performed and the tasks completed. The City may, prior to making any payment under this Agreement, require the Contractor to submit to it such additional information and/or documentation as it may deem necessary.
D. The acceptance by the Contractor, its successors or assigns, of any payment made on the final requisition under this Agreement, or of any final payment due on termination of this Agreement, shall constitute a full and complete release of the City from any and all claims, demands and causes of action whatsoever which the Contractor, its successors or assigns have or may have against the City under the provisions of this Agreement.
4. TIME PROVISIONS
A. The term of this Agreement shall commence effective ______________________ and conclude on ______________________. The Contractor shall perform its Services throughout this period.
B. This Agreement shall remain in effect until the services required hereunder are fully completed to the satisfaction of the City, unless otherwise terminated by the parties hereto.
5. TERMINATION AND SUSPENSION
The City may at any time and for any reason, with or without cause, terminate this Agreement by written notice specifying the termination date, which shall be not less than fifteen (15) days from the date such notice is given. In the event of such termination, the Contractor's Services shall be paid for in such amount as shall compensate the Contractor for the Services satisfactorily completed prior to termination. Such amount shall be fixed by the City after consultation with the Contractor, and shall be subject to audit by the City’s Comptroller. Termination under this section shall not give rise to any claim against the City for damages or for compensation in addition to that provided hereunder.
6. INSURANCE AND INDEMNIFICATION
The Contractor agrees to obtain at its own cost and expense all insurance required
Page 94 of 105, {00064733.DOC 1} 4 by the attached Insurance Rider and to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .