1-26P-005 Cell 9 and Phase II Closure Final Documents and Specifications.pdf

PDF 25 MB Posted

Attached to
Cell 9 and Phase II Closure
Solicitation number
US.263201
Issued by
Pennsylvania

About this file

Cell 9 and Phase II Closure Final Documents and Specifications

This document constitutes the final specifications and technical requirements for the Cell 9 and Phase II Closure project in Pennsylvania. The project encompasses the construction of comprehensive landfill closure infrastructure, including stormwater management facilities, excavation and fill operations, waste relocation activities, sliver filling with pre-compacted waste, access road construction, bottom liner installation, landfill cap systems, leachate collection systems, gas line installation, material stockpiling and hauling, fencing, landscaping, and all associated incidental work as detailed in the project plans. The scope also includes a separate electrical bid component requiring all labor, materials, tools, supervision, transportation, and equipment necessary to complete electrical installations in accordance with the project plans and specifications.

The specifications document establishes the technical standards, construction methodologies, material requirements, and performance criteria that bidders must adhere to when submitting proposals for both the general construction work and electrical components of the closure project. These final documents serve as the binding reference for all contractors and subcontractors involved in the project execution and define the contractual obligations, quality standards, and deliverables required for successful project completion.

View the file

Other files

File Type Posted
2-2026-11-23 GLRA Cell 9-Phase 2 Cap Plans v1.0.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .