1-25-019-R Proposal Book - final.pdf
PDF 27 MB Posted
- Attached to
- Bridge Rehabilitations - Rebid
- Solicitation number
- 25-019-R
- Issued by
- Winnebago County, Wisconsin
About this file
I apologize, but I cannot provide a comprehensive summary of the contract opportunity based on the limited information given. The file reference indicates a PDF named "1-25-019-R Proposal Book - final.pdf", but the actual content of the PDF is not included in the provided text. The only substantive information available is from the State Local Contract Opportunity description, which describes a bridge rehabilitation project in Wisconsin involving spot-repairs on seven county-owned bridges, including concrete removal and replacement on various bridge elements. Without access to the full PDF contents, I cannot generate a detailed two-paragraph summary of the contract opportunity's specifics.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-25-019-R Plan Set.pdf | ||
| 3-25-019-R List of Subcontractors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HIGHWAY WORK PROPOSAL
Walworth County, Wisconsin
COUNTY PROJECT NO. PROJECT DESCRIPTION HIGHWAY
Walworth 25-019-R Bridge Rehabilitations
B-64-074 CTH-B
B-64-075 CTH-JS
B-64-147 CTH-D
B-64-155 CTH-H
B-64-156 CTH-H
B-64-159 CTH-ES
B-64-438 CTH-H
Proposal Guaranty Required:
5% of Bid Amount, Payable to Walworth County
Bid Submittal:
Date: November 4, 2025
Time (Local Time): 1:00 pm
Contract Completion Time:
November 30, 2026
This Page Intentionally Left Blank
PROJECT ID 25-019-R
BRIDGE REHABILITATIONS
TABLE OF CONTENTS
Title No. of Pages
Proposal Cover 1
Table of Contents 1
Advertisement for Bids 2
Bid Requirements and Conditions 2
Bid Opening Teleconference 1
Insurance Requirements 2
Bid Preparation 1
List of Subcontractors 1
Special Provisions 6
Schedule of Items (Informational Only) 1
Bridge Inspection – Partial Reports (Informational Only) 46
ADVERTISEMENT FOR BIDS
PROJECT ID 25-019-R
BRIDGE REHABILITATIONS
NOTICE: Sealed (electronic) bids will be received by the Walworth County Purchasing Division, Department of Public Works, W4097 County Road-NN, Elkhorn, Wisconsin 53121, until 1:00 P.M.
local time on Tuesday, November 4, 2025, at which time all bids will be publicly opened and recorded.
SCOPE: In general, the work under this project involves various spot-repairs on seven county-owned bridges. The work includes removing deteriorated concrete from portions of abutments, piers, decks, and other elements as shown on the plans, and replacing those portions with new concrete as specified.
** NEW ** ELECTRONIC BIDDING: Walworth County utilizes an internet-based procurement software called ‘Bonfire’ as the interface to exchange all official information between the County and Bidders.
Obtaining Bid Documents, Project Inquiries, and Bid Submittal will be accomplished through the Bonfire software platform.
Bidders may register for a Bonfire account at no charge through Walworth County’s Bonfire Portal at:
https://walworthcountywi.bonfirehub.com/
It is the bidder’s responsibility to check the project website for future announcements, addendums, etc.
prior to the bid deadline. Bids that do not acknowledge addendums may be rejected.
All questions must be received by the deadline(s) indicated. No information provided verbally, or by any other personnel, will be considered binding.
PROJECT COMPLETION: All work under this Contract shall be completed by November 30, 2026.
Liquidated damages for failure to complete the work in accordance with the date(s) set forth above shall be Nine Hundred Fourty-Five dollars ($945.00) for each calendar day in excess thereof.
BID SECURITY: Bids must be accompanied by a Bid Bond the amount of five (5) percent of the bid price, payable to Walworth County, Wisconsin, as a guarantee that if the Bid is accepted, the Bidder will execute and file the proper contract documents within fifteen (15) days after notification of award of the contract. In case the successful bidder shall fail to execute such contract documents, the bid bond shall be forfeited to Walworth County as liquidated damages.
BIDDING SCHEDULE:
Bid Documents Issued: October 09, 2025
Pre-Bid Meeting: N/A
Final Questions Due: October 23, 2025 (10:00 a.m.)
Bids Due: November 4, 2025 ( 1:00 p.m.)
Project Award: November 17, 2025
WAGE RATES: Neither State of Wisconsin prevailing wage rates nor Federal (Davis-Bacon) prevailing wage rates are applicable to this project.
QUALIFICATIONS: Bidders shall be experienced in this type of work and shall be prequalified with the
Wisconsin Department of Transportation for work in the class and amount of their bid.
-OR-
Shall provide a minimum proof of responsibility in writing on the bid form of: Three (3) Concrete Repair or
Restoration Projects completed on commercial or municipal buildings, bridges or dams within the last five
(5) years, having a contract amount greater than Fifty Thousand Dollars ($50,000.00). Project and project owner information shall be provided with the bid submittal.
BID WITHDRAWAL: No bid shall be withdrawn for a period of thirty (30) days after the scheduled opening of bids. Bids may be withdrawn only in total and only by a written request to Walworth County
Purchasing, Department of Public Works, prior to the time and date of the scheduled bid deadline.
BID ACCEPTANCE – REJECTION: Walworth County reserves the right to accept or reject any or all bids, in whole or in part, received in response to this advertisement, to waive any irregularities in bidding, or to accept any bid they deem most advantageous to the County.
Published by the authority of: Walworth County
BID REQUIREMENTS AND CONDITIONS
The bidder, submitting this bid, agrees and declares as a condition thereof, to be bound by the following conditions and requirements.
All prospective bidders shall be on the Wisconsin Department of Transportation list of approved
Contractors. Any Contractor that appears on the Wisconsin Department of Transportation’s List of
Disapproved, Suspended, and Debarred Contractors will be disallowed.
The bidder declares that he has carefully examined the site of, and the bid, plans, specifications and contract forms for the work contemplated and it is assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of the specifications, special provisions, and contract. It is mutually agreed that submission of a bid shall be considered conclusive evidence that the bidder has made such examination.
The bidder submits herewith a proposal guarantee in proper form and amount payable to the party as designated in the advertisement inviting bids, to be retained by and become the property of the owner of the work in the event the undersigned shall fail to execute the contract and return the same to the County within fifteen (15) days after having been notified in writing to do so; otherwise to be returned.
The form of agreement or contract resulting from the acceptance of the bid shall be on forms either supplied by Walworth County or approved by Walworth County.
The bidder declares that he understands that the estimate of quantities in the schedule of items is approximate only and that the actual quantities may be greater or less in accordance with the specifications.
The bidder agrees to perform the said work, for and in consideration of the payment in the amount becoming due on account of work being performed, according to the unit prices in the schedule of items, and to accept such amounts in full payment of said work.
Retainage on project estimates will be applied in accordance with the Section 66.0901(9)(b), Statutes of
Wisconsin.
Walworth County is a tax-exempt municipality under WI Stats. 77.54(9a). The bidder shall investigate the statutory requirements for payment of sales and use taxes and, if required, shall include taxes in the bid.
Bidder shall comply with the provisions set forth in the Wisconsin Administrative Code and Statutes in order to obtain a state sales tax exemption on the purchase of certain items and shall forward this information to his suppliers in order that the sale of such material and equipment be properly recorded as a tax-exempt sale.
The bidder declares that all of the said work will be performed at his own cost and expense, that he will furnish all necessary materials, labor, tools, machinery, apparatus, and other means of construction in a manner provided on the plans, specifications, special provisions and contract of which this bid will become a part. The bidder further agrees that the plans, specifications and special provisions are made a part hereof, as fully and completely as if attached hereto.
The bidder, if awarded the contract, shall pay all claims as required by Section 779.14of the Wisconsin
Statutes and shall be subject to and discharge all liabilities for injuries pursuant to Chapter 102 of the
Wisconsin Statutes, and all acts amendatory thereto. He shall further be responsible for any damage to property or injury to persons occurring through his own negligence or that of his employees or agents, incident to performance of work under this contract.
Upon completion of the work and receipt of all required documentation and material reports, Walworth
County (or designee) may submit to the contractor a tentative-final estimate of the quantities of work performed by the contractor. Within 30 calendar days of receiving the tentative-final estimate, the contractor shall submit a written statement of agreement with the final quantities. In the event of a discrepancy, the contractor shall submit item-by-item documentation of the quantities to be reviewed. If the contractor does not submit a written statement within those 30-days, Walworth County will process the estimate as a final payment with no further negotiation.
Prior to release of final payment and retainage, the contractor shall submit lien waivers for the prime contractor and subcontractors on forms supplied by, or approved by Walworth County.
The bidder, if awarded the contract, shall permit authorized representatives of the Federal, State, and
County government to inspect and audit all data and records of the contractor as they relate to this contract. Said right shall extend to any subsidiary, subcontractor, or parent corporation which relate to the construction on this project.
It is expressly agreed and understood that the bidder is in all respects an independent contractor, and the bidder is in no respect an agent, servant, or employee of Walworth County.
Walworth County reserves the right to cancel any agreement that may result from this request for bids, with no penalty, if the Walworth County Board of Supervisors fails to appropriate funds for this contract.
BID OPENING TELECONFERENCE
1. PUBLIC BID OPENING
No in-person bid openings for Public Works projects will be conducted in Walworth County.
Vendors may participate in the public bid opening for this project as described in this Section.
The bids opened and read are considered preliminary and subject to review and verification of applicable bid requirements. Contract(s) will be awarded to the lowest responsive, responsible bidder unless stated otherwise in the request for bids.
2. INSTRUCTIONS FOR PROJECT 25-019-R
The County will host this bid opening on Tuesday, November 4, 2025, at 1:15 p.m. via Microsoft Teams.
Interested participants may attend electronically via the live stream video conference or may participate by using the audio-only option provided herein.
Join the meeting now
Meeting ID: 232 477 128 574 3
Passcode: 5FE6LB7B
Dial in by phone
+1 414-219-0219,,111044488# United States, Milwaukee
Find a local number
Phone conference ID: 111 044 488# https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2VlMjQ0ZmItYzk4MS00MDRkLTlhNzUtY2M3ZjBmNDA5YzVi%40thread.v2/0?context=%7b%22Tid%22%3a%22abdd0c04-3909-4e20-bbcb-7b8a0283a1af%22%2c%22Oid%22%3a%228de371d7-f0f4-4ae6-b61f-d0478201db3c%22%7d tel:+14142190219,,229201665 https://dialin.teams.microsoft.com/3545793f-3d5d-4816-a86c-5b26c488d908?id=229201665
INSURANCE REQUIREMENTS
1.01 Contractor shall furnish County with Certificate of Insurance indicating proof of the following insurance from companies licensed in the State of Wisconsin:
A. Workers Compensation and Employers' Liability - The Contractor shall procure and maintain during the life of this contract Workers’ Compensation insurance with a minimum limit as required by Wisconsin Statutes. The Contractor shall also carry Employers Liability limits of at least $100,000 Each Accident, $100,000 Disease – Each Employee, and $500,000 Disease – Policy Limit. Contractor shall require all subcontractors not protected under its insurance to take out and maintain such insurance throughout the project term.
B. Commercial General Liability - with a minimum limit of $1,000,000 per occurrence and
$2,000,000 aggregate combined single limit for bodily injury and property damage liability. The County reserves the right to require higher or lower limits where warranted.
1) If excavating, underground or collapse is involved, the limits of liability stated above shall be increased to $2,000,000 per occurrence.
2) If Asbestos and/or hazardous materials are involved, the limits of liability stated above shall be changed to $5,000,000 per occurrence.
3) This insurance shall include, but is not limited to, the following coverage:
a) Premises – Operations
b) Products and Completed Operations
c) Personal and Advertising Injury
d) Contractual Liability
e) Underground, Explosion, and Collapse
f) Contractor’s indemnity obligations under this contract
4) This insurance must not include the following:
a) Any exclusion for water intrusion or water damage
b) Any exclusion of coverage relating to earth subsidence or movement
c) Any exclusion for the insured’s vicarious liability, strict liability, or statutory liability (other than worker’s compensation)
d) Any limitation or exclusion based on the nature of Contractor’s work
e) Any limitation or exclusion for damages arising from the work performed by a subcontractor
f) Any limitation or exclusion for damages related to roofing, if the work involves roofing
g) Any provisions resulting in the erosion of insurance limits by defense costs other than those already incorporated in to ISO form CG 00 01
C. Automobile Liability – with a minimum limit of $1,000,000 per occurrence and $2,000,000 aggregate combined single limit for bodily injury and property damage liability. This insurance shall include coverage for all of the following:
1) Owned Automobiles
2) Hired Automobiles
3) Non-Owned Automobiles
D. Professional Liability – Not Required
E. Contractor’s Pollution – Not Required
F. Umbrella or Excess Coverage – Umbrella or Excess Coverage may be used in combination with the required primary coverage in (A.) through (E.) to meet the minimum insurance limits that are specified in this section, provided such insurance result in the same or greater coverage as the coverages required. In no event shall any Umbrella or Excess insurance provide narrower coverage than the primary policy. The Excess policy shall not require exhaustion of the underlying limits only through the actual payment by the underlying insurers.
G. Property Insurance – Contractor is responsible for obtaining or maintaining any other insurance deemed necessary, such as property or inland marine, to cover any property or equipment that is owned or rented by the Contractor and used within the scope of this project.
1.02 If any insurance specified above is a claims-made policy, the retroactive date must pre-date the commencement of furnishing any service under this contract, including design. An Extended Reporting Period, or “tail” coverage, must be provided for at least 2 years following completion of the work.
1.03 Walworth County, shall be named as additional insureds under the Contractor’s Commercial General
Liability, Automobile Liability, Employer’s Liability, Umbrella or Excess, and Pollution Liability insurance policies. Walworth County shall be listed as, “Walworth County, its employees, elected officials, representatives, members of its boards and/or commissions and engineering consultants.”
1.04 Unless prohibited by law, Walworth County shall be provided a waiver of subrogation by endorsement to the Commercial General Liability, Automobile Liability, Workers’ Compensation, Employer’s Liability, Contractor’s Pollution, and Umbrella or Excess Insurance.
1.05 Contractor’s insurance shall provide a thirty (30) day notice to the County prior to cancellation or material policy change. The notice shall be given to Walworth County Purchasing, Department of Public Works, W4097 County Road NN, Elkhorn, Wisconsin 53121. NOTE: Standard Cancellation Clause on a Certificate of Insurance is not acceptable. Upon receipt of notice from insurer, Owner shall have the right to stop the Work until the lapse in coverage has been cured by the procurement of replacement coverage by the Contractor. The furnishing of notice shall not relieve the Contractor of any contractual obligation to provide required coverage.
1.06 The Contractor’s certificate shall list the Certificate Holder and address as follows: Walworth County, Attn: Walworth County Purchasing, Department of Public Works, W4097 County Road NN, Elkhorn, Wisconsin 53121.
1.07 Contractor shall require all of its contractors and subcontractors performing work related to this contract to carry sufficient minimum insurance to cover liabilities arising from or out of the performance of this contract. Contractor shall require subcontractor to furnish Certificates of Insurance to Walworth County upon request.
25-019-R
BID PREPARATION
Walworth County utilizes an internet-based procurement software called ‘Bonfire’ as the interface to exchange all official information between the County and Bidders, including the preparation and submission of bids.
Bidders may register for a Bonfire account at no charge through Walworth County’s Bonfire
Portal at: https://walworthcountywi.bonfirehub.com/
Bidder shall assume full responsibility for timely delivery of Electronic Bids.
Within the Bonfire software:
Complete the electronic / online Bid Form.
Upload a Bid Security to the electronic submittal.
Upload a List of Subcontractors to the electronic submittal.
CERTIFICATION
Submitting a bid (electronically on the internet) to the WALWORTH COUNTY DEPARTMENT
OF PUBLIC WORKS, is an acknowledgement that the bid is in accordance with the advertised request for proposals. The bidder is to furnish and deliver all materials, and to perform all work for the improvement of the designated project in the time specified, in accordance with the appended Proposal Requirements and Conditions.
Submitting an electronic bid on the Internet shall certify that the bidder has examined and carefully prepared his bid from the plans, highway work proposal, and all addenda, and has checked the same in detail before submitting said proposal or bid; and that the bidder or his agents, officer, or employees have not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with this proposal or bid.
25-019-R
LIST OF SUBCONTRACTORS
Section 66.0901(7) of the Wisconsin Statutes provides that a bidder, as a part of his bid, shall submit a list of the subcontractors he proposes to contract with and the class of work to be performed by each, provided that to qualify for such listing, each subcontractor must first submit his bid in writing to the general contractor at least 48 hours prior to the time of bid closing. It further provides that a bid of a bidder shall not be invalid if any subcontractor, and the class of work to be performed by such subcontractor, has been omitted from a bid.
No subcontract, whether listed or later proposed, may be entered into without the written consent of the
Walworth County.
* * TO BE COMPLETED ELECTRONICALLY IN BONFIRE * *
Special Provisions
Table of Contents
Article Description Page #
1. Definition and Terms
2. General
3. Scope of Work
4. Control of the Work
5. Control of Materials
6. Legal Relations and Responsibility to the Public
7. Progress Payments
8. Retainage
9. Prosecution and Progress
10. Inspecting Work
11. Traffic
12. Traffic Control
13. Information to Bidders, Permits
14. Environmental Protection, Aquatic Exotic Species Control
15. Utilities
16. Erosion Control
17. Notice to Contractor – Modification or Elimination of Bid Items
18. Notice to Contractor – Erosion Control BMPs
19. Public Convenience and Safety
20. Traffic Control, Item SPV.0105.01
STSP’S Revised July 3, 2024
SPECIAL PROVISIONS
1. Definition and Terms.
References to Owner, Department, Secretary and State in the contract documents shall mean Walworth County Wisconsin.
References to Engineer in the contract documents shall mean the Owner’s designated representative.
References in the specifications to details shown on the plans shall also mean details bound with the Proposal.
References to WisDOT shall mean the Wisconsin Department of Transportation.
Reference to “standard spec” or “standard specifications” shall mean the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2025 Edition.
References to Construction Materials Manual (CMM) shall mean the Wisconsin Department of Transportation’s (WisDOT’s) Construction Materials Manual.
2. General.
Perform the work under this construction contract for Project 25-019-R ‘Bridge Rehabilitations’, Walworth County, Wisconsin as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2025 Edition, as published by the department, and these special provisions.
If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule of prices is developed in the US standard measure system, the department will pay for the work as bid in the US standard system.
100-005 (20240703)
3. Scope of Work.
The work under this contract shall consist of concrete surface repair, riprap placement, restoration, traffic control and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract for multiple bridges.
104-005 (20090901)
4. Control of the Work.
The owner and engineer are not responsible for the contractor’s means, methods, techniques, sequences, or procedures, or for the contractor’s safety, health, and sanitation program.
The owner may suspend the work in writing for any reason at any time during the contract. Except as specified in standard spec 104.2.2.3 for owner-ordered suspensions, the engineer will allow no additional payment or time extension due to a suspension of work.
Revise the title and first paragraph of standard spec 104.2.2.3 by changing all occurrences of "engineer" and "engineer's" to "owner" and "owner's," respectively.
Delete the second paragraph (which begins with the phrase "The engineer may . . .") of standard spec 105.1.
Revise the first paragraph of standard spec 105.7 by deleting the phrase "and to suspend all work being improperly performed."
Revise the second paragraph of standard spec 105.8 by deleting the sentence "Temporarily suspend work, in writing, until the engineer is notified and decides all questions at issue."
5. Control of Materials.
Conform to standard spec 106 as modified in this special provision.
The department approved source, as referred to in standard spec 106.1.1 (3), shall mean the Wisconsin Department of Transportation’s approved source.
The department Approved Product Lists (APL), as referred to in standard spec 106.3.2 (1), shall mean the Wisconsin Department of Transportation’s APL.
Plants certified by the department, and the department’s approved vendor list, as referred to in standard spec 106.3.3.3.1 (1) part 2, shall mean the Wisconsin Department of Transportation’s plant certification and approved vendor list.
Delete standard spec 106.3.4.1 (3).
The department’s laboratory qualification program, as referred to in standard specs 106.3.4.1 (5) and
106.3.4.2.2.1 (3), shall mean the Wisconsin Department of Transportation’s laboratory qualification program.
The department may conduct verification testing, as referred to in standard spec 106.3.4.3.3.
The department will not perform independent assurance testing, as referred to in standard spec 106.3.4.3.4.
6. Legal Relations and Responsibility to the Public.
Revise the first sentence of standard spec 107.12 to read as follows:
The contractor and their insurer shall defend, indemnify, and save harmless the engineer and governmental entities that are involved in the project, or in which all or a part of the project site is located, including officers, agents, and employees of any of the foregoing from suits, actions, or claims brought because of injuries or damages sustained by any person or property arising from one or more of the following: [text continues as in the standard spec].
7. Progress Payments
Revise standard spec 109.6.2 to read as follows:
The owner will make one progress payment each month.
8. Retainage.
Revise the second paragraph of standard spec 109.6.3.3 to read as follows:
In addition to the above retainage, the owner will retain 5% of the value of the work completed, and 5% of the value of materials and equipment delivered and suitably stored, until 50% completion. At 50% completion, no additional amounts will be retained unless engineer certifies that the work is not proceeding satisfactorily but amounts previously retained will not be paid to the contractor until the owner finally accepts the work. When the contractor substantially completes the work under the contract or upon completion and acceptance of the work, and pending final payment, the engineer may choose to reduce the amount retained.
9. Prosecution and Progress.
Begin work within 10 calendar days after the engineer issues a written notice to do so.
Complete all project work for the contract by November 30, 2026.
When directed by the Engineer - the contractor shall schedule and conduct routine progress meetings.
Hold the meetings in a mutually agreed upon location and be prepared to discuss the work schedule.
Subcontractors shall be in attendance at the weekly progress meetings.
Notify the engineer if there are any changes in the schedule, early completions, or cancellations of scheduled work.
Provide the project engineer and emergency services with a telephone number with which the contractor or the contractor’s representative can be contacted during non-working hours in the event a safety hazard develops.
10. Inspecting Work.
Contractor shall notify Walworth County and the Owner’s designated representative at least 72 hours before placing starting work on any structure and placing any concrete. Contact information will be provided at the preconstruction meeting.
11. Traffic.
The bridges shall remain open during construction utilizing flagging operations and shoulder closures as necessary. Place advanced warning signs prior to any removals.
12. Traffic Control.
Perform this work in accordance with the requirements of section 643 of the standard specifications, and as shown on the plans, or as approved by the engineer, except as hereinafter modified.
No operation shall proceed until all applicable traffic control devices for such work are in the proper location.
The contractor shall have available at all times sufficient experienced personnel to promptly install, remove, and reinstall the required traffic control devices, or to perform flagging operations to route traffic in order to perform the operations.
The contractor shall coordinate traffic restrictions with the area police, sheriff, and fire departments so emergency vehicle access is maintained at all times.
The contractor shall not disturb, remove, or obliterate any traffic control signs, advisory signs, or beam guard in place along the traveled roadways without the approval of the engineer.
No traffic control signing shall be placed on existing signposts or power poles. Signs shall be mounted on posts provided by the contractor in accordance with the plan details and standard detail drawings.
13. Information to Bidders, Permits.
Walworth County has coordinated this project with the Wisconsin Department of Natural Resources (WDNR). While no permit(s) were required for this work, it should be noted that saw cut slurry and chipping debris shall be collected and not allowed to flow or fall into the water and/or wetlands.
Contractor shall inform the County and WDNR with proposed methods of debris containment prior to commencing work. Project contacts are listed on the General Notes sheet in the plan set.
14. Environmental Protection, Aquatic Exotic Species Control.
Exotic invasive organisms such as VHS, zebra mussels, purple loosestrife, and Eurasian water milfoil are becoming more prolific in Wisconsin and pose adverse effects to waters of the state. Wisconsin State Statutes 30.07, "Transportation of Aquatic Plants and Animals; Placement of Objects in Navigable Waters", details the state law that requires the removal of aquatic plants and zebra mussels each time equipment is put into state waters.
At construction sites that involve navigable water or wetlands, use the following cleaning procedures to minimize the chance of exotic invasive species infestation. Use these procedures for all equipment that comes in contact with waters of the state and/or infested water or potentially infested water in other states.
Ensure that all equipment that has been in contact with waters of the state, or with infested or potentially infested waters, has been decontaminated for aquatic plant materials and zebra mussels before being used in other waters of the state. Before using equipment on this project, thoroughly disinfect all equipment that has come into contact with potentially infested waters. Guidelines from the Wisconsin Department of Natural Resources for disinfection are available at:
http://dnr.wi.gov/topic/invasives/disinfection.html
Use the following inspection and removal procedures:
1. Before leaving the contaminated site, wash machinery and ensure that the machinery is free of all soil and other substances that could possibly contain exotic invasive species;
2. Drain all water from boats, trailers, bilges, live wells, coolers, bait buckets, engine compartments, and any other area where water may be trapped;
3. Inspect boat hulls, propellers, trailers and other surfaces. Scrape off any attached mussels, remove any aquatic plant materials (fragments, stems, leaves, seeds, or roots), and dispose of removed mussels and plant materials in a garbage can before leaving the area or invested waters; and
4. Disinfect your boat, equipment and gear by either:
4.1. Washing with ~212 F water (steam clean), or
4.2. Drying thoroughly for five days after cleaning with soap and water and/or high pressure water, or http://dnr.wi.gov/topic/invasives/disinfection.html
4.3. Disinfecting with either 200 ppm (0.5 oz per gallon or 1 Tablespoon per gallon) Chlorine for 10-minute contact time or 1:100 solution (38 grams per gallon) of Virkon Aquatic for 20- to 30-minute contact time. Note: Virkon is not registered to kill zebra mussel veligers nor invertebrates like spiny water flea. Therefore, this disinfect should be used in conjunction with a hot water (>104º F) application.
Complete the inspection and removal procedure before equipment is brought to the project site and before the equipment leaves the project site.
stp-107-055 (20130615)
15. Utilities.
This contract does not come under the provision of Administrative Rule Trans 220.
stp-107-066 (20080501)
Overhead and/or underground utilities may be located within the project limits. The contractor shall contact Diggers Hotline to verify locations prior to construction. Use caution to ensure the integrity of underground facilities and maintain code clearances from overhead facilities at all times.
16. Erosion Control
This project does not fall under the provisions of TRANS 401.
Where areas are disturbed, Re-topsoil graded areas, as designated by the engineer, immediately after grading is completed within those areas. Seed, fertilize, and mulch/erosion mat top-soiled areas, as designated by the engineer, within 24hrs after placement of topsoil. If graded areas are left exposed for more than 24hrs, seed those areas with temporary seed and mulch/erosion mat within 24 hrs.
Prior to seeding, coordinate with the WDNR Liaison Craig Webster, 141 NW Barstow, Room 180, Waukesha, WI 53188, (262) 574-2141 on the application of seed mix 20 and temporary seed.
When performing roadway cleaning operations, the contractor shall use equipment having vacuum or water spray mechanisms to eliminate the dispersion of dust. If vacuum equipment is employed, it shall have suitable self-contained particulate collectors to prevent discharge from the collection bin into the atmosphere.
Stockpile excess material or spoils on upland areas away from wetlands, floodplains and waterways.
Stockpiled soil shall immediately be protected against erosion with silt fence, temporary seed, mulch, or as directed by the engineer.
Do not pump water from the construction site to a storm water conveyance without the water first passing through a sediment basin and sediment bag in accordance with the Environmental Protection article of these special provisions.
17. Notice to Contractor – Modification or Elimination of Bid Items
The department will not allow for a Cost Reduction Incentive as described in subsection 104.10 of the standard specifications for any elimination and/or modification of any contract bid items. Further, the department will not apply standard spec 109.5 for the total elimination, or partial elimination, whether by department or the contractor, of contract bid items.
18. Notice to Contractor – Erosion Control BMPs
All necessary erosion control BMPs shall be in place prior to starting bridge rehabilitation activities. The contractor shall determine if additional erosion control devices are needed based on their means and methods with approval by the engineer. All additional devices/work will be incidental to the contract.
19. Public Convenience and Safety.
Revise standard spec 107.8(6) as follows:
Check for and comply with local ordinances governing the hours of operation of construction equipment.
Do not operate motorized construction equipment from 7 PM until the following 7 AM, unless prior written approval is obtained from the engineer.
stp-107-001 (20060512)
20. Traffic Control, Item SPV.0105.01
A Description
This special provision describes providing, erecting, maintaining, moving, and removing temporary traffic control signs, lights, drums, barricades, covering signs, and all necessary traffic control for the project.
B Materials
Furnish traffic control devices that conform to standard specification 643.2.
C Construction
Install signs conforming to standard specification 643.3 prior to bridge work. If shoulder or lane closures or restrictions are necessary to install signs or cover existing signs, adhere to State traffic control standards and complete this work during off peak travel times.
Protect and maintain local traffic in the work zone by proper use of barricades, drums, warning lights, signs, flaggers and other traffic control devices conforming to federal, state and local regulations.
Installing, maintaining, moving and removing all traffic control devices shall conform to standard specification 643.3.
Notify emergency services at least 24 hours in advance of full highway closures. Full closure of the highway, with approval from the engineer, shall be set up in a manner, with adequate advance warning, that allows local traffic to access alternative routes.
All traffic control devices shall be operational 24 hours a day, seven days a week, including holidays. The contractor shall furnish the name and 24-hour contact phone number of the individual under direct employ who will be responsible for maintenance of temporary traffic control on the project. An individual from a subcontractor may be provided in addition to, not in lieu of, the contractor’s individual. If notified by the engineer or department of a deficiency in traffic control, correct the deficiency within the time specified in standard specification 643.3.1.
Removal all temporary traffic control devices at the conclusion of the work or when the device is no longer necessary.
D Measurement
Traffic Control, including all work for road closures, shoulder closures, traffic control and safety devices will be considered incidental to the project and will not be measured or paid as an item of work.
E Payment
Payment for furnishing, erecting, re-erecting, moving, maintaining, covering and uncovering, and removing temporary traffic control signs, barricades, drums, and similar devices; lights; furnishing and using flaggers as necessary; covering and uncovering conflicting existing permanent signs; and providing a 24-hour contact for emergencies will be considered incidental to the project and will not be paid as an item of work.
Project ID: 25-019-R
Bridge Rehabilitations
B-64-74
WisDOT Item No. Description Unit Est Qty
203.0335 Debris Containment over Waterway B-64-74 EACH 1
509.1500 Concrete Surface Repair SF 205
B-64-75
WisDOT Item No. Description Unit Est Qty
509.1500 Concrete Surface Repair SF 18
B-64-147
WisDOT Item No. Description Unit Est Qty
203.0335 Debris Containment over Waterway B-64-147 EACH 1
509.1500 Concrete Surface Repair SF 235
B-64-155
WisDOT Item No. Description Unit Est Qty
203.0335 Debris Containment over Waterway B-64-155 EACH 1
509.1500 Concrete Surface Repair SF 143
606.0200 Medium Riprap CY 20
B-64-156
WisDOT Item No. Description Unit Est Qty
203.0335 Debris Containment over Waterway B-64-156 EACH 1
509.1500 Concrete Surface Repair SF 80
B-64-159
WisDOT Item No. Description Unit Est Qty
203.0335 Debris Containment over Waterway B-64-159 EACH 1
509.1500 Concrete Surface Repair SF 124
B-64-438
WisDOT Item No. Description Unit Est Qty
203.0335 Debris Containment over Waterway B-64-438 EACH 1
509.1500 Concrete Surface Repair SF 114
INCIDENTAL
WisDOT Item No. Description Unit Est Qty
SPV.0105.01 Traffic Control LS 1
Note: See Project Special Provisions
Schedule of Items (For Information Only)
1B-64-074 13-Aug-2024 inspection as of 01-Oct-2024
STATE OF WISCONSIN
DEPARTMENT OF TRANSPORTATION
Inspection Report for
B-64-074 CTH B over NIPPERSINK CREEK
Aug 13, 2024
Type Prior Date Prior Team Leader Frequency (mos) Performed Routine 08-11-22 Makela, Joshua J (9669) 24 X SIA review 08-11-22 Makela, Joshua J (9669) 48
SNBI 0 X
Uw-Profile 08-23-16 Krueger, Joseph (9647) 24 X
Start Coordinates End Coordinates (optional)
Latitude 42°29'50.50"N Latitude
Longitude 88°19'59.10"W Longitude
Owner COUNTY Maintainer COUNTY
Team members Time Log Hours
Minutes
Leden, Andrew: Team Leader
Weather Temperature (f)
Condition Sunny
Name Number Signature Signature Date Inspector
Leden, Andrew 9705 Andrew Leden
10-01-24 E-signed by Andrew Leden(atleden)
2B-64-074 13-Aug-2024 inspection as of 01-Oct-2024
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
Identification & Location Feature On:
CTH B
Section Town Range:
S35 T01N R18E
Structure Number:
B-64-074 Feature Under:
NIPPERSINK CREEK
County:
WALWORTH
Location
0.1M W JCT CTH H TO E
Municipality:
GENOA CITY
Structure Name:
Geometry Traffic measurements in feet, except where noted Lanes ADT ADT year Traffic Pattern Approach Roadway Width:
Bridge Roadway Width:
36.0
Total Length:
73.8 On 2 2700 2015 two way traffic
Approach Pavement Width:
Deck Width:
43.0
Deck Area (sq ft):
Capacity Load Rating Inventory rating:
HS22
Overburden depth (in):
0.0
Last rating date:
05-22-09
Controlling:
Operating rating:
HS38
Deck surface material:
Concrete
Control location:
Posting: Emergency Vehicle Weight Limit (tons):
Re-rate for capacity (Y/N): Re-rate notes:
Hydraulic Classification Scour Critical Code(113):
Stable- above top footing (8)
Q100 (ft3/sec):
High water elevation (ft):
818.9
Velocity (ft/sec):
8.0
Sufficiency #:
86.6
Span(s) Span # Material Configuration Depth (in) Length (ft) Main
1 CONT CONCRETE Slab - Solid - Flat 36.0 Y 2 CONT CONCRETE Slab - Solid - Flat 36.0
Expansion joint(s) Temperature: File:77 New:75
Clearance Item File Measurement (ft) File Date New Measurement (ft)
Highway min vertical on cardinal
Horizontal on cardinal
Construction History Year Work Performed FOS id
1989 New Structure 3705-00-70
Maintenance Items History Item Recommended by Status Status change Year completed Deck - Repair Sidewalk Thomson, Cory L (9550) COMPLETE 10/21/22 2022
Comment:
Repair NW curb.
Status Comment:
7B-64-074 13-Aug-2024 inspection as of 01-Oct-2024 page 7 Structure No.:B-64-074
UW Profile Item 1 2024 UW Profile Spreadsheet b64-074_xpd1.xlsx
Routine Item 1 South elevation view b64-074_24_Rd13.jpg
Routine Item 2 North elevation view b64-074_24_Rd8.jpg
Routine Item 3 Longitudinal view looking west b64-074_24_Rd1.jpg Linked Element(s):
Approach roadway - asphalt
8B-64-074 13-Aug-2024 inspection as of 01-Oct-2024 page 8 Structure No.:B-64-074
Routine Item 4 Longitudinal view looking east b64-074_24_Rd4.jpg Linked Element(s):
Approach roadway - asphalt
Routine Item 5 Typical view, span 1 b64-074_24_Rd21.jpg Linked Element(s):
Reinforced concrete slab - coated reinforcing
Routine Item 6 Typical view, span 2 b64-074_24_Rd20.jpg
Reinforced concrete slab - coated reinforcing
9B-64-074 13-Aug-2024 inspection as of 01-Oct-2024 page 9 Structure No.:B-64-074
Routine Item 7 Span 1, South deck facia CS3 spalling with exposed rebar b64-074_24_Rd10.jpg Linked Element(s):
Reinforced concrete slab - coated reinforcing
Routine Item 8 Span 1, South deck facia CS3 spalling with exposed rebar b64-074_24_Rd11.jpg Linked Element(s):
Reinforced concrete slab - coated reinforcing
Routine Item 9 Span 2, South deck facia CS3 spalling with exposed rebar b64-074_24_Rd17.jpg
10B-64-074 13-Aug-2024 inspection as of 01-Oct-2024 page 10 Structure No.:B-64-074
Routine Item 10 Span 1, longitudinal crack at mid span b64-074_24_Rd14.jpg Linked Element(s):
Reinforced concrete slab - coated reinforcing
Routine Item 11 Span 1, patch in deck at West abutment b64-074_24_Rd15.jpg Linked Element(s):
Reinforced concrete slab - coated reinforcing
Routine Item 12 Span 2, longitudinal crack with adjacent spalls b64-074_24_Rd19.jpg
11B-64-074 13-Aug-2024 inspection as of 01-Oct-2024 page 11 Structure No.:B-64-074
Routine Item 13 Transverse cracks, and wearing surface over pier b64-074_24_Rd2.jpg Linked Element(s):
Reinforced concrete slab - coated reinforcing -> Wearing surface ( bare)
Routine Item 14 Typical wearing surface condition b64-074_24_Rd3.jpg Linked Element(s):
Reinforced concrete slab - coated reinforcing -> Wearing surface ( bare)
Routine Item 15 West deck edge with spalling b64-074_24_Rd5.jpg
Reinforced concrete slab - coated reinforcing -> Wearing surface ( bare)
12B-64-074 13-Aug-2024 inspection as of 01-Oct-2024 page 12 Structure No.:B-64-074
Routine Item 16 East deck edge at resurfacing b64-074_24_Rd7.jpg Linked Element(s):
Reinforced concrete slab - coated reinforcing -> Wearing surface ( bare)
Routine Item 17 CS3 longitudinal crack at East End b64-074_24_Rd9.jpg Linked Element(s):
Reinforced concrete slab - coated reinforcing -> Wearing surface ( bare)
Routine Item 18 Typical sidewalk condition over pier b64-074_24_Rd6.jpg
Routine Item 19 South end of pier, large spall with exposed rebar b64-074_24_Rd12.jpg
13B-64-074 13-Aug-2024 inspection as of 01-Oct-2024
Reinforced concrete pier wall
Routine Item 20 South end of pier, large spall with exposed rebar b64-074_24_Rd18.jpg Linked Element(s):
Reinforced concrete pier wall
Routine Item 21 Timber debris at upstream nose b64-074_24_Rd16.jpg
1B-64-075 20-Aug-2024 inspection as of 07-Oct-2024
Inspection Report for
B-64-075 CTH JS over WHITE RIVER
Aug 20, 2024
Type Prior Date Prior Team Leader Frequency (mos) Performed Routine 08-09-22 Makela, Joshua J (9669) 24 X Special 07-25-17 Reay, Scott (2023) 0 SIA review 08-09-22 Makela, Joshua J (9669) 48
SNBI X
Uw-Profile 07-24-14 Bolka, John (2007) X
Start Coordinates End Coordinates (optional)
Latitude 42°40'59.52"N Latitude
Longitude 88°18'29.17"W Longitude
Owner COUNTY Maintainer COUNTY
Team members Time Log Hours
Minutes
Leden, Andrew: Team Leader
Weather Temperature (f)
Condition Partly Cloudy
Name Number Signature Signature Date Inspector
Leden, Andrew 9705
10-07-24 E-signed by Andrew Leden(atleden)
2B-64-075 20-Aug-2024 inspection as of 07-Oct-2024
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
Identification & Location Feature On:
CTH JS
Section Town Range:
S25 T03N R18E
Structure Number:
B-64-075 Feature Under:
WHITE RIVER
County:
WALWORTH
Location
1.4M E JCT CTH DD
Municipality:
SPRING PRAIRIE
Structure Name:
Geometry Traffic measurements in feet, except where noted Lanes ADT ADT year Traffic Pattern Approach Roadway Width:
Bridge Roadway Width:
44.0
Total Length:
70.0 On 2 2800 2018 two way traffic
Approach Pavement Width:
Deck Width:
47.0
Deck Area (sq ft):
Capacity Load Rating Inventory rating:
HS20
Overburden depth (in):
2.0
Last rating date:
04-13-03
Controlling:
Operating rating:
HS34
Deck surface material:
Bituminous
Control location:
Posting: Emergency Vehicle Weight Limit (tons):
Re-rate for capacity (Y/N): Re-rate notes:
Hydraulic Classification Scour Critical Code(113):
Stable- within footing limits (5)
Q100 (ft3/sec):
High water elevation (ft):
769.5
Velocity (ft/sec):
7.2
Sufficiency #:
95.8
Span(s) Span # Material Configuration Depth (in) Length (ft) Main
1 CONT CONCRETE Slab - Solid - Flat 34.0 Y 2 CONT CONCRETE Slab - Solid - Flat 34.0
Expansion joint(s) Temperature: File:70 New:68
Clearance Item File Measurement (ft) File Date New Measurement (ft)
Highway min vertical on cardinal
Horizontal on cardinal
Special Components Component Year Work Performed Note
OVERLAY - POLYMER -
ROSPHALT 50
2002 Overlay - Bituminous
Construction History Year Work Performed FOS id
1987 New Structure 1322-03-73 2002 Overlay - Bituminous
Maintenance Items History Item Recommended by Status Status change Year completed IMP-Polymer Modified Overlay Jashinsky, Dan (2010) REJECTED 08/31/17
Comment:
Replace overlay in 2022.
Status Comment:
Approach - Other Work Makela, Joshua J (9669) COMPLETE 10/04/18 2018
Comment:
Clear debris in Northeast and Southwest quadrants under approach guardrail
7B-64-075 20-Aug-2024 inspection as of 07-Oct-2024 page 7 Structure No.:B-64-075
UW Profile Item 1 2024 UW Profile Spreadsheet b64-075_xpd1.xlsx
Routine Item 1 South elevation view b64-075_24_Rd6.jpg
Routine Item 2 North elevation view b64-075_24_Rd10.jpg
Routine Item 3 Longitudinal view looking west b64-075_24_Rd1.jpg
8B-64-075 20-Aug-2024 inspection as of 07-Oct-2024 page 8 Structure No.:B-64-075
Routine Item 4 Longitudinal view looking east b64-075_24_Rd3.jpg
Routine Item 5 Typical wearing surface condition b64-075_24_Rd2.jpg Linked Element(s):
Reinforced concrete slab - black steel reinforcing -> Hma (ac) overlay
Routine Item 6 East span, delam at CL b64-075_24_Rd8.jpg Linked Element(s):
Reinforced concrete slab - black steel reinforcing
Routine Item 7 South east abutment and deck corner with spall b64-075_24_Rd7.jpg
9B-64-075 20-Aug-2024 inspection as of 07-Oct-2024
Reinforced concrete slab - black steel reinforcing
Routine Item 8 Northwest deck corner, spall b64-075_24_Rd9.jpg Linked Element(s):
Reinforced concrete slab - black steel reinforcing
Routine Item 9 Southwest abutment and deck corner, spall with exposed rebar b64-075_24_Rd11.jpg Linked Element(s):
Reinforced concrete slab - black steel reinforcing Reinforced concrete abutment
Routine Item 10 North rail, spall near West End b64-075_24_Rd4.jpg
Reinforced concrete bridge rail
10B-64-075 20-Aug-2024 inspection as of 07-Oct-2024 page 10 Structure No.:B-64-075
Routine Item 11 South rail, spall at East end b64-075_24_Rd5.jpg
Reinforced concrete bridge rail
1B-64-147 20-Aug-2024 inspection as of 07-Oct-2024
Inspection Report for
B-64-147 CTH D over HONEY CREEK
Aug 20, 2024
Type Prior Date Prior Team Leader Frequency (mos) Performed Routine 08-09-22 Makela, Joshua J (9669) 24 X Special 11-19-20 Reay, Scott (2023) 0 SIA review 08-09-22 Makela, Joshua J (9669) 48
SNBI X
Uw-Profile 08-26-16 Krueger, Joseph (9647) X
Start Coordinates End Coordinates (optional)
Latitude 42°44'53.99"N Latitude
Longitude 88°18'36.44"W Longitude
Owner COUNTY Maintainer COUNTY
Team members Time Log Hours
Minutes
Leden, Andrew: Team Leader
Weather Temperature (f)
Condition Partly Cloudy
Name Number Signature Signature Date Inspector
Leden, Andrew 9705
2B-64-147 20-Aug-2024 inspection as of 07-Oct-2024
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
Identification & Location Feature On:
CTH D
Section Town Range:
S01 T03N R18E
Structure Number:
B-64-147 Feature Under:
HONEY CREEK
County:
WALWORTH
Location
0.1M W JCT CTH DD
Municipality:
SPRING PRAIRIE
Structure Name:
Geometry Traffic measurements in feet, except where noted Lanes ADT ADT year Traffic Pattern Approach Roadway Width:
Bridge Roadway Width:
40.0
Total Length:
43.8 On 2 2100 2018 two way traffic
Approach Pavement Width:
Deck Width:
42.0
Deck Area (sq ft):
Capacity Load Rating Inventory rating:
HS23
Overburden depth (in):
0.0
Last rating date:
05-20-09
Controlling:
Operating rating:
HS38
Deck surface material:
Concrete
Control location:
Posting: Emergency Vehicle Weight Limit (tons):
Re-rate for capacity (Y/N): Re-rate notes:
Hydraulic Classification Scour Critical Code(113):
Stable- above top footing (8)
Q100 (ft3/sec):
High water elevation (ft):
782.7
Velocity (ft/sec):
8.1
Sufficiency #:
87.3
Span(s) Span # Material Configuration Depth (in) Length (ft) Main
1 CONCRETE Slab - Solid - Flat 42.0 Y
Expansion joint(s) Temperature: File: New:65
Clearance Item File Measurement (ft) File Date New Measurement (ft)
Highway min vertical on cardinal
Horizontal on cardinal
Construction History Year Work Performed FOS id
1983 New Structure 3698-02-73
Maintenance Items History Item Recommended by Status Status change Year completed Drainage - Repair Washouts / Erosion Thomson, Cory L (9550) COMPLETE 08/28/20 2020
Comment:
Add gravel to repair erosion at guardrail south side, west approach.
Status Comment:
Maintenance Items Item Priority Recommended by Status Status change Deck - Other Work Medium Leden, Andrew (9705) IDENTIFIED 08/20/24
Comment:
At bottom corner of slab at fascia, remove loose and delaminated concrete, clean reinforcement, coat spalls with epoxy and install flashing to serve as drip edge. Seal cracks in deck surface.
6B-64-147 20-Aug-2024 inspection as of 07-Oct-2024 page 6 Structure No.:B-64-147
UW Profile Item 1 2024 UW Profile Spreadsheet b64-147_xpd1.xlsx
Routine Item 1 North elevation view b64-147_24_Rd6.jpg
Routine Item 2 South elevation view b64-147_24_Rd10.jpg
Routine Item 3 Longitudinal view looking east b64-147_24_Rd1.jpg
7B-64-147 20-Aug-2024 inspection as of 07-Oct-2024 page 7 Structure No.:B-64-147
Routine Item 4 Longitudinal view looking west b64-147_24_Rd3.jpg
Routine Item 5 Typical wearing surface condition b64-147_24_Rd2.jpg Linked Element(s):
Reinforced concrete slab - coated…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .