1-27-146 RFP - Posted.pdf
PDF 2 MB Posted
- Attached to
- On Call Outfall Stabilization and Stream Repairs
- Solicitation number
- 27-146
- Issued by
- Harford County, Maryland
About this file
This is a Request for Proposals (RFP) issued by Maryland for an on-call contract to perform outfall stabilization and stream repairs. The contract is designed to facilitate construction of multiple small outfall stabilization projects while providing flexibility to address maintenance-required stream repairs throughout the state. The RFP establishes an on-call contracting mechanism that allows the agency to issue task orders for individual projects as needs arise, rather than committing to a single large project upfront. The document outlines the general scope, evaluation criteria, and contract terms, though specific quantities and individual project details would be determined through subsequent task order issuances. Response requirements, submission deadlines, and any scheduled pre-bid meetings or site visits would be detailed within the RFP sections, with contract award and commencement dates to be determined based on the proposal evaluation timeline.
The RFP includes standard contract terms and conditions applicable to Maryland state procurement, with pricing to be established through the competitive proposal process. Funding for individual task orders would be allocated as projects are identified and authorized. The on-call nature of the contract allows the state to manage costs by distributing work across multiple projects and budget cycles. Additional details regarding set-asides, incumbent information, contract duration, renewal options, and specific technical requirements would be contained within the RFP document sections addressing contract administration, qualifications, and scope specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Prequalification Application.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HARFORD COUNTY MARYLAND
DEPARTMENT OF PROCUREMENT
Robert G. Cassilly County Executive
Director of Procurement Spencer Ebann
HARFORD COUNTY PROCUREMENT
220 S. MAIN STREET, BEL AIR, MD 21014
www.harfordcountymd.gov 410.638.3550
REQUEST FOR PROPOSALS
PROPOSALS RECEIVED AFTER THE DUE DATE AND TIME
WILL BE REJECTED AND RETURNED UNOPENED
Minority, Disadvantaged, Women, Small and Veteran Owned Business Enterprises are encouraged to respond to solicitations. The Maryland Department of Transportation website, www.mdot.maryland.gov/newMDOT/MBE/Index.html, provides important information, including certification, workshops, and other valuable resources to suppliers
SOLICITATION NUMBER: 27-146
SOLICITATION TITLE: On Call Outfall Stabilization and Stream Repairs
PROCUREMENT AGENT: Karen Post 410-638-3550 kmpost@harfordcountymd.gov
PRE-PROPOSAL MEETING: Date Place
November 23, 2026, 9:00 AM EST 1st Floor Conference Room
QUESTIONS DUE DATE AND TIME:
PREQUALIFICATION REQUIREMENT:
SOLICITATION DUE DATE AND TIME:
BONDING REQUIREMENT:
INSURANCE
TIMELY DELIVERY OF SOLICITATION
DOCUMENTS:
DELIVERY METHODS:
Address: 212 South Bond Street Bel Air, MD 21014
December 4, 2026, by 1:00 PM EST
Prequalification(s) are required D3 - Storm drains and/or K1 - Drainage Channels and/or 05 - Stream Restoration
January 8, 2027, by 1:00 PM EST
Performance Bond is required on a project-by-project basis Payment Bond is required on a project-by-project basis Maintenance Bond is required on a project-by-project basis
Light Construction / Renovation
Submittals must be received prior to the solicitation due date and time. Accepted Request for Proposals submittals will not be publicly opened. All submittals should be sealed, labeled with the solicitation number, title, and vendor’s name and directed to the Department of Procurement.
Must be entered into Euna by 1:00 PM of the date due.
http://www.mdot.maryland.gov/newMDOT/MBE/Index.html
RFP NO. 27-146
OUTFALL STABILIZATION AND STREAM REPAIRS
TABLE OF CONTENTS
1. INTRODUCTION Page 1
2. GENERAL INFORMATION Page 7
3. EVALUATION AND SELECTION CRITERIA Page 10
ATTACHMENTS:
ATTACHMENT A – General Provisions ATTACHMENT B – Bid Specific Items ATTACHMENT C – Task-Specific Specifications ATTACHMENT D – Example Structure Specifications ATTACHMENT E – General Conditions ATTACHMENT F – Proposal Affidavit ATTACHMENT G – Cost Proposal ATTACHMENT H – Sample Contract with Bonds ATTACHMENT I – Insurance Requirements
A-1 thru A-3 B-1 thru B-49 C-1 thru C-13 D-1 thru D-8 E-1 thru E-29 F-1 thru F-5 G-1 thru G-6 H-1 thru H-22 I-1 thru I-5
RFP NO. 27-146
OUTFALL STABILIZATION AND STREAM REPAIRS
1. INTRODUCTION:
1.1 Request for Proposals Objective
This Request for Proposals is to solicit technical and cost proposals from qualified firms to provide On-Call Outfall Construction Services in Harford County. The intent of this Request for Proposals is to establish a requirement or “on call” contract with a roster of unit prices for items relative to the construction, rehabilitation and restoration of outfalls and outfall channels on County-identified Outfall Restoration Projects. The County identifies degraded stormwater outfalls across a wide variety of properties and designs improvements to meet various restoration goals and regulatory requirements.
1.2 Contract Purpose
1.2.1 The purpose of these specifications is to request proposals to furnish all necessary labor, equipment, materials, supervision, tools, services, and all related incidentals required to perform all work necessary for stormwater outfall construction services from a Contractor(s) at various locations for Harford County.
1.2.2 Locations may include State, County or locally owned public properties and capital improvement projects on private property.
1.2.3 This will be a project-by-project task-based contract that is based on general unit cost bid items. The scope of a particular project will determine the selection of those items required to complete the work. If a project scope does not include an already established unit cost, then the Contractor and County shall negotiate a reasonable cost for the item(s). If the Contractor foresees a project cannot be completed within the cost proposal, the Contractor shall notify the County for approval to proceed on any additional work. The County shall not pay for additional work if the Contractor performs the work without the County approval.
1.2.4 On-call services associated with stormwater outfall restoration may include, but are not limited to survey, permitting, site preparation, construction, maintenance, trash and debris removal, planting, seeding, excavating, grading, environmental compliance and other work as required for delivering a completed stormwater outfall restoration site.
1.2.5 Contract Specifications for bid items are the specifications governing this type of work. In addition to these specifications, each assignment will have additional special provisions specific to the project’s design. These will be included in project assignments prior to finalizing a task order.
1.2.6 The Contractor will be provided with plans, specifications and estimated item quantities for each task assigned.
1.3 Information for Proposers
1.3.1 Proposals must be submitted through the Euna portal.
1.3.2 Each proposal submission shall consist of two separate submission requirements – Submission One – Technical proposal and Submission Two – Cost Proposal.
1.3.2.1 Submission One – Technical Proposal:
1.3.2.1.1 “Submission One – Technical Proposal”, proposer must include the following items which make up the Technical Proposal:
1.3.2.1.1.1 A brief transmittal letter which includes your
firm’s legal name and address, name, phone number, and email address of the primary point of contact for this RFP and signed by an officer authorized to bind the firm to its proposal. This may be a part of the General and Information technical category.
1.3.2.1.1.2 The proposal affidavit. See ATTACHMENT B.
1.3.2.1.1.3 The written technical proposal, formatted in
the order of and addressing the criteria described in Section 3.3 Technical Proposal, labeled “Technical Proposal”.
1.3.2.2 Submission Two – Cost Proposal:
1.3.2.2.1 “Submission Two – Cost Proposal”, proposer must include the following items which make up the Cost Proposal:
1.3.2.2.1.1 The Cost Proposal. See ATTACHMENT C
(pricing sheet in Euna).
1.3.3 The evaluation procedure for this RFP requires that technical evaluations be completed before cost proposals are opened. If technical and cost proposals are not separately sealed, your submission will be considered nonresponsive.
1.3.4 There will be no public opening of the proposal submissions.
1.3.5 Proposals submitted in response to this RFP are irrevocable for 120 days after the proposal due date.
1.3.6 Award of the contract is anticipated in March, 2027.
1.3.7 Proposers must be pre-qualified, prior to bid opening, in Category D3 – Storm drains and/or Category K1 – Drainage Channels and/or Category O5 – Stream Restoration.
1.4 Reservations
The County reserves the right to cancel this RFP at any time after issuance, to reject, in whole or in part, any and all proposals received, to waive minor technicalities in proposals, and to negotiate with responsible proposers in any manner necessary to serve its best interests.
1.5 Addenda
Any necessary additions or corrections to this RFP will be made by addenda, and available to all proposers of record. Addenda becomes part of the RFP and must be acknowledged by each proposer; failure to acknowledge any addenda shall not relieve proposers of compliance with the terms thereof. The County assumes no responsibility for oral instructions.
1.6 Economy of Preparation
Proposals should be prepared simply and economically, providing a straightforward, concise description of the proposer’s ability to satisfy the requirements of this RFP.
1.7 Incurred Expenses
Proposers are responsible for proposal preparation and submission costs, as well as travel costs incurred in connection with pre-award discussions or activity.
1.8 Acceptance of Terms and Conditions
By submitting a proposal in response to this RFP, the proposer accepts the terms and conditions set forth herein.
1.9 Public Information Act Notice
Proposers shall identify any portions of their proposals deemed to contain confidential or proprietary information or trade secrets, and provide justification why such material, upon request, should not be disclosed in accordance with §806 of the Harford County Charter.
1.10 Evidence of Proposer Responsibility
The County may require proposers to submit additional information regarding financial responsibility, technical expertise, and other qualifications, and may consider any information otherwise available concerning those qualifications. The County may make such investigation as it deems necessary to determine proposer responsibility.
1.11 Award Without Discussion
The County reserves the right to accept the best written proposal without further discussions. The proposer should ensure that the initial proposal is both complete and competitively priced.
1.12 Contractor Responsibilities; Subcontractors
The County will enter into a contract with the selected proposer only, and that proposer shall be responsible for all products and services required by the RFP. Subcontractors, if any, must be identified in the proposal, with a complete description of their role relative to the proposer.
1.13 Conflicts of Interest
The proposer shall identify any actual or potential conflicts of interest that exist, or which may arise if the proposer is recommended for award and propose how such conflicts might be resolved.
1.14 Financial Disclosure
The successful proposer shall comply with the provisions of Section 14-103.1 of the Election Law Article of the Annotated Code of Maryland, which requires that every business that makes or has a single contract with a single governmental entity involving cumulative consideration of at least $200,000 shall, within 15 days after award of the contract, file with the State Board of Elections certain specified information to include disclosure of beneficial ownership of the business.
1.15 Political Contribution Disclosure
The successful proposer shall comply with the provisions of Title 14, of the Election Law Article of the Annotated Code of Maryland, which requires that every person who enters into a single contract with the State of Maryland, including its agencies or a political subdivision of the State, shall file with the State Board of Elections a statement complying with the requirements of §14-104(b) of the Election Law Article of the Annotated Code of Maryland.
1.16 Anti-Bribery Affidavit
Section 16-202, State Finance and Procurement Article requires that each proposer seeking a contract submit an affidavit stating whether the entity or any of its officers, directors, or partners, or any of its employees directly involved in obtaining contracts with the State, have been convicted of bribery, attempted bribery, or conspiracy to bribe under the laws of any state or the federal government. The affidavit form that must be returned with each proposal is included with this RFP and should be submitted with the technical proposal.
1.17 Non-Collusion
By its signature on the proposal documents submitted, the successful proposer attests that its agents, servants and/or employees, to the best of its knowledge and belief, have not in any way colluded with anyone for and on behalf of the proposer, or themselves, to obtain information that would give the proposer an unfair advantage over others, nor has it colluded with anyone for and on behalf of the proposer, or itself, to gain any favoritism in the award of this RFP.
1.18 Compliance with Laws
By submitting a response to this solicitation, proposer represents that it is not in arrears in the payment of any obligation due and owing Harford County or the State of Maryland, including the payment of taxes and employee benefits, and that it shall not become so in arrears during the term of any contract arising from award of this RFP.
1.19 Governing Law
The laws of Harford County and the State of Maryland, and where applicable, federal law and regulation, will govern the contract awarded pursuant to this RFP.
1.20 Ownership and Retention of Records
All reports, drawings, and other data prepared under the contract issued pursuant to this RFP shall become the property of Harford County. Unless otherwise required by applicable statute of limitations, the successful proposer shall retain all records and documents related to any contract awarded pursuant to this RFP for 3 years after final contract payment by the County, and shall make them available for inspection and audit by authorized representatives of the County at all reasonable times.
1.21 Piggyback Procurement
Harford County reserves the right to extend the terms and conditions of this solicitation to any and all other agencies within the state of Maryland as well as any other federal, state, municipal, county, or local governmental agency under the jurisdiction of the United States and it’s territories. This shall include but not limited to private schools, parochial schools, non-public schools such as charter schools, special districts, intermediate units, non-profit agencies providing services on behalf of government, and/or state, community and/or private colleges/universities that require these goods, commodities and/or services. This is conditioned upon mutual agreement of all parties pursuant to special requirements, which may be appended thereto. The supplier/contractor agrees to notify the issuing body of those entities that wish to use any contract resulting from this proposal and will also provide usage information, which may be requested. A copy of the contract pricing and the proposal requirements incorporated in this contract will be supplied to requesting agencies. Each participating jurisdiction or agency shall enter into its own contract with the Award Proposer(s) and this contract shall be binding only upon the principals signing such an agreement. Invoices shall be submitted in duplicate “directly” to the ordering jurisdiction for each unit purchased. Disputes over the execution of any contract shall be the responsibility of the participating jurisdiction or agency that entered into that contract. Disputes must be resolved solely between the participating agency and the Award Proposer. Harford County does not assume any responsibility other than to obtain pricing for the specifications provided.
1.22 Billing and Payment
The successful proposer shall keep accurate, document records of time, material, and transportation applicable to this contract. Payment will be made on a monthly basis, and related records will be available for audit purposes during normal business hours, as often as deemed necessary.
Payment will only be made for work that has first been previously authorized with County approval.
Quotes for projects or task orders resulting from the subsequent contract must contain the following statement if the Contractor is providing a quote using the Contractor’s quote form: This quote is subject to the terms and conditions of Harford County Contract No. 27-146, which cannot be changed or supplemented by anything contained herein unless expressly agreed to by the County via written Addendum.
1.23 Contract Term
The initial term of the Contract shall be for one (1) year and shall begin on date of contract execution or about March 1, 2027.
Harford County reserves the option to renew this contract for four (4) additional, one (1) year periods based on mutual agreement.
Unit prices shall remain firm for the first twelve (12) months of the Contract.
Prices may be negotiated only during the renewal period. Upon request, prices may be increased for exercised option years upon approval from Harford County, but in no case will the change in price exceed the change in the Consumer Price Index (CPI-U) All Urban Consumers for the preceding twelve (12) month period or 3% whichever is lower.
1.24 Issuing Office
Harford County, Maryland Department of Procurement 220 South Main Street Bel Air, Maryland 21014 Attn: Karen Post, Procurement Agent III Email: kmpost@harfordcountymd.gov
1.25 Request for Proposals Schedule
Emailed requests for clarification and additional information must be received via email to the Procurement Agent no later than 1:00 PM EST December 4, 2026, to ensure adequate time to prepare and post addenda.
Submission of proposals needs to be entered into the Euna portal no later than 1:00 PM EST on January 8, 2027.
There will be no public opening for the proposal submissions.
Proposals submitted in response to this RFP are irrevocable for ninety (90) calendar days after the proposal due date.
The award of contract(s) is anticipated in March 2027.
2 GENERAL REQUIREMENTS
Contractors are required to submit pricing information for all bid items included in the contract.
All work shall be performed under the direction of the Department of Public Works (DPW) Watershed Protection and Restoration Office. There is no guaranteed minimum under this contract.
2.1 Contract Amount
2.1.1 The maximum amount of compensation for the services rendered under this Contract shall not exceed $5,000,000 per year collectively for all selected Contractor(s).
2.1.2 The value of the assignments under this Contract shall be dependent upon program funding and may not add up to the maximum amount of contract compensation during the contract period. If this should occur, the County shall not be liable to compensate the Contractor(s) for any portion of the mailto:kmpost@harfordcountymd.gov remaining contract amount.
2.1 Project Assignments
2.1.2 If more than one Contract is awarded, the County reserves the right to select any Contractor for a task, in any order, at any time. There is no guarantee of the amount of work awarded to each Contractor. It is the intent of the County to be as fair as possible among awarded vendors for quantity of work opportunities.
2.1.3 Tasks will be assigned to the Contractor based on their capabilities and expertise to complete the work.
2.1.4 The County will notify one or more of the Contractors when a specific project has been designed and permitted and is ready for construction.
2.1.5 The Contractor(s) will then submit a cost proposal.
2.1.6 The cost proposal shall include a breakdown in costs of construction by utilizing the unit prices listed in the bid form, and the actual quantities provided by the County for a specific project. The Contractor shall use best professional judgement in developing a cost that most closely meets the design intent of the contract documents, including details and specifications. Items required for a particular project, including Construction Stakeout, Maintenance of Streamflow, Maintenance of Traffic, etc., will be negotiated and agreed to with the County prior to task award. Additional unit costs not included in the contract bid sheet, shall also be negotiated and agreed with the County prior to task award.
2.1.7 Should the Contractor choose to use a subcontractor(s), the amount of work completed by the subcontractor(s) is limited to 40% of the cost proposal.
2.1.8 The County will review each cost proposal to determine the proposal that provides the most efficient project approach with the greatest value.
2.1.9 The County reserves the right at any time prior to issuing the notice to proceed to negotiate any portion of a proposal prior to or after selection of a proposal.
2.1.10 Should none of the proposals meet the County’s criteria, the County reserves the right to solicit cost proposals from additional Contractors.
2.1.11 The County reserves the right at any time prior to issuing a notice to proceed to suspend, terminate or modify a project for any reason. In the event of such suspension, termination or modification, Harford County shall have no obligation or liability to any of the Contractors preparing or submitting proposals.
2.2 Force Account Assignments
2.2.2 The Contractor(s) must be able to provide immediate services if the urgency of a project assignment so warrants.
2.2.3 When emergency action is necessary, it may not be possible to prepare a written proposal prior to the start of work. In these cases, the Contractor shall provide the required services, using wage and resource rates as provided in the Contract. The Contractor shall keep careful records and provide complete documentation as backup for all compensation of services rendered.
2.2.4 If the utilized resource is not included in the Contract, then the Contractor shall provide documentation for the basis of resource cost.
These costs shall be justified to the satisfaction of the Project Manager.
2.3 Right of Way
The right-of-way and/or easements for the area to be affected by the subject project(s) that is to be constructed under this contract have been obtained by the County.
Any additional right-of-way or easement required by the Contractor for operations, plant, equipment, storage of materials, access to disposal areas, etc., must be obtained and paid for by the Contractor.
2.4 Mobilization
This item will be negotiated on a task-by-task basis and should include the cost of required insurance, bonds, and any other incidental administrative charges.
2.5 Erosion and Sediment Control
All work shall be done in accordance with Section 214 of the Harford County Code and the most Current Edition of the Maryland Standards and Specifications for Soil Erosion and Sediment Control. The Contractor’s cost for all sediment control items shall include maintenance for the length of the project.
Payment shall be on a one-time basis and shall include removal at the end of the project. Measurement and payment shall be on a per item basis as utilized for each project.
2.6 Daily Cleanup
The Contractor shall perform daily clean-up of all excess materials and removal all trash, materials, equipment, etc.
2.7 Performance, Payment and Maintenance Bonds
The Performance, Payment and Maintenance Bonds required for this contract will be set at the time of issuance of task order and will be dependent on the estimated cost of a task assignment.
3. EVALUATION AND SELECTION CRITERIA:
3.1 Evaluation Committee
The County has established an evaluation committee who will first review each technical proposal for compliance with requirements, and then score each technical proposal in accordance with the criteria that follows:
3.2 Evaluation Criteria
The technical proposal is scored on a pass / fail criteria. The cost proposal is scored on a ranking system, with the lowest price receiving the highest rank.
You must pass all technical categories for your cost proposal to be opened and reviewed. To receive a passing score, the Contractor must submit proof of experience as described in Section 3.3.
Harford County reserves the right to award all or part of the project based solely on the best interest of the County as determined by the Director of Procurement.
3.3 Technical Proposal
The technical proposal must be submitted in the format, as outlined below.
General Information and Introduction: Pass / Fail
Section 1: Provide a brief description of your company. What are your company’s areas of special expertise? Describe what sets your company apart. Describe your company’s structure including your working relationship and experiences working with your sub- Contractors (if applicable).
A transmittal or cover page identifying contact information should be included in Section 1.
Familiarity with Harford County, Maryland: Pass / Fail
Section 2: Describe your familiarity and experience working within Harford County, Maryland. What is your company’s level of experience with local storm drains and streams.
Make it clear if you are referring to your company’s experience or your sub-Contractors.
Prior work with Harford County Government will be considered in this section.
Expertise in Similar Work: Pass / Fail
Section 3: Provide descriptions of at least three (3) and not more than five (5) projects that best exemplify your company’s abilities under this contract for projects similar to those described in this RFP.
Provide a complete project narrative including general scope of work, job location, and/or photographs to illustrate the project.
Clearly identify the team members, applicable sub-Contractors and their roles associated with each project.
Provide current name, phone number and email address for at least one (1) reference for each project.
Qualifications / Experience of Project Team: Pass / Fail
Section 4: Provide resumes, certifications and licenses the Owner and key staff members, including Contract Manager, Construction Operations Manager and Field Supervisors that will be involved with assigned projects.
3.4 Cost Proposal:
The Committee will open and score only the cost proposals submitted by firms achieving a passing score from the Technical Proposal. A passing score of all four sections deemed “passed”.
The Committee will rank the cost proposals, with the lowest price receiving the highest rank.
All pricing must be submitted into the Bid Table located on the electronic portal. There must be an entry for all bid items. The County will not accept “no bid” for an item. If you do not provide pricing items for all items, your submission may be deemed non-responsive.
The quantities on the Bid Table are estimates and may be increased or decreased without any adjustment to the Contract unit price.
3.5 Basis of Award
The Committee will recommend to the Director of Procurement an award to the responsive, responsible Contractor, whose proposal is determined to be the most advantageous to the County, considering both the technical and cost scores, in accordance with Section 41-26 of the Harford County Procurement Code.
The Committee’s recommendation is subject to approval of the Harford County Board of Estimates.
The County reserved the right to award to multiple bidders based on the technical and cost proposals submitted, in order to allow for a multiple award if deemed to be in the County’s best interest to do so. There is no minimum guarantee in terms of the volume, scale or dollar amount of the work assigned to the Contractor(s)
GENERAL PROVISIONS
SPECIFICATIONS:
The Contract will be constructed under, but not limited to, provision of the following:
1. Maryland Department of Transportation State Highway Administration Standard Specifications for Construction and Materials dated July 2026 and subsequent addenda and the Harford County Road Code dated May, 2008 and revisions thereto as published by Harford County, Maryland and The Harford County Road Code should only be utilized for items not found in the Maryland State Highway Specifications.
2. All standard details, standard plats, or standards referred to shall be those by Harford County, Maryland and the Special Provisions, unless specifically noted otherwise, correct to the date of advertisement, or such standards as found elsewhere in the Proposal Form.
3. The Federal and State Water and Air Pollution Control Regulations.
4. OSHA, MOSHA - Federal and State Occupational Safety and Health Acts.
5. Applicable Permits
6. Manual of Uniform Traffic Control Devices (MUTCD).
7. Easement Agreements
DEFINITIONS:
1. County: Shall mean Harford County, Maryland.
2. Department: The word "Department" shall mean the Harford County Department of Public Works.
3. Engineer: The Director of the Harford County Department of Public Works or his authorized representative.
4. Inspector: The authorized representative of the Engineer assigned to make detailed inspection of any or all portions of the work.
5. Director: The word "Director" shall mean the Harford County Director of Public Works.
6. MDOT SHA: Shall mean the Maryland Department of Transportation State Highway Administration.
7. Specifications: Shall refer to all specifications described in Specifications, Item 2 of the General Provisions.
8. NFPA: Shall mean the National Fire Protection Association.
9. OSHA: Shall mean the Occupational Safety and Hazard Administration.
ATTACHMENT A
Attachement A-1
10. MOSHA: Shall mean the Maryland Occupational Safety and Hazard Administration.
11. CONTRACTOR: The authorized representative of the construction firm and/or company that was awarded the contract.
12. MUTCD: The Federal Highway Administration’s Manual of Uniform Traffic Control Devices, current edition.
NOTICE TO PROCEED:
Notice to Proceed will be given to the Contractor by the Director of Procurement. The Contractor shall begin work within ten (10) business days after receipt of such notice, or at an alternate date, with approval of the County. The Contractor may develop a schedule to phase the work to accommodate the stream closure period, or other reasons, with approval of the County.
However, phasing the work does not alter Time for Completion.
TIME FOR COMPLETION:
Time for Completion will be established during task order assignment.
WARRANTY OF WORK
Unless otherwise specified in the Contract Documents, the Contractor shall be responsible for warranting his work for a period of 1 year from the date of completion. The care and maintenance of the project limits shall begin immediately upon the completion of the project and shall continue in accordance with these specifications for a period of 1 year. The Contractor, at the request of Harford County, shall perform all work to repair and/or maintain l grading, structures, and vegetative stabilization in accordance with the applicable specification, and at no additional cost to Harford County.
LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC:
Shall be in accordance with Section 107 of the Harford County Road Code.
PROSECUTION AND PROGRESS:
Shall be in accordance with Section 108 of the Harford County Road Code, amended as follows:
LIQUATED DAMAGES:
For each working day that the contractor is in default in completing the work to be done under this contract, the contractor shall pay to the County liquidated damages which the County will suffer by reason of such default. The County shall be fully authorized and empowered to deduct and retain the amount of any damages, determined as monies due from the contractor under the contract at any time after such damages are incurred. Permitting the contractor to finish work, or any part of it, after the period of time of completion may have been extended, shall in no way waive the rights of the County under the contract. The amount of liquidated damages shall be $500.00 per working day.
Attachement A-2
Any Contractor who experiences a stop work order for a sediment control or grading violation may be charged the contractual specified amount of liquidated damage per day for every day of shutdown regardless of their status on the approved project schedule, whether the Contractor finishes on time, after, or prior to the scheduled completion date.
The Contractor may also be subject to fines and civil penalties in accordance with sections
214.21 and 214.22 of the Harford County Code.
PAYMENT:
Shall be in accordance with Section 109 of the Harford County Road Code.
COUNTY MAY INCREASE OR DECREASE QUANTITIES:
1. The Contractor will be paid for the actual quantity of authorized work done or material furnished under each item of the bid at the unit price stipulated for each item. The County reserves the right, without violation of the contract, to increase or decrease the quantities stated.
2. Except as noted in item 3 below, in case the quantity of any item is increased as above provided, the Contractor shall not be entitled to compensation over and above the unit price bid for such items: and in case the quantity of any item is decreased as above provided, the anticipated profits, because of such decrease.
3. If the actual quantity of a pay item is 25% above or below the estimated quantity stated in the Contract, an equitable adjustment in the Contract price shall be made upon demand of either party, as described in Section 104.03 of the Harford County Road Code, CONTINGENT ITEMS:
Construction items identified in these Special Provisions as being Contingent are provided in the Contract for use when and as directed by the Engineer. The quantities for these items shown in the "Invitation for Bids" booklet are established for the purpose of obtaining a bid price. The quantities for these Contingent Items may be increased or decreased without any adjustment to the Contract unit price bid or the Contingent Item(s) may be deleted entirely from the Contract by the Engineer without negotiation. The Contractor will not be allowed to submit a claim against Harford County for any adjustment to the Contract unit price bid should the Contingent Item(s) be increased, decreased or eliminated entirely.
EASEMENT AGREEMENTS:
Harford County Government will obtain all necessary easements to construct the project.
STREAM CLOSURE PERIOD:
Stream Closure Period is determined on a per-project basis.
Attachement A-3
BID ITEM SPECIFICATIONS
The items listed in this section refer to the items on which the proposer is submitting costs.
ITEM 1030: CLEARING AND GRUBBING
DESCRIPTION
This work shall consist of clearing and grubbing within the limits specified in the Contract Documents. All work to be performed under this item shall be in accordance with the requirements of Section 101 of the of the Maryland Department of Transportation, State Highway Administration’s Standard Specifications for Construction and Materials, with the following additions and/or modifications.
Clearing within the construction area includes removing and disposing of trees, shrubs and other vegetation within the limits of disturbance as is required for construction or as directed by the County. The Limit of Disturbance (LOD) shown on the plans is not the limit of clearing and grubbing. Only trees designated in the Contract Documents and those trees approved by Harford County and the Engineer may be removed.
No open burning will be permitted within the construction limits for this project.
The removal, and the stockpiling of any materials labeled for re–use, shall be incidental to the pay item for Clearing and Grubbing.
Grubbing within the construction area includes removing from the ground and disposing of all stumps, roots, stubs, brush, trash, rubble, and debris at locations off the project site.
CONSTRUCTION METHODS
Project Staging
To minimize the potential for erosion, sedimentation, and the degradation of water quality, clearing and grubbing will be conducted in stages. The area cleared and grubbed at any one time shall be limited to the area of active construction work.
Unless noted in the Sequence of Construction, no areas will be cleared and grubbed until the areas disturbed during the previous construction stage have been stabilized (i.e.
covered by fabric and/or seeded and mulched). The Engineer shall have ultimate authority in this determination.
Damaging or Destroying Vegetation Beyond the Limit of Disturbance
The Contractor shall not damage or destroy any trees, shrubs or turf, which exist beyond the limits of disturbance as illustrated on the Contract Documents and specified.
The Contractor shall be responsible for any and all damages to trees, shrubs, or turf located beyond the limits of disturbance that occurs from his operations during the life of the Contract. The Contractor shall fully restore, at his own expense, and to the satisfaction of the Engineer, any trees, shrubs, or turf that have been damaged or destroyed.
ATTACHMENT B
Attachment B-1
Salvaging and Stockpiling
The Contractor and Engineer shall meet onsite to determine availability of logs for use in the in-stream structures, bank protection, and/or log step pools. Logs determined to meet the specifications shall be salvaged and stockpiled for later use on-site, at no additional cost to the County.
Salvaged logs and rootwads which are deemed suitable for re-use as identified in the Contract Documents should be stored and elevated off the ground until use in construction.
Chipping
Describes chipping of cut trees within the limit of disturbance and spreading or placing on the site as directed by the Engineer. Chipping shall be accomplished by use of a chipping machine to a size acceptable to the Engineer. Material deemed by the Engineer unsuitable for chipping (too large, invasive species, etc.) shall be hauled offsite to an approved disposal location at no additional cost to the County.
Flush Cutting
Describes cutting trees flush with the ground. The stump is left in place to leave the surrounding soil and infrastructure undisturbed. Flush cutting shall be accomplished by removing the whole tree that is above ground and leaving the root system in place. The stump shall be treated with a systemic herbicide applied directly to the stump to prevent the stump from resprouting from the remaining plant material. The Contractor shall use a 25% herbicide solution in water that uses glyphosate (such as Round Up) or triclopyr (such as Remedy Ultra) for cut stump applications.
MEASUREMENT AND PAYMENT
Clearing and grubbing will be measured and paid for by the contract unit price per acre cleared and grubbed. The payment will be full compensation for the removal and disposal of all materials cleared and grubbed, and for all material, labor, equipment, tools, and incidentals necessary to complete the work. The chipping and spreading of chipped materials, removal of unsuitable material, stump treatment and the salvaging and stockpiling of logs shall be incidental to this item.
END OF SECTION
ITEM 1060: HIGH VISIBILITY SAFETY FENCE
DESCRIPTION
High visibility safety fence shall be installed as specified on the contract documents for use along and within areas of the Limits of Disturbance where trees, shrubs, and property are to be protected and as directed by the Engineer. Areas where high visibility safety fence is to be installed will be designated by flagging in the field.
MATERIALS
Attachment B-2
High Visibility Safety Fence - Fence shall be orange, red, or yellow colored heavy duty warning barrier fence, high density polyethylene diamond mesh with UV stabilizer and minimum 5,000 P.S.I. tensile strength with a mesh opening of 1½ inch.
Posts - Posts shall be a conventional metal “T” or “U” post.
Ties - Tension wire or rope and zip-ties (cable ties).
CONSTRUCTION METHODS
The Contractor shall erect the high visibility safety fence as designated on the Contract Documents and as directed by the Engineer prior to beginning construction.
Posts shall be spaced at a maximum of ten (10) feet. Zip-ties (cable ties), wrapped around a horizontal fence strand and post, are for securing the fencing to the post. Tension wire or rope may be used as a top stringer woven through the top row of strands to prevent potential sagging. Should construction sequencing allow, and with the approval of the Engineer, fencing from a completed section of the project site can be removed and reused on the site. The high-visibility safety fence and posts shall be removed at the end of the contract and with the approval of the Engineer. The fence and posts shall become the property of the Contractor at the completion of the project.
MEASUREMENT AND PAYMENT
High Visibility Safety Fence will be measured and paid for at the contract unit price per linear foot installed. The payment will be full compensation for furnishing, installation, maintenance, and removal of the fence as shown on the Contract Documents, including all materials, labor, equipment, tree protection area signage, tools and incidentals necessary to complete the work.
END OF SECTION
ITEM 2010: UNCLASSIFIED EXCAVATION
DESCRIPTION
This work consists of all labor, materials, equipment and services necessary for and incidental to the execution and completion of earthwork and grading, as indicated on the Contract Drawings and specified herein. Preparation of subgrade is part of this work. In general, except as otherwise noted herein and/or on the Contract Drawings, earthwork and grading shall be in accordance with Sections 201 through 211 of the Maryland Department of Transportation, State Highway Administration’s (MDSHA) Standard Specifications for Construction and Materials, latest edition and any addenda thereto, unless otherwise noted below. All references to measurement and payment in the MDSHA specifications shall be disregarded.
Excavation and/or grading undertaken in the general site limits that is intended to be permanent shall be classified under these pay items, including but not limited to grading in and along the existing stream channel and adjoining areas, floodplain, stream, and/or channel changes and grading for outfall stabilization. The depth or width of excavation shall not determine the excavation classification.
Attachment B-3
Immediately notify the County in the event unsuitable earth is encountered during earthwork or subsequent construction operations at or just below the final sub-grade elevation. Stop all work within the immediate vicinity of the unsuitable material. Do not remove any unsuitable material without obtaining written authorization and proper measurements from the County. Unsuitable material shall be removed from the site as soon as possible.
Demolition and/or removal of debris from the stream channel, including trees and debris jams, tires, concrete lining, broken up concrete and other materials as designated by the Engineer. The cost of demolition and/or removal of debris from the stream channel shall be incidental to the cost of Unclassified Excavation.
Unsuitable and excess materials removed in any excavation shall be removed from the project site and deposited in disposal sites with an approved sediment and erosion control permit.
Saturated material to be removed and disposed of shall be partially dewatered on site.
When exported, dewatered spoil material shall be transported in lined water-tight trucks and adequately covered or tarped. Sufficient freeboard shall be maintained. No additional payment shall be made for the transport of dewatered material in lined trucks. No payment shall be made for the portion of the weight that is in excess of the dry material weight, nor shall payment be made for any additional trucks or equipment required as a result of the Contractors election to export partially dewatered material.
Undercut and backfill for material installation shall be incidental to the various material items and shall not be included in the price bid.
Payment for earthwork associated with any work covered in clearing and grubbing will be incidental to the various material items and will not be included in the price bid. No payment will be made for temporary grading required for the installation of tree protection measures, sediment controls or site access. This work shall be incidental to the price bid for the various material items, construction stakeout, or mobilization.
The Contract quantity has been estimated based on survey and will serve as a basis for estimated payments. The total quantity shall be considered fixed, and the Contractor shall be paid the total quantity at completion of grading without recalculation of actual quantities. It shall be the Contractor’s sole responsibility to determine the effort necessary to achieve the grades shown and complete the job within the payment quantities. See Measure and Payment section.
It shall be the obligation of the Contractor to utilize all suitable materials from excavation in the construction of fills throughout the entire area of the Contract. No payment shall be made for the purchase or import of suitable materials which are required due to the premature removal of suitable material from the project site.
UTILITIES
Notify “Miss Utility” by calling 1-800-257-7777 at least forty-eight (48) hours prior to performing earthwork. Locate existing underground utilities in the areas of work. If utilities are to remain in place, provide adequate means of protection during earthwork
Attachment B-4 operations. The Contractor will be responsible for the repair of any damage to utilities shown on the plans or identified in the field.
Should piping or other utilities be encountered during excavation, consult the County immediately for directions as to procedures. Cooperate with the County and utility companies in keeping respective services and facilities in operation. Repair damaged utilities to satisfaction of County.
Do not interrupt existing utilities serving occupied facilities, except when permitted in writing by the County and acceptable temporary utility services have been provided.
CONSTRUCTION STANDARDS
Explosives: The use of explosives is prohibited unless approved by the County.
Safety: Provide protective measures necessary for the safety of the workers, public and adjacent property. Prevent cave-ins, collapse of walls, structures and slopes, both on and adjacent to the site.
Standards: Comply with regulations of local authorities having jurisdiction, including all applicable OSHA requirements.
Repair: Includes the removal of damaged materials and replacement with new materials (as required by these specifications) where such materials are affected by settlement or other damage caused by improper earthwork.
MATERIALS
The County will not furnish any materials other than those materials which are available within the excavation limits of the project site as designated on the Contract Drawings by sections, grade lines and/or contour lines.
Suitable material is any material meeting the quality requirements specified in the Contract Documents which is not frozen and which has a suitable moisture content.
Unsuitable material is any material not meeting all the requirements for suitable material.
Suitable material for fills or backfills shall be from on-site excavations (if of proper quality) or from borrow sources.
All fill and/or backfill material shall be free from vegetative matter, organics, frozen material, waste metal products, unsightly debris, toxic material, or other deleterious materials. The material shall not contain mica in quantities, which, in the judgment of the Engineer are sufficient to affect compaction characteristics.
Fill that is referred to on the Plans as “Suitable Fill” shall be from on-site excavations (if of property quality) and shall be a minimum of 80 pounds per cubic foot for the maximum dry density according to AASHTO T-180, Method C. or to the satisfaction of the Engineer.
MATERIAL STORAGE
Stockpile excavated material suitable for backfill or fill as indicated on Contract Drawings, until required. Place, grade, and shape stockpiles for proper drainage. Stockpile locations
Attachment B-5 are indicated on the Contract Drawings, though temporary stockpiling of material may be permitted anywhere within the LOD with approval of the Sediment Control Inspector and Engineer.
Locate and retain soil materials away from edge of excavations.
Topsoil shall be salvaged from within grading limits and stockpiled for use as specified in the Contract Documents or as directed by the Engineer.
Dispose of excess and/or unsatisfactory waste materials as specified herein.
Do not stockpile excavated or borrow material within the roadway limits, adjacent to water bodies, adjacent to open excavations or pits or within the 100-year floodplain, unless approved by the Engineer. Drainage will be directed to an approved erosion and sediment control device.
USE OF EXCAVATED MATERIAL
With the approval of the County, use any excavated native stone, gravel, sand or other material including but not limited to riprap and streambed material that conforms to the requirements of the Contract Documents. All other excavated material shall be disposed of at an approved location.
Do not excavate or remove any material that is not within the limits of excavation, as indicated by the slope and grade lines on the Contract Drawings, without written authorization from the County.
SUBMITTALS
The County will visually inspect the proposed fill material. The County may request the Contractor to obtain samples of proposed fill materials, including onsite material to be used under proposed rock structures, and perform all required testing to determine that fill materials are in conformance with the Contract Documents. The Contractor shall submit test results to the County for review and approval prior to installation.
CONSTRUCTION
All earth slopes shall be finished in accordance with the contours, elevation, or to the lines on the Contract Drawings. The work shall be done in proper sequence with other operations involved.
Slopes excavated or constructed for the convenience of the Contractor, such as for haul roads or temporary drains, shall meet the design slope on the Contract Drawings for that area. Exceptions will require approval of the Engineer prior to construction of the slope.
No payment will be made for temporary slope construction.
Berm ditches, when required, shall be constructed before or at the time cuts are started.
The widening of cut or excavation sections beyond the limits shown on the Contract Drawings is prohibited in all instances except when required to remove unsuitable material by written order of the Engineer. When so ordered by the Engineer, the
Attachment B-6 procurement of additional suitable materials, including those for embankments, shall be done in accordance with the following provisions.
The widening of cuts or excavation sections shall be finished so that completed flat and slope areas shall be uniform in appearance; the slopes shall be no steeper than the cut slopes indicated on the Contract Drawings and shall be in accordance with the line and slope directed by the Engineer.
Uniformly grade areas within limits of grading under this section, including adjacent transition areas. Smooth finish surface within specified tolerances, with uniform levels or slopes between points where elevation is shown, or between such points and existing grades.
Fine grading around existing trees to remain is to be performed under the supervision of an LTE using small equipment or by hand grading only.
The backfilling around trees to be saved as shown on the Contract Drawings shall be…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .