1-4487 City of Norwalk Various Roof Replacement Projects FINAL.pdf
PDF 31 MB Posted
- Solicitation number
- 4487
- Issued by
- Fairfield County, Connecticut
About this file
This is a comprehensive bid solicitation document from the City of Norwalk, Connecticut for various roof replacement projects across four municipal facilities. The City seeks bids for EPDM membrane roofing system replacements at the Norwalk Health Department, Benjamin Franklin Community Center, Norwalk Public Library, and South Norwalk Library, totaling approximately 43,350 square feet across all sites. The project involves removal of existing roofing systems (varying types including EPDM, built-up, and PVC), installation of polyisocyanurate insulation with continuous R-Value of 30, gypsum fiber cover board, and fully adhered EPDM membrane roofing with either 20-year or 30-year no-dollar-limit warranties. Bidders must submit electronic bids through Bonfire by 2:00 PM on January 20, 2026, and hard copy submissions by 2:00 PM on January 22, 2026. A non-mandatory pre-bid walkthrough is scheduled for 10:00 AM on January 7, 2026, at Norwalk City Hall. The bid opening is scheduled for 2:00 PM on January 22, 2026. Project work must commence by April 15, 2026, and be substantially completed by June 15, 2026. A mandatory 10% bid deposit is required, with 100% performance and payment bonds and maintenance bonds required from the successful bidder.
The successful contractor will be selected based on the sum of base bid and alternate items chosen by the City in its best interest. Prevailing wage rates as established by the State of Connecticut apply to all labor on the project, with weekly certified payroll submissions required. The bidder must carry comprehensive insurance coverage including $1,000,000 commercial general liability per occurrence and $2,000,000 annual aggregate, along with workers' compensation, automobile liability, and umbrella/excess liability coverage. Liquidated damages are assessed at $100 per day for delays beyond the completion date. The contract requires compliance with all Connecticut Building Code provisions, OSHA safety requirements, and environmental protection standards. General contractor overhead and profit markup for change orders is set at 15%, with subcontractor markup at 10% and general contractor markup on subcontractor net costs at 5%. Project funding and budget amounts are not specified in the bid documents; the contract amount will be determined by the selected bidder's proposal pricing.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF NORWALK
PURCHASING DEPARTMENT
08052025
SEALED BIDS MUST BE RECEIVED BY THE OFFICE OF THE PURCHASING AGENT, 125 EAST AVENUE
NORWALK, CT 06856 BY THE DATE AND TIME OF BID OPENING
PROJECT NUMBER: 4487
REQUESTING DEPARTMENT: Building Management
DATE OF BID ISSUANCE: 12/24/2025
TITLE OF BID: City of Norwalk Various Roof Replacement Projects
RFI/QUESTION DEADLINE: 2:00 PM 01/13/2026
ELECTRONIC SUBMISSION DEADLINE: 2:00 PM 01/20/2026
HARD COPY SUBMISSION DEADLINE: 2:00 PM 01/22/2026
MANDATORY WALKTHROUGH:
DATE, TIME, AND LOCATION OF
WALKTHROUGH
YES ( ) NO ( X)
January 7, 2026, 10:00 AM, Norwalk City Hall – Lobby, 125 East Ave., Norwalk, CT
TIME/DATE OF BID OPENING: 2:00 PM 01/22/2026
BID DEPOSIT REQUIRED:
IF YES, AMOUNT REQUIRED
YES (X ) NO ( )
10%
SUCCESSFUL BIDDERS ONLY:
PERFORMANCE & PAYMENT BOND
REQUIRED:
IF YES, AMOUNT REQUIRED
YES (X) NO ( )
100%
SUCCESSFUL BIDDERS ONLY:
MAINTENANCE BOND REQUIRED: YES (X) NO ( )
ALL TERMS AND CONDITIONS, SPECIFICATIONS AND BID FORMS ARE ATTACHED HERETO.
NOTE: THE FOLLOWING DOCUMENTS WILL BE REQUIRED FOR A BID TO BE COMPLIANT
1. SECTION 1 -1.5 FORMS ONLY BIDDER’S INFORMATION AND ACKNOWLEDGEMENT FORM,
INCLUDING PRICING SHEETS, EXCEPTIONS TAKEN, IF ANY, ADDENDA ACKNOWLEDGMENT
FORMS, ANY OTHER REQUIREMENTS INDICATED IN SPECIAL NOTES SECTION, AND BID
SECURITY IF REQUIRED (ONE ORIGINAL PLUS TWO (2) COPIES)
Page 1 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
08052025
NOTICE TO BIDDERS
1. ALL BIDS WILL BE OPENED PROMPTLY AT THE ADVERTISED TIME OF OPENING. THERE WILL BE
NO DELAYS OR POSTPONEMENTS WHICH ARE NOT PUBLICLY ADVERTISED. ANY BID RECEIVED
AFTER THE ADVERTISED TIME OF OPENING WILL NOT BE ACCEPTED.
2. IF A BIDDER USES A COURIER SERVICE FOR BID DELIVERY, IT SHALL BE THE BIDDER’S
RESPONSIBILITY THAT THE BID REACHES THE PURCHASING DEPARTMENT BY THE DATE AND
TIME SPECIFIED HEREIN.
3. ALL BIDS SUBMITTED TO THE CITY MUST BE IN A CLEARLY MARKED AND SEALED ENVELOPE.
REFERENCE THE PROJECT NUMBER ON THE OUTSIDE OF THE ENVELOPE.
4. OBLIGATION OF BIDDERS:
a. AT THE TIME OF OPENING BIDS, EACH BIDDER SHALL BE PRESUMED TO HAVE
INSPECTED THE SITES AND TO HAVE MADE HIM/HERSELF THOROUGHLY FAMILIAR
WITH THE PLANS AND CONTRACT DOCUMENTS, INCLUDING ALL ADDENDA. THE
FAILURE OR OMISSION OF ANY BIDDER TO RECEIVE OR EXAMINE ANY FORM,
INSTRUMENT OR DOCUMENT SHALL IN NO WAY RELIEVE ANY BIDDER FROM ANY
OBLIGATION IN RESPECT TO THEIR BID.
b. EACH BIDDER MUST FULLY INFORM HIM/HERSELF OF THE CONDITIONS RELATING TO
THE WORK WHICH WILL BE PERFORMED. FAILURE TO DO SO WILL NOT RELIEVE THE
SUCCESSFUL BIDDER OF HIS/HER OBLIGATION TO FURNISH ALL LABOR AND
MATERIALS NECESSARY TO CARRY OUT THE PROVISIONS OF THE CONTRACT
DOCUMENTS AND TO COMPLETE THE CONTEMPLATED WORK. IN AS MUCH AS
POSSIBLE, THE CONTRACTOR MUST, IN CARRYING OUT HIS/HER WORK, EMPLOY SUCH
MEANS AND METHODS AS WILL NOT CAUSE ANY INTERRUPTIONS OR INTERFERENCE
WITH THE WORK OF ANY OTHER CONTRACTOR.
5. TIME IS OF THE ESSENCE (IF APPLICABLE):
a. IF THE PROJECT IS NOT COMPLETED BY THE DATE SPECIFIED AS THE SUBSTANTIAL
COMPLETION DATE IN THE CONTRACT ENTERED INTO BY THE CITY AND THE
CONTRACTOR, THE CONTRACTOR WILL BE SUBJECT TO CONSEQUENTIAL AND/OR
LIQUIDATED DAMAGES.
Page 2 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
08052025
GENERAL INFORMATION
1.1 INTRODUCTION
The City of Norwalk is requesting bids for various roof replacement projects within the City.
The requirements of this project are outlined in greater detail under Section 2 Scope of Work/Project Specifications.
1.2 BID DOCUMENTS
All Bid documents for this invitation are available over the internet at http://www.norwalkct.gov. Adobe Acrobat reader is required to view this document. If you do not have this software you may download it for free from Adobe.
1.3 ADDENDA
All addenda, if issued will be available over the internet at http://www.norwalkct.gov. We strongly suggest that you check for any addenda a minimum of forty-eight hours in advance of the bid deadline. It is the responsibility of the bidder to check for issuance of any addenda.
1.4 BIDDER’S LIST
Bidder’s list for this solicitation will not be published.
1.5 QUESTIONS CONCERNING THIS BID
All questions concerning this solicitation must be directed, via e-mail, to Carleen Megaro, Buyer at cmegaro@norwalkct.gov. The deadline for the submission of questions is 2:00 pm, January 13, 2026.
1.6 SUBMISSION OF BID
The City of Norwalk is requesting electronic submission along with hard copy submission.
All participants are required to submit both by the said date and time. Hard copy submission must match the electronic submission and will be the official accepted submission. The City of Norwalk has the right to reject any submission that does not meet this criteria.
All sealed electronic submissions must be submitted in Bonfire no later than January 20, 2026, at 2:00PM.
All sealed hard copy Bids should be submitted to the City of Norwalk’s Purchasing Department no later than January 22, 2026 at 2:00 PM at the address listed below:
City of Norwalk Purchasing Department 125 East Avenue, Room 211 Norwalk, CT 06856-5125
Page 3 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL http://www.norwalkct.gov/ http://www.norwalkct.gov/
08052025
1.7 SUMMARIES
A list of the proposing firms will be available any time after 5:00 pm on the day of the opening at Purchasing-Bid Postings. Results will not be provided over the phone.
SPECIAL NOTES:
1.) PROJECT SCHEDULE: Begin April 15, 2026 and complete by June 15, 2026.
2.) A Non-Mandatory pre-bid conference and walkthrough will be held at 10:00 am, January
7, 2026 meeting at Norwalk City Hall, 125 East Avenue, Norwalk, CT. We will meet in the lobby. A walkthrough of the buildings to follow.
i. Please note that no additional walkthroughs are planned for this facility.
Subcontractors are encouraged to attend the scheduled pre-bid conference.
3.) BUILDING PERMITS - Contractors shall obtain and pay for all required permit(s) for this project. Permit fees are NOT waived for this project.
4.) References to Department of Public Works, Director of Public Works, and Engineer in section 3 and section 4 are to be interpreted as "Owner's designated representative".
5.) Section 4, Item 109-04-2b, page 79, Contractor Charges is changed to read "...profit and overhead shall be figured at fifteen (15) percent unless some other basis is approved by the Director."
6.) Section 3.8, Liquidated Damages, change to read “Liquidated damages as defined in Article 27 of the Norwalk General Conditions for Construction will be $100.00 per day.
7.) Contractors are hereby reminded that all submitted bid amounts MUST include all costs/insurance premium required to satisfy the various insurance limits as identified in these documents.
8.) Contractors are hereby advised that the determination of the lowest responsible bidder will be based on the Sum of the Base Bid(s) and the Alternate item(s) selected by the City in its best interest. Said determination by the City would be final.
9.) Prevailing Wage Rates shall apply to these services. All labor required for this project shall comply with the State of Connecticut. A copy of the State of Connecticut prevailing wage rates is included or to be provided via bid addendum prior to bid opening as a component of this solicitation. See Section 5 for this information.
10.) Prevailing Wages Projects: It is a requirement to submit certified payroll at minimum weekly.
11.) IMPORTANT Submission Information: As of 08/10/2020, a new interior Customer Service window opened inside City Hall that will help serve the public during the COVID- 19 pandemic. The window is staffed by Customer Service representatives Monday – Friday from 9 a.m. – 3:00 p.m. If you are planning to use the Customer Service window to drop off your submission, it is recommended to drop off the submission as early as possible since the team will be serving other customers.
It is still recommended to use a courier service (i.e. FedEx, UPS, USPS, DHL, etc.) to deliver the submission to the above address by the due date and time.
Page 4 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL https://www.norwalkct.gov/Bids.aspx?CatID=showStatus&txtSort=Category&showAllBids=on&Status=open
08052025
12.) Public Opening: Per the City of Norwalk Purchasing Guidelines , Bids shall be opened publicly by the Purchasing Agent or his designee, in the presence of one or more witnesses at the time and place designated in the Invitation for Bids. The amount of each bid, and such other relevant information as may be specified by the bid, together with the name of each bidder shall be recorded; the record and each bid shall be open to public inspection. If you wish to hear the bid/RFP opening, please join us through a teleconference.
Access Number: (866) 640-4044 or (678) 302-3554
Participant Code: 968 704
Page 5 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL https://www.norwalkct.gov/DocumentCenter/View/334/City-Procurement-Guidelines?bidId=
08052025
SECTION 1 – FORMS OF PROPOSAL
Page 6 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
BIDDER’S INFORMATION AND ACKNOWLEDGMENT FORM
Bidder’s Name
Street Address
City State Zip
Business Telephone:
Email Address:
Printed Name and Title of Individual Submitting Bid
The undersigned acknowledges that the terms, conditions and specifications of this bid are understood and unconditionally accepted.
Signature Date
Page 7 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
08052025
Exceptions: Note any vendor(s) responding to this proposal shall indicate any/all exceptions (if any) taken to language in this proposal. BIDDERS MAY NOT TAKE EXCEPTION TO
SUBSTANTIVE TERMS OF STANDARD CONTRACT FORMS PROVIDED IN THE RFP/RFQ/ITB.
Exceptions must be declared below in order to be considered by the City:
Page 8 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
08052025
1.1 RESPONSE FORM
Vendor Name -
Address -
Phone -
Fax -
Email -
Manager -
Fed ID#
The undersigned hereby declares that they have carefully examined the plans, specifications and project site and has satisfied themselves as to all the quantities and conditions and understands that in signing this proposal they waives all right to plead any misunderstanding regarding the same.
The undersigned further understands and agrees that they will furnish and provide all the necessary material, machinery, implements, tools, labor, services, and other items of whatever nature, and to do and perform all the work necessary under the aforesaid conditions, to carry out the contract and to accept in full compensation therefore the amount of the contract as agreed to by the Contractor and the City.
The undersigned further agrees, in case of variations of quantities from those shown or specified, the following unit prices will be used in adjusting the contract price. If quantities are authorized by the City, the following amount will be added to the contract as required. Unless otherwise noted, each UNIT PRICE shall include all equipment, tools, labor, permits, fees, etc., incidental to the installation and completion of the work involved.
It is further understood and agreed that all the information included in, and attached to, or required by the Request for Bid shall become public record upon delivery to the City.
The following prices shall apply to this project. Please provide pricing for both the Option A and Option B. See SECTION 2 for what each site entails.
1. Option A - Roof Project including – New fully adhered .060 EPDM insulated roofing system with twenty (20) years No Dollar Limit Warranty
SITE PRICE
A Norwalk Health Department $
B Benjamin Franklin Community Center $
C Norwalk Public Library $
D South Norwalk Library $
E TOTAL SITES (A-D) $
TOTAL SITES (A-D) In writing
Page 9 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
2. Option B – Roof project including – New fully adhered .090 EPDM insulated roofing system with thirty (30) years No Dollar Limit Warranty
SITE PRICE
A Norwalk Health Department $
B Benjamin Franklin Community Center $
C Norwalk Public Library $
D South Norwalk Library $
E TOTAL SITES (A-D) $
TOTAL SITES (A-D) In writing
Page 10 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
3.
Submitted by:
Print Name of Authorized Agent of Company
Signature of Authorized Agent of Company
Date
The above signatory acknowledges receipt of the following addenda issued during the bidding period and understands that they are a part of the bidding documents (if applicable):
Addendum # Dated Addendum # Dated
Bid Security in the form of a (check one) is attached.
Bond
Certified Check
Cost for performance bond included in lump sum per thousand dollars
Page 11 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
1.2 STATEMENT OF BIDDERS QUALIFICATIONS
Please answer the following questions regarding your company's past performance. Failure to reply to this instruction may be regarded as justification for rejecting a bid.
1. Number of years in business:
2.
Number of personnel employed: Part Time Full Time
3. List projects of this type/size your firm has completed within the last three (3) years:
Project
Date
Contact Person
Phone No.
4. SUBCONTRACTORS: If subcontractors are to be used, please list firm name, address, name of principal, and phone number below or on a separate sheet. Also, indicate the portion or section of work a subcontractor will be performing.
COMPANY NAME
ADDRESS
PRINCIPAL
PHONE
PORTION/SECTION OF
WORK
Page 12 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
5. ORGANIZATIONAL STRUCTURE OF
BIDDER (check which applies) general partnership limited partnership limited liability corporation limited liability partnership, corporation doing business under a trade name individual doing business under a trade name other (specify)
6. STATUS OF THE BUSINESS AND ITS CURRENT
STANDING WITH THE SECRETARY OF STATE'S
OFFICE; e.g., are all required filings current and in good standing or has the entity been withdrawn or canceled
Connecticut corporations - Will the Secretary of State be able to issue a Certificate of Good Standing within 30 days of the bid opening?
Yes
No
Out-of-State corporations - Do you have a valid license to do business in the State of Connecticut? (Evidence in the form of a Certificate of Authority from the Connecticut Secretary of State will be required within 30 days of the bid opening.)
Yes
No
7. Provide CT eLICENSE (https://www.elicense.ct.gov) and Business Registration (https://business.ct.gov/?language=e n_US)
8. Is your local organization an affiliate of a parent company? If so, indicate the principal place of business of your company and the name of the agent for service if different from what has been indicated on the response form:
Business Name Address City State Zip
Name of Agent
Page 13 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL https://www.elicense.ct.gov/ https://business.ct.gov/?language=en_US https://business.ct.gov/?language=en_US
08052025
NOTE: In the case of a Limited Liability Corporation or a Limited Liability Partnership a certified copy of the Articles of Organization certified as valid and in effect as of the date of the bid opening will be required within 30 days of the bid opening. A listing of the corporate officers, in the case of a corporation; the general or managing partners, in the case of a partnership; or the managers and members in the case of either a limited liability partnership or company will be required within 30 days of the bid opening.
9. The awarded contractor may be required to submit one copy of the following information relative to its company's financial statements prior to contract signing. This information must represent the current circumstance which surrounds the financial position of the bidding organization. Note: This information will be kept confidential if provided in a separate envelop from your bid pricing.
All information should be supported with appropriate audited financials.
a. Book Value (Total Assets (-) Total Liabilities)
b. Working Capital (Current Assets (-) Current Liabilities
c. Current Ratio (Current Assets/Current Liabilities)
d. Debt to Equity Ratio (Long Term Debt/Shareholder's Equity)
e. Return on Assets (Net Income/Total Assets)
f. Return on Equity (Net Income/Shareholder's Equity)
g. Return on Invested Capital (Net Income/Long Term Debt = Shareholders' Equity)
All responses to this questionnaire are understood to be proprietary to the vendor, and will be considered confidential. Additional information may be requested subsequent to your responding to this bid request.
1.3 CITY OF NORWALK VENDOR RECORDS
If you have not done business with the City of Norwalk as a vendor, your business information needs updating or your vendor record has not been updated over three (3) years. Please complete and include the latest version of Internal Revenue Service (IRS) W-9 Form with your submission. Here is the URL to the IRS website: https://www.irs.gov/forms-pubs/about-form-w-9
1.4 INSURANCE
Insurance Agency Name: Tel:
Agency Address: Email:
Page 14 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL https://www.irs.gov/forms-pubs/about-form-w-9
1.5 CITY OF NORWALK VENDOR QUESTIONNAIRE – IT INFORMATION SECURITY
Page 15 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
City of Norwalk Vendor Questionnaire
IT Information Security
Rev 8.4.22
1. Third-Party Contact Information (please provide the POC for follow-up questions to this questionnaire):
Vendor Name, Address, Point-of-Contact Name, Phone Number and Email
2. Description of Services/Products: Please provide a detailed description of services/products your organization aims to provide to the City?
3. System and Equipment Access: Will your organization use your own systems and equipment to perform the services, or will your organization need access to the City’s systems, equipment and network? (Yes or
No, If Yes, please explain)
YES ☐ NO ☐
4. Description of Data: Are you using data from the City in order provide the services/product to the City
(Yes or No, if Yes proceed to 3.1)
a. What data is needed to provide the services/products to the City?
Example: Name, Social Security Number, Trade Information, Source Code, Payroll or Accounts Payable data, student or patient data, Law Enforcement data, any Personally Identifiable Information (PII), etc.
Page 16 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
If your answers to Questions 3 and 4 are BOTH “NO”, thank you for completing the IT
Information Security Questionnaire.
If one or both questions are “YES”, please complete the remaining questions.
5. Office Locations: How many office locations does your organization have? Please include the locations of your organization.
6. Data Center Locations: How many data centers does your organization utilize to provide services/products to the City? Please include the locations of the data centers utilized by your organization.
7. Business Entity: What is your business entity type?
*Example: Sole Proprietorship, Partnership, C Corporation, S Corporation, Limited Liability Corporation (LLC), Limited Liability Partnership (LLP)
8. How many employees and contingent workers do you have in your organization?
1-10 ☐ 10-50 ☐ 50-100 ☐ 100-500 ☐ 500-1000 ☐ 1000 or more ☐
9. Physical Access: Does your organization need to be onsite or offsite to provide services/products to the City?
Page 17 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
10. Access to Data: How is your organization accessing City data?
*Example: Is the data supposed to be sent to your organization via email or will the data need to be uploaded to an application?
*Note: For third-parties that are providing an application to perform the services, please specify whether the application will be an internally hosted solution, cloud-based solution (i.e. SaaS, IaaS, PaaS), or a traditional web-based application (i.e. eBay, WebEx, online banking application)
11. Data Storage: Does your organization outsource data storage or does your organization utilize its own databases to store data? Does your organization store data outside of the United States?
YES ☐ NO ☐
12. Segregation of Data: Does your organization’s database structure allow segregation of sensitive client data?
YES ☐ NO ☐
13. Independent Attestations: Does your organization have independent attestations such as (i.e. ISO 27001, SSAE-18 SOC-1, SOC-2, PCI- DSS, ISO 9001)?
Page 18 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
14. Information Security
a. Does your organization have written information security policies and procedures (WISP)?
b. How often are the information security policies and procedures reviewed and updated?
c. Who in the organization is responsible for reviewing and updating the information security policies and procedures?
d. Does your organization have privacy policies and procedures?
e. How often are the privacy policies and procedures updated?
f. Who in the organization is responsible for reviewing and updating the privacy policies and
g. What methods of encryption are utilized for data at rest and in transit?
Page 19 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
h. Are the encryption methods utilized FIPS 140-2 approved?
i. Does your organization utilize firewalls to filter incoming data and information from the internet into your company network?
j. Does your organization perform penetration testing at least once per year to determine if unauthorized access to the computer network and malicious activity is possible externally?
k. Does your organization perform vulnerability testing at least once per year in order to identify vulnerabilities within the internal network?
l. Does your organization perform background checks on employees and contingent workers prior to onboarding them? Describe the nature of these background checks (i.e., criminal, credit, international, etc.).
Page 20 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
m. Does your organization utilize multi-factor authentication?
n. Does your organization utilize scan cards or biometric scans to grant employees and contingent workers access to the building and data centers where data is stored?
o. If offering a technology product, does the organization utilize software development life cycle (SDLC) or
Agile to build and maintain technological product?
p. Does the technological product undergo information security testing and quality assurance testing prior to deployment?
q. Does the Vendor provide annual Cybersecurity Awareness training to their employee?
Page 21 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
r. Does the Vendor provide annual phishing simulations for their employee?
s. Have users been educated on how to report suspected security violations or vulnerabilities?
t. Does the Vendor have an employee identified as the Chief Information Security Officer?
u. Are all the Vendor laptops encrypted?
v. Are all Vendor computers (workstations, notebooks) required to join the Company’s domain and receive Group Policies?
w. Does the Vendor meet the NIST 800-63 password guidelines?
Page 22 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
15. Risk Management
a. Does your organization have an enterprise risk management framework implemented at your organization?
b. Does your organization have documented enterprise risk management policies and procedures?
c. Who in the organization is responsible for reviewing the enterprise risk management policies and
d. Does your organization utilize an outside third-party to provide services/products to the client?
e. Does your organization have a third-party risk management program (TPRM)?
Page 23 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
f. Does your organization include right-to audit clauses in contracts with third parties?
g. Does your organization have a certificate of insurance (COI)? Please attach a copy of your COI.
Business Continuity/Disaster Recovery
a. Does your organization have a business continuity plan?
b. How often is the business continuity plan updated?
c. Does your organization conduct business continuity tests once per year?
Page 24 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
d. Does your organization have a disaster recovery plan?
e. How often is the disaster recovery plan updated?
f. Does your organization conduct disaster recovery tests once per year?
g. Does your organization have business continuity and/or disaster recovery sites?
h. Are the business continuity/disaster recovery sites located in the United States or outside the
United States? Please include the locations of business continuity/disaster recovery sites?
Page 25 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
SECTION 2 – SCOPE OF WORK / PROJECT SPECIFICATIONS
Page 26 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
2.1 Introduction
The City of Norwalk is requesting bids for roof replacement at Norwalk Health Department, Benjamin Franklin Community Center, Norwalk Public Library, and South Norwalk Library. Please see the roofing specifications and drawings for what the project entails at each site. The City will be choosing one (1) bidder to do all four (4) sites.
2.2 Specifications
Page 27 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
PROJECT MANUAL
Project Number: ________
Roofing Replacement at
NORWALK HEALTH DEPARTMENT
137 East Avenue
Norwalk, Connecticut 06851
GILL & GILL Architects, LLC 17 High Street, Suite 301, Norwalk, Connecticut 06851
July 3, 2025
Page 28 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
TABLE OF CONTENTS
DOCUMNET 00101-1
Norwalk Health Department
TABLE OF CONTENTS
Cover Sheet 00101 Table of Contents 00102 Project Narrative 00103 List of Drawings
TECHNICAL SPECIFICATIONS
Division 1 General Requirements
01010 Summary of Work 01045 Cutting and Patching 01100 Procedures, Controls and Payments 01740 NDL Warranty
Division 2 Site Work 02050 Demolition and Salvage
Division 3 Concrete 03511 Cementitious Wood Fiber Roof Deck Panels
Division 6 Wood and Plastics 06110 Rough Carpentry
Division 7 Thermal and Moisture Protection
07723 Roof Hatches 07724 Roof Hatch Rail System
07530 EPDM Membrane Roofing 07600 Flashing and Sheet Metal 07700 Roofing Accessories
07900 Joint Sealers
Division 15 Mechanical
15000 General Mechanical Provisions 15140 Hangers & Supports 15250 Pipe & Ductwork Insulation 15400 Roof Drains 15410 Plumbing Piping
Division 16 Electrical
16000 Basic Electrical Requirements
END OF DOCUMENT
Page 29 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
PROJECT NARRATIVE
DOCUMENT 00102-1
The project consists of replacement of 3 areas of roofing totaling approximately 8,440 square feet of existing 60 mil E.P.D.M. insulated roofing with a new fully adhered .060 EPDM insulated roofing system with 20 years No Dollar Limit warranty. There is an alternate for a fully adhered .090 roofing system with 30 years NDL warranty. The work is to be completed in one mobilization.
Page 30 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
DOCUMENT 00102-2
Page 31 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
LIST OF DRAWINGS
DOCUMENT 00103-1
LIST OF DRAWINGS
Cover Codes, Notes, Legends, Abbreviations & Location Map
A-1 Demolition & Roof Plans A-2 Details A-3 Details
Page 32 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
SUMMARY OF WORK
SECTION 01010 - 1
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Documents affecting work of this Section include, but are not necessarily limited to, General Requirements, bidding documents and drawings.
1.2 SUMMARY
A. Furnish and install roof materials, insulation, flashings, and miscellaneous materials on the roof areas designated by drawings:
1. Installation of Ethylene propylene diene monomer (EPDM) membrane roofing system on wood and tectum deck, including but not limited to:
a. Removal and legal disposal of existing EPDM roofing membrane, insulation, drains, accessories and flashings down to deck.
b. Polyisocyanurate insulation, continuous R Value of 30, mechanically fastened to decking.
c. ¼” per foot slope minimum tapered polyisocyanurate insulation, mechanically fastened to decking.
d. ½” cover board mechanically fastened to decking.
e. EPDM membrane fully adhered to cover board.
f. Install specified drains, flashing, metal edging and coping systems.
g. New drains and scuppers.
1.3 INTENT OF THE SPECIFICATIONS
A. The intent of these specifications is to describe the materials and methods of construction required for the performance of the work. In general, it is intended that the drawings shall delineate the detailed extent of the work. In the event of a discrepancy between drawings, specifications or industry standards, the most expensive method shall govern unless otherwise directed by the Owner or Architect.
1.4 PROTECTION
A. The Contractor shall use every available precaution to provide for the safety of property owner, visitors to the site, and all connected with the work under the specification.
B. All existing facilities both above and below ground shall be protected and maintained free of damage. Existing facilities shall remain operating during the period of construction unless
Page 33 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
SECTION 01010 - 2
otherwise permitted. All access roadways must remain open to traffic unless otherwise permitted.
C. Barricades shall be erected to fence off all construction areas from operations personnel.
D. Safety Requirements
1. All application, material handling, and associated equipment shall conform to and be operated in conformance with OSHA safety requirements.
2. Comply with federal, state, local and owner fire and safety requirements.
3. Advise owner whenever work is expected to be hazardous to owner employees and/or operations.
4. Maintain a crewman as a floor area guard whenever roof decking is being repaired or replaced.
5. Maintain proper fire extinguisher within easy access whenever power tools, roofing kettles, and torches are being used.
6. All safety requirements of the building owner must be followed. No exceptions will be permitted. Safety orientation meeting required prior to performing any work.
E. The Contractor shall provide safe access for the Owner and Architect to examine and inspect the work during the entire duration of the project.
1.5 HOUSEKEEPING
A. Keep materials neat and orderly.
B. All materials stored on the roof shall be tied down or otherwise secured to prevent wind from blowing loose materials off the roof.
C. Remove scrap, waste and debris from project area at the end of each day to prevent loose materials from being blown off the roof.
D. Maintenance of clean conditions on both the interior and exterior of the building while work is in progress and cleanup when work is completed shall be in strict accordance with the "General Requirements" of this contract. The Contractor shall be responsible for cleaning dust and debris on a daily basis. If the Contractor fails to do so and school custodians are required to clean dust and/or debris caused by the Contractor, the Contractor shall be back charged for the custodial time.
Page 34 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
SECTION 01010 - 3
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 Contractor to notify City prior to commencing work.
END OF SECTION
Page 35 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
CUTTING AND PATCHING
SECTION 01045 - 1
1.01 SUMMARY
A. Provide cutting and patching work to properly complete the requirements of the project for:
1. Structural work
2. Mechanical, electrical and plumbing systems.
3. Visual requirements, including detailing and tolerances.
4. Operational and safety limitations.
5. Fire resistance ratings.
6. Inspection, preparation, and performance.
7. Cleaning
B. Do not cut and patch in a manner that would resulting a failure of the work to perform as intended, decrease energy performance, increase maintenance, decrease operational, or decrease safety.
C. All cutting and patching operations shall be conducted under the direct supervision of the General Contractor.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Match existing materials for cutting and patching work with new materials conforming to project requirements.
3.01 MATERIALS
A. Inspect conditions prior to work to identify scope and type of work required. Protect adjacent work. Notify Owner 48 hours in advance of work requiring interruption to building services or Owners operations.
B. Perform work with workmen skilled in the trades involved.
C. Cutting: Use cutting tools, not chopping tools. Make neat holes. Minimize damage to adjacent work. Check for concealed utilities and structure before cutting.
D. Patching: Make patches, seams, and joints durable and inconspicuous. Comply with tolerances for new work.
E. Clean work area and areas affected by cutting and patching operations daily or at regular intervals during the work week, or as directed by the Architect or Owner.
Page 36 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
PROCEDURES, CONTROLS AND PAYMENTS
SECTION 01100 - 1
Roofing Replacement at
A. Provide coordination of work including but not limited to:
1. Supervisory personnel.
2. Pre-Construction Conference.
3. Progress meetings at weekly intervals.
4. Other meetings as required by project conditions and progress.
B. Submit Project Schedule in bar chart form within 7 days of Notice to Proceed from Owner.
C. Submit Shop Drawing Submittal Schedule coordinated with project schedule prior to commencement of work.
D. Submit Shop Drawings with all information necessary for evaluation by architect in a legible fashion and in accordance with Shop Drawing submittal Schedule.
E. Submit Schedule of Values on AIA Document G703.
Submit list of subcontractors.
F. Notify Owner at least 48 hours in advance of tests required for systems and equipment.
G. Retain on site one set of progress documents as record drawings and specifications to be maintained and annotated by the Contractor on a regular basis as work progresses. These As-Built record documents are to be submitted to the Owner on a disc in PDF-A format at the completion of the project. Submission of a complete set of record documents is required to close out the project and to receive final payment.
H. Submit pencil copies of monthly requisitions for review by the Owner and Architect.
Submit three (3) original notarized copies of payment requests on AIA Document G702.
I. Submit certified payroll documentation weekly.
J. Post a list of emergency telephone numbers and addresses for individuals to be contacted in case of emergency.
PART 2 - PRODUCTS – Not Applicable To This Section
3.01 MINOR CHANGES IN THE WORK
A. Supplemental instructions authorizing minor changes in or clarifications of the work which do not involve an adjustment to the contract sum or the contract time, will be issued by the Architect in the form of a Clarification.
3.02 CHANGE ORDER PROPOSAL REQUESTS
A. Owner Initiated Proposal Requests: Proposed changes in the scope of work that will require adjustment to the contract sum or time frame will be issued by the Architect in the form of a Bulletin with a detailed description of the proposed change and supplemental or revised drawings or specifications if required.
1. Bulletins issued by the Architect are for pricing of the proposed change only and are not to be considered direction to stop work in progress or to execute the proposed change.
B. Upon receipt of the Architect’s bulletin, the Contractor shall prepare an itemized estimate of costs necessary to execute the proposed change including the following information:
Page 37 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
PROCEDURES, CONTROLS AND PAYMENTS
SECTION 01100 - 2
Roofing Replacement at Norwalk Health Department
1. Breakdown of all General Contractor labor costs.
2. Breakdown of all General Contractor material costs.
3. General Contractor markup percentage of 15% for work done with his forces.
4. Breakdown of all Subcontractor(s) labor costs.
5. Breakdown of all Subcontractor(s) material costs.
6. Subcontractor markup of 10%.
7. General Contractor’s markup of 5% on Subcontractor’s “net cost” (without
Subcontractor overhead and profit markup percentages).
8. Statement indicating the effect of the proposed changes on the contract time.
3.03 CONTRACTOR INITIATED REQUEST FOR CLARIFICATION OR CHANGES
A. When latent or unforeseen conditions require modification to the Contract, with or without adjustment to the contract sum or time frame, the Contractor shall submit such proposed change request or request for project clarification to the Architect in the form of a Request for Information (RFI).
B. All RFI’s shall be sequentially numbered.
1. RFI’s dealing with a proposed change shall include a statement outlining the reasons for the change and the effect of the change on the work.
2. RFI’s dealing with project clarification shall state the clarification required
(drawings, specification, design intent, etc.) and shall allow the Architect sufficient time to review the applicable data or field condition.
3.04 CHANGE ORDER PROCEDURE
A. Upon the Owner’s approval of a Change Order Proposal Request, the Contractor shall prepare a formal change order on AIA Form G701, for signature of the Owner and Architect.
B. All Change Orders must be reviewed and approved by the Owner and Architect before the Contractor may proceed with changes in the work, unless prior specific direction to proceed has been given by the Owner in the interest of timely project completion.
3.05 PRECONSTRUCTION CONFERENCE
A. Contractor shall schedule a Pre-Construction Conference and organizational meeting on the same day as the execution of the Agreement and prior to commencement of any construction activities. Contractor is required to review project schedule and State and federal regulations.
B. Attendees: Owner, Architect, Contractor, and his superintendent, major subcontractors, and other concerned parties shall each be represented at the conference by persons familiar with and authorized to conclude matters pertaining to the work.
C. Agenda: Discuss items of significance to the project including:
1. Construction schedule, project phasing, progress meeting date and time.
D. Contractor to notify the City prior to commencing work.
Page 38 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
WARRANTY
SECTION 01740-1
Roofing Replacement at Norwalk Health Department
PART 1 – GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including the General and Supplementary Conditions and other Division 1 Specification sections, apply to the work of this section.
B. Related specification sections:
1. Section 07530 – EPDM Membrane Roofing.
1.02 WARRANTY
A. Contractor shall provide a minimum twenty (20) year manufacturer’s warranty in the base bid. An Add Alternate shall be included with the base bid to provide a thirty (30) year manufacturer’s warranty.
B. Upon project completion and material supplier acceptance, material supplier will issue to Owner a No Dollar Limit, full coverage warranty to be effective upon acceptance and complete payment to material supplier.
C. Warranty shall cover all components installed under this specification. This includes all labor and materials necessary to correct any deficiencies during the life of the warranty.
D. Warranty will be limited to wind speeds of 120 mph.
E. The Contractor shall certify by letter from the manufacturer of the roof system, compliance with the above guarantee requirements. Letter shall certify that the Total System Warranty required by these specifications will be issued upon proper completion of the roof system installation.
F. The Contractor shall submit at the time of the final inspection, and as a condition of final payment, a written guarantee in which he agrees to maintain the entire roof system in a completely watertight condition at no cost to the Owner for two (2) years from the date of final acceptance.
PART 2 – PRODUCTS – Not Applicable To This Section
PART 3 – EXECUTION – Not Applicable To This Section
Page 39 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
DEMOLITION AND SALVAGE
SECTION 02050 - 1
Roofing Replacement at Norwalk Health Department
A. Drawings and general provisions of the Contract, including the General and Supplementary Conditions and
1. Section 01010 Summary of Work
1.02 DEMOLITION AND SALVAGE
A. General – This specification section governs the demolition, salvaging (to the extent specified by the
Owner), and disposal of materials resulting from the demolition.
B. The existing roofing is 60 mil EPDM, single-ply roofing with insulation applied over tectum decks.
C. Contractor is to remove existing roofing system down to existing deck including metal edges, drains, flashings at plumbing vents, parapet copings and other appurtenances as required to complete new work.
D. Contractor is to remove all adhesives on decks to provide a clean deck.
E. Contractor is to remove and salvage all plumbing vents, exhaust vents and other appurtenances to be re-used.
F. Contractor is to remove any rotted, deteriorated or damaged tectum decking.
PART 2 – PRODUCTS – Not Applicable to This Section
PART 3 – EXECUTION
3.01 PROCEDURES, PREPARATION, AND PROTECTION
A. Demolition operations shall be performed in such a manner that no damage to existing facilities or injury to persons will result from performance of the work.
B. The Contractor shall review and visually survey areas to be demolished prior to beginning demolition.
C. The use of equipment or wrecking devices is subject to the approval of the Owner. However, such approval does not relieve the Contractor of his responsibilities as outlined above and elsewhere in the Project Manual.
D. Contractor is responsible for protection of property during course of the work. Lawns, shrubbery, paving, and building shall be protected from damage. Repair any damage that does occur at no cost to the Owner.
E. New roofing, flashings, and insulation shall be installed and sealed in a watertight manner on same day of installation or before arrival of inclement weather.
F. At start of each work day drains within the daily work area shall be plugged to prevent debris from clogging drain lines. Plugs are to be removed at the end of each work day or prior to arrival of inclement weather.
G. At end of each work day partial installations shall be sealed with water stops along edges to prevent water entry to new roofing system.
H. Preparation shall be limited to those areas that can be covered with installed roofing material on same day or before arrival of inclement weather.
I. Prior to commencing demolition provide a dumpster or dump truck located adjacent to the building where allowed by Owner. Provide an enclosed chute from roof for removal of debris from roof area.
Demolished material is to be removed from roof as it accumulates. Do not pile debris in on roof in such a way as to overload roof structure. Protect building surfaces, mechanical equipment, air intakes, etc from dust and debris. Dispose of debris in a legal manner.
Page 40 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
DEMOLITION AND SALVAGE
SECTION 02050 - 2
Roofing Replacement at Norwalk Health Department
J. Work sequence shall be arranged so that newly constructed roof areas are not used for storage, equipment movement, or foot traffic. Move equipment and ground storage areas as work progresses.
K. Clean roof of loose stone and dirt with a closed vacuum system.
3.02 ASBESTOS
A. There are no asbestos containing materials present in the roofing materials in the areas to be re-roofed.
3.03 SALVAGE
A. Material removed from the building becomes the property of the Contractor unless specified otherwise by the Owner. Material salvaged for the Owner shall be placed in an area designated by the Owner for storage of the salvaged material
Page 41 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
CEMENTITIOUS WOOD FIBER ROOF DECK PLANKS
SECTION 03511-1
Roofing Replacement at Norwalk Health Department
PART 1 – GENERAL
1.01 SUMMARY
A. Section Includes:
1. Cementitious wood fiber plank roof deck and form system
B. Related Sections:
1. Section 07530: EPDM Membrane Roofing.
1.02 REFERENCES
A. ASTM International:
1. ASTM C177 Standard Test Method for Steady-State Heat Flux Measurements and Thermal
Transmission Properties by Means of the Guarded-Hot-Plate Apparatus.
2. ASTM C518 Standard Test Method for Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus.
3. ASTM C578 Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation.
4. ASTM D1621 Standard Test Method for Compressive Properties of Rigid Cellular Plastics.
5. ASTM D2842 Standard Test Method for Water Absorption of Rigid Cellular Plastics.
6. ASTM E96 Standard Test Methods for Water Vapor Transmission of Materials.
B. Underwriters Laboratories, Inc. (UL):
1. UL 580 Standard for Safety for Tests for Uplift Resistance of Roof Assemblies.
1.03 SYSTEM DESCRIPTION
A. Design Requirements: Provide roof deck assembly designed and tested according to the following:
1. Underwriters Laboratories UL 580 (UL Class 90 Design): [Design No. NM504] [Design No. NM511]
[Design No. NM512] [Design No. NM517] [Design No. NM533] [Design No. 474] [Design No. 475] [Design No. 451].
B. Performance Requirements:
1. Provide a roof deck system able to resist the wind uplift performance specified in Section 07530, 1.4, D. Provide letter bearing the seal and signature from a Connecticut registered Engineer.
2. Provide a roof deck system that has been manufactured, fabricated and installed to provide deflection of Less than L/240 at design load.
1.04 SUBMITTALS
A. General: Submit listed submittals in accordance with Conditions of the Contract and Division 1
Submittal Procedures Section.
B. Product Data: Submit manufacturer’s product data and installation instructions.
C. Shop Drawings: Provide drawings indicating locations and spacing of planks and purlins.
Page 42 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
CEMENTITIOUS WOOD FIBER ROOF DECK PANELS
SECTION 03511-2
Roofing Replacement at Norwalk Health Department
D. Samples: Submit selection and verification samples as follows:
1. Set of 6-inch square samples for each wood fiber deck unit required, showing full range of exposed texture to be expected in completed work.
2. Labeled set of all accessories required for a complete installation.
E. Quality Assurance/Control Submittals: Submit the following:
1. Test Reports: Upon request, submit certified test reports from recognized test laboratories.
2. Certificates: Submit manufacturer’s certificate that products meet or exceed specified requirements.
F. Closeout Submittals: Submit the following:
1. Warranty documents specified herein.
1.05 QUALITY ASSURANCE
A. Installer Qualifications: Utilize an installer having demonstrated experience on projects of similar size and complexity.
B. Regulatory Requirements and Approvals: Comply with requirements below.
1. International Code Council (ICC):
a. ICC-ES Evaluation Report ESR-1112.
2. Underwriters’ Laboratories of Canada (ULC) label.
a. Structural Cement-Fiber Unit-535X
1.06 DELIVERY, STORAGE & HANDLING
A. General: Comply with Division 1 Product Requirement Section.
B. Delivery: Deliver materials in manufacturer’s original, unopened, undamaged containers with identification labels intact.
1. Provide labels indicating brand name, deck style, plank size and plank thickness.
C. Storage and Protection: Store materials protected from exposure to harmful environmental conditions and at temperature and humidity conditions recommended by the manufacturer.
1. Prevent soiling, physical damage or wetting.
2. Store cartons open at each end to stabilize moisture content and temperature.
1.07 WARRANTY
A. Project Warranty: Refer to Conditions of the Contract for project warranty provisions.
B. Manufacturer’s Warranty: Submit, for Owner’s acceptance, manufacturer’s standard warranty document executed by authorized company official. Manufacturer’s warranty is in addition to, and not a limitation of, other rights Owner may have under contract documents.
1. Warranty Period: 15 years beginning with date of substantial completion.
Page 43 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
SECTION 03511-3
Roofing Replacement at Norwalk Health Department
PART 2 – PRODUCTS
2.01 ROOF DECK AND FORM SYSTEMS
A. Manufacturer: Tectum Inc.
1. Armstrong World Industries
B. Proprietary Systems. Cementitious deck form board systems, including the following configurations:
1. Tectum Roof Deck Plank.
2. Tectum Concealed Tee Deck.
2.02 ROOF DECK PANEL COMPONENTS
A. Proprietary Products. Cementitious deck form board products, including the following:
1. Tectum I Roof Deck Panels:
a. Material: Aspen wood fibers bonded with inorganic hydraulic cement.
b. Nominal Panel Thickness: 3 inches (76 mm).
2.03 ACCESSORIES – Tectum Roof Deck System(s) I
A. Provide accessories as follows:
1. Tectum Screws:
a. Material: Steel.
b. Type: 14 gauge Dekfast screw with 2 inch (51 mm) diameter washer
2. Construction Adhesive:
a. Manufacturer: Miracle Construction Adhesive.
Type: Adhesive SFA-66.
3. Johns Manville Screws:
b. Material: Steel.
c. Type: Lite-Deck screw with 2 inch (51 mm) diameter washer
3.01 MANUFACTURER’S INSTRUCTIONS
A. Comply with the instructions and recommendations of the roof deck panel manufacturer.
3.02 EXAMINATION
A. Site Verification of Conditions:
1. Verify that site conditions are acceptable for installation of roof deck panel system.
2. Do not proceed with installation of roof deck panel system until unacceptable conditions are
Page 44 of 416, 4487 City of Norwalk Various Roof Replacement Projects - FINAL
SECTION 03511-4
Roofing Replacement at corrected.
3.03 INSTALLATION
A. Roof Deck Plank Installation:
1. Remove damaged panels…