This is an architectural plans document prepared by DesignArc Group, LLC for the City of Sioux Falls, South Dakota, related to a painting project at the Denny Sanford Premier Center. The project involves painting and coating work on three primary areas: the generator housing, ice pit, and mechanical yard enclosure structures located at 1201 N West Avenue, Sioux Falls, South Dakota. The scope of work includes removing existing paint and coatings using dry-ice blasting and selective mechanical means, surface preparation and cleaning, application of new high-performance paint and urethane coatings, modification of swing gates with new hardware and louvered panels, and comprehensive plumbing work including temporary disconnection and reconnection of ice-melting coils and associated piping systems. The project is estimated at $85,432 and will be funded through the city's operating budget. A pre-bid meeting will be held at the site, with all contractors required to field-verify dimensions and existing conditions prior to fabrication and material ordering.
The plans include detailed specifications for material specifications, including high-performance coatings per specification section 099600, galvanized or stainless steel hardware, aluminum components for gate frames and louvers, and all necessary surface treatments compatible with prepared substrates. Contractors are required to temporarily disconnect and remove ice-melting coils and plumbing piping, drain the existing brine solution (approximately 500 to 600 gallons), provide new calcium chloride brine solution meeting industry standards, perform pressure testing of welds, and obtain owner sign-off on brine solution concentration and pH levels before refilling. The contractor must document existing conditions by camera prior to commencing work, protect all materials and equipment on site, manage debris through a designated chute with orange construction fencing, and return as-built drawings to the architect. The project specifies coordination with the existing frame and hinge conditions, verification of proper gate operation and alignment, and compliance with manufacturer specifications for all coating and hardware installations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-26-1093 SPECS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTACTS INDEX:
OWNER:
CITY OF SIOUX FALLS
ENGINEERING PROJECT MANAGER
CONTACT: REBECCA KOLLARS
231 NORTH DAKOTA AVENUE,
SIOUX FALLS, SD, 57104
PH: (605) 367-8698
rebecca.kollars@siouxfalls.gov
ARCHITECT OF RECORD:
DESIGNARC GROUP, LLC
ARCHITECT: MATTHEW WEISS
PROJECT MGR.: HERMELA ABOYE
2300 W. RUSSELL ST., SUITE 5
SIOUX FALLS, SD 57006
PH: (605) 525-8863
hermela@designarcgroup.com
SHEET INDEX:
I-2
I-90
RAPID CITY
SPEARFISH
I-90
PIERRE
SIOUX FALLS
BROOKINGS
ABERDEEN
WATERTOWN
I-2
MADISON
SOUTH DAKOTA LOCATION MAP
MITCHELL
I-29
I-29
I-90I-90
DENNY SANFORD
PREMIER CENTER
SIOUX FALLS
CONVENTION CENTER
SIOUX FALLS
ARENA N
W A
VE
SIOUX FALLS
STADIUM
THE DEN
SIOUX FALLS
SCHOOL DISTRICT
CENTRAL SERVICES
N WESTERN AVE
HOWARD WOOD FIELD
W. RUSSELL ST.
MECH. YARD ICE MELT PIT
D
AT
E
PR
IN
TE
D
S H
E E
T N
A M
E
PROJECT NO.
PROJECT MANAGER:
DATE:
SHEET:
STAMP:
R E
V
IS
IO
N
S
F U
L L -S
C A
L E x
H A
L F
-S C
A L E x
D R
A W
IN
G
M A
Y N
O T
B E
P
R
IN
T E
D T
O S
C A
L E
ARCHITECTURE & ENGINEERING
Located in Sioux Falls, Brookings & Mitchell South Dakota designarcgroup.com 605.525.9100
5/
/2
8:
:0
AM
IN
D
EX
P R
O
JE
C T
IN
FO
R M
A
TI
O N
T1.1
DA26-012
HERMELA ABOYE
04.17.2026
DENNY SANFORD PREMIER CENTER PAINTING - GENERATOR HOUSING, ICE PIT &
MECHANICAL YARD
1201 N WEST AVE, SIOUX FALLS, SD 57104 l BID REQUEST NUMBER: 26-1093 | OPERATING BUDGET
DENNY SANFORD PREMIER
CENTER PAINTING -
GENERATOR HOUSING, ICE
PIT & MECHANICAL YARD
SIOUX FALLS, SD
SF26-1093
100% CD'S
T1.1 INDEX & PROJECT INFORMATION
A1.1 MECHANICAL YARD
A1.2 ICE PIT
GENERAL NOTES - ARCH. SITE PLAN
A.
B.
C.
D.
E.
F.
ANY DAMAGE TO THE EXISTING WALKS, EQUIPMENT, OR EXISTING
LAWN SURFACE OR SPRINKLER WILL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO CORRECT PRIOR TO COMPLETION OF THE
PROJECT. IT IS RECOMMENDED THAT THE CONTRACTOR
DOCUMENT ANY CONCERNING CONDITIONS BY CAMERA PRIOR TO
COMMENCING WITH WORK.
A PRE-BID MEETING WILL BE HELD AT THE SITE. SEE INVITATION
TO BID FOR SPECIFICATIONS.
ALL MATERIALS REMOVED FROM THE PROJECT SITE SHALL BE
CONTAINED IN A DEBRIS CHUTE. ANY MARKS TO THE BUILDING
FACE FROM CONSTRUCTION MUST BE REMOVED AT PROJECT
COMPLETION. ANY DAMAGE TO WINDOWS OR BUILDING FACE
WILL BE REPAIRED AT CONTRACTOR EXPENSE.
CONTRACTOR SHALL SECURE ALL BUILDING MATERIALS AND
EQUIPMENT ON SITE. THE STADIUM WILL NOT BE RESPONSIBLE
FOR ANY STOLEN ITEMS.
CONTRACTOR TO RECORD ALL DEVIATIONS MADE DURING
CONSTRUCTION FROM THE ORIGINAL DOCUMENTS AND RETURN
TO ARCHITECT FOR AS-BUILT DRAWINGS.
SEE SPECIFICATIONS DIVISION 01 FOR DESCRIPTION OF
ADDITIONAL REQUIREMENTS.
KEYNOTES - ARCH. SITE PLAN
1.
2.
3.
4.
5.
DESIGNATED MATERIAL STORAGE/STAGING AREA FOR THIS
PROJECT. THIS AREA MUST BE PROTECTED BY STANDARD
ORANGE CONSTRUCTION FENCING. DO NOT BLOCK ANY DOORS
OR LOADING AREAS. NOTE ANY DISTURBED AREAS WILL NEED TO
BE RETURNED TO PRECONDITIONS.
NEARBY STREETS, GRAVEL DRIVES, AND THE STADIUM ENTRY
SHALL REMAIN OPEN AT ALL TIMES FOR USE BY OWNER. NO
PARKING SHALL BE ALLOWED IN THIS AREA. PARKING FOR THIS
PROJECT WILL BE PERMITTED IN THE LOT LOCATED BESIDE AND
BEHIND THE BUILDING.
DESIGNATED DUMPSTER LOCATION.
DESIGNATED SALVAGED MATERIAL STORAGE AREA FOR THIS
PROJECT. THIS AREA MUST BE PROTECTED BY STANDARD
ORANGE CONSTRUCTION FENCING. DO NOT BLOCK ANY DOORS
OR LOADING AREAS. NOTE ANY DISTURBED AREAS WILL NEED TO
BE RETURNED TO PRECONDITIONS.
ACCESS POINT TO WORK AREAS FOR CONTRACTORS.
-NOT TO SCALE-1 AREA MAP
-NOT TO SCALE-2 DENNY SANFORD PREMIER CENTER SITE MAP
PUBLIC WORKS - DIVISION OF ENGINEERING
CITY CENTER
231 NORTH DAKOTA AVENUE
SIOUX FALLS, SD 57104
APPROVED
CITY ENGINEER DATE
THE CITY OF SIOUX FALLS
N O
D
ES
C
R
IP
TI
O
N
D
AT
E:
5/21/26
N . W
ES
TE
R N
A
VE
DENNY SANFORD
PREMIER CENTER
SF
CONVENTION
CENTER
N
FIELD VERIFY
21' - 8"
FI
EL
D
VE
RI
FY
8"
GENERATOR
ENCLOSURE
FI
EL
D
VE
RI
FY
' H
4' - 0"
2.57 2.5
2.5
2.5
2.57
2.5
FIELD VERIFY
123' - 4" (12' H)
FIELD VERIFY
2' - 4" (12' H)
SIM.
OTHER
SIDE
2.5
2.5 82.58
2.59 2.59 2.59
5.12 5.12 5.12
8.72 8.72 8.72
9.70
9.70
9.7
9.7
9.7
9.7
9.7
9.70 9.7
8.17 9.70
2.59 8.72
2.59 8.72
2.58 9.70
2.58
2.58
2.58 9.70
9.70
9.70
2.58 9.70
2.58
2.58
9.70
9.70
2.57 9.70
8.17 9.70
2.58 9.70
3" X 3" X 1/4" ALUMINUM
SQUARE TUBE GATE
FRAME
6063-T52
∅3/16" CABLE
TRUSSING
AS REQUIRED
EXTRUDED ALUMINUM
LOUVERS, TYP.
6061-T52
1/4" X 1" ALUMINUM
FLAT BAR RIB
6061-T6
PLAN VIEW
GATE ELEVATION
CL
O
F G
AT
E
LA
TC
H
HA
ND
LE
FIELD VERIFY
4' - 0"
FI
EL
D
VE
RI
FY
0"
3'
- 6
7'
- 0
EXISTING POST. FIELD VERIFY
BOLTED CONNECTION; GORILLA HINGE 3000
PANEL ELEVATION
9.70
9.70
8.18
D
AT
E
PR
IN
TE
D
S H
E E
T N
A M
E
PROJECT NO.
PROJECT MANAGER:
DATE:
SHEET:
STAMP:
R E
V
IS
IO
N
S
F U
L L -S
C A
L E x
H A
L F
-S C
A L E x
D R
A W
IN
G
M A
Y N
O T
IN
T E
D T
O S
C A
L E
ARCHITECTURE & ENGINEERING
Located in Sioux Falls, Brookings & Mitchell South Dakota designarcgroup.com 605.525.9100
5/
/2
8:
:2
AM
M
EC
H A
N
IC
A L
YA
R
D
A1.1
DA26-012
HERMELA ABOYE
04.17.2026
DENNY SANFORD PREMIER
CENTER PAINTING -
GENERATOR HOUSING, ICE
PIT & MECHANICAL YARD
SIOUX FALLS, SD
SF26-1093
100% CD'S
KEYNOTES
2.57 REMOVE EXISTING PAINT FROM EXTERIOR STEEL FENCE USING DRY-ICE
BLASTING. CLEAN ALL SURFACES TO REMOVE LOOSE COATINGS, DIRT,
OIL, AND CONTAMINANTS WITHOUT DAMAGING BASE METAL.
2.58 SELECTIVELY REMOVE EXISTING PAINT FROM GENERATOR HOUSING.
LIMIT REMOVAL TO DETERIORATED OR DAMAGED AREAS ONLY. CLEAN
SURFACES OF RUST, DIRT, OIL, AND OTHER CONTAMINANTS WITHOUT
DAMAGING SUBSTRATE OR EQUIPMENT. PROTECT ALL OPENINGS,
CONTROLS, AND SENSITIVE COMPONENTS FROM DEBRIS AND MOISTURE
DURING WORK.
2.59 REMOVE ALL EXISTING WELDED CONNECTIONS AT SWING GATES,
INCLUDING FAILED OR DETERIORATED WELDS. GRIND SURFACES
SMOOTH AND REMOVE ALL WELD RESIDUE, RUST, AND CONTAMINANTS
WITHOUT DAMAGING BASE METAL.
5.12 REMOVE EXISTING HORIZONTAL BRACING AT SWING GATES AND WELD
CONNECTIONS W/O DAMAGING REMAINING FRAME MEMBERS. PROVIDE
A NEW REMOVABLE HORIZONTAL STRUT MEMBER AT EACH SWING GATE,
EXTENDING B/N GATE LEAF AND ADJ POST OR B/N POSTS AS REQ'D FOR
STABILITY. STRUT SHALL BE ADEQUATELY SIZED TO RESIST
ANTICIPATED LOADS & LIMIT DEFLECTION. ATTACH STRUT TO POSTS
USING BOLTED CONNECTIONS W/GALV OR SS HARDWARE. PROVIDE
QUICK-RELEASE BALL-LOCK PINS OR APPROVED EQUAL AT CONNECTION
POINTS TO ALLOW FOR TOOL-FREE REMOVAL WHILE MAINTAINING A
SECURE AND RIGID CONNECTION DURING NORMAL OPERATION.
COORDINATE W/EXISTING FRAME AND HINGE CONDITIONS. VERIFY
PROPER GATE OPERATION, CLEARANCES, AND ALIGNMENT UPON
COMPLETION.
8.17 REMOVE EXISTING LOUVERED FENCE PANEL & PROVIDE NEW SINGLE
SWING GATE WITH FIXED LOUVERED PANEL ABOVE WHERE INDICATED.
MODIFY OPENING & REFRAME AS REQ'D TO ACCOMMODATE NEW GATE
AND PANEL WHILE MAINTAINING OVERALL STRUCTURAL INTEGRITY AND
ALIGNMENT WITH ADJACENT FENCE SYSTEM. PROVIDE NEW STEEL GATE
FRAME, HARDWARE, AND REQ'D REINFORCEMENT MEMBERS. PROVIDE
NEW LOUVERED PANEL ABOVE GATE, MATCHING EXISTING IN MATERIAL,
PROFILE, & ALIGNMENT. ENSURE GATE OPENS & CLOSES FREELY AND IS
PROPERLY ALIGNED W/ADJACENT PANELS. COORDINATE W/EXISTING
SUPPORT POSTS, FRAMING, & GATE SYSTEM.
8.18 PROVIDE GATE HARDWARE INCLUDING HINGES, LATCHES, AND ALL
NECESSARY ACCESSORIES. GATE SHALL BE OPERABLE FOR BOTH
INGRESS AND EGRESS, WITH A THUMB TURN ON THE INTERIOR FOR
FREE EGRESS AND A KEYED LOCK ON THE EXTERIOR FOR CONTROLLED
ACCESS. LOCKING CYLINDER SHALL BE SARGENT LA KEYWAY,
PROVIDED BLANK, WITH FINAL KEYING TO BE SET BY OWNER.
8.72 PROVIDE NEW GORILLA HINGE 3000 BOLTED CONNECTIONS AT ALL
SWING GATE LOCATIONS, INCLUDING DRILLING OR FIELD-PUNCHING AS
REQUIRED. INSTALL GALV OR SS FASTENERS OF ADEQUATE SIZE AND
CAPACITY AND PER MANUFACTURER. ALIGN MEMBERS TRUE AND PLUMB
PRIOR TO FASTENING.
9.70 APPLY NEW HIGH PERFORMANCE PAINT PER SPEC SECTION 099600;
HIGH-PERFORMACE COATINGS.
1" = 100'-0"
KEY PLAN
GENERAL NOTES - EXIST. CONDITIONS
A.
B.
EXISTING FEATURES TO REMAIN SHALL BE PROTECTED FROM
DAMAGE DURING CONSTRUCTION. ANY FEATURES REQUIRING
TEMPORARY REMOVAL AND REINSTALL SHALL BE APPROVED IN
ADVANCE BY OWNER FOR INTENDED STORAGE LOCATION. ANY
DAMAGE TO EXISTING FEATURES BY CONTRACTOR SHALL BE
REPLACED BY CONTRACTOR AT NO COST TO THE OWNER.
ALL DIMENSIONS INDICATED ARE PROVIDED FOR BID PRICING
PURPOSES ONLY AND SHALL BE FIELD VERIFIED BY THE GENERAL
CONTRACTOR PRIOR TO FABRICATION AND MATERIAL ORDERING.
THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
CONFIRMING ALL EXISTING CONDITIONS AND DIMENSIONS IN THE
FIELD. ANY DISCREPANCIES SHALL BE REPORTED TO THE DESIGN
TEAM PRIOR TO PROCEEDING WITH WORK.
1/8" = 1'-0"1 FLOOR PLAN - MECHANICAL YARD
1" = 50'-0"2 GATE ATTACHMENT (TYP.) - A
1" = 50'-0"3 GATE ATTACHMENT (TYP.) - B
1" = 50'-0"4 GENERATOR HOUSING - E
1" = 50'-0"7 GENERATOR HOUSING - NW
1" = 50'-0"8 GENERATOR HOUSING - SW
1" = 50'-0"9 GENERATOR HOUSING - W
1" = 50'-0"5 MECH YARD ENCLOSURE
1" = 50'-0"6 MECH YARD ENCLOSURE GATE
1" = 50'-0"10 TOP OF GENERATOR HOUSING
3/8" = 1'-0"11 HORIZONTAL LOUVER BLADE SWING GATE
N O
D
ES
C
R
IP
TI
O
N
D
AT
N . W
ES
TE
R N
A
VE
DENNY SANFORD
PREMIER CENTER
SF
CONVENTION
CENTER
N
A1.2
Sim
2.63
2.63
2.6
2"
FIELD VERIFY
5' - 8" (3' 6"H)
2.66 7.0
7.01
7.01
7.01
7.01
7.01
2.63
2.63
2.63
8"
8" 4
2.63
2.63
2.63
2.63
8'
- 0
2.64
3'
- 6
5' - 8"
2.66
NEW
EXISTING
4'
- 9
8"
5' - 0"
7.01
7.01
7.01
7.012.63 7.01
2.65
7.01 7.0
3 3 /4"
2.63
2.63
2.64
7.01
7.01
7.0
7.01
2.632.64
2.65
7.01
7.01
7.01
7.01
2.67
2.66
2.64
7.01
7.01
7.0 12.6
2.67
D
AT
E
PR
IN
TE
D
S H
E E
T N
A M
E
PROJECT NO.
PROJECT MANAGER:
DATE:
SHEET:
STAMP:
R E
V
IS
IO
N
S
F U
L L -S
C A
L E x
H A
L F
-S C
A L E x
D R
A W
IN
G
M A
Y N
O T
IN
T E
D T
O S
C A
L E
ARCHITECTURE & ENGINEERING
Located in Sioux Falls, Brookings & Mitchell South Dakota designarcgroup.com 605.525.9100
5/
/2
8:
:3
AM
IC
E
PI
T
A1.2
DA26-012
HERMELA ABOYE
04.17.2026
DENNY SANFORD PREMIER
CENTER PAINTING -
GENERATOR HOUSING, ICE
PIT & MECHANICAL YARD
SIOUX FALLS, SD
SF26-1093
100% CD'S
KEYNOTES
2.63 REMOVE EXISTING URETHANE COATING AT ALL INDICATED SURFACES
BY ABRASIVE BLASTING AND/OR MECHANICAL MEANS. DRY ICE
BLASTING MAY BE USED FOR CLEANING ONLY AND SHALL NOT BE
RELIED UPON AS THE PRIMARY COATING REMOVAL METHOD.
2.64 EXISTING EXTENTS OF WATERPROOFING COATING ARE SHOWN FOR
REFERENCE, FEILD VERIFY. REMOVE EXISTING COATING AND EXTEND
REMOVAL TO LIMITS INDICATED OR AS REQUIRED TO ACHIEVE SOUND,
WELL-ADHERED SUBSTRATE.
2.65 REMOVE EXISTING WATERROOFING COATING FROM STEEL GATE.
PREPARE SURFACE BY DRY-ICE BLASTING AND SELECTIVE MECHANICAL
MEANS TO REMOVE ALL LOOSE OR DETERIORATED COATING, RUST, AND
CONTAMINANTS AND TO ACHIEVE A SUITABLE SURFACE PROFILE FOR
RECOATING. CLEAN AND PRIME AS REQUIRED IN ACCORDANCE WITH
COATING SYSTEM MANUFACTURER’S WRITTEN INSTRUCTIONS.
2.66 TEMPORARILY DISCONNECT AND REMOVE ICE-MELTING COILS AND
ASSOCIATED COMPONENTS PRIOR TO SURFACE PREPARATION AND
COATING APPLICATION. PROTECT ALL PIPING, CONTROLS, AND DRAINS
DURING WORK. REINSTALL AND RECONNECT SYSTEMS AFTER COATING
APPLICATION IS COMPLETE, AND VERIFY PROPER OPERATION.
2.67 TEMPORARILY DISCONNECT AND REMOVE PLUMBING PIPES AS
REQUIRED TO ALLOW COATING OF SURFACES BEHIND. PROTECT
COMPONENTS DURING WORK. REINSTALL AND RECONNECT AFTER
COATING APPLICATION IS COMPLETE.
7.01 APPLY NEW HIGH-PERFORMANCE, FLUID-APPLIED URETHANE COATING
SYSTEM TO AREAS INDICATED IN ACCORDANCE WITH PROJECT
SPECIFICATIONS AND MANUFACTURER’S WRITTEN INSTRUCTIONS.
COATING SYSTEM SHALL BE SUITABLE FOR INTENDED EXPOSURE
CONDITIONS AND COMPATIBLE WITH PREPARED SUBSTRATES. BASIS OF
DESIGN: PRODUCTS BY SIKA CORPORATION; SUBSTITUTIONS SUBJECT
TO ARCHITECT APPROVAL. SEE SPEC SECTION 071416.
GENERAL NOTES - EXIST. CONDITIONS
A.
B.
EXISTING FEATURES TO REMAIN SHALL BE PROTECTED FROM
DAMAGE DURING CONSTRUCTION. ANY FEATURES REQUIRING
TEMPORARY REMOVAL AND REINSTALL SHALL BE APPROVED IN
ADVANCE BY OWNER FOR INTENDED STORAGE LOCATION. ANY
DAMAGE TO EXISTING FEATURES BY CONTRACTOR SHALL BE
REPLACED BY CONTRACTOR AT NO COST TO THE OWNER.
ALL DIMENSIONS INDICATED ARE PROVIDED FOR BID PRICING
PURPOSES ONLY AND SHALL BE FIELD VERIFIED BY THE GENERAL
CONTRACTOR PRIOR TO FABRICATION AND MATERIAL ORDERING.
THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
CONFIRMING ALL EXISTING CONDITIONS AND DIMENSIONS IN THE
FIELD. ANY DISCREPANCIES SHALL BE REPORTED TO THE DESIGN
TEAM PRIOR TO PROCEEDING WITH WORK.
1" = 100'-0"
KEY PLAN
1/4" = 1'-0"1 FLOOR PLAN - ICE PIT
3/8" = 1'-0"2 ICE MELT PIT SECTION
1" = 50'-0"3 ICE MELTING PIT - A
1" = 50'-0"4 ICE MELTING PIT - B
1" = 50'-0"5 ICE MELTING PIT - C
1.
2.
3.
4.
ICE PIT MELT PIPING REMOVAL/RE-INSTALLATION SCOPE OF WORK
GENERAL CONTRACTOR TO RETAIN A QUALIFIED PLUMBER CAPABLE OF:
GENERAL CONTRACTOR TO RETAIN A QUALIFIED PLUMBER CAPABLE OF DRAINING THE
ENTIRE ICE MELT BRINE SYSTEM, INCLUDING ALL ASSOCIATED PIPING AND COMPONENTS
REQUIRED TO COMPLETE THIS WORK. IT IS ANTICIPATED THAT THE SYSTEM CONTAINS
APPROXIMATELY 500 TO 600 GALLONS OF BRINE SOLUTION. THE EXISTING BRINE
SOLUTION SHALL NOT BE REUSED. CONTRACTOR SHALL PROVIDE NEW BRINE SOLUTION
FOR COMPLETE SYSTEM REFILL AFTER WORK IS COMPLETE.
** PLUMBER IS RESPONSIBLE FOR DISPOSAL OF THE EXISTING BRINE SOLUTION IN
ACCORDANCE WITH ALL LOCAL CODES AND REQUIREMENTS.
DISCONNECT THE PIPING WITHIN THE ICE MELT PIT FOR FUTURE RE-CONNECTION AFTER
THE NEW SURFACE TREATMENT HAS BEEN APPLIED AND CURED.
** NOTE THAT THE REPAIR SHOULD NOT CAUSE A LEAK AT THE PIPE PENETRATIONS
THROUGH THE FLOOR OF THE ICE MELT PIT. THE PIPING SHOULD BE SEALED SO THAT
CONSTRUCTION WASTE, OR SURFACE TREATMENT MATERIAL DOES NOT ENTER THE
PIPING SYSTEM.
RECONNECT THE ICE MELT PIT PIPING USING A CERTIFIED WELDER AND PERFORM A
PRESSURE TEST TO CONFIRM THAT WELDING OF THE PIPE HAS FULLY SEALED THE PIPE
CUTS AND REPAIRS.
IN THE EVENT THAT ELECTRO-FUSION PIPING IS CUT OR DAMAGED DURING THE
PROCESS, MATCHING ELECTRO-FUSION COUPLERS WILL NEED TO BE PROVIDED AND
INSTALLED AS PART OF THE REPAIR. THE CONTRACTOR IS RESPONSIBLE TO ACCOUNT
FOR THE FITTINGS AND PARTS REQUIRED, THE TIME AND LABOR NECESSARY FOR THE
REPAIR, AND A WARRANTY OF THE FINAL REPAIR.
THE ICE MELT PIPING IS SHOWN IN VIEW #5/SHEET A1.2. IT IS EXPECTED THAT THIS WILL
REQUIRE CUTTING OF PIPING TO EXPOSE ICE PIT SURFACE BELOW THE PIPE SO NEW
SURFACE TREATMENT CAN BE APPLIED WITHOUT OBSTRUCTION. RETAIN PIPE SECTIONS
REMOVED FOR RE-INSTALLATION LATER.
PLUMBER WILL BE REQUIRED TO MIX NEW BRINE SOLUTION (CALCIUM CHLORIDE SOLUTION)
TO REPLACE VOLUME DRAINED AS PART OF PERFORMING THIS SCOPE OF WORK. THE
NEWLY MIXED SOLUTION MUST MEET INDUSTRY STANDARDS/REQUIREMENTS AND MATCH
THE STRENGTH AND ph OF THE EXISTING BRINE SOLUTION. OWNERS REPRESENTATIVE TO BE PRESENT AND SIGN OFF ON NEW BRINE MIXTURE CONCENTRATION AND ph BEFORE THE
REFILL PROCESS OCCURS. DO NOT REFILL BRINE SOLUTION WITHOUT SIGN OFF BY OWNERS
REPRESENTATIVE.
REFILLING OF THE BRINE SOLUTION WILL REQUIRE BLEEDING THE SYSTEM OF AIR AND WILL
REQUIRE MONITORING OF THE SYSTEM TO ENSURE THAT AIR LEAVING THE SYSTEM IS FULLY
REMOVED AND SUFFICIENT BRINE SOLUTION IS PROVIDED TO FULLY FILL THE SYSTEM.
PLUMBING CONTRACTOR IS RESPONSIBLE TO PROVIDE THE NEW CALCIUM CHLORIDE, THE
PROPER WATER TO BE USED FOR THE MIX, AND PROVIDE ALL NECESSARY TESTING
SUPPLIES TO ENSURE THAT SOLUTION CONCENTRATION/STRENGTH AND ph LEVELS AND
ACHIEVED AND ARE STABLE.
PLUMBING CONTRACTOR TO PROVIDE AS PART OF THE SUBMITTAL THE QUALIFICATIONS AND
CERTIFICATES FOR THE WELDER WHO WILL BE PERFORMING ALL WELDS ON SITE AND
INCLUDE A DESCRIPTION OF HOW THE WORK WILL BE PERFORMED SO AS NOT TO DAMAGE
THE NEW SURFACE TREATMENTS FOR THE ICE MELT PIT. ALSO IDENTIFY THE WELDING
METHOD PROPOSED FOR RECONNECTING THE PIPING AND THE RECOMMENDED PIPE AND
PIPE WELD SURFACE TREATMENTS FOR PREVENTING CORROSION AND PREMATURE FAILURE
OF THE REPAIR.
N O
D
ES
C
R
IP
TI
O
N
D
AT
| T1.1 - INDEX & PROJECT INFORMATION |
| A1.1 - MECHANICAL YARD |
| A1.2 - ICE PIT |
File details come from the government source that posted it. Updated .