1-2026.05.28 - Project Manual.pdf
PDF 22 MB Posted
- Attached to
- R004061.0440 - Limekiln Drive Bridge Replacement
- Solicitation number
- US.238252
- Issued by
- Fulton County, Pennsylvania
About this file
This is a Project Manual and bidding document package for the Limekiln Drive Bridge Replacement project submitted to Chambersburg Borough in Franklin County, Pennsylvania by Herbert, Rowland & Grubic, Inc. The project involves the replacement of an existing bridge with a precast concrete box culvert and associated utilities. Bids will be received online via PennBID until June 16, 2026 at 10:00 AM local time, with public bid opening and reading to follow. A mandatory pre-bid conference is scheduled for Friday, June 5, 2026 at 10:00 AM at the Limekiln Drive Bridge location near 95 Limekiln Drive, Chambersburg, PA. Bidders must attend this conference and sign in to be eligible to submit a proposal. The bidding documents include comprehensive specifications for various construction items including clearing and grubbing, excavation work (Class 1, 1A, and 2), selected borrow materials, geotextile installation, asphalt paving (base course, wearing course, and binder course), subbase materials, drainage pipes, and concrete work. Estimated quantities range significantly across items, from 1 lump sum clearing and grubbing item to 683 square yards of asphalt wearing course. Contract award is anticipated to proceed to the lowest responsible and responsive bidder following bid evaluation.
Bid security of 10 percent of the maximum bid price is required in the form of a certified check or bid bond. All bids must remain irrevocable for 60 days after bid opening as required by Pennsylvania law. The project falls under Pennsylvania prevailing wage requirements as the estimated cost exceeds $25,000. Successful bidders must comply with the Pennsylvania Public Works Employment Verification Act (Act 141 of 2022), requiring E-Verify system utilization for all employees. The contract will include performance and payment bonds, and successful bidders must execute the agreement within 15 days of the Notice of Award and furnish required bonds and insurance documentation. The project is subject to anti-pollution measures, statutory requirements, and Pennsylvania Department of Transportation prequalification if any work occurs on PENNDOT rights-of-way. Owner reserves the right to assist with work such as hauling demolished materials and debris, with credits issued via change order. All contract documents, including the Agreement, General Conditions, Special Provisions, and detailed construction plans, are included in the Project Manual submitted in May 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-2026.06.09 - Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .