About this file
This is a Bid Specifications document issued by the Authority of the Borough of Charleroi, Washington County, Pennsylvania, for Contract No. 2026-08 covering the removal, hauling, and disposal of dewatered municipal wastewater treatment plant solids. The contractor shall provide thirty (30) cubic yard containers at the designated wastewater treatment plant location, transport filled containers to a permitted landfill for disposal, and rotate empty containers back to the facility. The contract estimates approximately 80 to 100 containers will be required annually (approximately 2 containers per week), with an estimated annual dewatered tonnage of 1,340 tons at 23.5% solids content. Sealed bids must be submitted online via PennBid by 10:00 AM local time on Monday, December 14, 2026. Contractors must deliver containers within 24 hours of notice, by 8:00 AM the following day, with liquidated damages of $500 per day assessed for late deliveries. The contract term runs from January 1, 2027, through December 31, 2027, with the Authority retaining the option to extend the contract for two additional one-year periods at its sole discretion, with written notice required at least 30 days before expiration.
Bidders must submit bid security equal to ten percent (10%) of their total bid amount in the form of either a certified check or bid bond from a surety approved by the Authority. The successful bidder must provide performance and maintenance bonds equal to one hundred percent (100%) of the contract amount. All bids must include proof of an approved Pennsylvania Department of Environmental Protection disposal site permit, vehicle approval documentation, and written evidence of legal right to dispose of sludge at the designated facility for the contract duration. The contractor is solely responsible for all permits, compliance with federal and state environmental regulations, vehicle maintenance, payment of appropriate wage rates, and cleanup of any spillage. Payment will be made monthly in one lump sum based on certified tonnage of wet sludge hauled and disposed, as determined by calibrated scales at the disposal site. The contractor must maintain commercial general liability insurance with limits of not less than $2,000,000 per occurrence and pollution liability insurance of not less than $1,000,000, with both the Authority and KLH Engineers named as additional insureds. All contractors and subcontractors must comply with the Public Works Employment Verification Act by participating in the E-Verify Program.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ISSUED TO:
AUTHORITY OF THE BOROUGH OF CHARLEROI
WASHINGTON COUNTY, PA
BIDDING DOCUMENTS FOR
CONTRACT NO. 2026-08
REMOVAL, HAULING AND DISPOSAL OF
DEWATERED MUNICIPAL WASTEWATER
TREATMENT PLANT SOLIDS
RELEASED FOR BID
NOVEMBER 2026
5313 Campbells Run Road, Suite 100
Pittsburgh, PA 15205
Telephone: (412) 494-0510
Fax: (412) 494-0426
E-mail: info@klhengineers.com
Ref. No. 388-84
Copyright © 2026 KLH Engineers, Inc.
All Rights Reserved Worldwide i 388/2026-08
Authority of the Borough of Charleroi
Removal, Hauling and Disposal of Dewatered Municipal
Wastewater Treatment Plant Solids
Contract No. 2026-08
TABLE OF CONTENTS
Section Page
Advertisement..........................................A-1 to A-2
Instructions to Bidders................................B-1 to B-6
Bid Form / Contract No. 2026-08...........................PennBid
Bid Bond...............................................D-1 to D-2
General Conditions....................................E-1 to E-16
Supplemental General Conditions........................F-1 to F-4
Technical Specifications...............................G-1 to G-6
Measurement and Payment................................H-1 to H-2
Agreement / Contract No. 2026-08.......................J-1 to J-4
Payment Bond...........................................K-1 to K-3
Performance and Maintenance Bond.......................K-4 to K-6
Certificate of Insurance......................................K-7
Exhibit A - Laboratory Testing Results Report Form 43 Sludge
Analysis ii 388/2026-08
THIS PAGE LEFT INTENTIONALLY BLANK
A-1 388/2026-08
ADVERTISEMENT
Sealed bids will be received by the Authority of the Borough of
Charleroi, Washington County, Commonwealth of Pennsylvania, for the following:
REMOVAL, HAULING AND DISPOSAL OF DEWATERED MUNICIPAL WASTEWATER
TREATMENT PLANT SOLIDS
BID OPENING – Sealed bids shall be submitted online via the PennBid
Program until 10:00 AM local time Monday, December 14, 2026, at which time all bids will become publicly available.
Equipment and Services to be provided shall be according to the specifications which are on file at the office of KLH ENGINEERS, INC., 5313 Campbells Run Road, Suite 100, Pittsburgh, Pennsylvania, 15205, and at the office of the Authority of the Borough of
Charleroi, 3 McKean Avenue, Charleroi, PA 15022.
All plans and specifications are available online at no cost at https://pennbid.bonfirehub.com.
No Bid may be withdrawn for a period of sixty (60) days after the time of the opening of the bids.
Contractor shall submit an E-Verify Program Verification in compliance with the Public Works Employment Verification Act 127 of
2012.
BIDDER'S SURETY -- A certified check payable to the Authority of the Borough of Charleroi or a bid bond on the bid form executed by the Bidder and a surety company approved by the OWNER, in an amount equal to ten percent (10%) of the total amount of bid, must be submitted with each bid or bids will be considered nonresponsive and immediately rejected.
SUCCESSFUL BIDDING BIDDER awarded this Contract shall provide a performance surety in the amount of one hundred percent (100%) of the Contract amount.
EQUAL OPPORTUNITY EMPLOYER -- the Authority of the Borough of
Charleroi fully complies with the provisions of this Act. All qualified bidders are invited to submit a proposal.
THE AUTHORITY OF THE BOROUGH OF CHARLEROI BOARD RESERVES THE RIGHT
TO AWARD OR TO REJECT ANY AND/OR ALL PORTIONS THEREOF PROPOSALS
A-2 388/2026-08
SUBMITTED, AND TO WAIVE INFORMALITIES IN THE BIDDING PROCESS IF IN
THE BEST INTEREST OF THE AUTHORITY.
Dennis Paluso
General Manager
B-1 388/2026-08
Section B
INSTRUCTIONS TO BIDDERS
B1 Designation of Work
The Work included under this Contract covers the furnishing of all labor, materials, tools, and equipment required to complete the Work as described herein, shown on the Contract Drawings and necessary for complete operating facilities.
The work under Contract No. 2026-08 generally consists of providing thirty (30) cubic yard containers at the designated location at the OWNER’s wastewater treatment plant (WWTP) site.
The OWNER will place into the dumpster dewatered municipal wastewater treatment plant solids and municipal refuse generated onsite. The contract requires the CONTRACTOR to transport the dumpster with the dewatered solids to a permitted landfill site for disposal. It is estimated that approximately 80 containers will be required per year, with 2 containers required per week.
CONTRACTOR must be able to deliver a 30 cubic yard container by
8:00 AM following 24-hours notice by the OWNER.
B2 Location of Construction Work
The OWNER’s WWTP site is located at 1002 Railroad Way, Charleroi, PA 15022. The location of the container(s) will be outside the OWNER’s dewatering building under the existing solids dewatering conveyor at the WWTP.
B3 Copies of Bidding Documents
Copies of the Bidding Documents for the described work may be obtained online at no cost via the PennBid Program
(https://pennbid.bonfirehub.com).
Complete sets of Bidding Documents shall be used in preparing
Bids; neither OWNER nor ENGINEER assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
OWNER and ENGINEER in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use.
B-2 388/2026-08
B4 Qualifications of Bidders
To demonstrate qualifications to perform the Work, each Bidder must be prepared to submit, within five (5) days of OWNER's request, written information such as financial data, previous experience, and evidence of authority to conduct business in the jurisdiction where the Project is located.
B5 Examination of Contract Documents and Site
Before submitting a bid, each Bidder shall: (a) examine the
Bidding/Contract Documents thoroughly, (b) visit the site to familiarize himself with local conditions that may in any manner affect access, cost, progress or performance of the Work, (c) familiarize himself with federal, state and local laws, ordinances, rules and regulations that may in any manner affect access, cost, progress or performance of the Work; and (d) study and carefully correlate Bidder's observations with the Contract
Documents.
Before submitting his bid, each Bidder shall, at his own expense, make such investigations and tests as the Bidder may deem necessary to determine his bid for performance of the Work in accordance with the time, price and other terms and conditions of the Contract Documents.
On request, OWNER may assist each Bidder who desires access to the site to conduct such investigations and tests as each Bidder deems necessary for submission of his bid.
B6 Interpretations
Bidder shall submit all questions about the meaning or intent of the Bidding Documents via the “Messages/Vendor Discussions” feature in PennBid no later than five (5) days prior to the date for receipt of bids. Replies will be issued by Addenda, posted within PennBid’s “Files/Public Notices” tab, and an email notice will be sent to all parties recorded as having received the
Bidding Documents. Questions received less than five days prior to the date of bid opening may not be answered. Only interpretations written by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
B7 Bid Security
Bid Security shall be made payable to OWNER, in an amount of not less than ten percent (10%) of the Bidder's maximum bid price in the form of either a certified bank check or a Bid Bond on the form attached in Section D, issued by a Surety meeting the
B-3 388/2026-08 requirements set forth at the bottom thereof.
The Bid Security of the successful Bidder will be retained until such Bidder has executed the Agreement and furnished the required Contract Security, whereupon it will be returned. If the successful Bidder fails to execute and deliver the Agreement and furnish the required Contract Security within fifteen (15) days of Notice of Award, OWNER may annul said Notice and the Bid
Security of that Bidder will be forfeited. The Bid Security of any Bidder whom OWNER believes to have a reasonable consideration for receiving the award may be retained by OWNER until after the effective date of the Agreement.
B8 Employee Eligibility Verification
Bidders shall include a Public Works Employment Verification
Form, as provided by the Pennsylvania Department of General
Services, and available at www.dgs.state.pa.us. The Public Works
Employment Verification Form pertains to each employee hired by the CONTRACTOR after January 1, 2013, whether the employee will be working on or offsite of the Project, or otherwise. The
Public Works Employment Verification Form will be evaluated by the OWNER as part of establishing Bidder responsibility.
B9 Contract Time
The number of calendar days within which, or the date by which, the Work is to be completed (the Contract Time) is set forth in the Bid Form and will be included in the Agreement.
B10 Bid Forms
With the exception of the Public Works Employment Verification
Form which must be obtained from the Pennsylvania Department of
General Services website, www.dgs.state.pa.us, the Bid Forms are available within PennBid’s “Bid” tab.
Bids by Corporations must be executed and submitted in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to submit).
Bids by Partnerships must be executed and submitted in the partnership name by a partner.
The bids shall contain an acknowledgment of receipt of all
Addenda (the numbers of which shall be filled in on the Bid Form
B-4 388/2026-08 by the Bidder).
The address to which communications regarding the bid are to be directed must be shown.
B11 Submission of Bids
Bids shall be submitted online via the PennBid Program
(https://pennbid.bonfirehub.com).
B12 Modification and Withdrawal of Bids
Bids may be modified or withdrawn at any time prior to the opening of Bids.
B13 Award of Contract
OWNER reserves the right to reject any and all bids for whatsoever cause and to waive any and all informalities in the bid. Discrepancies between words and figures will be resolved in favor of words. Discrepancies between the indicated sum and/or the products shown as a result of extending unit prices and the correct sum and/or products thereof will be resolved in favor of the correct sum and/or products.
In evaluating bids, OWNER shall consider the qualifications of the Bidders, whether or not the bids comply with the prescribed requirements and alternates and unit prices (if requested) in the Bid Forms.
OWNER may conduct such investigations as he deems necessary to assist in the evaluation of any bid and to establish the responsibility, qualifications, and financial ability of any or all Bidders.
If the Contract is to be awarded, it will be awarded on the Base
Bid or Alternate Bid items selected by the OWNER which are those of the lowest responsive and responsible Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interests of the Project.
B14 Performance and Other Bonds
The General Conditions and/or the Supplemental General
Conditions set forth OWNER's requirements as to Performance and other Bonds. When the successful Bidder delivers the executed
Agreement to OWNER it shall be accompanied by the required
B-5 388/2026-08
Contract Security.
B15 Signing of Agreement
When OWNER advises of a Contract award to the successful Bidder, it will be accompanied by at least five (5) unsigned counterparts of the Agreement and all other Contract Documents.
Within fifteen (15) days thereafter, CONTRACTOR shall sign and deliver all counterparts of the Agreement to OWNER with all other Contract Documents attached. Within ten (10) days thereafter OWNER will deliver two (2) fully signed counterparts to CONTRACTOR -- one each intended for the CONTRACTOR and the
CONTRACTOR's Surety Company. The times set forth herein are of the essence and Bidder's failure to comply herewith may, at the discretion of the OWNER, result in forfeiture of the Bid
Security.
B16 Pennsylvania Sales and Use Tax
Materials and equipment utilized under the Contract may or may not be exempt from Pennsylvania sales tax. The CONTRACTOR shall make their own determination as to which, if any, of the materials and equipment utilized under the Contract are exempt from sales tax. Beyond issuing a blanket sales tax exemption form, the OWNER and/or ENGINEER will provide no further assistance in this determination. Failure of the CONTRACTOR to make this determination will not be grounds for additional compensation under the Contract.
End of Section B
Instructions to Bidders
B-6 388/2026-08
D-1 388/2026-08
Section D
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we _________________________ as Principal and ________________________________________________ of ________________________________, State of __________________, a corporation existing under the laws and the State of __________ ________________________, and authorized to transact business in ______________________, as Surety, are held and firmly bound unto
(OWNER)
(Address) hereinafter called the Obligee, in the sum of ___________________ _________________________Dollars ($____________________________).
lawful money of the United States of America, for payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has submitted the accompanying Proposal or Bid dated _________________, 20___, for the _______________________________
NOW THEREFORE, the condition of this Bond shall be such that if the Principal, upon due acceptance of said Proposal and award of the Contract to him by the Obligee, bonds with good and sufficient surety as may be required by the Contract Documents, and furnishes the Obligee proper evidence of effectiveness of insurance coverage, respectively, within the time, in the forms and in the amounts as appropriate, required by the Contract Documents, and enters into a Contract with the Obligee in accordance with the Contract Documents, then this Bond shall be void; otherwise, the Bond shall be and shall remain in full force and effect.
The Principal and Surety hereby stipulate and agree that if the Principal fails to perform all conditions of this Bond, they will pay the sum of the Bond to the Obligee as fixed, liquidated damages.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its Bond shall be in no way impaired or affected by any extension of time within which the OWNER may accept such bid; and said Surety does hereby waive notice of any extension.
D-2 388/2026-08
It is the intention of the parties to be legally bound by this instrument.
IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their several seals this ____ day of ___________, 20___, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned and representative, pursuant to authority of its governing body.
ATTEST: DATE ___________________, 20_____
WITNESS: _________________________________
Name of Bidder, Corporation, Firm or Individual
_________________________ By_______________________________
(Title)
Business Address of Bidder
ATTEST:
Surety
Attorney-in-Fact
IMPORTANT - Surety companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the Project is located.
E-1 388/2026-08
Section E
GENERAL CONDITIONS
E1 Definitions
Wherever used in these General Conditions or in the other
Contract Documents, the following terms have the meanings indicated which are applicable to both the singular and plural thereof:
Addenda
Written or graphic instruments issued prior to the opening of bids which clarify, correct, or change the bidding documents or the Contract Documents and which will be included as Section L of the Contract Documents for award and construction.
Advertisement
The legally published and/or distributed notification to prospective Bidders and others of the Project and the OWNER's intent to receive bids on same. The Advertisement is included as
Section A of these documents.
Agreement
The written agreement between OWNER and CONTRACTOR covering the
Work to be performed; other Contract Documents are attached to the Agreement and made a part thereof as provided therein. The
Agreement is included as Section J of the Bidding/Contract
Application for Payment
The form accepted by ENGINEER which is to be used by CONTRACTOR in requesting progress or final payments and which is to include such supporting documentation as is required by the Contract
Documents, Section H.
Bid
The offer or proposal of the bidder submitted on the prescribed
Bid Form setting forth the prices for the Work to be performed.
Bid Forms are Section C of these documents.
Bonds
Bid, performance, payment, labor and materialsmen, maintenance and special bonds and other instruments of security. The Bid
Bond form is Section D; other Surety Bond forms are Section K of these documents.
E-2 388/2026-08
Contract Documents
The Advertisement, Instructions to Bidders, Bid Form, Bid Bond, General Conditions, Supplemental General Conditions, Technical
Specifications, Measurement and Payment, Agreement, Bonds and
Addenda together with all modifications and supplements issued on or after the Effective Date of the Agreement.
Contract Price
The moneys payable by OWNER to CONTRACTOR under the Contract
Documents as stated in the Agreement.
Contract Time
The number of calendar days stated in the Bid Form and in the
Agreement for the completion of the Work.
CONTRACTOR
The person(s), firm(s) or corporation(s) with whom OWNER has entered into the Agreement.
Effective Date of the Agreement
The date indicated in the Agreement on which it becomes effective, but if no such date is indicated it means the date on which the Agreement is signed and delivered by the last of the parties to sign and deliver.
ENGINEER
KLH Engineers, Inc.
General Conditions
Terms pertaining to the Contract and the performance of the Work thereunder that are of frequent and continuing applicability.
The General Conditions are included as Section E of these documents.
Laws and Regulations
Laws, rules, regulations, ordinances, codes appertaining to the conduct of and/or location of the work.
Insurance
Protection provided to the parties to the Contract as required by the General Conditions and the Supplemental General
Conditions and evidenced by either insurance policies or certificates of insurance coverages. Form of certificate and coverages is included under Section K.
E-3 388/2026-08
Measurement and Payment
The conditions under which payments are to be determined and made to the CONTRACTOR for Work performed under the Contract or as an addition to or deduction from the Contract. The
Measurement and Payment provisions are included as Section H.
Notice of Award
The written notice by the OWNER or ENGINEER to the apparent
Successful Bidder stating that the Contract has been awarded to it.
Notice to Proceed
A written notice given by the OWNER or ENGINEER to CONTRACTOR fixing the date on which the Contract Time will commence. When such Notice to Proceed is not issued, the Contract Time will commence on the date appearing in the Agreement (Section J).
OWNER
The private or public agency with whom CONTRACTOR has entered into the Agreement and for whom the Work is to be provided.
Project
The total construction of which the Work to be provided under the Contract Documents may be the whole, or a part as indicated elsewhere in the Contract Documents.
Technical Specifications
Those portions of the Contract Documents consisting of written technical descriptions of materials, equipment, construction systems, standards and workmanship as applied to the Work and certain administrative details applicable thereto. They are
Section G of these documents.
Subcontractor
An individual, firm or corporation having a direct contract with
CONTRACTOR or with any other Subcontractor for the performance of a part of the Work at the site.
Substantial Completion
The Work (or a specified part thereof) which has progressed to the point where, in the opinion of the OWNER and/or ENGINEER, it is sufficiently complete, in accordance with the Contract
Documents, so that the WORK (or specified part) can be utilized for the purposes for which it is intended.
E-4 388/2026-08
Supplemental General Conditions
The part of the Contract Documents which amends or supplements these General Conditions (if any). They are Section F of these documents.
Supplier
A manufacturer, fabricator, supplier, distributor, materialman or vendor.
Unit Price Work
Work to be paid for on the basis of unit prices.
Work
The entire construction or the various separately identifiable parts thereof required to be furnished under the Contract
Documents. Work is the result of performing services, furnishing labor, and furnishing and incorporating materials and equipment into the construction, all as required by the Contract
E2 Preliminary Matters
E2.1 Delivery of Bonds
When CONTRACTOR delivers the executed Agreements to OWNER, CONTRACTOR shall also deliver to OWNER such Bonds as CONTRACTOR may be required to furnish in accordance with the Contract
Documents. The Surety Bond forms are attached as Section K of these documents.
E2.2 Copies of Documents
All bidding documents are available online at no cost via the
PennBid Program (https://pennbid.bonfirehub.com). Unauthorized reproduction of the drawings or the specifications by the
CONTRACTOR shall not be permitted.
E2.3 Public Works Employment Verification Act
The Contractor and any Subcontractor(s) shall participate in the
E-Verify Program operated by the United States Department of
Homeland Security that electronically verifies employment eligibility for employees (“EVP”) and shall, subject to the requirements of federal law governing the use of EVP, use EVP to verify employment eligibility of each new employee hired after
January 1, 2013, whether such employee will be working onsite or offsite of the Work or otherwise. Contractor and any
Subcontractor(s) shall prove participation with EVP through providing the Owner with a fully completed and unaltered Public
Works Employment Verification Form, as provided by the
Pennsylvania Department of General Services, and available at
E-5 388/2026-08 www.dgs.state.pa.us, for each employee hired by the Contractor after January 1, 2013, whether the employee will be working onsite or offsite of the Project or otherwise. Each new employee hired by Contractor or Subcontractor(s) after January 1, 2013, shall be verified within 5 business days of his start date, whether such employee will be working onsite or offsite of the
Project or otherwise.
A Subcontractor must submit to the Contractor, and the
Contractor must submit to the Owner, a fully complete and unaltered Public Works Employment Verification Form prior to commencing work.
The Contractor and Subcontractor(s) shall maintain documentation of continued compliance with the Public Works Employment
Verification Act by utilizing the EVP for new employees hired throughout the duration of the public works contract.
Neither the Contractor nor Subcontractor(s) shall discriminate against an employee on the basis of race, ethnicity, color or national origin while utilizing the EVP for verification purposes.
Contractors and Subcontractor(s) shall cooperate with the
Pennsylvania Department of General Services and/or any other competent authorities during any investigation or audit arising under the Act.
Contracts between the Contractor and Subcontractor(s) and
Subcontractor(s) with Subcontractor(s) shall contain provisions substantially similar to the following:
“This Agreement is subject to the requirements of the Public
Works Employment Verification Act, Act 127 of 2012, 43 P.S. §§
167.1-167.11, and applicable regulations and guidelines, 4 PA.
Code Ch. 66 (the “Act”). Generally, the Act requires that prior to beginning work on a public works contract; Subcontractors are required to submit to the public body awarding the contract a fully completed and unaltered Public Works Employment
Verification Form, as provided by the Pennsylvania Department of
General Services, and available at www.dgs.state.pa.us. Each new employee hired by Subcontractor after January 1, 2013, shall be verified within 5 business days of his start date, whether such employee will be working onsite or offsite of a public work or otherwise.
The Subcontractor(s) shall maintain documentation of continued compliance with the Public Works Employment Verification Act, Act 127 of 2012, 43 P.S. §§ 167.1-167.11, by utilizing the E-
Verify Program for new employees hired throughout the duration
E-6 388/2026-08 of the public works contract. Subcontractor(s) shall not discriminate against an employee on the basis of race, ethnicity, color or national origin while utilizing the E-Verify
Program operated by the United States Department of Homeland
Security for verification purposes. Subcontractor(s) shall cooperate with the Pennsylvania Department of General Services and/or any other competent authorities during any investigation or audit arising under the Act.”
E2.4 Commencement of Contract Time; Notice to Proceed
The Contract Time will commence on the effective date of the
Agreement or, if a Notice to Proceed is given, on the date indicated in the Notice to Proceed. A Notice to Proceed may follow contract award by OWNER by no more than 45 days, unless otherwise specifically noted within Section B, Instructions to
Bidders.
E2.5 Starting the Project
CONTRACTOR may start to perform the Work on the date when the
Contract Time commences, but no Work shall be done at the site prior to the date on which the Contract Time commences. If scheduled by the Engineer, the CONTRACTOR will be required to attend a pre-construction meeting.
Within ten days after the Effective Date of the Agreement
(unless otherwise specified in the General Requirements), CONTRACTOR shall submit to OWNER or his designee, for review:
- A proposed progress schedule indicating the starting and completion dates of the various stages of the work;
- A schedule of values for all of the Work. This will include quantities and prices of items aggregating the
Contract Price and will subdivide the Work into component parts in sufficient detail to serve as the basis for progress payments during construction.
Before any Work at the site is started, CONTRACTOR shall deliver to OWNER, with a copy to ENGINEER, certificates, and other evidence of insurance requested by OWNER which CONTRACTOR is required to purchase and maintain in accordance with the
Contract Documents.
E3 Intent of the Contract Documents
E3.1 The Contract Documents comprise the entire agreement
E-7 388/2026-08 between OWNER and CONTRACTOR concerning the Work. The Contract
Documents are complementary; what is called for by one is as binding as if called for by all. The Contract Documents will be construed in accordance with the law of the place of the
Project.
If, during the performance of the Work, CONTRACTOR finds a conflict, error or discrepancy in the Contract Documents, CONTRACTOR shall so report to ENGINEER in writing at once, and before proceeding with the Work affected thereby shall obtain a written interpretation or clarification from ENGINEER; any work performed by CONTRACTOR without reporting such conflicts, errors, or discrepancies, in writing, to the ENGINEER will be at the CONTRACTOR's risk.
In addition, the requirements of the Contract Documents may be supplemented and minor variations and deviations in the Work may be authorized, in one or more of the following ways:
- ENGINEER'S approval of Shop Drawing(s) or sample(s)
- ENGINEER's written interpretation or clarification
E4 Bonds and Insurance
E4.1 Performance and Other Bonds
CONTRACTOR shall furnish Bonds, each in an amount equal to the
Contract Price as security for the faithful performance and payment of all CONTRACTOR's obligations under the Contract
Documents; CONTRACTOR shall also furnish such other Bonds as are required by the Contract Documents. All Bonds shall be in the forms prescribed by the bidding documents or Supplemental
General Conditions and be executed by such Sureties as are named in the current list of "Companies Holding Certificates of
Authority as Acceptable Sureties on Federal Bonds and as
Acceptable Reinsuring Companies" as published in Circular 570
(amended) by the Audit Staff Bureau of Accounts, U. S. Treasury
Department. All Bonds signed by an agent must be accompanied by a certified copy of the authority to act.
If the Surety on any Bond furnished by CONTRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements of the above paragraph, CONTRACTOR shall within five days thereafter, substitute another
Bond and Surety, meeting the OWNER's approval.
E-8 388/2026-08
E4.2 Contractor's Liability Insurance
CONTRACTOR shall purchase and maintain such insurance as is appropriate for the Work being performed and furnished and will provide protection from claims which may arise out of or result from CONTRACTOR's performance and furnishing of the Work and
CONTRACTOR's other obligations under the Contract Documents, whether it is to be performed or furnished by CONTRACTOR, by any
Subcontractor, by anyone directly or indirectly employed by any of them to perform or furnish any of the Work, or by anyone for whose acts any of them may be liable.
The insurance required shall include the specific coverages and be written for not less than the limits of liability and coverages provided in the Supplemental General Conditions. The
Certificate of Insurance included in Section K of these documents shall be required to be completed prior to the commencement of any construction work. All of the policies of insurance required to be purchased and maintained shall contain a provision or endorsement that the coverage afforded will not be canceled, materially changed, or renewal refused, until at least ten days' prior written notice has been given to OWNER and
ENGINEER. All such insurance shall remain in effect until final payment and at all times thereafter when CONTRACTOR may be correcting, removing, maintaining, repairing or replacing defective Work.
E5 Change of Contract Price
E5.1 The Contract Price constitutes the total compensation
(subject to authorized adjustments) payable to CONTRACTOR for performing the Work. All duties, responsibilities and obligations assigned to or undertaken by CONTRACTOR shall be at his expense without change in the Contract Price.
E5.2 The Contract Price may only be changed by a Change Order.
Any claim for an increase or decrease in the Contract Price shall be based on written notice outlining the bases for the claim and be delivered by the party making the claim to the other party promptly (but in no event later than thirty days) after the occurrence of the event giving rise to the claim and stating the general nature of the claim. Notice of the amount of the claim with supporting data shall be delivered within sixty days after such occurrence and shall be accompanied by claimant's written statement that the amount claimed covers all known amounts (direct, indirect, and consequential) to which the claimant is entitled as a result of the occurrence of said event.
E-9 388/2026-08
E5.3 The value of any Work covered by a Change Order or of any claim for an increase or decrease in the Contract Price shall be determined in one of the following ways:
- Where the Work is covered by unit prices contained in the Contract Documents, value shall be determined by application of unit prices to the quantities of the items involved.
- By mutual acceptance of an agreed price, if work is not covered by unit prices.
- If the Work is not covered by unit prices and the parties are unable to agree upon a price, the value shall be determined on the basis of the Cost of the
Work, plus a Contractor's Fee for overhead and profit, the total amount of which shall be determined on the basis of the sum of the following items (1) through
(6):
(1) The actual cost to the CONTRACTOR or subcontractor, if employed by the CONTRACTOR, of labor, including foremen (but not including superintendence), said cost to include Base
Wages, Social Security (FICA) payments, Federal and State Unemployment Compensation payments and
Workmen's Compensation payments;
(2) The actual cost to the CONTRACTOR or subcontractor of materials and equipment utilized or being installed permanently into the work;
and, expendable materials necessary for the conduct and performance of the work (as approved prior to performance of the work) -- the cost of all such approved permanent and expendable materials to be reconciled from suppliers' invoices;
(3) The rental cost of construction machinery and equipment during the time of use on the extra work, said rental rates to be 75% of those published in daily, weekly and/or monthly rate schedules of a recognized Contractors' association;
(4) The actual cost of power and any other necessary
E-10 388/2026-08 utility services;
(5) Business and occupation, sales and/or other applicable taxes;
(6) An allowance for Profit and Overhead -- to be determined by calculating the sum of the following:
(a) The resultant obtained by multiplying the
Base Wages referred to in paragraph (1) above times a factor of 0.15;
(b) The resultant obtained by multiplying the actual cost of materials and equipment referred to in paragraph (2) above times a factor of 0.05;
(c) The resultant obtained by multiplying the cost of extra work if performed by subcontractor times a factor of 0.02.
E6 Termination
E6.1 Owner May Terminate the Work
Upon the occurrence of any one or more of the following events the OWNER may terminate the work:
(a) If CONTRACTOR commences a voluntary case under any chapter of the Bankruptcy Code (Title 11, United
States Code), as now or hereafter in effect or if
CONTRACTOR takes any equivalent or similar action by filing a petition or otherwise under any other federal or state law in effect at such time relating to the bankruptcy or insolvency and the OWNER does not receive adequate assurances from the CONTRACTOR and
Trustee in Bankruptcy, and the CONTRACTOR's surety that the CONTRACTOR will complete the Contract in accordance with the terms thereof and at the time specified therein within 20 days of the filing of such petition;
(b) If a petition is filed against CONTRACTOR under any chapter of The Bankruptcy Code as now or hereafter in effect at the time of filing, or if a petition is filed seeking any such equivalent or similar relief against CONTRACTOR under any other federal or state
E-11 388/2026-08 law in effect at the time relating to bankruptcy or insolvency and the OWNER does not receive adequate assurances from the CONTRACTOR, any Trustee in
Bankruptcy and the CONTRACTOR's Surety that the
CONTRACTOR will complete the Contract in accordance with the terms thereof and at the time specified therein within 20 days of the filing of such petition;
(c) If CONTRACTOR makes a general assignment for the benefit of creditors;
(d) If a trustee, receiver, custodian or agent of
CONTRACTOR is appointed under applicable law or under contract, whose appointment or authority to take charge or property of CONTRACTOR is for the purpose of enforcing a lien against such property for the general administration of such property for the benefit of
CONTRACTOR's creditors;
(e) If CONTRACTOR admits in writing an inability to pay its debts generally as they become due;
(f) If CONTRACTOR, in the opinion of the ENGINEER, persistently fails to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workmen or suitable materials or equipment or failure to adhere to the progress schedule as revised from time to time);
(g) If CONTRACTOR disregards Laws or Regulations of any public body having jurisdiction.
OWNER may, after giving CONTRACTOR and Surety seven days' written notice and to the extent permitted by law, terminate the services of CONTRACTOR, exclude CONTRACTOR from the site and take possession of the Work and of all CONTRACTOR'S tools, appliances, construction equipment and machinery at the site and use the same to the full extent they could be used by CONTRACTOR
(without liability to CONTRACTOR for trespass or conversion), incorporate in the Work all materials and equipment stored at the site or for which OWNER has paid CONTRACTOR but which are stored elsewhere, and finish the Work as OWNER may deem expedient. In such case CONTRACTOR shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price (less any liquidated damages which may be imposed because of the CONTRACTOR's failure
E-12 388/2026-08 to complete the Contract within the time period set forth in the
Contract Documents) exceeds the direct, indirect and consequential costs of completing the Work such excess will be paid to CONTRACTOR. If such costs exceed such unpaid balance, CONTRACTOR shall pay the difference to OWNER, plus any liquidated damages. Such costs incurred by OWNER will be reviewed as to reasonableness by ENGINEER, but when exercising any rights or remedies under this paragraph OWNER shall not be required to obtain the lowest price for the Work performed.
Where CONTRACTOR's services have been so terminated by OWNER, the termination will not affect any rights or remedies of OWNER against CONTRACTOR or Surety Company then existing or which may thereafter accrue, including their liability to OWNER of liquidated damages because of CONTRACTOR's failure to complete the work within the contract time. Any retention or payment of moneys due CONTRACTOR by OWNER will not release CONTRACTOR or
Surety Company from liability.
Upon seven days' written notice to CONTRACTOR, OWNER may, without cause and without prejudice to any other right or remedy, elect to abandon the Work and terminate the Agreement.
In such case, CONTRACTOR shall be paid for all Work executed and expenses sustained plus reasonable termination expenses.
No payment will be paid to CONTRACTOR for profits applicable to the uncompleted work or for damages of any kind regardless of whether the termination is a termination for convenience or a termination for fault. If the OWNER terminates the CONTRACTOR for fault and a court, arbitrator, or other body having jurisdiction over this Contract determines that such termination was wrongful, the termination will be deemed a termination for convenience and the rights and remedies of the CONTRACTOR will be limited to such rights and remedies he would have had if the
Contract had been terminated for the OWNER's convenience pursuant to Section E12.2 hereof.
E6.2 Owner May Terminate for Convenience
The OWNER reserves the right to terminate this Contract for its convenience, without any fault upon the part of the CONTRACTOR, at any time in its sole discretion. If termination for convenience occurs prior to commencement of work by the
CONTRACTOR, the OWNER will pay the CONTRACTOR reasonable mobilization costs the CONTRACTOR incurred prior to notice of termination, but no payment will be made for the CONTRACTOR's costs in bidding and entering into the Contract, loss of profits, or damages of any kind. If the OWNER terminates the
E-13 388/2026-08 contract for its convenience after the CONTRACTOR has commenced work, the OWNER will pay the CONTRACTOR any retentions due on previously approved estimates, the value of the work installed by the CONTRACTOR since the last approved estimate, and reasonable demobilization expenses. No payment will be made for any loss of profit on the omitted work or damages of any kind.
E6.3 Contractor May Stop Work or Terminate
If, through no act or fault of CONTRACTOR, the Work is suspended by OWNER or under an order of court or other public authority, or ENGINEER fails to act on any Application for Payment within forty-five days after it is submitted, or OWNER fails for thirty days to pay CONTRACTOR any sum finally determined to be due, then CONTRACTOR may, upon seven days' written notice to OWNER terminate the Agreement and recover from OWNER payment for all
Work executed and any expense sustained plus reasonable termination expenses, unless the OWNER cures the default within seven days of receipt of the written notice from the CONTRACTOR.
In addition and in lieu of terminating the Agreement, if
ENGINEER has failed to act on an Application for Payment or
OWNER has failed to make any payment as aforesaid, CONTRACTOR may upon seven days' written notice to OWNER stop the Work until payment of all amounts then due. The provisions of this paragraph shall not relieve CONTRACTOR of his obligations to carry on the Work in accordance with the progress schedule and without delay during disputes and disagreements with OWNER.
E7 Miscellaneous
E7.1 Giving Notice
Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice.
E7.2 Payments by Contractor
The CONTRACTOR shall pay: (a) for all transportation and utility services not later than the 15th day of the calendar month following that in which services are rendered; (b) for all materials, tools, and equipment not later than the 28th day of the calendar month following that in which such materials, tools and equipment are delivered at the site of the project and the balance of the cost thereof, not later than the 30th day following the completion of installation, and testing where
E-14 388/2026-08 applicable, of that part of the work in or on which such materials, tools and equipment are incorporated or used, and;
(c) to each of his Subcontractors, not later than the 14th day following each progress, periodic or final payment to the
CONTRACTOR, the respective amounts allowed the CONTRACTOR on account of the work performed by his Subcontractors to the extent of each Subcontractor's interest therein.
E7.3 Assignments
The CONTRACTOR shall not assign the whole or any part of this
Contract or moneys due to become due hereunder without written consent of the OWNER. In case the CONTRACTOR assigns all or any part of the moneys due or to become due under this Contract, the instrument of assignment shall contain a clause substantially to the effect that it is agreed that the right of the assignee in and to any moneys due or to become due to the CONTRACTOR shall be subject to prior claims of all persons, firms and corporations for services rendered or materials supplied for the performance of the work called for in this Contract.
E7.4 Engineer's Decisions
While the ENGINEER will endeavor to interpret the Contract and render his decisions in a fair and unbiased manner, his exercise of such interpretation shall not give rise to any duty or responsibility to the CONTRACTOR or to any Subcontractor and he shall not be liable to the CONTRACTOR or any Subcontractor for any interpretation, decision or measurement made pursuant to
Paragraph E3.1, E6.4 or any other provision of the Contract
E7.5 Work Hours/Schedule
The CONTRACTOR must provide the OWNER/ENGINEER with a written schedule of proposed activities prior to commencement of any work on the project. The written schedule shall include adequate detail to allow determination of work to be completed within any given week. The schedule shall be updated on a monthly basis throughout the length of the contract if work is not progressing as outlined in the original schedule. The schedule shall include the number of days per week and hours per day the CONTRACTOR proposes to work. The OWNER/ENGINEER shall be given a one week notice of any work schedule changes.
E7.6 Night and Weekend Work
The CONTRACTOR shall confine his work schedule to a Monday through Friday, dawn to dusk schedule. Any work the CONTRACTOR proposes to perform at night or on weekends must receive prior
(3 days notice) written approval of the OWNER.
E-15 388/2026-08
E8 Dispute Resolution
E8.1 Jurisdiction and venue for any dispute arising under this
Agreement shall vest in the Court of Common Pleas of
Westmoreland County, Pennsylvania with the laws of the
Commonwealth of Pennsylvania controlling. The parties may, by mutual agreement, determine to submit any dispute to mediation through any service available in Westmoreland County, Pennsylvania.
End of Section E
General Conditions
E-16 388/2026-08
F-1 388/2026-08
Section F
SUPPLEMENTAL GENERAL CONDITIONS
F1 Required Contractors Insurance Coverages
Under Section E5 of the General Conditions certain stipulations are set forth regarding Contractor's Liability Insurance, Property
Insurance, Receipt and Application of Proceeds and Partial
Utilization -- Property Insurance. All policies of insurance shall name the CONTRACTOR as the insured party. The CONTRACTOR and his insurance agent shall be required to complete the Certificate of
Insurance appended in Section K of the Contract Documents prior to, or at the time that the Agreement is executed, and the surety bonds are posted by the CONTRACTOR. OWNER and KLH Engineers, Inc. shall be an additional insured with respect to liability arising out of and from the work performed by CONTRACTOR for OWNER. Insurer waives all right of subrogation against OWNER, its clients, or its employees. The insurance coverage under the insurance contract is primary to any comparable liability insurance carried by the OWNER or its agent. The specific coverages required to be provided prior to commencement of construction by the CONTRACTOR and any and all subcontractors on this project shall be as follows:
F. INSURANCE
CONTRACTOR shall obtain insurance of the types and in the amounts described below. The insurance shall be written by insurance companies with an A. M. Best rating of A- or better and on forms acceptable by OWNER.
F.1 COMMERCIAL GENERAL AND UMBRELLA LIABILITY INSURANCE
CONTRACTOR shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance with a limit of not less than $2,000,000 each occurrence. If such CGL insurance contains a general aggregate limit, it shall apply separately to the Project.
F.1.1 CGL insurance shall be written on ISO occurrence form CG
00 01 (or a substitute form providing equivalent coverage) and shall cover liability arising from premises, operations, independent contractors, products-completed operations, and personal injury and advertising injury.
F.1.2 OWNER and KLH Engineers, Inc. shall be added by endorsement as named additional insureds under the CGL and under the commercial umbrella, if any. This insurance, including insurance provided under the commercial umbrella, if any, shall apply as primary insurance with respect to any
F-2 388/2026-08 other insurance or self-insurance programs providing coverage to Owner and/or KLH Engineers, Inc. and shall at a minimum provide to Owner and KLH Engineers, Inc. the same coverage, as that provided to Contractor, including completed operations coverage and shall provide coverage to Owner and KLH
Engineers, Inc. for any liability arising from or in any way related to Contractor’s work, regardless of any alleged or actual apportionment of negligence or liability.
F.1.3 There shall be no endorsement or modification of the CGL limiting the scope of coverage for liability arising from pollution, explosion, collapse, or underground property damage.
F.1.4 Waiver of Subrogation Contractor waives all rights against Owner and/or KLH Engineers, Inc. and their agents, officers, directors, and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained pursuant to paragraph F.1 of this Agreement.
F.1.5 Continuing CGL Coverage Contractor shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella liability insurance, with a limit of not less than $2,000,000 each occurrence for at least 3 years following substantial completion of the Work.
F.1.5.1 Continuing CGL insurance shall be written on ISO occurrence form CG 00 01 (or substitute form providing equivalent coverage) and shall, at minimum, cover liability arising from products-completed operations and liability assumed under an insured contract.
F.1.5.2 Continuing CGL insurance shall have a products-completed operations aggregate of a least two times its each occurrence limit or provide aggregate limits per location/project.
F.1.5.3 Continuing commercial umbrella coverage, if any, shall include liability coverage for damage to the insured’s completed Work equivalent to that provided under ISO form CG
00 01.
F-3 388/2026-08
F.2 Contractor’s Pollution Liability Insurance
Contractor shall purchase and maintain a policy covering third-party injury and property damage, including cleanup costs, as a result of pollution conditions arising from Contractor’s operations and completed operations with a limit of not less than $1,000,000.
End of Section F
Supplemental General Conditions
F-4 388/2026-08
G-1 388/2026-08
Section G
Technical Specifications
1.0 Container Specifications
The successful bidder shall provide one (1) container at a time.
Each container shall be 30 cubic yard capacity and shall be suitable for loading with dewatered wastewater treatment plant sludge by means of the existing conveyor system at the Authority’s wastewater treatment plant. Container shall be provided with covers, in good condition to prevent rain, snow, etc. from accumulating in the container.