1-2026.02.25 School House Rd Contract Documents.pdf
PDF 6 MB Posted
- Attached to
- School House Road (T-314) Culvert Replacement
- Solicitation number
- Not on record
- Issued by
- Pennsylvania
About this file
This is a contract drawing and specification document for Chapman Township, Clinton County, Pennsylvania, prepared by Penncore Consulting LLC for Contract 2026-01, the School House Road (T-314) Culvert Replacement project. The project encompasses clearing and grubbing, erosion and sediment control installation, earthwork, removal of the existing culvert, installation of a new aluminum box culvert with headwalls, full-depth pavement restoration, and vegetative stabilization on School House Road in Chapman Township. The construction contract documents include existing conditions and demolition plans, improvement plans, erosion and sediment control plans, site and layout plans with survey data, profiles and sections, and detailed notes and specifications. Chapman Township will provide the culvert and headwall materials and coordinate delivery with the contractor's schedule. Sealed bids are due Friday, March 27, 2026, at 3:00 p.m., with public opening and reading of bids scheduled for the Chapman Township Board of Supervisors meeting on Tuesday, April 7, 2026, at 5:00 p.m. Contractor work hours are limited to 7:00 a.m. to 5:00 p.m. on weekdays only. The project includes seasonal restrictions: no in-stream work between October 1 and December 31 due to the natural trout stream designation, and no tree removal between May 15 and July 31 due to Northern Long-Eared Bat habitat protection.
Each bid must be accompanied by a certified check or bid bond equal to at least ten percent of the total bid amount. All bids shall remain irrevocable for 60 days following the bid opening date, with the option to extend to 120 days if necessary. Prevailing wage requirements apply to all work performed on the project. Bidders must submit all questions regarding the bidding documents through the "Vendor Discussions" tab in PennBid by 3:00 p.m. on Friday, March 20, 2026. Chapman Township reserves the right to waive any defects or informalities, accept any bid or combination of bids deemed in the Township's best interest, and reject any or all bids. All bid documents and solicitation details are available at no cost on PennBid at https://pennbid.bonfirehub.com. The contractor is responsible for utility locating through the PA-One Call System at 800-242-1776 at least three working days prior to beginning work, compliance with all federal, state, and local regulations, OSHA standards, erosion and sediment control maintenance, and proper disposal of all construction debris and excess excavated material off-site in accordance with applicable regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-2026.02.25 School House Rd Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STREAM
PROPOSED FEATURES
LIMITS OF DISTURBANCE /
PERMIT BOUNDARY
ROAD
RIPRAP
SILTSOCK
PROPERTY LINE
BUILDING
FLOODWAY
RIGHT-OF-WAY
GRAVEL DRIVE
CULVERT
PREPARED BY:
PENNCORE CONSULTING LLC
999 MAIN STREET
SOUTH WILLIAMSPORT, PA 17702
PHONE: (570) 980-3994
CONTRACT DRAWINGS
FOR
SCHOOL HOUSE ROAD (T-314) CULVERT REPLACEMENT
CHAPMAN TOWNSHIP, CLINTON COUNTY, PA
CONTRACT 2026-01
MARCH 2026
OWNER:
CHAPMAN TOWNSHIP
196 MAIN STREET
NORTH BEND, PA 17760
(570) 923-2044
SCALE: 1" = 2000'
USGS QUAD: RENOVO EAST, PA
GENERAL NOTES
1. EXISTING TOPOGRAPHY IS FROM AN EXISTING FEATURES AND TOPOGRAPHY SURVEY
GATHERED BY PENNCORE CONSULTING LLC IN JULY 2025. NO BOUNDARY SURVEY HAS BEEN
PERFORMED FOR THIS PROJECT.
2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS ON SITE PRIOR
TO ANY CONSTRUCTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES.
3. A GEOTECHNICAL INVESTIGATION HAS BEEN CONDUCTED AS A PART OF THIS PROJECT (SEE
PROJECT MANUAL).
4. THE WORK COMPLETED FOR THE PREPARATION OF THIS PLAN DID NOT INCLUDE THE
PERFORMANCE OF AN ENVIRONMENTAL AUDIT, OR ASSESSMENT. THEREFORE PENNCORE
CONSULTING, LLC (PENNCORE) MAKES NO WARRANTY OR GUARANTEE EITHER EXPRESSED OR
IMPLIED AS TO THE ENVIRONMENTAL CONDITIONS OF THE SITE IN REGARD TO SURFACE OR
SUBSURFACE POLLUTION AS REGULATED BY PENNSYLVANIA CODE TITLE 25. ENVIRONMENTAL
PROTECTION, DEPARTMENT OF ENVIRONMENTAL PROTECTION, CHAPTERS 75, 101, 271, 273, 275, 277, 279, 281, AND 285.
5. THE LOCATIONS OF EXISTING UTILITIES SHOWN ON THIS SITE PLAN ARE BASED ON THE BEST
AVAILABLE INFORMATION AND SHALL BE CONSIDERED APPROXIMATE. THE CONTRACTOR IS
RESPONSIBLE FOR LOCATING ALL PUBLIC AND PRIVATE UTILITIES WHICH LIE IN OR ADJACENT
TO THE PROJECT SITE. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO
PROTECT EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED SERVICE. THE CONTRACTOR IS
RESPONSIBLE FOR CONTACTING THE PA-ONE CALL SYSTEM AT 800-242-1776, NO LESS THAN
THREE (3) WORKING DAYS PRIOR TO BEGINNING WORK, AS REQUIRED BY PENNSYLVANIA STATE
LAW.
6. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS BEFORE STARTING WORK, ANY DISCREPANCIES FOUND BETWEEN THE DRAWINGS, SPECIFICATIONS AND SITE CONDITIONS, OR ANY INCONSISTENCIES OR AMBIGUITIES IN THE DRAWINGS OR SPECIFICATIONS SHALL BE
IMMEDIATELY REPORTED TO THE PROJECT'S ENGINEER, IN WRITING, WHO SHALL PROMPTLY
ADDRESS SUCH INCONSISTENCIES OR AMBIGUITIES. WORK DONE BY THE CONTRACTOR AFTER
HIS DISCOVERY OF SUCH DISCREPANCIES, INCONSISTENCIES, OR AMBIGUITIES, WITHOUT
RECEIVING A RESPONSE FROM THE PROJECT'S ENGINEER, SHALL BE DONE AT THE
CONTRACTOR'S RISK.
7. IF REQUIRED, THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH UTILITIES FOR THE ADJUSTMENT OR RELOCATION OF UTILITY SURFACE FEATURES, i.e., VALVE BOXES, UTILITY
POLES, MANHOLES, ETC. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING OF
RELOCATION CONFLICTING UTILITIES WHICH ARE A RESULT OF THESE IMPROVEMENTS AT NO
ADDITIONAL COST.
8. ALL CONSTRUCTION DEBRIS, INCLUDING EXCESS EXCAVATED MATERIAL, ASPHALT, SCRAP
WOOD, ETC., SHALL BE DISPOSED OFF-SITE BY THE CONTRACTOR IN ACCORDANCE WITH
FEDERAL, STATE, AND LOCAL REGULATIONS.
9. STRIPPING OF VEGETATION, RE-GRADING, OR OTHER WORK SHALL BE DONE IN A MANNER THAT
WILL MINIMIZE EROSION. ANY EROSION AND SEDIMENT POLLUTION CONTROLS THAT ARE
DEEMED NECESSARY BY THE CLINTON COUNTY CONSERVATION DISTRICT, SHALL BE
IMPLEMENTED IMMEDIATELY BY THE CONTRACTOR. WHENEVER SEDIMENTATION IS CAUSED BY
STRIPPING VEGETATION, RE-GRADING OR OTHER DEVELOPMENT, IT SHALL BE THE
RESPONSIBILITY OF THE PERSON, CORPORATION OR OTHER ENTITY CAUSING SUCH
SEDIMENTATION TO REMOVE IT FROM ALL ADJOINING SURFACES, DRAINAGE SYSTEMS AND
WATERCOURSES AND TO REPAIR ANY DAMAGE.
10. THIS PLAN ILLUSTRATES ALL EXISTING SIGNS TO REMAIN UPON COMPLETION OF WORK. ANY
CONFLICTING OR DAMAGED SIGNS WITHIN THE PROJECT AREA NOT INDICATED ON THE PLAN
MUST BE REMOVED AND/OR REPLACED.
11. THE CONTRACTOR SHALL BE COGNIZANT OF THE EFFECT OF HIS WORK ON ADJACENT
PROPERTIES. ALL COMPLAINTS WILL BE BROUGHT TO THE ATTENTION OF THE TOWNSHIP
ROADMASTER. MEASURES NECESSARY FOR DUST CONTROL SHALL BE EXERCISED DURING ALL
WORK OPERATIONS.
12. THE INFORMATION SHOWN ON THIS DRAWING MAY HAVE ALSO BEEN RELEASED IN A DIGITAL
DRAWING FORMAT. ONCE A DRAWING IS RELEASED FROM PENNCORE IN A DIGITAL FORMAT, WE
HAVE NO CONTROL OVER THE MANIPULATION OR MISUSE OF THE DATA CONTAINED IN THAT
FILE. THE VIEWER IS THEREFORE CAUTIONED AND SHOULD COMPARE ANY SUBSEQUENT
REPRODUCTIONS OR MANIPULATIONS OF THIS DATA WITH THE ORIGINAL HARD COPY SEALED
PLAN PROVIDED BY PENNCORE. THE USER OF THE DIGITAL DATA IS ALSO CAUTIONED THAT ANY USE OF THE DATA CONTAINED IN THE DIGITAL FILE, WHICH IS NOT SHOWN ON THE HARD COPY
DRAWING, MUST BE AT THE RISK OF THE USER.
13. UNLESS OTHERWISE NOTED, ALL FINAL GRADES FOR PROPOSED IMPROVEMENTS SHALL
SMOOTHLY TRANSITION TO MATCH EXISTING GRADES. CONTRACTOR SHALL ENSURE THAT
POSITIVE DRAINAGE AWAY FROM FOUNDATIONS IS PROVIDED AND NO LOW SPOTS OF
PUDDLING OCCUR WITHIN THE LIMITS OF WORK.
14. WORK ON THIS PROJECT SHALL CONFORM TO THE PROJECT'S SPECIFICATIONS, AND WHERE
APPLICABLE, THE LATEST STANDARDS AND SPECIFICATIONS OF THE PENNSYLVANIA
DEPARTMENT OF TRANSPORTATION (PENNDOT) IN THE CASE OF CONFLICT, THE PROJECT'S
OWNER SHALL BE NOTIFIED FOR CLARIFICATION. ALL WORK IN THE LEGAL RIGHT-OF-WAY IS TO BE BUILT ACCORDING TO: TC-8600 & TC-8700 SERIES (PUBLICATION 111M); TC-7800 SERIES
(PUBLICATION 148) WORK ZONE TRAFFIC CONTROL (PUBLICATION 213); THE MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES, DATED 2003; AND THE REGULATIONS (PUBLICATION 212)
GOVERNING THE DESIGN, LOCATION, AND OPERATION OF ALL OFFICIAL TRAFFIC SIGNS,
SIGNALS AND PAVEMENT MARKINGS ON AND ALONG ALL HIGHWAYS WITHIN THE
COMMONWEALTH OF PENNSYLVANIA; PENNDOT PUBLICATION NO. 408; PENNDOT PUBLICATION
NO. 35; APPROVED CONSTRUCTION MATERIALS (BULLETIN 15); PENNDOT PUBLICATION NO. 72M;
STANDARDS FOR ROADWAY CONSTRUCTION, PENNSYLVANIA CODE, TITLE 67,
TRANSPORTATION, CHAPTER 459.
15. ALL EXISTING SIGNS DISTURBED DURING CONSTRUCTION SHALL BE REINSTALLED IN
ACCORDANCE WITH APPLICABLE LOCAL, COUNTY, STATE, AND FEDERAL REGULATIONS.
16. THE CONTRACTOR WILL PROMPTLY NOTIFY THE OWNER, IN WRITING, OF ANY SUBSURFACE OR LATENT PHYSICAL CONDITIONS AT THE SITE DIFFERING MATERIALLY FROM THOSE INDICATED IN
THE CONTRACT DOCUMENTS.
17. THE CONTRACTOR, DURING THE PERFORMANCE OF ALL WORK ASSOCIATED WITH THE
CONSTRUCTION OF THIS PROJECT, IS RESPONSIBLE FOR COMPLIANCE WITH ALL FEDERAL,
STATE, AND LOCAL LAWS, CODES, AND REGULATIONS. THE CONTRACTOR SHALL TAKE ALL
SAFETY PRECAUTIONS AS REQUIRED TO PROTECT EMPLOYEES AND OTHER PERSONS FROM
INJURY.
18. THE DESIGNATION OF EXCESS WASTE DISPOSAL AND CONSTRUCTION STAGING AREAS, WHICH
MAY BE REQUIRED, BUT ARE NOT NOTED ON THE PLANS, ARE THE RESPONSIBILITY OF THE
CONTRACTOR AND SUBJECT TO THE APPROVAL OF CHAPMAN TOWNSHIP AND THE
DEPARTMENT OF ENVIRONMENTAL PROTECTION. ALL CONSTRUCTION DEBRIS, INCLUDING
EXCESS EXCAVATED MATERIAL, SCRAP WOOD, ETC, SHALL BE DISPOSED OFF-SITE BY THE
CONTRACTOR IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS.
19. ALL EXISTING PAVEMENT TO BE REMOVED SHALL BE SAW CUT ALONG LIMITS OF PROPOSED
PAVEMENT REMOVAL, BEFORE REMOVAL OPERATIONS BEGIN. THE CONTRACTOR IS
RESPONSIBLE FOR THE OFF-SITE DISPOSAL OF PAVEMENT WHICH IS REMOVED.
20. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTING MEASURES TO PREVENT DAMAGE TO
ALL EXISTING FEATURES (TO REMAIN) WITHIN PROJECT LIMITS AND ALONG ADJACENT
PROPERTIES.
21. EROSION AND SEDIMENT POLLUTION CONTROL MEASURES SHALL BE MAINTAINED
CONTINUOUSLY, RELOCATED, AS NECESSARY, AND SHALL BE CHECKED AFTER EVERY
RAINFALL. SEEDED AREAS SHALL BE CHECKED REGULARLY, AND SHALL BE WATERED,
FERTILIZED, RESEEDED, AND MULCHED, AS NECESSARY, TO OBTAIN A DENSE COVER OF
GRASS.
22. UNLESS OTHERWISE NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS, PENNDOT 2A
SUBBASE FOR BACKFILL AROUND ANY TRENCH OPENINGS, SHALL BE COMPACTED T0 100% OF
MAXIMUM DENSITY AS DETERMINED BY THE STANDARD PROCTOR TEST AS SET OUT BY ASTM
STANDARD D-698. THE CONTRACTOR SHALL, PRIOR TO ANY OPERATIONS REQUIRING
BACKFILLING SHALL ESTABLISH AN OPTIMUM BACKFILLING SEQUENCE TO ACHIEVE THE
SPECIFIED LEVEL OF COMPACTION. ONCE THE SEQUENCE FOR BACKFILLING HAS BEEN
ESTABLISHED, THAT SEQUENCE SHALL BE USED IN ALL AREAS OF BACKFILLED REQUIRED.
COMPACTION TESTS SHALL BE TAKEN AT RANDOM LOCATIONS THAT REPRESENT THE ENTIRE
LENGTH OF THE INSTALLED LINE TO ENSURE THAT COMPACTION REQUIREMENTS ARE BEING
MET. THE CONTRACTOR SHALL SUBMIT RESULTS OF THE PROCTOR TEST TOGETHER WITH A
CERTIFICATION THAT THE MATERIAL TESTED IS REPRESENTATIVE OF THE MATERIALS TO BE
USED ON THE PROJECT. TESTS SHALL BE CONDUCTED BY AN EXPERIENCED TECHNICIAN
UNDER THE SUPERVISION OF A LICENSED PROFESSIONAL ENGINEER REPRESENTING THE
LABORATORY.
23. ALL EXCAVATIONS, INCLUDING TRENCHES, SHALL BE KEPT DRY TO PROTECT THEIR INTEGRITY.
IF PUMPING OF AN OPEN TRENCH IS NECESSARY DURING THE COURSE OF CONSTRUCTION, A
SEDIMENT FILTER BAG OR OTHER FORM OF FILTERING IS REQUIRED BEFORE DISCHARGING
INTO THE STORMDRAIN SYSTEM.
24. ALL TRENCHING SHALL OCCUR AS DESIGNATED IN THIS PLAN SET. THE CONTRACTOR SHALL
USE EQUIPMENT APPROPRIATE TO MAINTAIN A MAXIMUM PAVEMENT OPENING. IF THE
CONTRACTOR PROPOSES A REVISED TRENCHING METHOD OR ALIGNMENT, CHAPMAN
TOWNSHIP AND PENNDOT OFFICIALS SHALL BE NOTIFIED IMMEDIATELY.
25. THE CONTRACTOR IS NOTIFIED THAT OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
CLEARANCES MUST BE MAINTAINED TO OVERHEAD POWER LINES FROM ANY CONSTRUCTION
EQUIPMENT. THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF OSHA STANDARDS IN
THIS REGARD.
26. OSHA EXCAVATION STANDARD SHALL APPLY TO THIS CONTRACT. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR SAFETY OF TRENCH AND STRUCTURES.
27. CONTRACTOR SHALL LIMIT WORK HOURS FROM 7:00 AM TO 5:00 PM DURING ONLY WEEKDAYS
WITHIN THE LIMITS OF WORK.
28. EXISTING RIGHT OF WAY SHALL BE CONFIRMED BY THE TOWNSHIP.
29. THIS STREAM IS A NATURAL TROUT STREAM AND THUS SEASONAL IN-STREAM WORK
RESTRICTIONS SHALL APPLY AS FOLLOWS: NO IN STREAM WORK SHALL OCCUR BETWEEN
OCTOBER 1 - DECEMBER 31.
30. THIS PROJECT IS WITHIN AN AREA OF NORTHERN LONG-EARED BAT. NO REMOVAL OF TREES
SHALL OCCUR BETWEEN MAY 15- JULY 31.
31. CONTRACTOR MAY CLOSE ROAD DURING CONSTRUCTION. CONTRACTOR SHALL PROVIDE
SUITABLE SIGNAGE AND BARRIERS TO PROTECT THE PUBLIC. CONTRACTOR SHALL
COORDINATE WITH NEIGHBORS IMPACTED BY WORK AND ENSURE VEHICULAR ACCESS TO
RESIDENTS.
EXISTING FEATURES
LEGEND:
MAJOR CONTOUR (10' INTERVAL)
MINOR CONTOUR (2' INTERVAL)
CONSTRUCTION PLANS
SHEET DESCRIPTION NO.
C-001 COVER SHEET & TOC 1
C-101 EXISTING CONDITIONS & DEMOLITION PLAN 2
C-201 IMPROVEMENT PLAN 3
C-203 EROSION AND SEDIMENT CONTROL PLAN 4
C-301 SITE / LAYOUT PLAN 5
C-302 PROFILES & SECTIONS 6
C-401 NOTES & DETAILS 7
I HEREBY CERTIFY THAT THE DOCUMENTS LISTED
BELOW WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF PENNSYLVANIA:
SHEETS: C-001, C-101 THROUGH C-402
ROAD OFFSET
GUARDRAIL
DEADMAN ANCHOR
EDGE OF ROADWAY
SILTSOCK
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
D
EM
O
LI
TI
O
N P
LA
N
C-101
EXISTING IMPROVEMENTS TO
BE REMOVED/REPLACED
DEMOLITION NOTES:
1. HIGHLIGHTED AREAS INDICATE THE GENERAL LOCATIONS OF DEMOLITION WORK TO BE
PERFORMED. CONTRACTOR TO REFER TO IMPROVEMENTS PLAN VIEWS (C-201 ) AND
PROVIDED DETAILS FOR ADDITIONAL INFORMATION ON THE WORK TO BE PERFORMED IN
EACH AREA.
2. ALL LIMITS OF DEMOLITION SHALL BE MARKED IN THE FIELD IN COORDINATION AND
AGREEMENT WITH PROJECT ENGINEER PRIOR TO START OF WORK.
3. BOUNDARY LINES WERE APPROXIMATED USING AVAILABLE COUNTY GIS DATA.
4. RIGHT OF WAY SHALL BE CONFIRMED BY THE TOWNSHIP.
SC
H
O O
L H
O U
SE
R
O
AD
G P-
C
H
AP
M
AN
T O
W N
SH
IP
, C
LI
N
TO
N C
O U
N
TY
, P A
M
AI
N S
TR
EE
T
SO
U
TH
W
IL
LI
AM
SP
O
R T, P A
(5
) 9
DATE: MARCH 2026
DRAWN BY:
DRAFTING CK:
ENGINEERING CK:
CONSTRUCTION CK:
ENVIRONMENTAL CK:
DRAWING NO.:
SHEET OF REV. 0
D
AT
E D
ES
C
R
IP
TI
O
N
AP
PR
O
VE
D
R
EV
IS
IO
N S
AKS
BPS
BPS
N/A
N/A
PROJECT #: 2024-408
1/
/2
IN
C
R
EA
SE
D
C U
LV
ER
T
LE
N G
TH
BP
S
RECOMMENDED
DATE
IM
PR
O
VE
M
EN
TS
P
LA
N
C-201
IMPROVEMENT NOTES:
1. CONTRACTOR TO REFER TO THE NOTES AND DETAILS (SHEETS C-301 & C-400'S) FOR ADDITIONAL INFORMATION RELATED TO THE CONSTRUCTION AND INSTALLATION OF THE PROPOSED IMPROVEMENTS.
2. THIS STREAM IS A NATURAL TROUT STREAM AND THUS SEASONAL IN-STREAM WORK RESTRICTIONS SHALL APPLY AS FOLLOWS: NO IN STREAM WORK SHALL OCCUR BETWEEN OCTOBER 1 - DECEMBER 31.
3. THIS PROJECT IS WITHIN AN AREA OF NORTHERN LONG-EARED BAT. NO REMOVAL OF TREES SHALL
OCCUR BETWEEN MAY 15- JULY 31.
4. CHAPMAN TOWNSHIP WILL PURCHASE THE PROPOSED CULVERT AND HEADWALLS AND ALL MATERIALS WILL BE DELIVERED TO THE PROJECT SITE IN COORDINATION WITH THE CONTRACTOR'S SCHEDULE.
FULL DEPTH PAVEMENT RESTORATION
(SEE DETAIL ON SHEET C-401)
SC
H
O O
L H
O U
SE
R
O
AD
G P-
C
H
AP
M
AN
T O
W N
SH
IP
, C
LI
N
TO
N C
O U
N
TY
, P A
M
AI
N S
TR
EE
T
SO
U
TH
W
IL
LI
AM
SP
O
R T, P A
(5
) 9
DATE: MARCH 2026
DRAWN BY:
DRAFTING CK:
ENGINEERING CK:
CONSTRUCTION CK:
ENVIRONMENTAL CK:
DRAWING NO.:
SHEET OF REV. 0
D
AT
E D
ES
C
R
IP
TI
O
N
AP
PR
O
VE
D
R
EV
IS
IO
N S
AKS
BPS
BPS
N/A
N/A
PROJECT #: 2024-408
1/
/2
IN
C
R
EA
SE
D
C U
LV
ER
T
LE
N G
TH
BP
S
PROJECT EASEMENTS
TEMPORARY CONSTRUCTION EASEMENT
PERMANENT EASEMENT
RECOMMENDED
DATE
MINOR GRADING AREA
ER
O
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
PL
AN
C-202
IMPROVEMENT NOTES:
1. CONTRACTOR TO REFER TO THE NOTES AND DETAILS (SHEETS C-301 & C-400'S) FOR ADDITIONAL
INFORMATION RELATED TO THE CONSTRUCTION AND INSTALLATION OF THE PROPOSED
IMPROVEMENTS.
2. THIS STREAM IS A NATURAL TROUT STREAM AND THUS SEASONAL IN-STREAM WORK RESTRICTIONS SHALL APPLY AS FOLLOWS: NO IN STREAM WORK SHALL OCCUR BETWEEN OCTOBER 1 - DECEMBER 31.
3. THIS PROJECT IS WITHIN AN AREA OF NORTHERN LONG-EARED BAT. NO REMOVAL OF TREES SHALL
OCCUR BETWEEN MAY 15- JULY 31.
4. CHAPMAN TOWNSHIP WILL PURCHASE THE PROPOSED CULVERT AND HEADWALLS AND ALL MATERIALS WILL BE DELIVERED TO THE PROJECT SITE IN COORDINATION WITH THE CONTRACTOR'S SCHEDULE.
SC
H
O O
L H
O U
SE
R
O
AD
G P-
C
H
AP
M
AN
T O
W N
SH
IP
, C
LI
N
TO
N C
O U
N
TY
, P A
M
AI
N S
TR
EE
T
SO
U
TH
W
IL
LI
AM
SP
O
R T, P A
(5
) 9
DATE: MARCH 2026
DRAWN BY:
DRAFTING CK:
ENGINEERING CK:
CONSTRUCTION CK:
ENVIRONMENTAL CK:
DRAWING NO.:
SHEET OF REV. 0
D
AT
E D
ES
C
R
IP
TI
O
N
AP
PR
O
VE
D
R
EV
IS
IO
N S
AKS
BPS
BPS
N/A
N/A
PROJECT #: 2024-408
1/
/2
IN
C
R
EA
SE
D
C U
LV
ER
T
LE
N G
TH
BP
S
Point Table
Point #
Raw Description
BM1
BM2
BM3
BM4
BM5
EX N CL
CULV N CL
CULV S CL
EX S CL
SW C
SE C
NE C
NW C
EX CL
EX CL
EX CL
PROPOSED CL
PROPOSED CL
PROPOSED CL
PROPOSED CL
EX CL
EX CL
START OF WORK CL
END OF WORK CL
Elevation
651.164
660.824
663.704
667.503
652.670
659.735
660.050
659.880
658.635
660.300
659.670
659.670
660.300
659.815
659.774
659.714
659.930
660.350
659.900
659.120
658.235
657.422
659.710
658.765
Northing
431096.0310
431213.0770
431196.3641
431167.2860
431134.5170
431209.4784
431202.4238
431193.8381
431186.5644
431186.6635
431198.4330
431209.8167
431198.0539
431211.3082
431211.1489
431208.4545
431203.9005
431198.9582
431194.0160
431189.0737
431184.1309
431179.1881
431207.0120
431186.9643
Easting
1982093.6800
1981867.9290
1981816.4519
1981761.3130
1982014.5480
1981927.7269
1981941.2060
1981956.3080
1981969.1139
1981924.1608
1981976.8614
1981974.3212
1981921.6170
1981910.2000
1981920.1877
1981929.7163
1981938.6085
1981947.3019
1981955.9952
1981964.6885
1981973.3816
1981982.0746
1981932.9452
1981968.3969
OHE
OHE
OHE
OHE
OHE
A'
A
B
B'
0+00 0+10
0+20 0+30
0+40 0+50
0+60 0+70
0+
0+
0+
0+
SECTION ROAD CENTERLINE
SI
TE
LA
YO
U
T
PL
AN
SC
H
O O
L H
O U
SE
R
O
AD
G P-
C
H
AP
M
AN
T O
W N
SH
IP
, C
LI
N
TO
N C
O U
N
TY
, P A
M
AI
N S
TR
EE
T
SO
U
TH
W
IL
LI
AM
SP
O
R T, P A
(5
) 9
DATE: MARCH 2026
DRAWN BY:
DRAFTING CK:
ENGINEERING CK:
CONSTRUCTION CK:
ENVIRONMENTAL CK:
DRAWING NO.:
SHEET OF REV. 0
D
AT
E D
ES
C
R
IP
TI
O
N
AP
PR
O
VE
D
R
EV
IS
IO
N S
AKS
BPS
BPS
N/A
N/A
PROJECT #: 2024-408
1/
/2
IN
C
R
EA
SE
D
C U
LV
ER
T
LE
N G
TH
BP
S
C-301
EXISTING GRADE
PROPOSED GRADE
STREAM BOTTOM
LAYOUT COORDINATES
SECTION A-A'
SECTION B-B'
PR
O
FI
LE
S
AN
D S
EC
TI
O N
S
SC
H
O O
L H
O U
SE
R
O
AD
G P-
C
H
AP
M
AN
T O
W N
SH
IP
, C
LI
N
TO
N C
O U
N
TY
, P A
M
AI
N S
TR
EE
T
SO
U
TH
W
IL
LI
AM
SP
O
R T, P A
(5
) 9
DATE: MARCH 2026
DRAWN BY:
DRAFTING CK:
ENGINEERING CK:
CONSTRUCTION CK:
ENVIRONMENTAL CK:
DRAWING NO.:
SHEET OF REV. 0
D
AT
E D
ES
C
R
IP
TI
O
N
AP
PR
O
VE
D
R
EV
IS
IO
N S
AKS
BPS
BPS
N/A
N/A
PROJECT #: 2024-408
1/
/2
IN
C
R
EA
SE
D
C U
LV
ER
T
LE
N G
TH
BP
S
C-302
EXISTING GRADE
PROPOSED GRADE
STREAM BOTTOM
EXISTING GRADE
PROPOSED GRADE
STREAM BOTTOM
N O
TE
S
D
ET
AI
LS
DISTURBED
AREA UNDISTURBED
AREA
DISTURBED
AREA
UNDISTURBED
AREA
NOTES:
1. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE SOCK SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN SOCK ALIGNMENT (SEE ABOVE). MAXIMUM SLOPE LENGTH ABOVE ANY SOCK SHALL NOT EXCEED THAT SHOWN ON FIGURE 4.2 IN APPENDIX A OF THE E&S PLAN.
2. TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS.
3. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES ½ THE ABOVE GROUND HEIGHT OF THE SOCK AND
DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
4. SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER’S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION.
5. BIODEGRADABLE FILTER SOCK SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR.
POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER’S RECOMMENDATIONS.
6. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD
AS A SOIL SUPPLEMENT.
COMPOST FILTER SOCK DETAIL
N.T.S.
PLAN VIEW
SECTION VIEW
FLOW
FL
O
W FLO
W
STAKE ON 10'-0"
CENTERS MAXCOMPOST
FILTER
SOCK
2" X 2"
WOOD STAKECOMPOST
FILTER SOCK
LOOSE
COMPOST
(3")
(1 2"
C.F.S. = COMPOST FILTER SOCK
SOCK
NO.
DIA.
(IN)
SOCK
LENGTH
(FT)
CFS-1 12 11
CFS-2 12 14
5:1 5:1
NOTES:
1. TOPSOIL SHOULD BE REMOVED PRIOR TO INSTALLATION OF ROCK CONSTRUCTION
ENTRANCE.
2. EXTEND ROCK OVER FULL WIDTH OF ENTRANCE.
3. RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE SEDIMENT REMOVAL
BMP PRIOR TO ENTERING ROCK CONSTRUCTION ENTRANCE.
4. MOUNTABLE BERM SHOULD BE INSTALLED WHEREVER OPTIONAL CULVERT PIPE IS
USED. PIPE TO BE SIZED APPROPRIATELY FOR SIZE OF DITCH BEING CROSSED.
5. MAINTENANCE: ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY
MAINTAINED TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE
SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE.ALL SEDIMENT DEPOSITED
ON PAVED ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION
SITE IMMEDIATELY. IF EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING
DEPOSITED ON ROADWAY, EXTEND LENGTH OF ROCK CONSTRUCTION ENTRANCE BY
50 FEET INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL WASH RACK.
WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY DITCHES,
SEWER, CULVERTS, OR OTHER DRAINAGEWAYS IS NOT ACCEPTABLE.
PROFILE
PLAN
ROCK CONSTRUCTION ENTRANCE
N.T.S.
EXISTING
GROUND
GEOTEXTILE,
CLASS 4, TYPE A
AASHTO NO.1
COARSE AGGREGATE
8" MIN
MOUNTABLE BERM,
(6" MIN)
EARTH FILL
PIPE AS NECESSARY
EXISTING
ROADWAY50'-0" MIN
3'-0"
50'-0" MIN
20'-0" MIN 10'-0" MIN
10'-0" M
IN
10'-0" M
IN
EXISTING
ROADWAY
COMPOST FILTER SOCK (WHEN
LOCATED IN HQ & EV WATERSHEDS)
COMPOST FILTER SOCK (WHEN
LOCATED IN HQ & EV WATERSHEDS)
COMPOST FILTER SOCK (WHEN
LOCATED IN HQ & EV WATERSHEDS)
FILTER BAG
FILTER BAG
PLAN VIEW
ELEVATION VIEW
NOTES:
LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING
STANDARDS:
A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.
BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND
NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.
NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF ANY
RECEIVING SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.
THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.
THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE
MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND SCREENED.
FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY
AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED.
INTAKE HOSE
PUMP
CLAMPS
DISCHARGE HOSE
HEAVY DUTY LIFTING STRAPS
(RECOMMENDED)
INTAKE HOSEPUMP
CLAMPS
DISCHARGE HOSE
WELL VEGETATED, GRASSY AREA
WELL VEGETATED, GRASSY AREA
JERSEY BARRIER OPTION
STACKED SANDBAGS OPTION
SANDBAG DIVERSION DAM OR COFFERDAM
SANDBAGSIMPERVIOUS MEMBRANE
SANDBAG TO HOLD IMPERVIOUS
LINER IN PLACE
IMPERVIOUS LINER EXTENDED TO
STREAM BOTTOM AND SECURED
WITH SANDBAGS
JERSEY BARRIER
SANDBAG (TYP)
NORMAL STREAM FLOW
OPTIONAL SANDBAG PLATFORM
WORK AREA
2 BAG MIN. HEIGHT ABOVE NORMAL BASE FLOW
NOTES:
GRUBBING SHALL NOT TAKE PLACE WITHIN 50 FEET OF TOP-OF-BANK UNTIL ALL MATERIALS REQUIRED TO COMPLETE
CROSSING ARE ON SITE AND READY FOR INSTALLATION.
BYPASS PUMP INTAKE SHALL BE MAINTAINED A SUFFICIENT DISTANCE FROM THE BOTTOM TO PREVENT PUMPING OF
CHANNEL BOTTOM MATERIALS.
WATER ACCUMULATING WITHIN THE WORK AREA SHALL BE PUMPED TO A PUMPED WATER FILTER BAG OR SEDIMENT
TRAP PRIOR TO DISCHARGING INTO ANY SURFACE WATER.
HAZARDOUS OR POLLUTANT MATERIAL STORAGE AREAS SHALL BE LOCATED AT LEAST 100 FEET BACK FROM THE TOP
OF STREAMBANK.
ALL EXCESS EXCAVATED MATERIAL SHALL BE IMMEDIATELY REMOVED FROM THE STREAM CROSSING AREA.
ALL DISTURBED AREAS WITHIN 50 FEET OF TOP-OF-BANK SHALL BE BLANKETED OR MATTED WITHIN 24 HOURS OF INITIAL DISTURBANCE FOR MINOR STREAMS OR 48 HOURS OF INITIAL DISTURBANCE FOR MAJOR STREAMS UNLESS
OTHERWISE AUTHORIZED.
APPROPRIATE STREAMBANK PROTECTION SHALL BE PROVIDED WITHIN THE CHANNEL.
PROPOSED TEMPORARY CROSSING WILL BE WITHIN DEWATERED WORK ZONE. TEMPORARY CROSSING SHALL
CONSIST OF TWO 24" HDPE PIPES.
STREAM
BOTTOM
10 FT.
MIN.
10 FT.
MIN.
TYPICAL TEMPORARY ACCESS ROAD AND
WORK AREA WITH PUMP BYPASS
SANDBAGS (TYP)
SEDIMENT
BARRIER (TYP)
TRENCH
SPOIL
TRENCH
SPOIL
TOP OF STREAM BANK
TOP OF STREAM BANK
INTAKE
DISCHARGE
ENERGY DISSPATOR
PUMP
WORK AREA
N.T.S.
N.T.S.
PUMPED WATER FILTER BAG DETAIL
N.T.S.
NURSE CROP
SEEDING
RATE
(LB/ACRE)
FOR SPRING SEEDING (UP TO JUNE 15)
ANNUAL RYEGRASS, OR
SPRING OATS, OR
WINTER WHEAT, OR
WINTER RYE, OR
SPRING OATS PLUS RYEGRASS (ANNUAL OR PERENNIAL)
FOR LATE SPRING & SUMMER SEEDING (JUNE 16 - AUGUST 15)
ANNUAL RYEGRASS, OR
JAPANESE OR FOXTAIL MILLET, OR
SUDANGRASS, OR
SPRING OATS, OR
WINTER WHEAT, OR
WINTER RYE
FOR LATE SUMMER & FALL SEEDING (AUGUST 16 AND LATER)
ANNUAL RYEGRASS, OR
WINTER WHEAT, OR
WINTER RYE
64 (OATS)
10 (RYE)
SPECIES
TEMPORARY COVER
SEEDING RATE
(LB/ACRE)
64 (OATS)
20 (RYE)
RECOMMENDED TEMPORARY COVER OR NURSE CROPS
STRAW
HAY
WOOD FIBER HYDROMULCH
HYDRAULIC EROSION
CONTROL PRODUCTS
3 TON/ACRE
3 TON/ACRE
VARIABLE
VARIABLE
NOTES:
1. PLACE MULCH IMMEDIATELY AFTER SEEDING OR, AT A MAXIMUM, WITHIN 48 HOURS AFTER SEEDING IS COMPLETED.
2. LOOSE MULCH SHALL BE ANCHORED IN CONFORMANCE WITH PROJECT SPECIFICATIONS IMMEDIATELY AFTER
APPLICATION.
3. DURING PERIODS OF NON-GERMINATION, THE ABOVE LISTED MULCH TYPES (APPLIED AT THE SPECIFIED RATE) MAY
BE USED FOR TEMPORARY STABILIZATION.
4. EROSION CONTROL MATTING SHALL BE INSTALLED IN PLACE OF MULCHING AT ALL LOCATIONS SPECIFIED IN THE EROSION CONTROL MATTING DETAIL AND ALL OTHER DISTURBED AREAS SPECIFICALLY IDENTIFIED ON THE PLAN
DRAWINGS.
EITHER WHEAT OR OAT STRAW, FREE OF WEEDS, NOT CHOPPED
TIMOTHY, MIXED CLOVER, OR OTHER NATIVE FORAGE GRASSES
APPLY PER PRODUCT MANUFACTURER RECOMMENDATIONS
APPLY PER PRODUCT MANUFACTURER RECOMMENDATIONS
MULCH TYPE RATE NOTES
MULCH APPLICATION RATE DETAIL
NOTES:
1. SEEDING APPLICATION RATES ARE STATED AS POUNDS PER ACRE OF PURE LIVE SEED (PERCENTAGE OF PURE SEED MULTIPLIED BY THE PERCENTAGE OF GERMINATION) FOR EACH SPECIES. APPLIED SEEDING RATES SHALL MEET, OR EXCEED, THE HIGHEST CALCULATED INDIVIDUAL SPECIES SEEDING RATE BASED ON THE
SEED MIX UTILIZED.
2. CONTRACTOR SHALL SELECT SEED MIXTURES APPROPRIATE FOR SITE SPECIFIC CONDITIONS INCLUDING SLOPE OF THE WORK AREA, SOIL PH AND FERTILITY, AVAILABLE SUNLIGHT AND ANTICIPATED USE OF THE
WORK AREA.
3. AREAS THAT MAY BE SUBJECT TO EARTHMOVING WITHIN 12 MONTHS MAY BE STABILIZED WITH TEMPORARY
SEED MIXTURES. ALL OTHERS SHOULD BE STABILIZED WITH PERMANENT SEED MIXTURES.
4. CONTRACTOR SHALL MAKE PREPARATIONS FOR SEEDING AND MULCHING AS DISTURBED AREAS APPROACH FINAL GRADE. IN NO CASE SHOULD AN AREA EXCEEDING 15,000 SQUARE FEET, WHICH IS TO BE STABILIZED BY
VEGETATION, REACH FINAL GRADE WITHOUT BEING SEEDED AND MULCHED.
5. CONTRACTOR SHALL APPLY TOPSOIL AND PREPARE THE SEED BED IN CONFORMANCE WITH PROJECT
SPECIFICATIONS PRIOR TO APPLICATION OF SEED FOR PERMANENT STABILIZATION.
STABILIZATION DURING NON-GROWING SEASONS:
ALL CONSTRUCTION SHOULD BE PLANNED FOR COMPLETION WITHIN THE RECOMMENDED DATES FOR THE APPLICATION OF PERMANENT SEEDING AND ESTABLISHMENT OF A PERMANENT VEGETATIVE COVER, HOWEVER, WHEN CONSTRUCTION MUST BE DONE AND IS COMPLETED DURING A NON-GROWING SEASON (WINTER TIME, ETC.), TEMPORARY STABILIZATION BMPS MUST BE IMPLEMENTED AND ADEQUATELY MAINTAINED. THE APPLICATION OF STRAW MULCH AT THE RATE OF THREE (3) TONS PER ACRE IS RECOMMENDED. THE BMPS SHOULD BE CHECKED WEEKLY (UNLESS SNOW COVERED) TO IDENTIFY AREAS THAT BECOME BARE. THESE BARE AREAS SHOULD BE
COVERED WITH A PROPERLY INSTALLED EROSION CONTROL MATTING OR MULCH.
ALL TEMPORARY EROSION AND SEDIMENT POLLUTION CONTROLS MUST BE MAINTAINED UNTIL 70% PERENNIAL
VEGETATIVE COVER IS ACHIEVED.
RECOMMENDED PERMANENT SEED MIXTURE
PENNDOT FORMULA B
FORMULA AND SPECIES % BY
WEIGHT
MINIMUM % MAX %
WEED
SEED
SEEDING RATE
LB/1000 SQ. YD
(LB/ACRE)PURITY GERMINATION
FORMULA B RESIDENTIAL MIX 42.0 (210)
TOTAL
PERENNIAL RYEGRASS MIXTURE (LOLIUM
PERENNE). A COMBINATION OF IMPROVED
CERTIFIED VARIETIES WITH NO ONE
VARIETY EXCEEDING 50% OF THE TOTAL
RYEGRASS COMPONENT.
20 97 90 0.1000
8.5 (41.14)
CREEPING RED FESCUE OR CHEWINGS
FESCUE (FESTUCA RUBRA OR SSP
COMMUTATE) (IMPROVED AND CERTIFIED)
30 97 85 0.1000
12.5 (60.5)
KENTUCKY BLUEGRASS MIXTURE (POA
PRATENSIS). A COMBINATION OF
IMPROVED CERTIFIED VARIETIES WITH NO
ONE VARIETY EXCEEDING 50% OF THE
TOTAL BLUEGRASS COMPONENT.
50 97 80 0.1500
21.0 (101.64)
SC
H
O O
L H
O U
SE
R
O
AD
G P-
C
H
AP
M
AN
T O
W N
SH
IP
, C
LI
N
TO
N C
O U
N
TY
, P A
M
AI
N S
TR
EE
T
SO
U
TH
W
IL
LI
AM
SP
O
R T, P A
(5
) 9
DATE: MARCH 2026
DRAWN BY:
DRAFTING CK:
ENGINEERING CK:
CONSTRUCTION CK:
ENVIRONMENTAL CK:
DRAWING NO.:
SHEET OF REV. 0
D
AT
E D
ES
C
R
IP
TI
O
N
AP
PR
O
VE
D
R
EV
IS
IO
N S
AKS
BPS
BPS
N/A
N/A
PROJECT #: 2024-408
1/
/2
IN
C
R
EA
SE
D
C U
LV
ER
T
LE
N G
TH
BP
S
C-401
(IF NECESSARY BASED ON SITE CONDITIONS)
PIPE CULVERTS WITH CLEAN
STONE FILL OVER CULVERT
RIPRAP LINING DETAIL
N.T.S.
RIPRAP
WHEN USING LARGER SIZED STONE,
CHOKE VOIDS WITH R-3 SIZED ROCK
FILTER STONE, UNIFORM
GRADATION, 18" THICKNESS
X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X
X X X X
6 OZ NON-WOVEN
GEOTEXTILE MATERIAL
RIPRAP SIZE PLACEMENT
DEPTH FILTER STONE
R-3 9 AASHTO #57
R-4 18 AASHTO #3
R-5 27 AASHTO #3
R-6 36 AASHTO #1
R-7 45 AASHTO #1
R-8 63 AASHTO #1
NEW & EXISTING BITUMINOUS PAVING & JOINT
NOT TO SCALE
FULL DEPTH PAVEMENT RESTORATION
NOT TO SCALE
CUTOFF WALL & REINFORCEMENT DETAIL
NOT TO SCALE
| Sheets and Views |
| 2026.01.12 School House Rd GP-11 REV 1-CV-CONS |
| 2026.01.12 School House Rd GP-11 REV 1-C-101 |
| 2026.01.12 School House Rd GP-11 REV 1-C-201 |
| 2026.01.12 School House Rd GP-11 REV 1-C-202 |
| 2026.01.12 School House Rd GP-11 REV 1-C-301 |
| 2026.01.12 School House Rd GP-11 REV 1-C-302 |
| 2026.01.12 School House Rd GP-11 REV 1-C-401 |
File details come from the government source that posted it. Updated .