1-2026.10.26-LCCC Biotech Labs Project Manual-Update.pdf
PDF 6 MB Posted
- Attached to
- LCCC Biotechnology Training Facility - Rebid
- Solicitation number
- US.263000
- Issued by
- Lehigh County, Pennsylvania
About this file
This is a project manual for the Lehigh Carbon Community College (LCCC) Biotechnology Training Facility renovation project, a construction initiative managed by the Pennsylvania institution in Schnecksville, Pennsylvania. The project encompasses the comprehensive renovation of the first floor of Science Hall to create a state-of-the-art Biotechnology Laboratory and Training Facility, including two biotechnology teaching laboratories, laboratory support and storage spaces, a biotechnology lecture hall, aseptic fill and automated fill training rooms, office space, and associated support areas. The scope of work includes demolition, new partitions, ceiling and light fixtures, casework, flooring and finishes, as well as HVAC, plumbing, and electrical installations, with exterior work including patio area refurbishment. An alternate bid item for window removal and replacement is available. The mandatory pre-bid meeting is scheduled for November 20, 2026, at 10:00 AM at the Shipping/Receiving Dock in Science Hall's lower level. Sealed bids are due by 12:00 PM on December 11, 2026, through the PennBid Program at www.pennbid.net. Bidding documents are available at no cost beginning November 16, 2026. Clarification questions may be submitted through PennBid's "Clarifications (From Vendors)" tab on or before December 2, 2026, with responses provided to all registered parties. The project is being bid as a Prime General Construction Contract, with MKSD Architects, LLC serving as the Project Architect.
The file does not provide specific pricing information, contract award dates, or contract term details in the available sections. No set-asides are explicitly identified in this document. The project is funded through Lehigh Carbon Community College and is located at 4525 Education Park Drive, Schnecksville, PA 18078. This is a rebid of the project, indicating a previous bidding cycle has occurred. All bidding parties must register through the PennBid platform to access solicitation documents and participate in the clarification process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-2026.10.26-LCCC Biotech Labs Issued for Bid Permit-Update.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEHIGH CARBON COMMUNITY COLLEGE
Biotechnology Training Facility
4525 Education Park Drive Schnecksville, PA 18078
MKSD Project No. 26.147
Architect
MKSD, LLC
1209 Hausman Road Suite A
Allentown, PA 18104 Phone: (610) 366-2081
Fax: (610) 366-8399
PROJECT MANUAL – 26.147 LCCC Biotechnology Training Facility Dated: October 26, 2026
TABLE OF CONTENTS 00 0010 - 1 of 1 LCCC Biotechnology Training Facility MKSD Project No. 26.147
LCCC BIOTECHNOLOGY TRAINING FACILITY
TABLE OF CONTENTS
DIVISION 00 - BIDDING REQUIREMENTS
SECTION 00 0010: TABLE OF CONTENTS
SECTION 00 0050: COPYRIGHT
SECTION 00 1113 ADVERTISEMENT FOR BIDS
SECTION 00 1153: CONTRACTORS QUALIFICATION STATEMENT – AIA A305
SECTION 00 1400: AGREEMENT OF SURETY
SECTION 00 2113: INSTRUCTIONS TO BIDDERS – AIA A701
SECTION 00 2600: PROCUREMENT SUBSTITUTION PROCEDURES
SECTION 00 4113 GC BID FORM
SECTION 00 4200: NON-COLLUSION AFFADAVIT
SECTION 00 4210: NON-DISCRIMINATION CLAUSE
SECTION 00 4220: AGREEMENT CONTRACT FORM - AIA A101
SECTION 00 4313: BID BOND – AIA A310
SECTION 00 4314: PERFORMANCE & PAYMENT BONDS
SECTION 00 4316: MAINTENANCE BOND
SECTION 00 5000: GENERAL CONDITIONS – AIA A201
SECTION 00 5010: SUPPLEMENTARY CONDITIONS
SECTION 00 5020: PA STATUTORY REQUIREMENTS
SECTION 00 5030: NO-LIEN AGREEMENT
SECTION 00 6000: CONTRACTORS AFFIDAVIT OF PAYMENT OF DEBTS AND
CLAIMS – AIA G706
SECTION 00 6010: CONTRACTORS AFFIDAVIT OF RELEASE OF LIENS – AIA
G706A
SECTION 00 6020: CONSENT OF SURETY – AIA G707
SECTION 00 6216: INSURANCE CERTIFICATE REQUIREMENTS
SECTION 00 7343: PREVAILING WAGE REQUIREMENTS
SECTION 00 8000: PA EMPLOYMENT VERIFICATION
SECTION 00 8010: PA E-VERIFY ACKNOWLEDGMENT FORM
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 1000: CONTRACT SUMMARY
SECTION 01 2200: UNIT PRICES
SECTION 01 2300: ALTERNATES
SECTION 01 2500: SUBSTITUTION PROCEDURES
SECTION 01 2600: CONTRACT MODIFICATION PROCEDURES
SECTION 01 2900: APPLICATION FOR PAYMENT
SECTION 01 3200: CONSTRUCTION PROGRESS DOCUMENTATION
SECTION 01 3300: SUBMITTAL PROCEDURES
SECTION 01 4000: QUALITY CONTROL REQUIREMENTS
SECTION 01 4200: REFERENCE STANDARDS AND DEFINITIONS
SECTION 01 5000: TEMPORARY FACILITIES AND CONTROLS
SECTION 01 6000: PRODUCT REQUIREMENTS
SECTION 01 7300: EXECUTION REQUIREMENTS
SECTION 01 7329: CUTTING AND PATCHING
SECTION 01 7423: FINAL CLEANING
SECTION 01 7700: CLOSEOUT PROCEDURES
TABLE OF CONTENTS 00 0010 - 2 of 1 LCCC Biotechnology Training Facility MKSD Project No. 26.147
SECTION 01 7823: OPERATION AND MAINTENANCE DATA
SECTION 01 7836: WARRANTIES
SECTION 01 7839: PROJECT RECORD DOCUMENTS
SECTION 01 7900: DEMONSTRATION AND TRAINING
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 4116: SELECTIVE DEMOLITION
DIVISION 03 – CONCRETE
SECTION 03 3000: CAST IN PLACE CONCRETE
DIVISION 04 - MASONRY
SECTION 04 2000: UNIT MASONRY
SECTION 04 2100: THIN BRICK
DIVISION 05 - METALS
SECTION 05 4000: COLD FORMED METAL FRAMING
DIVISION 06 - WOOD AND PLASTICS
SECTION 06 1000: ROUGH CARPENTRY
SECTION 06 4116: PLASTIC LAMINATE FACED ARCHITECTURAL CABINETS
SECTION 06 6400: PLASTIC PANELING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 2100: THERMAL INSULATION
SECTION 07 9200: JOINT SEALANTS
DIVISION 08 - DOORS AND WINDOWS
SECTION 08 0671: DOOR HARDWARE SCHEDULE
SECTION 08 1113: HOLLOW METAL DOORS & FRAMES
SECTION 08 1416: FLUSH WOOD DOORS
SECTION 08 4113: ALUMINUM FRAMES ENTRANCES AND STOREFRONTS
SECTION 08 7100: DOOR HARDWARE
SECTION 08 8000: GLAZING
SECTION 08 8700: ARCHITECTURAL WINDOW FILM
DIVISION 09 - FINISHES
SECTION 09 2216: NON-STRUCTURAL METAL FRAMING
SECTION 09 2900: GYPSUM BOARD
SECTION 09 5113: ACOUSTICAL PANEL CEILING
SECTION 09 6513: RESILIENT BASE AND ACCESSORIES
SECTION 09 6516: RESILIENT SHEET FLOORING
SECTION 09 6519: RESILIENT TILE FLOORING
SECTION 09 9100: PAINTING
DIVISION 10 – SPECALITES
SECTION 10 1423: PANEL SIGNAGE
TABLE OF CONTENTS 00 0010 - 3 of 1 LCCC Biotechnology Training Facility MKSD Project No. 26.147
DIVISION 12 – FURNISHINGS
SECTION 12 2413: ROLLER WINDOW SHADES
DIVISION 22 – PLUMBING
SECTION 22 0500: COMMON WORK RESLTS FOR PLUMBING
SECTION 22 0518: ESCUTCHEONS FOR PLUMBING PIPING
SECTION 22 0523: GENERAL-DUTY VALVES FOR PLUMBING PIPING
SECTION 22 0529: HANGERS AND SUPPORTS FOR PUMBING PIPING AND
EQUIPMENT
SECTION 22 0553: IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
SECTION 22 0710: PLUMBING PIPING INSULATION
SECTION 22 1116: DOMESTIC WATER PIPING
SECTION 22 1119: DOMESTIC WATER PIPING SPECIALTIES
SECTION 22 1316: SANITARY WASTE AND VENT PIPING
SECTION 22 1319: SANITARY WASTE PIPING SPECIALTIES
SECTION 22 1319.13: SANITARY DRAINS
SECTION 22 4216.16: COMMERCIAL SINKS
SECTION 22 6113: COMPRESSED-AIR PIPING FOR LABORATORY AND
HEALTHCARE FACILITIES
SECTION 22 6119: COMPRESSED-AIR EQUIPMENT FOR LABORATORY AND
HEALTHCARE FACILITIES
DIVISION 23 - HVAC
SECTION 23 0500: COMMON WORK RESULTS FOR HVAC
SECTION 23 0513: COLLEGE COMMON MOTOR REQUIREMENTS FOR HVAC
EQUIPMENT
SECTION 23 0529: HANGERS AND SUPPORTS FOR HVAC PIPING AND
EQUIPMENT
SECTION 23 0553: IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 23 0593: TESTING, ADJUSTING, AND BALANCING
SECTION 23 0713: DUCT INSULATION
SECTION 23 0719: HVAC PIPING INSULATION
SECTION 23 2300: REFRIGERANT PIPING
SECTION 23 3113: METAL DUCTS
SECTION 23 3300: AIR DUCT ACCESSORIES
SECTION 23 8126: SPLIT-SYSTEM AIR-CONDITIONERS
DIVISION 26 – ELECTRICAL
SECTION 26 0511: REQUIREMENTS FOR ELECTRICAL SYSTEMS
SECTION 26 0519: REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
SECTION 26 0526: GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
SECTION 26 0529: HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
SECTION 26 0533.16: BOXES AND COVERS FOR ELECTICAL SYSTEMS
SECTION 26 0544: SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS
AND CABLING
SECTION 26 0553: IDENTIFICATION FOR ELECTRICAL SYSTEMS
SECTION 26 0923: LIGHTING CONTROL DEVICES
SECTION 26 2213: LOW-VOLTAGE DISTRIBUTION TRANSFORMERS
SECTION 26 4116: LOW-VOLTAGE BUCK-BOOST TRANSFORMERS
TABLE OF CONTENTS 00 0010 - 4 of 1 LCCC Biotechnology Training Facility MKSD Project No. 26.147
SECTION 26 2416: PANELBOARDS
SECTION 26 2702: EQUIPMENT WIRING SYSTEMS
SECTION 26 2813: FUSES
SECTION 26 2816: ENCLOSED SWITCHES AND CIRCUIT BREAKERS
SECTION 26 5119: LED INTERIOR LIGHTING
SECTION 26 5213: EMERGENCY AND EXIT LIGHTING
DIVISION 27 – COMMUNICATIONS
SECTION 27 0528: PATHWAYS FOR COMMUNICATIONS SYSTEMS
SECTION 27 0529: HANGERS AND SUPPORTS FOR COMMUNICATIONS
SYSTEMS
DIVISION 28 – ELECTRIC SAFETY & SECURITY
SECTION 28 4621.11: ADDRESSABLE FIRE-ALARM SYSTEMS
END OF SECTION
COPYRIGHT 00 0050 - 1 of 1 LCCC Biotechnology Training Facility MKSD Project No. 26.147
COPYRIGHT
All reports, construction documents, and computer files relating to this project are the property of MKSD, LLC MKSD, LLC retains all common law, statue and other reserved rights including the copyright thereto.
Reproduction of the material herein or substantial use without written permission of MKSD, LLC the copyright laws of the United States and will be subject to legal prosecution.
2026 MKSD, LLC
COPYRIGHT
MKSD, LLC
THIS PAGE LEFT INTENTIONALLY BLANK
ADVERTISEMENT TO BID
ADVERTISEMENT TO BID 00 1113 - 1 of 2
INVITATION TO BID
NOTICE IS HEREBY GIVEN that Lehigh Carbon Community College will receive sealed bids online, via the PennBid Program at www.pennbid.net until 12:00:00 PM, prevailing time on December 11, 2026 for the construction of the Biotechnology Training Facility located in Lehigh County at 4525 Education Park Drive, Schnecksville, PA 18078.
The scope of work for this project includes the provision of all labor, materials, tools, supervision and permits, to renovate an portion of the first floor of Science Hall. The scope of work for this project includes, but is not limited to, renovating the existing first floor of Science Hall to create a new, state-of-the-art Biotechnology Laboratory and Training Facility. The project includes renovation of existing laboratories, classrooms, storage areas, and offices to accommodate two biotechnology teaching laboratories, laboratory support and storage spaces, a biotechnology lecture hall, aseptic fill and automated fill training rooms, office space, and associated support areas. Work includes demolition, new partitions, ceiling / light fixtures, casework, flooring and other finishes. HVAC, plumbing, and electrical work are included in the renovation. Exterior work includes refurbishment of the existing patio area. Alternate Bid Item: Removal and replacement of existing windows in area of work.
All bidding documents and solicitation details will be available at no cost at www.PennBid.net on or after November 16, 2026. A mandatory pre-bid meeting will be held on November 20, 2026 at 10:00 AM in the Shipping / Receiving Dock in the lower level of Science Hall.
Questions may be submitted through PennBid’s “Clarifications (From Vendors)” tab on or before December 2, 2026. Responses will be provided via PennBid to all registered parties.
Construction will be bid for the following Prime Contracts:
Contract No. 1 – General Construction Contract;
The Project Architect is MKSD Architects, LLC, 1209 Hausman Road, Suite A, Allentown, PA 18104.
Either a Certified Check or a Bid Bond (with a corporate surety authorized to do business in Pennsylvania) drawn to the order of Lehigh Carbon Community College in the amount equal to ten percent (10%) of the amount of the bid must be submitted with each bid as security. A Performance Bond in the amount of 100% of the contract shall be furnished by the successful bidder as detailed in the Instructions to Bidders.
This project is subject to the Pennsylvania Prevailing Wage Act, approved August 15, 1961, P.L.
987 (Act No. 442), as amended and supplemented, and reference is made to the prevailing minimum wage rates applicable to this project which have been promulgated by the Secretary of Labor and Industry. Bidders shall prepare their bids after giving consideration to the applicability of said Pennsylvania Wage Act to the work involved and all other laws and regulations, state or federal, applicable to such projects.
Immediately following the due date and time, all bids received at the College will be opened publicly at 2:00PM on December 11, 2026 and referred to the owner for final award. An http://www.pennbid.net/
ADVERTISEMENT TO BID
ADVERTISEMENT TO BID 00 1113 - 2 of 2 LCCC Biotechnology Training Facility MKSD Project No. 26.147 abstract of the bids received will be available to bidders on PennBid following the date and time that bids are due as indicated above
NONDISCRIMINATION IN EMPLOYMENT
Bidders on this work will be required to comply with the Pennsylvania Human Relations Act No. 222. The requirements for bidders and contractors under these enactments are explained in the project documents.
Except as otherwise provided by law, no bidder may withdraw his bid within ninety (90) consecutive calendar days after the actual date of opening thereof, or one hundred twenty (120) consecutive calendar days if the award is delayed by a required approval of another governmental agency, the sale of bonds or the award of a grant or grants.
The Board of Trustees will accept the bid of the lowest responsible bidder when the kinds and quality of supplies and equipment offered are the same or are equal, but they reserve the right to accept or reject any of all bids, to cure any non-material oversight, to withhold award for a period of sixty (60) days, and to award the bid in the best interest of Lehigh Carbon Community College as judged by the Board of Trustees.
Advertise: 11/16/2026
AIA
Document A305® – 2020 Contractor's Qualification Statement
AIA Document A305 – 2020. Copyright © 1964, 1969, 1979, 1986, and 2020. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 09:24:24 ET on 05/15/2023 under Order No.2114397647 which expires on 01/09/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (1212564306)
ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed.
This document has important legal consequences.
Consultation with an attorney is encouraged with respect to its completion or modification.
ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.
THE PARTIES SHOULD EXECUTE A SEPARATE CONFIDENTIALITY AGREEMENT IF THEY INTEND FOR ANY OF THE
INFORMATION IN THIS A305-2020 TO BE HELD CONFIDENTIAL.
SUBMITTED BY: SUBMITTED TO:
(Organization name and address.) (Organization name and address.)
« » «Lehigh Carbon Community College »« »
4525 Education Park Dr Schnecksville, PA 18078» »
TYPE OF WORK TYPICALLY PERFORMED
(Indicate the type of work your organization typically performs, such as general contracting, construction manager as constructor services, HVAC contracting, electrical contracting, plumbing contracting, or other.)
THIS CONTRACTOR’S QUALIFICATION STATEMENT INCLUDES THE FOLLOWING:
(Check all that apply.)
[ « » ] Exhibit A – General Information [ « » ] Exhibit B – Financial and Performance Information [ « » ] Exhibit C – Project-Specific Information [ « » ] Exhibit D – Past Project Experience [ « » ] Exhibit E – Past Project Experience (Continued)
CONTRACTOR CERTIFICATION
The undersigned certifies under oath that the information provided in this Contractor’s Qualification Statement is true and sufficiently complete so as not to be misleading.
Organization’s Authorized Representative Signature
Date
Printed Name and Title
NOTARY
State of: « » County of: « » Signed and sworn to before me this « » day of « » « »
Notary Signature
My commission expires: « »
AGREEMENT OF SURETY 00 1400 - 1 of 1 LCCC Biotechnology Training Facility MKSD Project No. 26.147
SECTION 00 1400 - AGREEMENT OF SURETY
(Note: This Agreement must be properly executed and must accompany the Certified Check, or Bid Bond, whichever is furnished as Bid Security.)
KNOW ALL MEN BY THESE PRESENTS, that we ___________________________________________
__________________________________________, as Surety, a corporation existing under the laws of the State of ______________________________________, and authorized to transact business in the
Commonwealth of Pennsylvania, hereby agree to execute within the time limit specified in the Contract
Documents, the Contract Bonds in the forms and in the amounts required for the faithful performance and proper fulfillment of the Contract for__________________________________________________ on behalf of _________________________________________________________________________ hereinafter called the Bidder, provided that the above Contract be awarded to the Bidder within ninety (90) days after the date of opening of bids or otherwise as set forth in the Instructions to Bidders; and the Surety further agrees that should the Surety after notification of intent to make such award omit or refuse to execute the required bonds, then the Surety shall pay to Lehigh Carbon Community College, 4525 Education Park Dr, Schnecksville, PA 18078 the amount of the Bid Security.
WITNESS CORPORATE SURETY
(Affix ______________________________________ __________________________________ Corporate DATE SIGNATURE Seal)
ATTORNEY-IN-FACT
END OF SECTION 00 1400
Document A701™ – 2018 Instructions to Bidders
AIA Document A701™ – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved.
The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:03:33 ET on 02/25/2021 under Order No.6263448050 which expires on 01/22/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (1248295508)
ADDITIONS AND DELETIONS:
The author of this document has added information needed for its completion.
The author may also have revised the text of the original AIA standard form.
An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed.
This document has important legal consequences.
Consultation with an attorney is encouraged with respect to its completion or modification.
FEDERAL, STATE, AND LOCAL
LAWS MAY IMPOSE
REQUIREMENTS ON PUBLIC
PROCUREMENT CONTRACTS.
CONSULT LOCAL AUTHORITIES
OR AN ATTORNEY TO VERIFY
REQUIREMENTS APPLICABLE TO
THIS PROCUREMENT BEFORE
COMPLETING THIS FORM.
It is intended that AIA Document G612™–2017, Owner’s Instructions to the Architect, Parts A and B will be completed prior to using this document.
ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.
for the following Project:
(Name, location, and detailed description)
« Lehigh Carbon Community College – Biotechnology Training Facility» «4525 Education Park Drive, Schnecksville, PA 18078 » « The scope of work for this project includes, but is not limited to, renovating the existing first floor of Science Hall to create a new, state-of-the-art Biotechnology Laboratory and Training Facility. The project includes renovation of existing laboratories, classrooms, storage areas, and offices to accommodate two biotechnology teaching laboratories, laboratory support and storage spaces, a biotechnology lecture hall, aseptic fill and automated fill training rooms, office space, and associated support areas. Work includes demolition, new partitions, ceiling / light fixtures, casework, flooring and other finishes. HVAC, plumbing, and electrical work are included in the renovation. Exterior work includes refurbishment of the existing patio area.
Alternate Bid Item:
Deduct - Removal and replacement of existing windows in area of work.
Deduct – Installation of exterior monument sign
THE OWNER:
(Name, legal status, address, and other information)
«Lehigh Carbon Community College »« » 4525 Education Park Dr Schnecksville, PA 18078» »« »
THE ARCHITECT:
(Name, legal status, address, and other information)
«MKSD, LLC »« »
1209 Hausman Road, Suite A« » «Allentown, PA 18104 »
AIA Document A701™ – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved.
The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:03:33 ET on 02/25/2021 under Order No.6263448050 which expires on 01/22/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms
TABLE OF ARTICLES
1 DEFINITIONS
2 BIDDER’S REPRESENTATIONS
3 BIDDING DOCUMENTS
4 BIDDING PROCEDURES
5 CONSIDERATION OF BIDS
6 POST-BID INFORMATION
7 PERFORMANCE BOND AND PAYMENT BOND
8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS
AIA Document A701™ – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved.
The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:03:33 ET on 02/25/2021 under Order No.6263448050 which expires on 01/22/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms
ARTICLE 1 DEFINITIONS
§ 1.1 Bidding Documents include the Bidding Requirements and the Proposed Contract Documents. The Bidding Requirements consist of the advertisement or invitation to bid, Instructions to Bidders, supplementary instructions to bidders, the bid form, and any other bidding forms. The Proposed Contract Documents consist of the unexecuted form of Agreement between the Owner and Contractor and that Agreement’s Exhibits, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in Article 8 of these Instructions. The invalidity of any covenant, restriction, condition, limitation or any part or provision of the Proposed Contract Documents shall not impair or affect in any manner the validity, enforceability or effect of the remainder of the Proposed Contract Documents.
§ 1.2 Definitions set forth in the General Conditions of the Contract for Construction, or in other Proposed Contract Documents apply to the Bidding Documents.
§ 1.3 Addenda are written or graphic instruments issued by the Architect, which, by additions, deletions, clarifications, or corrections, modify or interpret the Bidding Documents.
§ 1.4 A Bid is a complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents.
§ 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents, to which Work may be added or deleted by sums stated in Alternate Bids.
§ 1.6 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not change, the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.
§ 1.7 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, as described in the Bidding Documents.
§ 1.8 A Bidder is a person or entity who submits a Bid and who meets the requirements set forth in the Bidding Documents.
§ 1.9 A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of the Work.
ARTICLE 2 BIDDER’S REPRESENTATIONS
§ 2.1 By submitting a Bid, the Bidder represents that:
.1 the Bidder has read and understands the Bidding Documents;
.2 the Bidder understands how the Bidding Documents relate to other portions of the Project, if any, being bid concurrently or presently under construction;
.3 the Bid complies with the Bidding Documents;
.4 the Bidder has visited the site, become familiar with local conditions under which the Work is to be performed, and has correlated the Bidder’s observations with the requirements of the Proposed Contract Documents;
.5 the Bid is based upon the materials, equipment, and systems required by the Bidding Documents without exception; and
.6 the Bidder has read and understands the provisions for liquidated damages, if any, set forth in the form of Agreement between the Owner and Contractor.
.7 the Bidder is a properly licensed Contractor according to the laws and regulations of City of Allentown, Lehigh County, Pennsylvania and meets qualifications indicated in the Procurement and Contracting Documents.
ARTICLE 3 BIDDING DOCUMENTS
§ 3.1 Distribution § 3.1.1 Bidding documents are available at no cost via the PennBid Program (www.pennbid.net).
§ 3.1.3 Bidding Documents will not be issued directly to Sub-bidders unless specifically offered in the advertisement or invitation to bid, or in supplementary instructions to bidders.
AIA Document A701™ – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved.
The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:03:33 ET on 02/25/2021 under Order No.6263448050 which expires on 01/22/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms
§ 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete Bidding Documents.
§ 3.1.5 The Bidding Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant of use is conferred by distribution of the Bidding Documents.
§ 3.2 Modification or Interpretation of Bidding Documents § 3.2.1 The Bidder shall carefully study the Bidding Documents, shall examine the site and local conditions, and shall notify the Architect of errors, inconsistencies, or ambiguities discovered and request clarification or interpretation pursuant to Section 3.2.2.
§ 3.2.2 Bidding Prime Contractors requiring clarification or interpretation of the Bidding Documents shall submit said inquiries via the “Clarifications” feature within PennBid no later than December 2, 2026 at 12:00 PM. »
§ 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modifications and interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall not rely upon them.
§ 3.3 Substitutions § 3.3.1 The materials, products, and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance, and quality to be met by any proposed substitution. See also the Procurement Substitution Procedures.
§ 3.3.2 Substitution Process § 3.3.2.1 Written requests for substitutions shall be received by the Architect at least ten days prior to the date for receipt of Bids. Requests shall be submitted in the same manner as that established for submitting clarifications and interpretations in Section 3.2.2.
§ 3.3.2.2 Bidders shall submit substitution requests on a Substitution Request Form if one is provided in the Bidding Documents.
§ 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or equipment specified in the Bidding Documents; (2) the reason for the requested substitution; (3) a complete description of the proposed substitution including the name of the material or equipment proposed as the substitute, performance and test data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall include a statement setting forth changes in other materials, equipment, or other portions of the Work, including changes in the work of other contracts or the impact on any Project Certifications (such as LEED), that will result from incorporation of the proposed substitution.
§ 3.3.3 The burden of proof of the merit of the proposed substitution is upon the proposer. The Architect’s decision of approval or disapproval of a proposed substitution shall be final.
§ 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, such approval shall be set forth in an Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them.
§ 3.3.5 No substitutions will be considered after the Contract award unless specifically provided for in the Contract Documents.
§ 3.4 Addenda § 3.4.1 Addenda will be transmitted via PennBid to Bidders known by the issuing office to have received complete Bidding Documents.
§ 3.4.2 Addenda will be available where Bidding Documents are on file.
§ 3.4.3 Addenda will be issued no later than one day prior to the date for receipt of Bids, except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.
AIA Document A701™ – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved.
The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:03:33 ET on 02/25/2021 under Order No.6263448050 which expires on 01/22/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms
§ 3.4.4 Prior to submitting a Bid, each Bidder shall ascertain that the Bidder has received all Addenda issued, and the Bidder shall acknowledge their receipt in the Bid.
ARTICLE 4 BIDDING PROCEDURES
§ 4.1 Preparation of Bids § 4.1.1 Bids shall be submitted electronically via the PennBid Program (www.pennbid.net), and shall include complete Bid Forms, as well as uploading of all required supporting documents.
§ 4.1.2 All blanks on the bid form shall be legibly executed. Paper bid forms shall be executed in a non-erasable medium.
§ 4.1.3 Sums shall be expressed in both words and numbers, unless noted otherwise on the bid form. In case of discrepancy, the amount entered in words shall govern.
§ 4.1.4 Edits to entries made on paper bid forms must be initialed by the signer of the Bid.
§ 4.1.5 All requested Alternates shall be bid. If no change in the Base Bid is required, enter “No Change” or as required by the bid form.
§ 4.1.6 Where two or more Bids for designated portions of the Work have been requested, the Bidder may, without forfeiture of the bid security, state the Bidder’s refusal to accept award of less than the combination of Bids stipulated by the Bidder. The Bidder shall neither make additional stipulations on the bid form nor qualify the Bid in any other manner.
§ 4.1.7 Each copy of the Bid shall state the legal name and legal status of the Bidder. As part of the documentation submitted with the Bid, the Bidder shall provide evidence of its legal authority to perform the Work in the jurisdiction where the Project is located. Each copy of the Bid shall be signed by the person or persons legally authorized to bind the Bidder to a contract. A Bid by a corporation shall further name the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached, certifying the agent’s authority to bind the Bidder.
§ 4.1.8 A Bidder shall incur all costs associated with the preparation of its Bid.
§ 4.1.9 The Owner may elect to disqualify a bid due to failure to submit a bid in the form requested, failure to bid requested alternates or unit prices, failure to complete entries in all blanks in the Bid Form, or inclusion by the Bidder of any alternates, conditions, limitations or provisions not called for.
§ 4.1.10 Bids shall include sales and use taxes, unless specifically exempted. Contractors shall show separately with each monthly payment application the sales and use taxes paid by them and their subcontractors in the form indicated.
Reimbursement of sales and use taxes, if any, shall be applied for by the Owner for the sole benefit of the Owner.
§ 4.2 Bid Security § 4.2.1 Each Bid shall be accompanied by the following bid security:
«Ten percent (10%). Either certified check or Form included in bidding documents. »
§ 4.2.2 The Bidder pledges to enter into a Contract with the Owner on the terms stated in the Bid and shall furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder. Should the Bidder refuse to enter into such Contract or fail to furnish such bonds if required, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as a penalty.
§ 4.2.3 If a surety bond is required as bid security, it shall be written on AIA Document A310™, Bid Bond, unless otherwise provided in the Bidding Documents. The attorney-in-fact who executes the bond on behalf of the surety shall affix to the bond a certified and current copy of an acceptable power of attorney. The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.
§ 4.2.4 The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until
(a) the Contract has been executed and bonds, if required, have been furnished; (b) the specified time has elapsed so that http://www.pennbid.net/
AIA Document A701™ – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved.
The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:03:33 ET on 02/25/2021 under Order No.6263448050 which expires on 01/22/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms
Bids may be withdrawn; or (c) all Bids have been rejected. However, if no Contract has been awarded or a Bidder has not been notified of the acceptance of its Bid, a Bidder may, beginning« 60 »days after the opening of Bids, withdraw its Bid and request the return of its bid security.
§ 4.3 Submission of Bids § 4.3.1 Bids, inclusive of bid security, and all documents required to be submitted with bids, shall be submitted electronically via the PennBid program on December 11, 2026 at 12:00:00 PM prevailing time.
§ 4.3.2 Paper copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be submitted to the office of the Architect within 48 hours after the opening of the bids on PennBid. The envelope shall be addressed to the party receiving the Bids and shall be identified with the Project name, the Bidder’s name and address, and, if applicable, the designated portion of the Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation “SEALED BID ENCLOSED” on the face thereof.
§ 4.3.3 Bids shall be submitted by the date and time and at the place indicated in the invitation to bid. Bids submitted after the date and time for receipt of Bids, or at an incorrect place, will not be accepted.
§ 4.3.4 The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.
§ 4.3.5 A Bid submitted by any method other than as provided in this Section 4.3 will not be accepted.
§ 4.4 Modification or Withdrawal of Bid § 4.4.1 Bids may be modified or withdrawn within PennBid at any time prior to the due date and time listed in the Advertisement for Bids.
§ 4.4.2 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids in the same format as that established in Section 4.3, provided they fully conform with these Instructions to Bidders. Bid security shall be in an amount sufficient for the Bid as resubmitted.
§ 4.4.3 After the date and time designated for receipt of Bids, a Bidder who discovers that it made a clerical error in its Bid shall notify the Architect of such error within two days of the bid opening, or pursuant to a timeframe specified by the law of the jurisdiction where the Project is located, requesting withdrawal of its Bid. Upon providing evidence of such error to the reasonable satisfaction of the Architect, the Bid shall be withdrawn and not resubmitted. If a Bid is withdrawn pursuant to this Section 4.4.3, the bid security shall be forfeited to and retained by the Township.
§ 4.5 Break-Out Pricing Bid Supplement Provide detailed cost breakdowns (schedule of values) no later than two business days following Architect’s request.
§ 4.6 Subcontractors, Suppliers, and Manufacturers List Bid Supplement Provide list of major subcontractors, suppliers, and manufacturers furnishing or installing products no later than two business days following Architect’s request. Contractor shall not change subcontractors, suppliers, or manufacturers from those submitted without the approval of the Architect and Owner.
ARTICLE 5 CONSIDERATION OF BIDS
§ 5.1 Opening of Bids If stipulated in an advertisement or invitation to bid, or when otherwise required by law, Bids properly identified and received within the specified time limits will be publicly opened through PennBid. A summary of the Bids will be made available to Bidders through PennBid.
§ 5.2 Rejection of Bids Unless otherwise prohibited by law, the Owner shall have the right to reject any or all Bids.
AIA Document A701™ – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved.
The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:03:33 ET on 02/25/2021 under Order No.6263448050 which expires on 01/22/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms
§ 5.3 Acceptance of Bid (Award) § 5.3.1 It is the intent of the Owner to award a Contract to the lowest responsive and responsible Bidder, provided the Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless otherwise prohibited by law, the Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid which, in the Owner’s judgment, is in the Owner’s best interests.
§ 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive and responsible Bidder on the basis of the sum of the Base Bid and Alternates accepted.
ARTICLE 6 POST-BID INFORMATION
§ 6.1 Contractor’s Qualification Statement Unless stated otherwise in the Bidding Documents, Bidders to whom award of a Contract is under consideration shall submit to the Architect, upon request and within the timeframe specified by the Architect, a properly executed AIA Document A305™, Contractor’s Qualification Statement, unless such a Statement has been previously required and submitted for this Bid.
§ 6.2 (Omitted).
§ 6.3 Submittals § 6.3.1 After notification of selection for the award of the Contract, the Bidder shall, as soon as practicable or as stipulated in the Bidding Documents, submit in writing to the Owner through the Architect:
.1 a designation of the Work to be performed with the Bidder's own forces;
.2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers of each; and
.3 names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the Work.
§ 6.3.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents.
§ 6.3.3 Prior to the execution of the Contract, the Architect will notify the Bidder if either the Owner or Architect, after due investigation, has reasonable objection to a person or entity proposed by the Bidder. If the Owner or Architect has reasonable objection to a proposed person or entity, the Bidder may, at the Bidder’s option, withdraw the Bid or submit an acceptable substitute person or entity. In the event of either withdrawal or disqualification, bid security will not be forfeited.
§ 6.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable objection must be used on the Work for which they were proposed and shall not be changed except with the written consent of the Owner and Architect.
ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND
§ 7.1 Bond Requirements § 7.1.1 The Bidder shall furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder in accordance with law.
§ 7.1.2 The cost of the bonds shall be included in the Bid. If the furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds shall be added to the Bid in determining the Contract Sum.
§ 7.1.3 The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.
§ 7.1.4 Unless otherwise indicated below, the Penal Sum of the Payment and Performance Bonds shall be the amount of the Contract Sum.
§ 7.2 Time of Delivery and Form of Bonds § 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than ten days following issuance of the Notice of Intent to Award.
AIA Document A701™ – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved.
The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:03:33 ET on 02/25/2021 under Order No.6263448050 which expires on 01/22/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms
§ 7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312, Performance Bond and Payment Bond.
§ 7.2.3 The bonds shall be dated on or before the date of the Contract.
§ 7.2.4 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix to the bond a certified and current copy of the power of attorney.
ARTICLE 8 EXECUTION OF THE CONTRACT
§ 8.1 Subsequent to the Notice of Award, and within 10 calendar days after the prescribed Form of Agreement is presented to the Awardee for signature, the Awardee shall execute and deliver the Agreement to the Owner through the Architect, in such number of counterparts as the Owner may require.
§ 8.2 Owner may deem as a default the failure of the Awardee to execute the Contract and/or to supply the required bonds within the period of time allowed.
§ 8.3 Unless otherwise indicated in the Procurement and Contracting Documents or the executed Agreement, the date of commencement of the Work shall be the date of the executed Agreement.
ARTICLE 9 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS
§ 9.1 Copies of the proposed Contract Documents have been made available to the Bidder and consist of the following documents:
.1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor, unless otherwise stated below.
.2 AIA Document A201™–2017, General Conditions of the Contract for Construction, unless otherwise stated below.
.3
.4 Drawings (Refer to “00 0950 List of Drawings”)
.5 Specifications (Refer to the “Table of Contents”)
.6 Addenda:
Number Date Pages
.7 Other Exhibits:
(Check all boxes that apply and include appropriate information identifying the exhibit where required.)
[ « » ] Supplementary and other Conditions of the Contract:
.8 Other documents listed below:
AIA Document A701™ – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved.
The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:03:33 ET on 02/25/2021 under Order No.6263448050 which expires on 01/22/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms
(List here any additional documents that are intended to form part of the Proposed Contract Documents.)
PROCUREMENT SUBSTITUTION PROCEDURES 00 2600 - 1 of 3 LCCC Biotechnology Training Facility MKSD Project No. 26.147
SECTION 00 2600 - PROCUREMENT SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 DEFINITIONS
A. Procurement Substitution Requests: Requests for changes in products, materials, equipment, and methods of construction from those indicated in the Procurement and Contracting Documents, submitted prior to receipt of bids.
B. Substitution Requests: Requests for changes in products, materials, equipment, and methods of construction from those indicated in the Contract Documents, submitted following Contract award. See Division 01 2600 “Contract Modification Procedures” for conditions under which Substitution requests will be considered following Contract award.
1.3 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.
1.4 PROCUREMENT SUBSTITUTIONS
A. Procurement Substitutions, General: By submitting a bid, the Bidder represents that its bid is based on materials and equipment described in the Procurement and Contracting Documents, including Addenda. Bidders are encouraged to request approval of qualifying substitute materials and equipment when the Specifications Sections list materials and equipment by product or manufacturer name.
B. Procurement Substitution Requests will be received and considered by Owner when the following conditions are satisfied, as determined by Architect; otherwise requests will be returned without action:
1. Extensive revisions to the Contract Documents are not required.
2. Proposed changes are in keeping with the general intent of the Contract
Documents, including the level of quality of the Work represented by the requirements therein.
3. The request is fully documented and properly submitted.
PROCUREMENT SUBSTITUTION PROCEDURES 00 2600 - 2 of 3 LCCC Biotechnology Training Facility MKSD Project No. 26.147
1.5 SUBMITTALS
A. Procurement Substitution Request: Submit to Architect. Procurement Substitution Request must be made in writing by prime contract Bidder only in compliance with the following requirements:
1. Requests for substitution of materials and equipment will be considered if received no later than 10 days prior to date of bid opening.
2. Submittal Format: Submit electronically each written Procurement Substitution Request, using form bound in Project Manual.
3. Submittal Format: Submit Procurement Substitution Request, using format provided on Project Web site.
a. Identify the product or the fabrication or installation method to be replaced in each request. Include related Specifications Sections and drawing numbers.
b. Provide complete documentation on both the product specified and the proposed substitute, including the following information as appropriate:
1) Point-by-point comparison of specified and proposed substitute product data, fabrication drawings, and installation procedures.
2) Copies of current, independent third-party test data of salient product or system characteristics.
3) Samples where applicable or when requested by Architect.
4) Detailed comparison of significant qualities of the proposed substitute with those of the Work specified. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.
5) Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.
6) Research reports, where applicable, evidencing compliance with building code in effect for Project, from ICC-ES.
7) Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by Owner and separate contractors, which will become necessary to accommodate the proposed substitute.
c. Provide certification by manufacturer that the substitute proposed is equal to or superior to that required by the Procurement and Contracting Documents, and that its in-place performance will be equal to or superior to the product or equipment specified in the application indicated.
d. Bidder, in submitting the Procurement Substitution Request, waives the right to additional payment or an extension of Contract Time because of the failure of the substitute to perform as represented in the Procurement Substitution Request.
B. Architect's Action:
1. Architect may request additional information or documentation necessary for evaluation of the Procurement Substitution Request. Architect will notify all
PROCUREMENT SUBSTITUTION PROCEDURES 00 2600 - 3 of 3 LCCC Biotechnology Training Facility MKSD Project No. 26.147 bidders of acceptance of the proposed substitute by means of an Addendum to the Procurement and Contracting Documents.
C. Architect's approval of a substitute during bidding does not relieve Contractor of the responsibility to submit required shop drawings and to comply with all other requirements of the Contract Documents.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF DOCUMENT 00 2600
BID FORM – STIPULATED SUM (SINGLE-PRIME CONTRACT) 00 4113.1 - 1 of 6 LCCC Biotechnology Training Facility MKSD Project No. 26.147
BID FORM (General Construction) LCCC Biotechnology Training Facility
Contract #26.147.1
DATED:
Bidder's Name and Address (Print or Type) (Bidder to insert date bid submitted)
Lehigh Carbon Community College 4525 Education Park Dr Schnecksville, PA 18078
To Whom It May Concern:
Base Bid, Single-Prime (All Trades) Contract: The undersigned Bidder, having carefully examined the Contract Documents, including all Addenda which are incorporated with these documents indicating various conditions affecting this contract, the undersigned herein agrees to furnish all materials, perform all labor and do all else necessary to complete the Contract for the above-named Project in accordance with said Contract Documents…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .