1-4460 City Fiber Optic Cable Emergency and Maintenance Services-FINAL.pdf

PDF 1 MB Posted

Attached to
City Fiber Optic Cable Emergency and Maintenance Services
Solicitation number
4460
Issued by
Fairfield County, Connecticut

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF NORWALK

PURCHASING DEPARTMENT

08052025

SEALED RFPS MUST BE RECEIVED BY THE OFFICE OF THE PURCHASING AGENT, 125 EAST AVENUE NORWALK, CT 06851

BY THE DATE AND TIME OF RFP OPENING

PROJECT NUMBER: 4460

REQUESTING DEPARTMENT: Other

DATE OF RFP ISSUANCE: 08/22/2025

TITLE OF RFP: City Fiber Optic Cable Emergency and Maintenance Services

RFI/QUESTION DEADLINE: 2:00PM 09/05/2025

ELECTRONIC SUBMISSION DEADLINE: 2:00PM 09/15/2025

HARD COPY SUBMISSION DEADLINE: N/A

MANDATORY WALKTHROUGH:

DATE, TIME, AND LOCATION OF WALKTHROUGH

YES ( ) NO (X )

N/A

TIME/DATE OF RFP OPENING: 2:00 PM 09/15/2025

RFP DEPOSIT REQUIRED:

IF YES, AMOUNT REQUIRED

YES ( ) NO (X )

SUCCESSFUL BIDDERS ONLY:

PERFORMANCE & PAYMENT BOND REQUIRED:

IF YES, AMOUNT REQUIRED

YES ( ) NO (X )

SUCCESSFUL BIDDERS ONLY:

MAINTENANCE BOND REQUIRED:

YES ( ) NO ( X)

ALL TERMS AND CONDITIONS, SPECIFICATIONS AND BID FORMS ARE ATTACHED HERETO.

NOTE: THE FOLLOWING DOCUMENTS WILL BE REQUIRED FOR A BID TO BE COMPLIANT

1. BIDDER’S INFORMATION AND ACKNOWLEDGEMENT FORM

2. RFP FORMS, INCLUDING PRICING SHEETS AND ADDENDA ACKNOWLEDGMENT FORMS

3. EXCEPTIONS (IF ANY)

Page 1 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

08052025

NOTICE TO BIDDERS

1. ALL RFPS WILL BE OPENED PROMPTLY AT THE ADVERTISED TIME OF OPENING. THERE WILL BE NO DELAYS OR POSTPONEMENTS WHICH ARE NOT PUBLICLY ADVERTISED. ANY RFP RECEIVED AFTER THE ADVERTISED TIME

OF OPENING WILL NOT BE ACCEPTED.

2. OBLIGATION OF BIDDERS:

a. AT THE TIME OF OPENING RFPS, EACH BIDDER SHALL BE PRESUMED TO HAVE INSPECTED THE SITES

AND TO HAVE MADE THEMSELVES THOROUGHLY FAMILIAR WITH THE PLANS AND CONTRACT

DOCUMENTS, INCLUDING ALL ADDENDA. THE FAILURE OR OMISSION OF ANY BIDDER TO RECEIVE OR

EXAMINE ANY FORM, INSTRUMENT OR DOCUMENT SHALL IN NO WAY RELIEVE ANY BIDDER FROM

ANY OBLIGATION IN RESPECT TO THEIR RFP.

b. EACH BIDDER MUST FULLY INFORM THEMSELVES OF THE CONDITONS RELATING TO THE WORK WHICH WILL BE PERFORMED. FAILURE TO DO SO WILL NOT RELIEVE THE SUCCESSFUL BIDDER OF

THEIR OBLIGATION TO FURNISH ALL LABOR AND MATERIALS NECESSARY TO CARRY OUT THE

PROVISIONS OF THE CONTRACT DOCUMENTS AND TO COMPLETE THE CONTEMPLATED WORK. IN AS MUCH AS POSSIBLE, THE CONTRACTOR MUST, IN CARRYING OUT THEIR WORK, EMPLOY SUCH MEANS AND METHODS AS WILL NOT CAUSE ANY INTERRUPTIONS OR INTERFERENCE WITH THE WORK OF ANY

OTHER CONTRACTOR.

3. TIME IS OF THE ESSENCE (IF APPLICABLE):

a. IF THE PROJECT IS NOT COMPLETED BY THE DATE SPECIFIED AS THE SUBSTANTIAL COMPLETION DATE IN THE CONTRACT ENTERED INTO BY THE CITY AND THE CONTRACTOR, THE CONTRACTOR WILL BE

SUBJECT TO CONSEQUENTIAL AND/OR LIQUIDATED DAMAGES.

Page 2 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

08052025

GENERAL INFORMATION

1. INTRODUCTION

The City of Norwalk, Connecticut (hereafter referred to as "the City"), is soliciting proposals from qualified and experienced contractors to provide ongoing, on-demand fiber optic cable emergency and maintenance services. The requirements of this project are outlined in greater detail under Section 2 Scope of Work/Project Specifications.

2. RFP DOCUMENTS

All RFP documents for this invitation are available over the internet at http://www.norwalkct.gov. Adobe Acrobat reader is required to view this document. If you do not have this software you may download it for free from Adobe.

3. ADDENDA

All addenda, if issued will be available over the internet at http://www.norwalkct.gov. We strongly suggest that you check for any addenda a minimum of forty-eight hours in advance of the RFP deadline. It is the responsibility of the bidder to check for issuance of any addenda.

4. BIDDER’S LIST

Bidder’s list for this solicitation will not be published.

5. QUESTIONS CONCERNING THIS RFP

All questions concerning this solicitation must be directed, via e-mail, to Sharon Conners, Purchasing Agent at sconners@norwalkct.gov. Please include the Project Number and Project Title in the subject line. The deadline for the submission of questions is 2:00 pm, September 5, 2025.

6. SUBMISSION OF RFP

The City of Norwalk requires electronic sealed submission for this project in the City of Norwalk’s BONFIRE portal (https://norwalkct.bonfirehub.com/portal/?tab=openOpportunities)

All sealed electronic submissions must be submitted in Bonfire no later than September 15, 2025, at

2:00PM.

7. SUMMARIES

A list of the proposing firms will be available any time after 5:00 pm on the day of the RFP opening at Purchasing-Bid Postings. RFP results will not be provided over the phone.

Page 3 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL http://www.norwalkct.gov/ http://www.norwalkct.gov/ mailto:sconners@norwalkct.gov https://norwalkct.bonfirehub.com/portal/?tab=openOpportunities https://www.norwalkct.gov/Bids.aspx?CatID=showStatus&txtSort=Date&showAllBids=on&Status=open

SPECIAL NOTES:

1. Public Opening: Per the City of Norwalk Purchasing Guidelines, Bids shall be opened publicly by the Purchasing

Agent or his designee, in the presence of one or more witnesses at the time and place designated in the Invitation for Bids. Receipt of Proposals: Proposals shall be opened so as to avoid disclosure of contents to competing proposers during the process of negotiation. A Register of Proposals shall be prepared in accordance with these Procurement Guidelines and shall be open for public inspection after contract award. If you wish to hear the bid/RFP opening, please join us through a teleconference.

Access Number: (866) 640-4044 or (678) 302-3554

Participant Code: 968 704

Page 4 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL https://www.norwalkct.gov/DocumentCenter/View/334/City-Procurement-Guidelines?bidId=

SECTION 1 – RESPONSE FORMS

Page 5 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

PROPOSER’S INFORMATION AND ACKNOWLEDGMENT FORM

Proposer’s Name

Street Address

City State Zip

Business Telephone:

Email Address:

Printed Name and Title of Individual Submitting Proposal

The undersigned acknowledges that the terms, conditions and specifications of this RFP are understood and unconditionally accepted.

Signature Date

Page 6 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

08052025

Exceptions: Note any vendor(s) responding to this proposal shall indicate any/all exceptions (if any) taken to language in this proposal. BIDDERS MAY NOT TAKE EXCEPTION TO SUBSTANTIVE TERMS OF STANDARD CONTRACT FORMS PROVIDED IN THE RFP/RFQ/ITB. Exceptions must be declared below in order to be considered by the City:

Page 7 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

08052025

1.1 PROPOSAL RESPONSE FORM

Vendor Name -

Address -

Phone -

Fax -

Email -

Manager -

Fed ID#

The undersigned hereby declares that they have carefully examined the plans, specifications and project sites and has satisfied themselves as to all the quantities and conditions and understands that in signing this proposal they waives all right to plead any misunderstanding regarding the same.

The undersigned further understands and agrees that they will furnish and provide all the necessary material, machinery, implements, tools, labor, services, and other items of whatever nature, and to do and perform all the work necessary under the aforesaid conditions, to carry out the contract and to accept in full compensation therefore the amount of the contract as agreed to by the Contractor and the City.

It is further understood and agreed that all information included in, attached to, or required by the Request for Proposal shall be public record upon delivery to the City.

A. PROPOSED FEES

1. DEVIATIONS FROM MATERIAL SPECIFICATIONS: Any deviations from the material specifications must be documented and submitted with your submission in detail on the exceptions page. If deviations are not documented completely, the bidder may be disqualified from consideration for an award.

Page 8 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

Ite m

De sc rip tio n Ty pe

U ni t o f

M ea su re

Ye ar t P ric e

Ye t P ric e O pt io na l

Ye t P ric e 1.

O ne P er so n Cr ew

Re gu la r W or ki ng H ou rs

Ba se

Da y

2.

O

P er so n Cr ew

O ve rt im e Ho ur s

Ho ur

3.

T w o

Pe rs on C re w

Re gu la r W or ki ng

H

4.

w o Pe rs on

C re w

O ve rt im e Ho ur s

5.

hr ee

P er so n

Cr ew

Re gu la r W or ki ng

H

6.

hr ee P er so n Cr ew

O ve rt im e Ho ur s

7.

F r P er so n Cr ew

Re gu la r W or ki ng H

8.

F r P er so n Cr ew

O ve rt im e Ho ur s

9.

Fu rn ish a nd In st al l 1

St ra nd S

M F ib er

O pt ic D ro p

Ca bl e in

F ro nt ie r D uc t nk

Li ar

F oo t

Fu rn ish a nd In st al l 4

St ra nd S

M F ib er

O pt ic C ab le in F ro nt ie r D uc t B an k ar

F

Fu rn ish a nd In st al l 1 /4

" N yl on R op e in F ro nt ie r D uc t B an k ar

F

Fu rn ish

In st al l M ax ce ll Fl ex ib le In ne rd uc t i n Fr on tie r D uc t B an k ar F

Fr on tie r M an ho le

P re

-E nt ry S et up

(D ry

M an ho le

Ea ch

Fr on tie r M an ho le P re -E nt ry

S et up (F ill ed w ith

W at er

Fu rn ish a nd In st al l 1

St ra nd S

M F ib er

O pt ic D ro p

Ca bl e La sh ed to a n Ex ist in g Fi g-

Ca bl e ar F

Fu rn ish a nd In st al l 4

St ra nd S

M F ib er

O pt ic C ab le

L as he d to a n Ex ist in g Fi g-

Ca bl e ar F

Fu rn ish a nd In st al l N ew

M es se ng er

L as h a

N ew

St ra nd S

M F ib er ar F

Fu rn ish a nd

In st al l N ew M es se ng er

L as h a N ew

St ra nd

S M

F ib ar

F

Fu rn ish a nd In st al l 1

St ra nd S

M F ib er

O pt ic C ab le in C ity C on du it ar F

Fu rn ish a nd

In st al l 4

St ra nd

S M

F ib er O pt ic

C ab le in

C ity

C on du it ar

F

Fu rn ish a nd In st al l O ve rh ea d Fi g-

St or ag e

Lo op w ith

S no w S ho es

Fu sio n Sp lic e up to

Fi be rs to

Fi be r T ru nk (N ew E nc lo su re

Fu sio n Sp lic e up to

Fi be rs to

Fi be r T ru nk (N ew E nc lo su re

In st al l a

S in gl e

Pa ne l H ou sin g an d

Te rm in at e a

Dr op

C ab le

Fu sio n Sp lic e up to

Fi be rs to fib er

T ru

(E xi st in g En cl os e)

Fu sio n Sp lic e up to

Fi be rs to fib er

T ru

(E xi st in g En cl os

Page 9 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

Ite m

De sc rip tio n Ty pe t o f

M ea su re

Ye t P ric e

Ye t P ric e O pt io na l

Ye t P ric e

Fu sio n

Bu tt

S pl ic e

F ib er s ( Ex ist in g En cl os

Fu sio n Bu tt S pl ic e

F ib er s (

Ex ist in g

En cl os

Fu sio n

Bu tt

S pl ic e

F ib er s ( N ew E nc lo su re

Fu sio n Bu tt S pl ic e

F ib er s (

N ew

E nc lo su re

In st al l N ew

M es se ng er C ab le o n

U til ity P ol es ar F

In st al l L as hi ng o n

Ex ist in g

O ve rh ea d Fi g-

Ca bl e or

M es se ng ar

F

Te st a nd

D oc um en t E xi st in g

F ib er D ro p

Ca bl e

Te st a nd

D oc um en t E xi st in g

F ib er C

Fu rn ish a nd In st al l C at

(O ut do or ) C ar F

In st al l C ity

F ur ni sh ed C an dy

C an e Br ac ke t o n

Po le o r M as t A rm

U ni fo rm ed

T ra ffi c

Co nt ro l

Al lo w an ce

Page 10 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

B. CERTIFICATION

Submitted By: Signature:

Authorized Agent of Company (Name & Title):

Date:

C. The above signatory acknowledges receipt of the following addenda issued during the bidding period and understands that they are a part of the bidding documents (if applicable):

Addendum # Dated Addendum # Dated

Addendum #

Dated Addendum #

Dated

Page 11 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

08052025

1.2 STATEMENT OF QUALIFICATIONS

Please answer the following questions regarding your company's past performance. Failure to reply to this instruction may be regarded as justification for rejecting a bid.

1. Number of years in business:

2. Number of personnel employed: Part Time Full Time

3. List six contracts of this type/size your firm has completed within the last four years:

Project Date Contact Person Phone No.

4. SUBCONTRACTORS: If subcontractors are to be used, please list firm name, address, name of principal, and phone number below or on a separate sheet. Also indicate portion or section of work subcontractor will be performing.

COMPANY NAME ADDRESS PRINCIPAL PHONE PORTION/SECTION

OF WORK

Page 12 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

08052025

5. ORGANIZATIONAL

STRUCTURE OF

BIDDER (check which applies) general partnership limited partnership limited liability corporation limited liability partnership corporation doing business under a trade name individual doing business under a trade name other (specify)

6. STATUS OF THE

BUSINESS AND ITS

CURRENT STANDING

WITH THE SECRETARY

OF STATE'S OFFICE; e.g., are all required filings current and in good standing or has the entity been withdrawn or canceled

Connecticut corporations - Will the Secretary of State be able to issue a Certificate of Good Standing within 30 days of the bid opening?

Yes No

Out-of -State corporations - Do you have a valid license to do business in the State of Connecticut? (Evidence in the form of a Certificate of Authority from the Connecticut Secretary of State will be required within 30 days of the bid opening.)

Yes No

7. CT eLICENSE (https://www.elicense.ct.gov ) / Business Registration (https://business.ct.gov/?language=en_US) :

8. Is your local organization an affiliate of a parent company? If so, Indicate the principal place of business of your company and the name of the agent for service if different from what has been indicated on the response form:

Business Name

Address

City. State & Zip

Name of Agent

Page 13 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL https://www.elicense.ct.gov/ https://business.ct.gov/?language=en_US

08052025

NOTE: In the case of a Limited Liability Corporation or a Limited Liability Partnership a certified copy of the Articles of Organization certified as valid and in effect as of the date of the bid opening will be required within 30 days of the bid opening. A listing of the corporate officers, in the case of a corporation; the general or managing partners, in the case of a partnership; or the managers and members in the case of either a limited liability partnership or company will be required within 30 days of the bid opening.

9. Your company may be asked to submit the following information relative to your company's financial statements prior to receiving an award. This information will not be part of the public bidding record and will remain confidential.

All information should be supported with appropriate audited financials

a. Book Value (Total Assets (-) Total Liabilities)

b. Working Capital (Current Assets (-) Current Liabilities

c. Current Ratio (Current Assets/Current Liabilities)

d. Debt to Equity Ratio (Long Term Debt/Shareholder's Equity)

e. Return on Assets (Net Income/Total Assets)

f. Return on Equity (Net Income/Shareholder's Equity)

g. Return on Invested Capital (Net Income/Long Term Debt = Shareholders' Equity)

All responses to this questionnaire are understood to be proprietary to the vendor, and will be considered confidential.

Additional information may be requested subsequent to your responding to this bid request.

1.3 CITY OF NORWALK VENDOR RECORDS

If you have not done business with the City of Norwalk as a vendor, your business information needs updating or your City of Norwalk vendor record has not been updated over three (3) years. Please complete and include the latest version of Internal Revenue Service (IRS) W-9 Form with your submission. Here is the URL to the IRS website:

https://www.irs.gov/forms-pubs/about-form-w-9

1.4 INSURANCE

Insurance Agency Name: Tel:

Agency Address: Email:

Page 14 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL https://www.irs.gov/forms-pubs/about-form-w-9

1.5 CITY OF NORWALK VENDOR QUESTIONNAIRE – IT INFORMATION SECURITY

Page 15 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

City of Norwalk Vendor Questionnaire

IT Information Security

Rev 8.4.22

1. Third-Party Contact Information (please provide the POC for follow-up questions to this questionnaire):

Vendor Name, Address, Point-of-Contact Name, Phone Number and Email

2. Description of Services/Products: Please provide a detailed description of services/products your organization aims to provide to the City?

3. System and Equipment Access: Will your organization use your own systems and equipment to perform the services, or will your organization need access to the City’s systems, equipment and network? (Yes or

No, If Yes, please explain)

YES ☐ NO ☐

4. Description of Data: Are you using data from the City in order provide the services/product to the City

(Yes or No, if Yes proceed to 3.1)

a. What data is needed to provide the services/products to the City?

Example: Name, Social Security Number, Trade Information, Source Code, Payroll or Accounts Payable data, student or patient data, Law Enforcement data, any Personally Identifiable Information (PII), etc.

Page 16 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

If your answers to Questions 3 and 4 are BOTH “NO”, thank you for completing the IT

Information Security Questionnaire.

If one or both questions are “YES”, please complete the remaining questions.

5. Office Locations: How many office locations does your organization have? Please include the locations of your organization.

6. Data Center Locations: How many data centers does your organization utilize to provide services/products to the City? Please include the locations of the data centers utilized by your organization.

7. Business Entity: What is your business entity type?

*Example: Sole Proprietorship, Partnership, C Corporation, S Corporation, Limited Liability Corporation (LLC), Limited Liability Partnership (LLP)

8. How many employees and contingent workers do you have in your organization?

1-10 ☐ 10-50 ☐ 50-100 ☐ 100-500 ☐ 500-1000 ☐ 1000 or more ☐

9. Physical Access: Does your organization need to be onsite or offsite to provide services/products to the City?

Page 17 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

10. Access to Data: How is your organization accessing City data?

*Example: Is the data supposed to be sent to your organization via email or will the data need to be uploaded to an application?

*Note: For third-parties that are providing an application to perform the services, please specify whether the application will be an internally hosted solution, cloud-based solution (i.e. SaaS, IaaS, PaaS), or a traditional web-based application (i.e. eBay, WebEx, online banking application)

11. Data Storage: Does your organization outsource data storage or does your organization utilize its own databases to store data? Does your organization store data outside of the United States?

YES ☐ NO ☐

12. Segregation of Data: Does your organization’s database structure allow segregation of sensitive client data?

YES ☐ NO ☐

13. Independent Attestations: Does your organization have independent attestations such as (i.e. ISO 27001, SSAE-18 SOC-1, SOC-2, PCI- DSS, ISO 9001)?

Page 18 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

14. Information Security

a. Does your organization have written information security policies and procedures (WISP)?

b. How often are the information security policies and procedures reviewed and updated?

c. Who in the organization is responsible for reviewing and updating the information security policies and procedures?

d. Does your organization have privacy policies and procedures?

e. How often are the privacy policies and procedures updated?

f. Who in the organization is responsible for reviewing and updating the privacy policies and

g. What methods of encryption are utilized for data at rest and in transit?

Page 19 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

h. Are the encryption methods utilized FIPS 140-2 approved?

i. Does your organization utilize firewalls to filter incoming data and information from the internet into your company network?

j. Does your organization perform penetration testing at least once per year to determine if unauthorized access to the computer network and malicious activity is possible externally?

k. Does your organization perform vulnerability testing at least once per year in order to identify vulnerabilities within the internal network?

l. Does your organization perform background checks on employees and contingent workers prior to onboarding them? Describe the nature of these background checks (i.e., criminal, credit, international, etc.).

Page 20 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

m. Does your organization utilize multi-factor authentication?

n. Does your organization utilize scan cards or biometric scans to grant employees and contingent workers access to the building and data centers where data is stored?

o. If offering a technology product, does the organization utilize software development life cycle (SDLC) or

Agile to build and maintain technological product?

p. Does the technological product undergo information security testing and quality assurance testing prior to deployment?

q. Does the Vendor provide annual Cybersecurity Awareness training to their employee?

Page 21 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

r. Does the Vendor provide annual phishing simulations for their employee?

s. Have users been educated on how to report suspected security violations or vulnerabilities?

t. Does the Vendor have an employee identified as the Chief Information Security Officer?

u. Are all the Vendor laptops encrypted?

v. Are all Vendor computers (workstations, notebooks) required to join the Company’s domain and receive Group Policies?

w. Does the Vendor meet the NIST 800-63 password guidelines?

Page 22 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

15. Risk Management

a. Does your organization have an enterprise risk management framework implemented at your organization?

b. Does your organization have documented enterprise risk management policies and procedures?

c. Who in the organization is responsible for reviewing the enterprise risk management policies and

d. Does your organization utilize an outside third-party to provide services/products to the client?

e. Does your organization have a third-party risk management program (TPRM)?

Page 23 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

f. Does your organization include right-to audit clauses in contracts with third parties?

g. Does your organization have a certificate of insurance (COI)? Please attach a copy of your COI.

Business Continuity/Disaster Recovery

a. Does your organization have a business continuity plan?

b. How often is the business continuity plan updated?

c. Does your organization conduct business continuity tests once per year?

Page 24 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

d. Does your organization have a disaster recovery plan?

e. How often is the disaster recovery plan updated?

f. Does your organization conduct disaster recovery tests once per year?

g. Does your organization have business continuity and/or disaster recovery sites?

h. Are the business continuity/disaster recovery sites located in the United States or outside the

United States? Please include the locations of business continuity/disaster recovery sites?

Page 25 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

SECTION 2 – SCOPE OF WORK / PROJECT SPECIFICATIONS

Page 26 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

2.1 Introduction

The City of Norwalk, Connecticut (hereafter referred to as "the City"), is soliciting proposals from qualified and experienced contractors to provide ongoing, on-demand fiber optic cable maintenance services. This Request for Proposals (RFP) is intended to establish a multi-year agreement with a responsive, capable, and dependable service provider to ensure the continued performance, reliability, and availability of the City’s fiber optic infrastructure. The selected firm must be available 24 hours a day, 7 days a week, 365 days per year.

2.2 Background

The City has developed multiple fiber optic networks to support internal operations, traffic management, intercity communications, and other critical services. These networks are essential to the City’s Information Technology infrastructure and include both aerial and underground segments. The City monitors these networks internally but relies on contracted support for physical inspection, maintenance, and emergency repair.

Given the vital role fiber connectivity plays in municipal operations, timely and expert response to fiber issues is a high priority. Emergency restoration efforts must begin within four (4) hours of notification, with full remediation completed within twenty-four (24) hours or less.

The supported networks include Municipal Fiber Backbone and Traffic Control Fiber Network. A hybrid aerial and underground system connecting traffic signals and related infrastructure.

With est. 7 Miles of fiber.

2.3 Scope of Services

The contractor shall perform the following services as part of the agreement:

A. Required Services

• Routine and preventive fiber infrastructure maintenance

• Emergency Response Time o Vendor must call back in less than one (1) Hour of notification and be onsite within Four (4) hours

• Emergency outage restoration:

o High, Level 1: Typical outage, backbone cut, 1-4 hours o Medium, Level 2: Partial service disruption, 4-8 hours

Page 27 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL o Low, Level 3: Minor faults, specific issues, 8-12 hours

• Fiber splicing (fusion/mechanical), connector replacement1. High, Level1:

• Enclosure, handhole, and conduit repairs/replacement

• OTDR, power meter, and light source testing

• Permitting coordination for public right-of-way work

• As-built documentation and redline drawings after repairs

• Fault isolation, diagnostics, and troubleshooting

• Traffic control setup and safety compliance during fieldwork

• Assistance with planned upgrades and network expansions

B. Standards and Specifications

All work must meet or exceed applicable industry and regulatory standards, including but not limited to:

• ANSI, ATIS, ASTM, BOCA, BICSI, EIA, IEEE, OSHA, NEMA, NESC, NFPA, TIA, UL

• Local building and electrical codes

• City of Norwalk design guidelines and technical specifications (to be provided)

• The Contractor shall warrant that all materials furnished shall be new, and free from defects

C. Testing and Documentation

• Perform OTDR testing with results not exceeding 0.15 dB/km at 1550 loss

• Submit test results and documentation for all repairs or changes

• Provide redline drawings and updated digital files of the affected area

• Secure City pre-approval for any infrastructure modifications

D. Site Management

• Remove all waste and material debris post-maintenance

• Restore disturbed sites to their original or better condition

• Ensure proper fill, leveling, seeding, and cleanup

E. Materials

The materials specifications specified herein are desired by the City; however, substitution of an alternative will be accepted. If an alternate is offered, the Proposer shall provide documentation why the offered alternate is equal or exceeds to the specification. The burden of proof as to whether an

Page 28 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL alternate specification is equal to shall lie with the Proposer. The Proposer understands and agrees that the City reserves the sole and final right to determine where alternate specifications are equivalent to and meet indicated standards of quality.

1. 48 strands single mode fiber optic:

CORNING, ALTOS® Loose Tube, Gel-Free Cable 48 F, Single Mode (0S2)

2. 12 strands single mode fiber optic:

CORNING, ALTOS® Loose Tube, Gel-Free Cable 12F, Single Mode (OS2)

3. Splice Closure Fiber (SFC), Preloaded CORNING, SFC-6C22-01-72, 72 single-fiber splice capacity. 6-in diameter, 22-in dome length, with splice trays

4. SFC Splice Trays CORNING, SFC-ST-099, 0.2-in, 12 heat shrink single-fiber splices

5. Messenger Cable Power & Tel, National Strand Products, 14EHS2500, Standard ¼" EHS Grade Green/Yellow 2500’

6. Closet Connector Housing (CCH)

Corning CCH-01U, Rack or unit, holds 2 CCH connector panels

2.4 Minimum Qualifications

The installation of Fiber Optic Cable and hardware requires specialized knowledge.

To be considered for this contract, respondents must demonstrate:

• Minimum of ten (10) years of experience in the business of Fiber Optic Cable installation and maintenance.

• Contractor holds an active status in the Telecommunications Systems Classification with the State of Connecticut Department of Administrative Services' Construction Contractor Prequalification Program https://portal.ct.gov/das/procurement-programs-and-services/contractor--prequalification?language=en_US

• Experience of maintaining municipal/metropolitan fiber networks within the last three

(3) years.

• Expertise in both aerial and underground fiber plant maintenance

• Proven ability to respond to emergency incidents within four (4) hours

• Experience with OTDR testing and interpreting fiber diagnostics

• Availability of appropriate equipment, tools, and trained personnel

Page 29 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL https://portal.ct.gov/das/procurement-programs-and-services/contractor--prequalification?language=en_US https://portal.ct.gov/das/procurement-programs-and-services/contractor--prequalification?language=en_US

• Valid licenses including E1 and T1 State license, and Corning NPI (Network of Preferred Installers) in good standing with a minimal level of Expert

• Valid insurance, and ability to obtain local permits

• Strong project documentation and communication capabilities

• References from at least three (3) similar public sector projects

2.5 Equipment Requirements

The Contractor shall be required to have the following types of maintenance vehicles and equipment in connection with the work assignments.

• Pickup-type truck.

• Small capacity overhead lift vehicle to reach up to 30-foot working height

(one-person bucket, lift capacity less than or equal to 400 lbs.)

• Large capacity overhead lift vehicle to reach up to 45-foot working height

(two-person bucket, lift capacity more than 400 lbs.)

2.6 Staffing Requirements

To provide the City with sufficient flexibility in work assignments and to provide for cost-effective utilization of the Contractor’s equipment and staff, the following basic work crew make-ups have been developed for bidding purposes:

• One (1) Person Crew

• Two (2) Person Crew

• Three (3) Person Crew

• Four (4) Person Crew

Contractor will have a representative available to meet with a representative from the City to receive assignments at the sites. From this review, an estimate of time, type of crew and equipment will be drawn up and submitted for approval. The Contractor will supply all the materials necessary except for those specific items which are priced to include materials. The contractor will supply vehicles, tools, and manpower. Contractor will be paid based on an accepted estimate. No payment will be made beyond an approved estimate unless prior authorization is obtained in writing from the City.

Staff who will be deployed must go through City of Norwalk Police Department background screening process.

Page 30 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

2.7 Working Hours & Holidays

The selected contractor shall follow this City of Norwalk Holiday schedule and Working Hours.

CITY OF NORWALK WORKING HOURS

Regular Working Hours Monday-Friday 7:30 AM– 3:30 AM Over Time Working Hours Before Regular Working Hours, After Working Hours, Saturday, Sundays and City of Norwalk Holiday Schedule

CITY OF NORWALK HOLIDAY SCHEDULE

New Years Day Juneteeth Thanksgiving Day Martin Luther King Day Independence Day Day after Thanksgiving President’s Day Labor Day Christmas Day

Good Friday Columbus/Indigious

People’s Day

Memorial Day Veteran’s Day

2.8 Proposal Submission Format

Proposals should put forth full, accurate, and complete but concise information as required by this request. The City shall not be liable for costs incurred in the preparation of the response to this RFP or in connection with any presentation before a Selection Committee.

Firms should create their submissions in 8½” x 11” document size using a minimum 12-point font size, double sided, include page numbers and any blank pages must be watermarked “Intentionally Left Blank”. Proposals should be prepared simply and economically, providing a straightforward, concise description of the applicant's ability to meet the requirements of the RFP. Emphasis should be on completeness and clarity of content.

The City reserves the right to reject proposals/parts thereof or to solicit new proposal and award contracts as it deems tin its best interest. All proposals will remain property of the City. It is further understood and agreed that all information included in, attached to, or required by the Request for Proposal shall be public record upon delivery to the City.

To enable the City to compare the proposals received we ask that your proposal include the information specified below, the sequence listed, with each section of your proposal numbered to correspond to the numbers sequenced below.

Page 31 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

Request for Proposal (RFP) shall include the following, in this order:

1. Section 1-Executive Summary: Provide a brief history of your firm, company structure, and identify key qualities or services provided that distinguishes your firm from other firms. This section shall include a concise statement of the consultant's approach to the project and a summary of the Consultant's ability to provide the required services. Also include in this section include the Name and address of firm(s) and identification and contact information of the Project Lead.

2. Section 2-Project Team Organization and Staffing: Identification of Project Manager and all other team members – as well as any subcontractors to this project – and assigned duties, including a percentage breakdown of personnel hours and associated costs.

The City reserves the right to interview and specify key staff members on this project.

3. Section 3- Proposed Methodology and Response Plan: A clear description of how your firm would respond to an outage, prioritization, and methodology plan. Please also describe your firms methodology on its handling of a significant natural disaster and competing emergency response calls.

4. Section 4-References/Statement of Qualifications: Provide four (4) most recent current or previous government clients in which your firm provides the same size and scope of services requested by the City. Highlight how it’s directly related to City of Norwalk. The City, at its discretion may check references in order to determine the Offeror’s experience and ability to provide services described in the Scope of Work. All client reference information must be documented and verifiable.

Reference contacts must be aware that they are being used as a reference and agreeable to City interview for follow up. References shall include the following, in this order:

a. Client/Agency Name

b. Contact Name and Title (project manager role preferred), Telephone, and Email

c. Number of Projects Completed for Client/Agency

d. Project Names

e. Project Descriptions

f. Project Approach and Methodology

g. Year of Project and Length of Project

h. Project Budgets and Final Invoiced Amount

i. Contractor Personnel Assigned to Project and Project Role

5. Section 5-Other Information: Provide any other information that you believe will assist the City of Norwalk in making its selection. Such information may be in this section of your proposal

a. Copies of valid licenses including E1 and T1 State license, and Corning NPI (Network of Preferred Installers)

6. Section 6-Forms: Fully Completed Section 1 – Response Forms

Page 32 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

2.9 Selection Process

Proposals will be initially reviewed by a Selection Committee. The Selection Committee may select the two or three firms that best meet the City’s requirements. These firms will then be invited to represent their proposals to and respond to questions from the Selection Committee.

Following this selection process, the Selection Committee will make a recommendation to the Common Council Committee. Approval to enter into a contract has to be authorized by the Norwalk Common Council.

The City of Norwalk reserves the right to reject any and all proposals submitted, to request additional information from all proposers and to negotiate with one or more of the finalists regarding the terms of this engagement. The City of Norwalk also reserves the right to retain the proposals, use any ideas contained in the proposals and is not obligated in any manner to reimburse the proposers for the costs incurred in connection with responding to this Request for Proposals.

The Selection Committee intends to recommend the firm that, in its opinion, best meets the City’s needs, not necessarily the firm with the lowest fees.

The anticipated selection schedule is as follows:

RFP Interviews September 2025 Common Council Committee Review October 2025 Common Council Review October 2025

2.10 Criteria for Evaluating Proposal Submissions

The City of Norwalk shall be responsible for reviewing the proposals received and will further evaluate them, using the following criteria. The City reserves its rights to examine any other criteria and take the same under consideration and to reject any firm or proposals despite its compliance with these criteria if it determines that to do so would be in its best interests.

Criteria Weight

Relevant Experience and Qualifications 30%

Page 33 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

Criteria Weight

Proposed Methodology and Response Plan 20%

Availability and Response Times 15%

Cost Proposal and Fee Structure 20%

References and Past Performance 10%

Completeness and Quality of Proposal. 5%

Total Possible Points 100%

2.11 Prime Proposer Responsibility

Firm’s submitting proposals to this RFP may utilize the services of subcontractors. If subcontractors are planned to be used, this should be clearly explained in the proposal. The prime proposer will be responsible for the entire contract performance whether or not subcontractor is to perform.

All corporate information required in this RFP must be included for each proposed subcontractor. The proposal must also include copies of any agreements to be executed between the prime proposer and any subcontractors in the event of contract award. Under this RFP, the City of Norwalk retains the right to approve all subcontractors.

2.12 Key Personnel

The personnel and commitments identified on any proposer’s proposal will be considered essential to the work to be performed under this RFP. Prior to diverting any of the specified individuals to other programs or changing the level of effort of the specified individuals, the proposer must notify the City of Norwalk fourteen (14) days in advance and will be required to submit justification, including proposed substitutions, in sufficient detail, to permit evaluation of the impact on the project. The proposer will make no deviation without the prior written consent of the City of Norwalk. Replacement of personnel will be with personnel or equal ability and qualifications.

Any employee of the proposer, who in the sole opinion of the City of Norwalk is unacceptable, shall be removed from the project pursuant to the request of City of Norwalk. The proposer will have Fourteen

(14) Days to fill the vacancy with another employee of acceptable technical experience and skills subject to the written approval of the City of Norwalk.

Page 34 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

2.13 Availability of Funds

The contract award under this RFP is contingent upon the availability of funds to the City of Norwalk for this project. In the event that funds are not available, any contract resulting from this RFP will become void and of no force and effect.

2.14 Payment & Invoices

The proposer will bill the City of Norwalk based on the submission of monthly invoices in a format to be determined by the City.

2.15 Termination for Default or for the Convenience of the Contracting Agency Performance under this contract resulting from this RFP may be terminated by the City of Norwalk whenever;

The proposer, in the sole opinion of the City, is in default in the performance of the contract and shall fail to correct such default within the period specified by the contracting officer in a notice specifying default; or the contracting officer shall determine that termination is the best interest of the City of Norwalk.

Termination will be effected by delivery to the proposer of a notice to terminate, stating the date upon which the termination becomes effective. Upon receipt of the notice to terminate, the proposer shall:

• Stop all work

• Assign to the City of Norwalk all rights, title and interest in the work being developed;

• Deliver forthwith to the City of Norwalk all completed work and work in progress;

• Preserve and protect, until delivery to the City, all material plans, and documents related to this contract which, if the contract had been completed, would have been furnished to the City of Norwalk or necessary to the completion of the work

2.16 Negotiated changes

In the event negotiated changes occur after the awarding of the contract, the same pricing policies called for in the original contract will remain in effect

2.17 Contract Agreement(s) and Contract Period(s)

The selected proposer will be required to agree to and sign a formal written contract between the City of Norwalk and the proposer, prepared by the Law Department of the City of Norwalk. A sample of the contract, is provided in a separate section to illustrate the type of contract the City will use to contract for this project.

It is the intention of the City of Norwalk to enter into an agreement for Two (2) years with the option of one (1), one-year extensions for a potential total contract length of three (3) years. Any renewal is contingent upon satisfactory performance by the contractor and the City of Norwalk’s desire to continue with these services.

2.18 Right of Set-Off

The undersigned bidder hereby authorizes the City to set off against monies payable hereunder by the City to the bidder, an amount equal to any unpaid real and personal property taxes and assessments

Page 35 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

(the collection of which is not barred by the State of Limitations), owing by the bidder to the City, including all interest and lien charges in connection with such paid taxes.

2.19 Duration of Proposals

Proposals will remain in effect for a period of ninety (90) days from the deadline for submission of the proposal.

2.20 Acceptance of RFP Content

Provisions of this RFP and the contents of the successful response will be used to establish final contractual obligations. The City retains the option of canceling the award if the successful Respondent fails to accept such obligations. The City and the successful Respondent shall enter into a written contract for the work to be performed.

It is understood that this RFP and the Respondent’s proposal shall be attached and included by reference in a contract signed by the City and the successful Respondent.

This RFP is not an offer: Neither this RFP nor any subsequent discussions shall give rise to any commitment on the part of the City of Norwalk or confer any rights on any proposer unless and until a contract is fully executed by the necessary parties. The fully executed contract document will represent the entire agreement between the proposer and the Department and will supersede all prior negotiations, representations or agreements, alleged or made, between the parties. The City shall assume no liability for costs incurred by the proposer or for payment of services under the terms of the contract until the contract has been accepted and approved by the City’s Corporation Counsel and fully executed by all parties.

2.21 Insurance Coverage Requirements

Page 36 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

{00101091.DOCX 1}

CONSTRUCTION SERVICES INSURANCE RIDER

The Contractor shall provide and maintain insurance coverage related to its services in connection with the Project in compliance with the following requirements.

The insurance required shall be written for not less than the scope and limits of insurance specified hereunder, or required by applicable federal, state and/or municipal law, regulation or requirement, whichever coverage requirement is greater. It is agreed and understood that the scope and limits of insurance specified hereunder are minimum requirements and shall in no way limit or preclude the City from requiring additional limits and coverage to be provided under the Contractor's policies.

The insurance obligations under this agreement shall be (1) all the insurance coverage and/or limits carried by or available to the Contractor; or (2) the minimum insurance coverage requirements and/or limits shown in this agreement, whichever is greater.

Minimum Scope and Limits of Insurance:

Workers' Compensation Insurance: With respect to all operations the Contractor performs, it shall carry Workers' Compensation Insurance in accordance with the requirements of the laws of the State of Connecticut, and Employer's Liability limits of One Hundred Thousand Dollars ($100,000) coverage for each accident, One Hundred Thousand Dollars ($100,000) coverage for each employee by disease, Five Hundred Thousand ($500,000) policy limit coverage for disease.

Commercial General Liability: With respect to all operations the Contractor performs it shall carry Commercial General Liability insurance providing for a total limit of One Million Dollars ($1,000,000) coverage per Occurrence for all damages arising out of bodily injury, personal injury, property damage, products/completed operations, and contractual liability coverage for the indemnification obligations arising under this Agreement. The Annual Aggregate limit shall not be less than Two Million Dollars ($2,000,000).

Automobile Liability: With respect to each owned, non-owned, or hired vehicles the Contractor shall carry Automobile Liability insurance providing One Million Dollars ($1,000,000) coverage per accident for bodily injury and property damage.

Umbrella/Excess Liability: The Contractor shall carry Umbrella or Excess Liability Insurance providing for a total limit of One Million Dollars ($1,000,000) coverage per occurrence for all damages arising out of bodily injury, personal injury, property damage, products/completed operations, and contractual liability coverage for the indemnification obligations arising under this Agreement. The annual aggregate limit shall not be less than One Million Dollars ($1,000,000).

With respect to all operations the Contractor performs, the insurance limits required can be provided with a combination of Umbrella or Excess Liability insurance that would “follow form” of the underlying required terms and conditions.

Page 37 of 73. 4460City Fiber Optic Cable Emergency and Maintenance Services-FINAL

{00101091.DOCX 1} 2

Environmental Liability: If applicable, based on the Contractor’s Scope of Work, the Contractor is required to provide environmental and remediation (Contractor’s Pollution Liability –CPL-) insurance in the amount of One Million Dollars ($1,000,000) per claim limit and One Million Dollars ($1,000,000) aggregate limit per occurrence. If such insurance is written on a claims-made basis, the Contractor shall maintain such coverage continuously throughout the term of work for a period of seven (7) years following acceptance of the work by the City.

"Tail" Coverage: If any of the required liability insurance is on a "claims made" basis, "tail" coverage will be required at the completion of the Project for a duration of seven (7) years, or the maximum time period reasonably available in the marketplace. Continuous "claims made" coverage will be acceptable in lieu of "tail" coverage, provided its retroactive date is on or before the effective date of this Agreement. If continuous "claims made" coverage is used, Contractor shall be required to keep the coverage in effect for a duration of not less than seven (7) years following acceptance of the work by the City.

Acceptability of Insurers: The Contractor's policies shall be written by insurance companies licensed to do business in the State of Connecticut, with an AM Best rating of A-VII, or better. Additionally, all carriers are subject to approval by the City of Norwalk.

Subcontractors: The Contractor shall require all subcontractors to provide the same "minimum scope and limits of insurance" as required herein. All Certificates of Insurance shall be provided to the City's Corporation Counsel and to the City’s Finance Department (Attn: Risk Manager) as required herein.

Deductibles and Self-Insured Retentions: Any deductible or self-insured retention must be declared to and approved by the City. All deductibles or self-insured retentions are the sole responsibility of the Contractor to pay and/or to indemnify.

Notice of Cancellation or Nonrenewal: Each insurance policy required shall be endorsed to state that coverage shall not be suspended, voided, cancelled, or reduced in coverage or in limits before the expiration date except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City.

Notwithstanding this requirement, the Contractor is primarily responsible for providing such written notice to the City thirty (30) days prior to any policy change or cancellation that would result in a change of the amount or type of coverage provided. In the event of any such change the Contractor shall provide comparable substitute coverage so that there is no lapse in applicable coverage or reduction in the amount of coverage available to the City related to the Contractor’s services.

Waiver of Governmental…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .