1-2026-10-26 STP Roof Replacement Plans.pdf
PDF 11 MB Posted
- Solicitation number
- US.261372
- Issued by
- Allegheny County, Pennsylvania
About this file
This document is a set of architectural and engineering plans prepared by Gateway Engineers, Inc. for the Municipality of Bethel Park, Pennsylvania, for the Piney Fork Sewage Treatment Plant Roof Replacement project. The project involves the removal and replacement of existing roof systems at two buildings (Building A: approximately 1,900 square feet; Building B: approximately 1,400 square feet) with new TPO (thermoplastic polyolefin) membrane roofing systems. Building A currently has an existing ballasted roof system to be removed down to deck, while Building B has an existing membrane roof to be similarly removed. Both buildings will receive replacement roofs consisting of new TPO roofing systems per the provided drawings and specifications. The project is designed in accordance with the 2021 International Building Code (IBC), 2021 International Existing Building Code (IEBC), and applicable Pennsylvania prevailing wage requirements. Sealed proposals are due by 2:00 P.M. on Wednesday, November 18, 2026, via PennBid, with anticipated work commencement in Fall 2026. Proposals must remain firm for sixty days and be accompanied by certified checks or bid bonds, performance and labor/material payment bonds, and certificates of insurance and workers' compensation.
The plans establish specific design loading requirements including roof live loads of 20 PSF on flat roofs, base ground snow loads of 30 PSF with a flat roof snow load of 21 PSF, and minimum R-30 continuous insulation above the roof deck per the 2021 International Energy Conservation Code. The construction is classified as Type IIB with a minimum roof covering classification of Class C. All materials and workmanship must conform to the drawings, specifications, and applicable building codes, with the contractor responsible for verifying all dimensions prior to construction and notifying the engineer of any discrepancies. The plans include detailed specifications for TPO membrane installation, flashing details, roof penetration treatments, walkpad installation, and parapet construction, with references to Johns Manville manufacturer specifications and installation instructions. An alternate scope option for pipe rail systems fabricated from 1.5-inch diameter passivated stainless steel with 48-inch on-center post spacing is included for contractor consideration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-2026-10-26 STP Roof Replacement Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
FU
LL
-S
ER
VI
CE
C
IV
IL
E
NG
IN
EE
RI
NG
F
IR
M
W W
W .G
AT
EW
AY
EN
G
IN
EE
RS
.C O
M
P
IT
TS
BU
RG
H
B
U
TL
ER
, P
1-
5-
4-
PR
EP
AR
ED
F O
R
R
EV
IS
IO
N R
EC
O
R D
N o
D at e
Pa th
F ile na m e=
G :\P ro je ct s\
Be th el
P ar k\
ST
P
R oo fs \D w g\
-S he et
\C -9
B et he l P ar k
- S
TP
R oo fs .d w g
Pl ot
D at e=
/2 6/
2:
P
M A sh le y A.
S w ee ne y Sa ve D at e=
/2
6/
1:
A M
Project Number:
Drawing Scale:
Date Issued:
Index Number:
Drawn By:
Checked By:
Project Manager:
22.0
G at ew ay E ng in ee rs
In c.
A ll
R ig ht s
R es er ve d
THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. CS
KMN
KMN
AAS
10/26/2026
AS NOTED
C-90064
COVER SHEET
BE
TH
EL
P
AR
K, P A
SO
U
TH
P
AR
K
TO
W
N
SH
IP
, P
A
W
ES
T
LI
BR
AR
Y
AV
EN
U
E
P
IN
EY
F
O R
K R
O
AD
M U
N
IC
IP
AL
IT
Y
O F
BE
TH
EL
P
AR
K
R O
O F
R
EP
LA
C
EM
EN
T
PINEY FORK SEWAGE TREATMENT PLANT
ROOF REPLACEMENT
PREPARED FOR:
3100 PINEY FORK ROAD
MUNICIPALITY OF BETHEL PARK
5100 WEST LIBRARY AVENUE
BETHEL PARK, PA 15102
SOUTH PARK TOWNSHIP, PA 15129
SITE LOCATION MAP
NOT TO SCALE
SHEET INDEX
NO. TITLE
CS COVER SHEET
S000 GENERAL NOTES, CODE SUMMARY
S100 BUILDING A ROOF PLAN
S101 BUILDING B ROOF PLAN
S200 BUILDING A AND B DETAILS
S201 TYPICAL DETAILS
S202 TYPICAL DETAILS
S203 TYPICAL DETAILS
BUILDING B
BUILDING A
FU
LL
-S
ER
VI
CE
C
IV
IL
E
NG
IN
EE
RI
NG
F
IR
M
W W
W .G
AT
EW
AY
EN
G
IN
EE
RS
.C
TS
BU
RG
H
B
U
TL
ER
5-
4-
PR
EP
AR
ED
F O
R
R
EV
IS
IO
N R
EC
O
R D
N o
D at e
Pa th
F ile na m e=
G :\P ro je ct s\
Be th el
P ar k\
ST
P
R oo fs \D w g\
-S he et
\C -9
B et he l P ar k
- S
TP
R oo fs .d w g
Pl ot
D at e=
/2 6/
2:
P
M A sh le y A.
S w ee ne y Sa ve D at e=
/2
6/
1:
A M
Project Number:
Drawing Scale:
Date Issued:
Index Number:
Drawn By:
Checked By:
Project Manager:
22.0
G at ew ay E ng in ee rs
In c.
A ll
R ig ht s
R es er ve d
THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. S000
KMN
KMN
AAS
10/26/2026
C-90064
GENERAL NOTES,
CODE SUMMARY
BE
TH
EL
P
AR
K, P A
SO
U
TH
P
AR
K
TO
W
N
SH
IP
, P
A
W
ES
T
LI
BR
AR
Y
AV
EN
U
E
P
IN
EY
F
O R
K R
O
AD
M U
N
IC
IP
AL
IT
Y
O F
BE
TH
EL
P
AR
K
R O
O F
R
EP
LA
C
EM
EN
T
AB - ANCHOR BOLT
ADDL - ADDITIONAL
AI - AUXILIARY IRON
ALT - ALTERNATE
ALU - ALUMINUM
AR - ANCHOR ROD
ARCH - ARCHITECTURAL
BLDG - BUILDING
BLK (G) - BLOCK(ING)
BM(S) - BEAM(S)
BTM/ xxx - BOTTOM OF xxx
BTM - BOTTOM
BP - BASE PLATE
BRG - BEARING
BS - BOTH SIDES
BTW - BETWEEN
CHAN - CHANNEL
CIP - CAST IN PLACE
CJT - CONTRACTION/
CONSTRUCTION JOINT
CL - CENTERLINE
CLR - CLEAR(ANCE)
CMU - CONCRETE MASONRY UNIT
COL - COLUMN
CONC - CONCRETE
CONN - CONNECTION
CONST - CONSTRUCTION
CONT - CONTINUOUS
CONTR - CONTRACTOR
COORD - COORDINATE
CP - COMPLETE PENETRATION
CTR - CENTER(ED)
D - DEPTH or DEEP
DBL - DOUBLE
DEG - DEGREE
DEM - DEMOLITION
DET - DETAIL
DIA - DIAMETER
DIAG - DIAGONAL
DIM - DIMENSION
DIST - DISTANCE
DN - DOWN
DWG - DRAWING
EA - EACH
EF - EACH FACE
EJT - EXPANSION JOINT
EL - ELEVATION
ELEC - ELECTRICAL
ELEV - ELEVATOR
EMBED - EMBEDMENT
ENGR - ENGINEER
EOSL - EDGE OF SLAB
EQ - EQUAL
EQUIP - EQUIPMENT
EW - EACH WAY
EXIST - EXISTING
EXP - EXPANSION
EXT - EXTERIOR
FDN - FOUNDATION
FIN - FINISH(ED)
FLG - FLANGE
FLR - FLOOR
FO xxx - FACE OF xxx
FOC - FACE OF CONCRETE
FOF - FACE OF FINISH
FOS - FACE OF STEEL
FS - FAR SIDE
FT - FOOT or FEET
FTG - FOOTING
GA - GAGE
GALV - GALVANIZED
GEN - GENERAL
GL - GLUE LAMINATED BEAM
GR - GRADE
GWB - GYPSUM WALLBOARD
H - HIGH
HAS - HEADED ANCHOR STUD
HDR - HEADER
HGR - HANGER
HORIZ - HORIZONTAL
HSS - HOLLOW STRUCTURAL
SECTIONS
HT - HEIGHT
HVAC - HEATING, VENTILATING/
AIR CONDITIONING
ID - INSIDE DIAMETER
IF - INSIDE FACE
IN - INCHES
INFO - INFORMATION
INSUL - INSULATE or INSULATION
JST - JOIST
JT - JOINT
L - LENGTH
LED - LEDGER
LLH - LONG LEG HORIZONTAL
LLV - LONG LEG VERTICAL
LOC - LOCATION
LT - LIGHT
LSH - LONG SLOTTED HOLE/
LONG SIDE HORIZONTAL
MAS - MASONRY
MAX - MAXIMUM
MECH - MECHANICAL
MEZZ - MEZZANINE
MFR - MANUFACTURE(R/D)
MIN - MINIMUM
MISC - MISCELLANEOUS
MSE - MECHANICALLY STABALIZED
EARTH
NA - NOT APPLICABLE
NIC - NOT IN CONTRACT
NIP - NOT IN PERMIT
A. - NUMBER
NS - NEAR SIDE
NTS - NOT TO SCALE
OC - ON CENTER
OD - OUTSIDE DIAMETER
OF - OUTSIDE FACE
OH - OPPOSITE HAND
OPNG - OPENING
OPP - OPPOSITE
OVS - OVERSIZED
PAF - POWDER ACTUATED
FASTENER
PC - PRECAST
PIL - PILASTER
PCAP - PILE CAP
PL - PLATE
PLCS - PLACES
PLWD - PLYWOOD
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PT - POINT
RAD or R - RADIUS
REF - REFERENCE
REINF - REINFORCING
REQD - REQUIRED
RO - ROUGH OPENING
SCHED - SCHEDULE
SECT - SECTION
SHT - SHEET
SHTG - SHEATHING
SIM - SIMILAR
SOG - SLAB ON GRADE
SL - SLOPE
SPEC - SPECIFICATION
SPCS - SPACES
SQ - SQUARE
SSH - SHORT SLOTTED HOLE
STD - STANDARD
STIF - STIFFENER
STL - STEEL
STRUCT - STRUCTURAL
SYM - SYMMETRICAL
TBC - THREADED BAR COUPLER
TBR - TO BE REMOVED
THRD - THREAD(ED)
THK - THICK(NESS)
TO xxx - TOP OF xxx
TOC - TOP OF CONCRETE
TOF - TOP OF FOOTING
TOGB - TOP OF GRADE BEAM
TOS - TOP OF STEEL
TOSL - TOP OF SLAB
TYP - TYPICAL
T/C - TENSION/COMPRESSION
UNO - UNLESS NOTED OTHERWISE
VERT - VERTICAL
W - WIDTH
WT - WEIGHT
WWF - WELDED WIRE FABRIC
WP - WORK POINT
W/ - WITH
W/O - WITHOUT
ABBREVIATIONS
1. ALL CONSTRUCTION MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE REQUIREMENTS OF THE
DRAWINGS, SPECIFICATIONS, AND THE CODES, RULES AND REGULATIONS OF THE INTERNATIONAL BUILDING
CODE, 2021 EDITION, AND ALL OTHER APPLICABLE BUILDING CODES.
2. SPECIFICATIONS, CODES, AND STANDARDS NOTED IN THE CONTRACT DOCUMENTS SHALL BE OF THE LATEST APPROVED ISSUE, INCLUDING SUPPLEMENTS, UNLESS OTHERWISE NOTED. MATERIAL SPECIFICATIONS ARE
ASTM LATEST EDITION.
3. THESE DRAWINGS HAVE BEEN PRODUCED ON THE GATEWAY ENGINEERS, INC. CADD SYSTEM. ANY OTHER MARKS AFFIXED TO THE DRAWINGS, OTHER THAN PROFESSIONAL STAMPS AND SIGNATURES, HAVE BEEN MADE WITHOUT THE THE AUTHORIZATION OF GATEWAY ENGINEERS AND ARE THEREFORE INVALID.
4. IF ANY ERRORS OR OMISSIONS APPEAR IN THESE DRAWINGS, SPECIFICATIONS, OR OTHER DOCUMENTS; THE CONTRACTOR SHALL NOTIFY THE STRUCTURAL ENGINEER OR ARCHITECT IN WRITING OF SUCH OMISSION OR
ERROR BEFORE PROCEEDING WITH THE WORK.
5. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. THE OWNER AND ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES. THE STRUCTURAL DRAWINGS SHALL GOVERN THE WORK FOR ALL STRUCTURAL FEATURES, U.N.O. THE ARCHITECTURAL DRAWINGS SHALL GOVERN THE WORK RELATED TO DIMENSIONS. SCALING OF DRAWINGS TO OBTAIN DIMENSIONS SHALL NOT BE DONE AT ANY TIME. IF A REQUIRED DIMENSION IS NOT PROVIDED, THE CONTRACTOR SHALL SUBMIT A REQUEST FOR INFORMATION TO THE ENGINEER FOR CLARIFICATION. U.N.O. CONTRACTOR SHALL PROVIDE EQUAL SPACING OF STRUCTURAL COMPONENTS BETWEEN OVERALL DIMENSIONS PROVIDED ON THE
DRAWINGS.
6. NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. WHERE NOTES AND DETAILS ON DRAWINGS AND THESE GENERAL NOTES AND TYPICAL DETAILS ARE IN CONFLICT WITH THE PROJECT SPECIFICATIONS, CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD. CONDITIONS NOT SPECIFICALLY SHOWN SHALL BE CONSTRUCTED AS SHOWN FOR SIMILAR WORK, SUBJECT TO REVIEW BY
THE ARCHITECT AND STRUCTURAL ENGINEER.
7. THE CONTRACT DOCUMENTS REPRESENT THE FINISHED STRUCTURE; THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY THE
STRUCTURAL ENGINEER SHALL NOT INCLUDE INSPECTION OF THE ABOVE ITEMS.
8. CONTRACTOR SHALL PROVIDE TEMPORARY BRACING FOR THE EXISTING AND NEW STRUCTURE AND ALL STRUCTURAL COMPONENTS UNTIL ALL FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE WITH
THE STRUCTURAL DOCUMENTS.
9. MANUFACTURED MATERIALS SHALL BE APPROVED BY THE CHECKING AGENCY PRIOR TO THEIR USE. ALL
REQUIREMENTS OF THOSE APPROVALS SHALL BE FOLLOWED.
10. ALL STRUCTURAL SYSTEMS THAT ARE TO BE COMPOSED OF MANUFACTURED COMPONENTS TO BE FIELD ERECTED SHALL BE APPROVED BY THE CHECKING AGENCY PRIOR TO THEIR USE AND SHALL BE SUPERVISED BY THE SUPPLIER DURING MANUFACTURING, DELIVERY, HANDLING, STORAGE, AND ERECTION IN
ACCORDANCE WITH INSTRUCTIONS PREPARED BY THE SUPPLIER.
11. STRUCTURAL WORK SHALL BE TESTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS AND THE GENERAL NOTES. THE OWNER SHALL ENGAGE AN EXPERIENCED AND QUALIFIED TESTING AGENCY, EXPERIENCED IN THE TESTING TO BE PERFORMED, TO REVIEW AND TEST ALL NECESSARY
ELEMENTS.
12. THE CONTRACTOR SHALL DESIGN AND SUBMIT SHOP DRAWINGS ALONG WITH CALCULATIONS, SIGNED AND
SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF PENNSYLVANIA, FOR ALL
PRE-FABRICATED STAIRS, PLATFORMS, HANDRAILS, GUARDS AND/OR LADDERS. DESIGN OF THESE ELEMENTS
SHALL MEET ALL RELEVANT REQUIREMENTS OF THE DESIGN BUILDING CODE.
- CONTRACTOR SHALL SUBMIT ELECTRONIC COPIES (OF SHOP DRAWINGS, IN PDF FORM, FOR REVIEW OF GATEWAY ENGINEERS, INC. SHOP DRAWINGS SHOULD PROVIDE A COMPLETE COMPLETE INFORMATION FOR THE PRODUCTS AND/OR COMPONENTS BEING SUBMITTED. INCLUDING BUT NOT LIMITED TO: MEMBER SIZES AND LOCATIONS, GRADES OF MATERIALS, MATERIAL FINISH/COATING, CONNECTIONS, AND ANY SPECIAL
REQUIREMENTS FOR INSTALLATION/ERECTION.
13. THE CONTRACTOR SHALL NOT DIRECTLY INCORPORATE THE STRUCTURAL DRAWINGS OR ANY PORTIONS THEREOF INTO THE SHOP DRAWINGS WITHOUT WRITTEN PERMISSION OF GATEWAY ENGINEERS, INC.
14. THE REVIEW OF SHOP DRAWINGS AND OTHER SUBMITTALS FOR THIS PROJECT IS FOR GENERAL CONFORMANCE WITH THE CONTRACT DOCUMENTS. ANY COMMENTS EXPRESSED AS PART OF THE REVIEW OF SHOP DRAWINGS DOES NOT RELIEVE THE CONTRACTOR OF THEIR CONTRACTUAL OBLIGATION TO PROVIDE THE OWNER WITH THE PROJECT OUTLINED IN THE CONTRACT DOCUMENTS. ANY SUBMITTALS REVISED AND RESUBMITTED FOR REVIEW OR RECORD PURPOSES SHALL HAVE THE SUBSEQUENT REVISIONS
CLOUDED ON THE RESUBMITTED SHEETS.
15. ANY EXISTING ROOF PIPE PENETRATIONS, EQUIPMENT, FANS, DUCTS, ETC. EXTENDING ABOVE THE ROOF SHALL BE RAISED TO REMAIN ABOVE ROOF LEVEL AS REQUIRED BY ROOFING MANUFACTURE PER PLAN. THIS
INCLUDES NEW CURBS, ADJUSTMENTS TO PIPING DUCTING OR ELECTRIC, NEW FLASHINGS AND
TERMINATIONS, ETC. AS REQUIRED.
GENERAL NOTES DESIGN LOADING
1. ALL STRUCTURAL ELEMENTS WERE DESIGNED IN ACCORDANCE WITH THE 2021 INTERNATIONAL BUILDING
CODE (2021 IBC).
2. FLOOR/ROOF DEAD LOADS:
- HAVE BEEN CALCULATED VIA RELEVANT ENGINEERING SELF-WEIGHT INFORMATION
3. ROOF LIVE LOADS:
- FLAT ROOF 20 PSF
4. SNOW LOADS:
- BASE GROUND SNOW LOAD 30 PSF
- IMPORTANCE FACTOR (SNOW LOAD) 1.0
- EXPOSURE FACTOR 1.0
- THERMAL FACTOR 1.0
- FLAT ROOF SNOW LOAD 21 PSF
6. WIND LOADS: [WIND EXPOSURE AREA HAS NOT SIGNIFICANTLY CHANGED AND IS NOT REQUIRED TO BE
REVIEWED PER INTERNATIONAL EXISTING BUILDING CODE - SECTION 3404.4]
7. SEISMIC LOADS: [SEISMIC MASS HAS NOT SIGNIFICANTLY CHANGED AND IS NOT REQUIRED TO BE REVIEWED
PER INTERNATIONAL EXISTING BUILDING CODE - SECTION 3404.4]
PROJECT & CODE SUMMARY
PROJECT DESCRIPTION: THE PROJECT INCLUDES TWO ROOF REPLACEMENTS. BUILDING A CONSISTS OF AN EXISTING BALLASTED ROOF SYSTEM, WHICH SHALL BE REMOVED DOWN TO DECK. BUILDING B CONSISTS OF AN EXISTING MEMBRANE ROOF, WHICH SHALL BE REMOVED DOWN TO DECK. BOTH BUILDINGS SHALL HAVE REPLACEMENT ROOFS CONSISTING OF NEW TPO ROOFING SYSTEMS PER DRAWINGS AND SPECIFICATIONS.
BUILDING INFORMATION:
CONSTRUCTION TYPE: IIB
BUILDING AREA: EXISTING, NO CHANGE
BUILDING A: APPROXIMATELY 1900SF
BUILDING B: APPROXIMATELY 1400SF
BUILDING HEIGHT: EXISTING, NO CHANGE
BUILDING A: APPROXIMATELY 16FT, NO CHANGE
BUILDING B: APPROXIMATELY 22FT, NO CHANGE
APPLICABLE CODES:
2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2021 INTERNATIONAL BUILDING CODE (IBC) FOR NEW ELEMENTS
2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2021 INTERNATIONAL PLUMBING CODE (IPC)
2021 INTERNATIONAL EXISTING BUILDING CODE - LEVEL 1 ALTERATIONS
705.1 MATERIALS AND METHODS OF APPLICATION USED FOR RECOVERING OR REPLACING AN EXISTING ROOF
COVERING SHALL COMPLY WITH THE REQUIREMENTS OF CHAPTER 15 OF THE IBC.
EXCEPTIONS: 1. ROOF REPLACEMENT OR ROOF RECOVER OF EXISTING LOW-SLOPE ROOF COVERINGS SHALL NOT BE REQUIRED TO MEET THE MINIMUM DESIGN SLOPE REQUIREMENT OF 1/4 UNIT VERTICAL IN 12 UNITS HORIZONTAL
(2% SLOPE) IN SECTION 1507 OF THE IBC FOR ROOFS THAT PROVIDE POSITIVE DRAINAGE.
2. RECOVERING OR REPLACING AN EXISTING ROOF COVERING SHALL NOT BE REQUIRED TO MEET THE REQUIREMENT FOR SECONDARY (EMERGENCY OVERFLOW) DRAINS OR SCUPPERS IN SECTION 1502 OF THE IBC FOR ROOFS THAT PROVIDE POSITIVE DRAINAGE. EXISTING SECONDARY DRAINAGE OR SCUPPERS SHALL NOT BE
REMOVED UNLESS THEY ARE REPLACED IN ACCORDANCE WITH SECTION 1502 OF THE IBC.
705.2 ROOF REPLACEMENT SHALL INCLUDE THE REMOVAL OF ALL EXISTING LAYERS OF ROOF COVERINGS DOWN
TO THE ROOF DECK.
EXCEPTION: WHERE THE EXISTING ASSEMBLY INCLUDES AN ADHERED ICE BARRIER, THE EXISTING ICE BARRIER SHALL BE PERMITTED TO REMAIN IN PLACE AND COVERED WITH AN ADDITIONAL LAYER OF ICE BARRIER MEMBRANE
IN ACCORDANCE WITH SECTION 1507 OF THE IBC.
705.5 FLASHINGS SHALL BE RECONSTRUCTED IN ACCORDANCE WITH APPROVED MANUFACTURER'S INSTALLATION INSTRUCTIONS. METAL FLASHING TO WHICH BITUMINOUS MATERIALS ARE TO BE ADHERED SHALL BE PRIMED PRIOR
TO INSTALLATION.
706.2 ADDITION OR REPLACEMENT OF ROOFING OR REPLACEMENT OF EQUIPMENT
ANY EXISTING GRAVITY LOAD-CARRYING STRUCTURAL ELEMENT FOR WHICH AN ALTERATION CAUSES AN INCREASE IN DESIGN DEAD, LIVE, OR SNOW LOAD, INCLUDING SNOW DRIFT EFFECTS, OR MORE THAN 5% SHALL BE REPLACED OR ALTERED AS NEEDED TO CARRY THE GRAVITY LOADS REQUIRED BY THE IBC FOR NEW STRUCTURES.
PROVISION: BUILDING A DEAD LOAD IS ANTICIPATED TO BE REDUCED WITH THE REMOVAL OF THE BALLAST SYSTEM. BUILDING A AND BUILDING B LOADS ARE NOT ANTICIPATED TO INCREASE MORE THAN 5%. THE PLANNED ROOFTOP EQUIPMENT REPLACEMENT IS TO BE UNDER A SEPARATE COVER. HOWEVER, THE EQUIPMENT IS
ANTICIPATED TO BE REPLACED IN-KIND (CAPACITY, WEIGHT, SIZE, ETC.)
708.1 LEVEL 1 ALTERATIONS TO EXISTING BUILDINGS OR STRUCTURES DO NOT REQUIRE THE ENTIRE BUILDING OR STRUCTURE TO COMPLY WITH THE ENERGY REQUIREMENTS OF THE IECC. ALTERATIONS SHALL CONFORM TO THE
ENERGY REQUIREMENTS OF THE IECC AS THEY RELATE TO NEW CONSTRUCTION ONLY.
2021 INTERNATIONAL BUILDING CODE
1502.1 DESIGN AND INSTALLATION OF ROOF DRAINAGE SYSTEMS SHALL COMPLY WITH THIS SECTION, SECTION 1611
OF THIS CODE, AND CHAPTER 11 OF THE IPC.
1503.1 ROOF DECKS SHALL BE COVERED WITH APPROVED ROOF COVERINGS SECURED TO THE BUILDING OR STRUCTURE IN ACCORDANCE WITH THE PROVISIONS OF THIS CHAPTER. ROOF COVERINGS SHALL BE DESIGNED IN ACCORDANCE WITH THIS CODE, AND INSTALLED IN ACCORDANCE WITH THIS CODE AND THE MANUFACTURER'S
APPROVED INSTRUCTIONS.
1503.2 FLASHING SHALL BE INSTALLED IN A MANNER SO AS TO PREVENT WATER FROM ENTERING THE WALL AND ROOF THROUGH JOINTS IN COPINGS, THROUGH MOISTURE-PERMEABLE MATERIALS AND AT INTERSECTIONS WITH
PARAPET WALLS AND OTHER PENETRATIONS THROUGH THE ROOF PLANE.
1503.2.1 FLASHING SHALL BE INSTALLED AT WALL AND ROOF INTERSECTIONS, AT GUTTERS, WHEREVER THERE IS A CHANGE IN ROOF SLOPE OF DIRECTION AND AROUND ROOF OPENINGS. WHERE FLASHING IS OF METAL, THE METAL SHALL BE CORROSION RESISTANT WITH A THICKNESS OF NOT LESS THAN 0.019 INCH (0.483 MM) (NO.26 GALVANIZED
SHEET)
1503.3 PARAPET WALLS SHALL BE COPED OR COVERED IN ACCORDANCE WITH SECTIONS 1503.1 AND 1503.2. THE
TOP SURFACE OF THE PARAPET WALL SHALL PROVIDE POSITIVE DRAINAGE.
1503.5 A CRICKET OR SADDLE SHALL BE INSTALLED ON THE RIDGE OF ANY CHIMNEY OR PENETRATION GREATER THAN 30 INCHES WIDE AS MEASURED PERPENDICULAR TO THE SLOPE. CRICKET OR SADDLE COVERINGS SHALL BE
SHEET METAL OR THE SAME MATERIAL AS THE ROOF COVERING.
1504.4 ROOF COVERINGS INSTALLED ON ROOFS IN ACCORDANCE WITH SECTION 1507 THAT ARE MECHANICALLY ATTACHED OR ADHERED TO THE ROOF DECK SHALL BE DESIGNED TO RESIST THE DESIGN WIND LOAD PRESSURES FOR COMPONENTS AND CLADDING IN ACCORDANCE WITH SECTION 1609.5.2. THE WIND LOAD ON THE ROOF
COVERING SHALL NOT BE PERMITTED TO BE DETERMINED USING ALLOWABLE STRESS DESIGN.
1504.4.1 BUILT-UP, MODIFIED BITUMEN, FULLY ADHERED OR MECHANICALLY ATTACHED SINGLE-PLY ROOF SYSTEMS AND OTHER TYPES OF MEMBRANE ROOF COVERINGS SHALL BE TESTED IN ACCORDANCE WITH FM4474, UL580, OR
UL1897.
1504.6 METAL EDGE SYSTEMS, EXCEPT GUTTERS AND COUNTERFLASHING, INSTALLED ON BUILT-UP, MODIFIED BITUMEN AND SINGLE-PLY ROOFS, SHALL BE DESIGNED, CONSTRUCTED AND INSTALLED TO RESIST WIND LOADS IN ACCORDANCE WITH SECTION 1609 AND SHALL BE TESTED IN ACCORDANCE WITH METHODS G-1 AND G-2 OF
SPRIGT-1.
1504.7 ROOF COVERINGS INSTALLED ON LOW-SLOPE ROOFS IN ACCORDANCE WITH SECTION 1507 SHALL DEMONSTRATE PHYSICAL INTEGRITY OVER THE WORKING LIFE OF THE ROOF BASED ON 2,000 HOURS OF EXPOSURE TO ACCELERATED WEATHERING TESTS CONDUCTED IN ACCORDANCE WITH ASTM G152, ASTM G154 OR ASTM G155. THOSE ROOF COVERINGS THAT ARE SUBJECT TO CYCLICAL FLEXURAL RESPONSE DUE TO WIND LOADS SHALL NOT DEMONSTRATE ANY SIGNIFICANT LOSS OF TENSILE STRENGTH FOR UNREINFORCED MEMBRANES OR
BREAKING STRENGTH FOR REINFORCED MEMBRANES WHEN TESTED AS REQUIRED.
1504.8 ROOF COVERINGS INSTALLED ON LOWSLOPE ROOFS IN ACCORDANCE WITH SECTION 1507 SHALL RESIST IMPACT DAMAGE BASED ON THE RESULTS OF TESTS CONDUCTED IN ACCORDANCE WITH ASTM D3746, ASTM D4272
OR FM 4470 RESISTANCE TO FOOT TRAFFIC TEST.
1505.1 MINIMUM ROOF COVERING CLASSIFICATION FOR TYPES OF CONSTRUCTION: IIB = CLASS C
2021 INTERNATIONAL ENERGY CONSERVATION CODE
402.1.3 OPAQUE THERMAL ENVELOPE INSULATION COMPONENT MINIMUM REQUIREMENTS, R-VALUE METHOD
ROOF - INSULATION ABOVE ROOF DECK - ZONE 5: R-30 CONTINUOUS INSULATION
402.1.4.1.3 CONTINUOUS INSULATION BOARD SHALL BE INSTALLED IN NOT LESSS THAN TWO LAYERS, AND THE EDGE JOINTS BETWEEN EACH LAYER OF INSULATION SHALL BE STAGGERED, EXCEPT WHERE INSULATION TAPERS TO
THE ROOF DECK AT A GUTTER EDGE, ROOF DRAIN, OR SCUPPER.
402.2.1.2 THE MINIMUM THICKNESS OF ABOVE-DECK ROOF INSULATION AT ITS LOWEST POINT, GUTTER EDGE, ROOF
DRAIN, OR SCUPPER SHALL BE NOT LESS THAN 1 INCH.
1. REFER TO JOHNS MANVILLE WEBSITE (www.jm2. PLEASE SEE SINGLE PLY FLASHING SPECIFICA INSTRUCTIONS AND REQUIREMENTS WHICH A3. ANY CARPENTRY OR METAL WORK SHOULD BEWITH LOCAL CODE REQUIREMENTS AND/OR PROJBE REVIEWED AND APPROVED BY A LICENSED DE4. IF GAP OR CUT IN MEMBRANE IS GREATER THTHAT EXTENDS OUT ONTO THE MEMBRANE A MIN("L" PATCH SHOWN AT RIGHT WITHOUT TPO UNIV5. JM TPO EDGE SEALANT IS REQUIRED ON ALL CMEMBRANE. THIS INCULDES FACTORY CUT MEMB1. REFER TO JOHNS MANVILLE WEBSITE (www2. PLEASE SEE SINGLE PLY FLASHING SPECIFIREQUIREMENTS WHICH ARE CONSIDERED A P3. ANY CARPENTRY OR METAL WORK SHOULD 4. JM TPO EDGE SEALANT IS REQUIRED ON ALMEMBRANE. THIS INCLUDES FACTORY CUT ED
AND/OR PROJECT SPECS. THESE COMPONENT
JM SINGLE PLY LVOC CAULK (AT
OF CLAMP - SLOPED TO SHED WREFER TO JOHNS MANVILLE WEBSITE (wwPLEASE SEE JM TPO APPLICATION GUIDE F
INSTRUCTIONS AND REQUIREMENTS WHI
ANY CARPENTRY OR METAL WORK SHOUL
WITH LOCAL CODE REQUIREMENTS AND/O
SHOULD BE REVIEWED AND APPROVED BY
JM APPROVED FASTENERS & PLA
PENETRATION DEPENDANT ON D
SEE SPECIFICATIONS FOR FURTH
JM TPO MEMBRANE ADHERED TO
WITH JM APPROVED MEMBRANE
JM TPO 6" REINFORCED TERMINA
CONTINUOUS WELD AROU
SLOPE
1/4 :12
SL
O
PE
1/
:1
SLOPE
1/4 :12
SLOPE
1/4 :12
SLOPE
1/4 :12
SL
O
PE
1/
:1
SL
O
PE
1/
:1
ROOF DRAIN CLAMP AND STRAINER
TO BE REPLACED; CONTRACTOR TO
ENSURE PRODUCTS ARE
COMPATIBLE WITH, AND COVERED
BY ROOF WARRANTY. CLEAN ROOF
DRAIN LEADER PER ROOF
MANUFACTURER GUIDELINES.
ROOF DRAIN CLAMP AND STRAINER
TO BE REPLACED; CONTRACTOR TO
ENSURE PRODUCTS ARE
COMPATIBLE WITH, AND COVERED
BY ROOF WARRANTY. CLEAN ROOF
DRAIN LEADER PER ROOF
MANUFACTURER GUIDELINES.
EXISTING RTU TO BE REPLACED
IN-KIND UNDER SEPARATE
PERMIT / COVER.
PRE-FABRICATED CURB TO BE
COORDINATED WITH ROOFING
SCOPE OF WORK. ALL CURB
FLASHINGS TO BE PER PROVIDED
MANUFACTURER STANDARD
DETAILS HEREIN.
PROVIDE ROOF CRICKET AT
MECHANICAL CURB LOCATION.
EXISTING EXTERIOR WALL BELOW;
NO SOFFIT CONDITION.
EXISTING EXTERIOR WALL
PARAPET TO BE EXTENDED
PER TYPICAL DETAIL,
TYPICAL FULL PERIMETER.
EXISTING COPING TO BE
REPLACED PER PROVIDED
MANUFACTURER
STANDARD DETAIL,
TYPICAL FULL PERIMETER.
EXISTING WALKWAY PAVERS TO
BE REMOVED AND REPLACED
WITH NEW ADHERED AND HEAT
WELDED TPO WALKPADS PER
PROVIDED MANUFACTURER
STANDARD DETAIL. WALKWAY
PATH LAYOUT SHALL MATCH
EXISTING.
EXISTING ROOF LADDER ACCESS
AND CAGE STRUCTURE TO REMAIN.
ADD ALTERNATE SCOPE - ADD ALTERNATE NO. 1
PIPE RAIL SYSTEM:
· 1-1/2" DIA. PASSIVATED STAINLESS STEEL PIPE POSTS
AND RAILS
· POST SPACING ASSUMED TO BE 48" O.C. MAXIMUM
· GUARDRAIL SHALL RESIST LATERAL FORCES OF 200LBS
· INCLUDE PASSIVATED STAINLESS STEEL RAIL CORNER
TUBE, MID RAIL SUPPORTS, ELBOWS, TEES, CROSS, POST
CAPS, OTHER ACCESSORIES AND CONNECTIONS AS
REQUIRED TO COMPLETE GUARD
EXISTING MEMBRANE ROOF, INSULATION, AND
VAPOR BARRIER TO BE REMOVED. COMPLETE
REPLACEMENT PER TYPICAL DETAILS 1/S200
THROUGH 3/S203.
S200
S200
SIM
S2
SI
M
S2
SI
M
S2
S201
S20
S202
FLASH AROUND EXISTING ROOF
PENETRATIONS PER ROOFING
MANUFACTURER STANDARD DETAILS,
TYPICAL. EXTENSION OF PIPING MAY
BE REQUIRED TO ACHIEVE ADEQUATE
LENGTH BEYOND ROOF AND/OR
MANUFACTURER TYPICAL PIPE
FLASHING AS REQUIRED PER ROOFING
MANUFACTURER WARRANTY
REQUIREMENTS. ALL LOCATIONS NOT
SHOWN, CONTRACTOR TO FIELD
VERIFY ALL LOCATIONS.
S2
SI
M
A
FU
LL
-S
ER
VI
CE
C
IV
IL
E
NG
IN
EE
RI
NG
F
IR
M
W W
W .G
AT
EW
AY
EN
G
IN
EE
RS
.C
TS
BU
RG
H
B
U
TL
ER
5-
4-
PR
EP
AR
ED
F O
R
R
EV
IS
IO
N R
EC
O
R D
N o
D at e
Pa th
F ile na m e=
G :\P ro je ct s\
Be th el
P ar k\
ST
P
R oo fs \D w g\
-S he et
\C -9
B et he l P ar k
- S
TP
R oo fs .d w g
Pl ot
D at e=
/2 6/
2:
P
M A sh le y A.
S w ee ne y Sa ve D at e=
/2
6/
1:
A M
Project Number:
Drawing Scale:
Date Issued:
Index Number:
Drawn By:
Checked By:
Project Manager:
22.0
G at ew ay E ng in ee rs
In c.
A ll
R ig ht s
R es er ve d
THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. S100
KMN
KMN
AAS
10/26/2026
AS NOTED
C-90064
BUILDING A
ROOF PLAN
BE
TH
EL
P
AR
K, P A
SO
U
TH
P
AR
K
TO
W
N
SH
IP
, P
A
W
ES
T
LI
BR
AR
Y
AV
EN
U
E
P
IN
EY
F
O R
K R
O
AD
M U
N
IC
IP
AL
IT
Y
O F
BE
TH
EL
P
AR
K
R O
O F
R
EP
LA
C
EM
EN
T
SCALE:
BUILDING A ROOF PLANS100
1/4" = 1'-0"
NOTES:
1. ALL OPENINGS MUST BE PROTECTED FROM DUST AND DEBRIS DURING ALL WORK. THIS
INCLUDES PROTECTING OR COVERING ANY OPENINGS NEAR THE WORK AREA AS WELL
AS PROVIDING FILTERS FOR VENTS AND AIR INTAKES.
2. ALL EXTERIOR FIXTURES AND ITEMS MUST BE PROTECTED FOR THE DURATION OF THE
PROJECT. CONTRACTOR MAY ELECT TO REMOVE AND REINSTALL ITEMS AT NO
ADDITIONAL COST TO THE OWNER.
3. EXTERIOR LIGHTS, CAMERAS, SIGNAGE AND OTHER APPARATUSES ARE NOT SHOWN
FOR CLARITY. CONTRACTOR TO REMOVE AND REPLACE AS REQUIRED TO COMPLETE
WORK (WITH OWNER APPROVAL) AND/OR PROTECT FOR DURATION OF THE PROJECT.
SLOPE
1/4 :12
SLOPE
1/4 :12
SL
O
PE
1/
:1
SL
O
PE
1/
:1
ROOF DRAIN CLAMP AND STRAINER TO BE
REPLACED; CONTRACTOR TO ENSURE
PRODUCTS ARE COMPATIBLE WITH AND
COVERED BY ROOF WARRANTY. CLEAN
ROOF DRAIN LEADER PER ROOF
MANUFACTURER GUIDELINES.
PROVIDE ROOF CRICKET PER
ROOFING MANUFACTURER
INSTALLATION INSTRUCTIONS
EXISTING ROOF BLOWER DUCTING AND
EQUIPMENT TO REMAIN (SHOWN DASHED),
TYPICAL OF (3). FLASH AROUND ALL
ROOFTOP MOUNTS, EQUIPMENT, ETC. PER
ROOFING MANUFACTURER DETAILS.
EXISTING EXTERIOR WALL BELOW;
NO SOFFIT CONDITION.
EXISTING EXTERIOR WALL PARAPET
TO BE EXTENDED PER TYPICAL
DETAIL, TYPICAL FULL PERIMETER.
EXISTING ROOF LADDER
ACCESS WITH HARNESS
ARREST SYSTEM TO REMAIN
EXISTING COPING TO BE REPLACED PER
PROVIDED MANUFACTURER STANDARD
DETAIL, TYPICAL FULL PERIMETER.
EXISTING WALKWAY PAVERS TO BE
REMOVED AND REPLACED WITH NEW
ADHERED AND HEAT WELDED TPO
WALKPADS PER MANUFACTURER
PROVIDED STANDARD DETAIL.
WALKWAY PATH LAYOUT SHALL
MATCH EXISTING.
FLASH AROUND EXISTING ROOF PENETRATIONS
PER ROOFING MANUFACTURER STANDARD
DETAILS, TYPICAL. EXTENSION OF PIPING MAY
BE REQUIRED TO ACHIEVE ADEQUATE LENGTH
BEYOND ROOF AND/OR MANUFACTURER
TYPICAL PIPE FLASHING AS REQUIRED PER
ROOFING MANUFACTURER WARRANTY
REQUIREMENTS. ALL LOCATIONS NOT SHOWN,
CONTRACTOR TO FIELD VERIFY ALL LOCATIONS.
EXISTING FACE-MOUNTED RAIL SYSTEM
TO REMAIN. PROTECT DURING
DEMOLITION AND CONSTRUCTION.
TUBE, MID RAIL SUPPORTS, ELBOWS, TEES, CROSS, PO
EXISTING MEMBRANE
ROOF, INSULATION, AND
VAPOR BARRIER TO BE
REMOVED. COMPLETE
REPLACEMENT PER
TYPICAL DETAILS 1/S200
THROUGH 3/S203.
S200
S200
SIM
S2
SI
M
SI
M
S2
S201
S2
S200
S2
A
FU
LL
-S
ER
VI
CE
C
IV
IL
E
NG
IN
EE
RI
NG
F
IR
M
W W
W .G
AT
EW
AY
EN
G
IN
EE
RS
.C
TS
BU
RG
H
B
U
TL
ER
5-
4-
PR
EP
AR
ED
F O
R
R
EV
IS
IO
N R
EC
O
R D
N o
D at e
Pa th
F ile na m e=
G :\P ro je ct s\
Be th el
P ar k\
ST
P
R oo fs \D w g\
-S he et
\C -9
B et he l P ar k
- S
TP
R oo fs .d w g
Pl ot
D at e=
/2 6/
2:
P
M A sh le y A.
S w ee ne y Sa ve D at e=
/2
6/
1:
A M
Project Number:
Drawing Scale:
Date Issued:
Index Number:
Drawn By:
Checked By:
Project Manager:
22.0
G at ew ay E ng in ee rs
In c.
A ll
R ig ht s
R es er ve d
THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. S101
KMN
KMN
AAS
10/26/2026
AS NOTED
C-90064
BUILDING B
ROOF PLAN
BE
TH
EL
P
AR
K, P A
SO
U
TH
P
AR
K
TO
W
N
SH
IP
, P
A
W
ES
T
LI
BR
AR
Y
AV
EN
U
E
P
IN
EY
F
O R
K R
O
AD
M U
N
IC
IP
AL
IT
Y
O F
BE
TH
EL
P
AR
K
R O
O F
R
EP
LA
C
EM
EN
T
SCALE:
BUILDING B ROOF PLANS101
1/4" = 1'-0"
NOTES:
1. ALL OPENINGS MUST BE PROTECTED FROM DUST AND DEBRIS DURING ALL WORK. THIS
INCLUDES PROTECTING OR COVERING ANY OPENINGS NEAR THE WORK AREA AS WELL
AS PROVIDING FILTERS FOR VENTS AND AIR INTAKES.
2. ALL EXTERIOR FIXTURES AND ITEMS MUST BE PROTECTED FOR THE DURATION OF THE
PROJECT. CONTRACTOR MAY ELECT TO REMOVE AND REINSTALL ITEMS AT NO
ADDITIONAL COST TO THE OWNER.
3. EXTERIOR LIGHTS, CAMERAS, SIGNAGE AND OTHER APPARATUSES ARE NOT SHOWN
FOR CLARITY. CONTRACTOR TO REMOVE AND REPLACE AS REQUIRED TO COMPLETE
WORK (WITH OWNER APPROVAL) AND/OR PROTECT FOR DURATION OF THE PROJECT.
GUARDRAIL TO BE MINIMUM 42" ABOVE WALK
SURFACE, TYPICAL PERIMETER OF ROOF
TAPERED RIGID INSULATION ACHIEVING MINIMUM
R-30 SYSTEM OVER EXISTING ROOF DECK.
ASSUMED 1.5" MINIMUM TAPERED START AT LOW
POINTS, ROOF DRAINS. SLOPE PER PLAN.
APPROXIMATE EXISTING TOP OF PARAPET
EXISTING ROOF TO REMAIN; METAL DECK AND CONCRETE
EXISTING WALL
EXISTING BRICK MASONRY TO REMAIN
L4x4x1 4 LEDGER ANGLE WITH 12" DIAMETER ADHESIVE ANCHORS x4.5"
MINIMUM EMBEDMENT INTO MASONRY WALL AT 16" O.C. MAXIMUM
ADD ALTERNATE SCOPE - ADD ALTERNATE NO. 1
PIPE RAIL SYSTEM:
· 1-1/2" DIA. PASSIVATED STAINLESS STEEL PIPE POSTS AND RAILS
· POST SPACING ASSUMED TO BE 48" O.C. MAXIMUM
· GUARDRAIL SHALL RESIST LATERAL FORCES OF 200LBS
· INCLUDE PASSIVATED STAINLESS STEEL RAIL CORNER TUBE, MID RAIL
SUPPORTS, ELBOWS, TEES, CROSS, POST CAPS, OTHER ACCESSORIES
AND CONNECTIONS AS REQUIRED TO COMPLETE GUARD
ADD ALTERNATE SCOPE - ADD ALTERNATE NO. 1
PIPE RAIL SYSTEM; STAINLESS STEEL RAIL MOUNT BASE;
FASTEN PER MANUFACTURER INSTALLATION INSTRUCTIONS
NEW TPO ROOFING MEMBRANE
BASIS OF DESIGN: JOHNS MANVILLE GRAY TPO
MEMBRANE-COMPATIBLE ICE AND WATER SHIELD
TURN MEMBRANE OVER PARAPET WALL PER
MANUFACTURER STANDARD INSTALLATION DETAILS,
INSTRUCTIONS. TERMINATE WITH ROUT-IN TERM BAR
AT MASONRY. ANCHOR, SEAL AND SEAM AT
TERMINATIONS AND TRANSITIONS PER
MANUFACTURER INSTALLATION INSTRUCTIONS
FIRE RATED WOOD BLOCKING AND PARAPET EXTENSION TO
ACHIEVE HEIGHT REQUIRED FOR NEW INSULATION AND
MEMBRANE INSTALLATION.
5/8" DIAMETER ADHESIVE ANCHORS AT 48" O.C. MAXIMUM
WITH MINIMUM 6" EFFECTIVE EMBEDMENT
GALVANIZED CLEAT, 20 GA CONTINUOUS ALONG PARAPET
NEW GRAVEL STOP WITH DRIP EDGE PER DETAIL 3/S201
6" M
IN
O R
AS
R
EQ
D
BY
M
FR
EXISTING PIPE RAIL SYSTEM TO REMAIN
NEW TPO ROOFING MEMBRANE
BASIS OF DESIGN: JOHNS MANVILLE GRAY TPO
MEMBRANE-COMPATIBLE ICE AND WATER SHIELD
TAPERED RIGID INSULATION ACHIEVING MINIMUM R-30
SYSTEM OVER EXISTING ROOF DECK. ASSUMED 2.5"
BASE LAYER AND 0.5" MINIMUM TAPERED START AT
LOW POINTS, ROOF DRAINS. SLOPE PER PLAN.
TURN MEMBRANE OVER PARAPET WALL PER
MANUFACTURER STANDARD INSTALLATION DETAILS,
INSTRUCTIONS. TERMINATE WITH ROUT-IN TERM BAR
AT MASONRY. ANCHOR, SEAL AND SEAM AT
TERMINATIONS AND TRANSITIONS PER
MANUFACTURER INSTALLATION INSTRUCTIONS
EXISTING ROOF TO REMAIN; METAL DECK AND CONCRETE
FIRE RATED WOOD BLOCKING AND PARAPET EXTENSION TO
ACHIEVE HEIGHT REQUIRED FOR NEW INSULATION AND
MEMBRANE INSTALLATION.
5/8" DIAMETER ADHESIVE ANCHORS AT 48" O.C. MAXIMUM
WITH MINIMUM 6" EFFECTIVE EMBEDMENT
GALVANIZED CLEAT, 20 GA CONTINUOUS ALONG PARAPET
EXISTING WALL
EXISTING BRICK MASONRY TO REMAIN
NEW GRAVEL STOP WITH DRIP EDGE PER DETAIL 3/S201
6" M
IN
O R
AS
R
EQ
D
BY
M
FR
A
FU
LL
-S
ER
VI
CE
C
IV
IL
E
NG
IN
EE
RI
NG
F
IR
M
W W
W .G
AT
EW
AY
EN
G
IN
EE
RS
.C
TS
BU
RG
H
B
U
TL
ER
5-
4-
PR
EP
AR
ED
F O
R
R
EV
IS
IO
N R
EC
O
R D
N o
D at e
Pa th
F ile na m e=
G :\P ro je ct s\
Be th el
P ar k\
ST
P
R oo fs \D w g\
-S he et
\C -9
B et he l P ar k
- S
TP
R oo fs .d w g
Pl ot
D at e=
/2 6/
2:
P
M A sh le y A.
S w ee ne y Sa ve D at e=
/2
6/
1:
A M
Project Number:
Drawing Scale:
Date Issued:
Index Number:
Drawn By:
Checked By:
Project Manager:
22.0
G at ew ay E ng in ee rs
In c.
A ll
R ig ht s
R es er ve d
THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. S200
KMN
KMN
AAS
10/26/2026
AS NOTED
C-90064
BUILDING A
AND B DETAILS
BE
TH
EL
P
AR
K, P A
SO
U
TH
P
AR
K
TO
W
N
SH
IP
, P
A
W
ES
T
LI
BR
AR
Y
AV
EN
U
E
P
IN
EY
F
O R
K R
O
AD
M U
N
IC
IP
AL
IT
Y
O F
BE
TH
EL
P
AR
K
R O
O F
R
EP
LA
C
EM
EN
T
SCALE:
BUILDING A TYPICAL SECTION
AT PARAPETS200
1-1/2" = 1'-0" SCALE:
BUILDING B TYPICAL SECTION
AT PARAPETS200
1-1/2" = 1'-0"
APPROVED DECK
JM INSULATION / COVER BOARD
1" (25 mm)
3" (76 mm) LAP
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
REPLACES TA-5-ADH JM TPO
N.T.S 7-14-17 30 YEAR
T-MS-07 MEMBRANE SIDE LAP
JM TPO MEMBRANE ADHESIVE
(FOR ADHERED
SPECIFICATIONS ONLY)
1 1/2" (38 mm)
MIN. WELD
(CONTINUOUS)
JM TPO EDGE SEALANT
IF REQUIRED
JM TPO
MEMBRANE
JM TPO MEMBRANE
ADHERED OR
MECHANICALLY FASTENED
(END LAP
CONDITION ONLY)
NOTES:
1.
2.
3.
4.
REFER TO JOHNS MANVILLE WEBSITE (www.jm.com) FOR MOST UP-TO-DATE INFORMATION.
PLEASE SEE SINGLE PLY FLASHING SPECIFICATIONS FOR A FULL DESCRIPTION OF INSTALLATION
INSTRUCTIONS AND REQUIREMENTS WHICH ARE CONSIDERED A PART OF THIS DETAIL.
ANY CARPENTRY OR METAL WORK SHOULD BE DESIGNED AND CONSTRUCTED IN ACCORDANCE
WITH LOCAL CODE REQUIREMENTS AND/OR PROJECT SPECIFICATIONS. THESE COMPONENTS
SHOULD BE REVIEWED AND APPROVED BY A LICENSED DESIGN PROFESSIONAL.
JM TPO EDGE SEALANT IS REQUIRED ON ALL CUT OR NON-ENCAPSULATED EDGES OF REINFORCED
MEMBRANE. THIS INCLUDES FACTORY CUT MEMBRANE (SEE DETAIL T-MS-01).
1" (25 mm)
6"
OF WALKPAD
JM TPO WALKPAD
JM TPO ADHERED
30" WIDTH
LENGTH OF T
PO
WALKPAD
DETERMINED BY SEAMS
OF T
PO
FIE
LD MEMBRANE
HEAT WELDED - PERIMETER
JM TPO WALKPAD
HEAT WELDED - PERIMETER
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
REPLACES TM-93A JM TPO
N.T.S 7-14-17 20 YEAR
T-PT-05 TPO WALKPADS OVER ADHERED TPO MEMBRANE
LENGTH OF T
PO
WALKPAD
DETERMINED BY SEAMS
OF T
PO
FIE
LD MEMBRANE
1 1/2" (40 mm) MINIMUM
CONTINUOUS WELD AROUND
EDGE OF WALKPAD (MUST
BE WATERTIGHT)
TPO HEAT WELDED SEAM
HOLD ADHESIVE
BACK 2" (51 mm) FROM
WALKPAD EDGES
ADHERE WALKPADS
WITH JM MEMBRANE
ADHESIVE-SEE NOTE 7
NOTES:
1.
2.
3.
4.
REFER TO JOHNS MANVILLE WEBSITE (www.jm.com) FOR MOST UP-TO-DATE INFORMATION.
PLEASE SEE SINGLE PLY FLASHING SPECIFICATIONS FOR A FULL DESCRIPTION OF INSTALLATION
INSTRUCTIONS AND REQUIREMENTS WHICH ARE CONSIDERED A PART OF THIS DETAIL.
ANY CARPENTRY OR METAL WORK SHOULD BE DESIGNED AND CONSTRUCTED IN ACCORDANCE
WITH LOCAL CODE REQUIREMENTS AND/OR PROJECT SPECIFICATIONS. THESE COMPONENTS
SHOULD BE REVIEWED AND APPROVED BY A LICENSED DESIGN PROFESSIONAL.
JM TPO EDGE SEALANT IS REQUIRED ON ALL CUT OR NON-ENCAPSULATED EDGES OF REINFORCED
MEMBRANE. THIS INCLUDES FACTORY CUT MEMBRANE (SEE DETAIL T-MS-01).
5. CLEAN MEMBRANE SURFACE PRIOR TO WALKPAD INSTALLATION WITH TPO MEMBRANE CLEANER.
(152 mm)
6. DO NOT INSTALL WALKPADS OVER MEMBRANE SEAMS.
JM TPO ADHERED
(MAX. LE
NGTH 10' W
ITH
MIN. 2" G
AP B
ETWEEN
WALKPAD LE
NGTHS)
(MAX. LE
NGTH 10' W
ITH
MIN. 2" G
AP B
ETWEEN
WALKPAD LE
NGTHS)
7. JM APPROVED ADHESIVES FOR ADHERING TPO WALKPADS ARE JM LVOC MEMBRANE ADHESIVE (TPO & EPDM), JM MEMBRANE BONDING ADHESIVE (TPO & EPDM) AND JM TPO WATER BASED MEMBRANE ADHESIVE.
APPROVED DECK
JM INSULATION / COVER BOARD
PRESTO-TITE ANCHOR BAR
JM SINGLE PLY SEALING MASTIC
WOOD NAILER SECURELY
ANCHORED TO DECK-RE: DETAIL T-FE-V1
PRESTO-TITE FASCIA COVER
JM TPO MEMBRANE
ADHERED OR
MECHANICALLY FASTENED
JM TPO MEMBRANE ADHESIVE
(FOR ADHERED
SPECIFICATIONS ONLY)
STAINLESS STEEL
FASTENERS 12" (304 mm)
O.C. MIN. PROVIDED BY JM
MEMBRANE FASTENED ON BACK
SIDE OF WALL 12" (304 mm) O.C. MAX.
JM SINGLE PLY LVOC CAULK, OPTIONAL
1/
4" (3 m m m m
FA
SC
IA
C O
VE
R
H
EI
G H
T
NOTES:
1.
2.
3.
REFER TO JOHNS MANVILLE WEBSITE (www.jm.com) FOR MOST UP-TO-DATE INFORMATION.
PLEASE SEE SINGLE PLY FLASHING SPECIFICATIONS FOR A FULL DESCRIPTION OF INSTALLATION
INSTRUCTIONS AND REQUIREMENTS WHICH ARE CONSIDERED A PART OF THIS DETAIL.
ANY CARPENTRY OR METAL WORK SHOULD BE DESIGNED AND CONSTRUCTED IN ACCORDANCE
WITH LOCAL CODE REQUIREMENTS AND/OR PROJECT SPECIFICATIONS. THESE COMPONENTS
SHOULD BE REVIEWED AND APPROVED BY A LICENSED DESIGN PROFESSIONAL.
4. JM TPO EDGE SEALANT IS REQUIRED ON ALL CUT OR NON-ENCAPSULATED EDGES OF REINFORCED
MEMBRANE. THIS INCLUDES FACTORY CUT MEMBRANE (SEE DETAIL T-MS-01)
A
FU
LL
-S
ER
VI
CE
C
IV
IL
E
NG
IN
EE
RI
NG
F
IR
M
W W
W .G
AT
EW
AY
EN
G
IN
EE
RS
.C
TS
BU
RG
H
B
U
TL
ER
5-
4-
PR
EP
AR
ED
F O
R
R
EV
IS
IO
N R
EC
O
R D
N o
D at e
Pa th
F ile na m e=
G :\P ro je ct s\
Be th el
P ar k\
ST
P
R oo fs \D w g\
-S he et
\C -9
B et he l P ar k
- S
TP
R oo fs .d w g
Pl ot
D at e=
/2 6/
2:
P
M A sh le y A.
S w ee ne y Sa ve D at e=
/2
6/
1:
A M
Project Number:
Drawing Scale:
Date Issued:
Index Number:
Drawn By:
Checked By:
Project Manager:
22.0
G at ew ay E ng in ee rs
In c.
A ll
R ig ht s
R es er ve d
THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. S201
KMN
KMN
AAS
10/26/2026 N.T.S.
C-90064
TYPICAL DETAILS
BE
TH
EL
P
AR
K, P A
SO
U
TH
P
AR
K
TO
W
N
SH
IP
, P
A
W
ES
T
LI
BR
AR
Y
AV
EN
U
E
P
IN
EY
F
O R
K R
O
AD
M U
N
IC
IP
AL
IT
Y
O F
BE
TH
EL
P
AR
K
R O
O F
R
EP
LA
C
EM
EN
T
SCALE:
MEMBRANE SIDE LAP
MANUFACTURER DETAILS201
NOT TO SCALE SCALE:
TPO WALKPADS OVER TPO MEMBRANE
MANUFACTURER DETAILS201
NOT TO SCALE
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
FLASHING EDGE JM TPO
N.T.S 12-06-19 30 YEAR
T-FE-P2 JM PRESTO TITE FASCIA SYSTEM FOR SINGLE PLY SYSTEMS
SCALE:
TPO TERMINATION WITH GRAVEL STOP DETAILS201
NOT TO SCALE
STRAINER
ISSUE DATEDRAWING NO.
SCALE
MEMBRANE TYPE:
MAXIMUM GUARANTEE TERM:
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy for general educational purposes only. This complimentary assistance is not to be either used or relied upon by anyone as a substitute for professional engineering design and documentation required by any building code, contract, or applicable law. By accepting the general conceptual information, you agree it does not constitute any representations, endorsements of, or an assumption by Johns Manville of any duty or liability for either the adequacy of the design of a building, any of its components or the sufficiency of any construction.REPLACES TF-55 30 YEAR
JM TPO
N.T.S
7-17-17T-DV-07
PRIMARY DRAIN SUMP (LOW SLOPE) UP TO 3:12 SLOPE
TAPERED DRAIN
JM SINGLE PLY SEALING MASTIC
CLAMP RING
JM INSULATION / COVER BOARD
CLEAN OUT EXISTING
DRAIN PIPE AND LEADER
AS REQUIRED
JM TPO MEMBRANE
ADHERED OR
MECHANICALLY FASTENED
NOTES:
1.
2.
3.
4.
REFER TO JOHNS MANVILLE WEBSITE (www.jm.com) FOR MOST UP-TO-DATE INFORMATION.
PLEASE SEE SINGLE PLY FLASHING SPECIFICATIONS FOR A FULL DESCRIPTION OF INSTALLATION
INSTRUCTIONS AND REQUIREMENTS WHICH ARE CONSIDERED A PART OF THIS DETAIL.
ANY CARPENTRY OR METAL WORK SHOULD BE DESIGNED AND CONSTRUCTED IN ACCORDANCE
WITH LOCAL CODE REQUIREMENTS AND/OR PROJECT SPECIFICATIONS. THESE COMPONENTS
SHOULD BE REVIEWED AND APPROVED BY A LICENSED DESIGN PROFESSIONAL.
JM TPO EDGE SEALANT IS REQUIRED ON ALL CUT OR NON-ENCAPSULATED EDGES OF
REINFORCED MEMBRANE. THIS INCLUDES FACTORY CUT MEMBRANE (SEE DETAIL T-MS-01).
INSULATION TAPERED
TO DRAIN
JM TPO MEMBRANE
ADHESIVE (FOR ADHERED
SPECIFICATIONS ONLY)
JM TPO FIELD MEMBRANE
ADHERED INTO DRAIN BOWL
APPROVED DECK
CUT HOLE THROUGH MEMBRANE AT LEAST THE
SAME DIAMETER AS THE ROOF DRAIN PIPE-TYP.
5. REPLACE ANY BROKEN COMPONENTS (DRAINS, RINGS, BOLTS, ETC.)
1/2" (13 mm) MIN.
6. SUMP AREA MUST BE PROPERLY TAPERED SO THAT THE DRAIN FLASHING IS NOT INSTALLED UNDER TENSION.
APPROVED DECK
JM INSULATION / COVER BOARD
JM APPROVED FASTENERS & PLATES 12" (304 mm) O.C. MAX.
PENETRATION DEPENDANT ON DECK MATERIAL(S).
SEE SPECIFICATIONS FOR FURTHER INFORMATION
PEEL & STICK
SECTION OF RTS
ISSUE DATEDRAWING NO.
SCALE
MEMBRANE TYPE:
MAXIMUM GUARANTEE TERM:
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy for general educational purposes only. This complimentary assistance is not to be either used or relied upon by anyone as a substitute for professional engineering design and documentation required by any building code, contract, or applicable law. By accepting the general conceptual information, you agree it does not constitute any representations, endorsements of, or an assumption by Johns Manville of any duty or liability for either the adequacy of the design of a building, any of its components or the sufficiency of any construction.FLASHING WALL 20 YEAR
JM TPO
N.T.S
11-28-22T-FW-B1
BASE FLASHING WITH HORIZONTAL REINFORCED TERMINATION STRIP - RTS
JM TPO MEMBRANE ADHERED TO WALL
WITH JM APPROVED MEMBRANE ADHESIVE (SEE DETAIL T-FW-M1)
JM TPO MEMBRANE MECHANICALLY
FASTENED OR ADHERED
NOTES:
JM MEMBRANE PRIMER (SEE NOTE 4)
JM TPO 6" REINFORCED TERMINATION STRIP (RTS)
JM TPO MEMBRANE ADHESIVE FOR
ADHERED SPECIFICATIONS ONLY
APPROVED
WALL / SUBSTRATE
1.
2.
3.
4.
REFER TO JOHNS MANVILLE WEBSITE (www.jm.com) FOR MOST UP-TO-DATE INFORMATION.
PLEASE SEE SINGLE PLY FLASHING SPECIFICATIONS FOR A FULL DESCRIPTION OF INSTALLATION INSTRUCTIONS AND
REQUIREMENTS WHICH ARE CONSIDERED A PART OF THIS DETAIL.
ANY CARPENTRY OR METAL WORK SHOULD BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH LOCAL CODE REQUIREMENTS AND/OR PROJECT SPECIFICATIONS. THESE COMPONENTS SHOULD BE REVIEWED AND APPROVED BY A LICENSED DESIGN PROFESSIONAL.
PRIME UNDERSIDE OF FIELD MEMBRANE AT PEEL & STICK SECTION WITH JM TPO MEMBRANE PRIMER OR JM SINGLE PLY MEMBRANE PRIMER (LOW VOC). ROLL TPO MEMBRANE WITH ROLLER UNDER PRESSURE AT PEEL & STICK SECTION OF RTS.
5. THIS DETAIL IS NOT COMPATIBLE OR ELIGIBLE FOR GUARANTEE WITH JM SELF ADHERED TPO MEMBRANE.
ISSUE DATEDRAWING NO.
SCALE
MEMBRANE TYPE:
MAXIMUM GUARANTEE TERM:
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy for general educational purposes only. This complimentary assistance is not to be either used or relied upon by anyone as a substitute for professional engineering design and documentation required by any building code, contract, or applicable law. By accepting the general conceptual information, you agree it does not constitute any representations, endorsements of, or an assumption by Johns Manville of any duty or liability for either the adequacy of the design of a building, any of its components or the sufficiency of any construction.NEW DETAIL 30 YEAR
JM TPO
N.T.S
1-2-15T-MS-01
CUT EDGE SEALANT
NOTES:
JM TPO MEMBRANE
JM TPO CUT EDGE (SEE NOTES 4 & 5)
JM TPO MEMBRANE
JM TPO EDGE SEALANT
IF REQUIRED
1.
2.
3.
4.
5.
REFER TO JOHNS MANVILLE WEBSITE (www.jm.com) FOR MOST UP-TO-DATE INFORMATION.
PLEASE SEE SINGLE PLY FLASHING SPECIFICATIONS FOR A FULL DESCRIPTION OF INSTALLATION INSTRUCTIONS AND
REQUIREMENTS WHICH ARE CONSIDERED A PART OF THIS DETAIL.
ANY CARPENTRY OR METAL WORK SHOULD BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH LOCAL CODE REQUIREMENTS AND/OR PROJECT SPECIFICATIONS. THESE COMPONENTS SHOULD BE REVIEWED AND APPROVED BY A
LICENSED DESIGN PROFESSIONAL.
JM TPO EDGE SEALANT IS A ONE-PART POLYMERIC MATERIAL USED TO SEAL CUT EDGES OF JM TPO MEMBRANES WHERE THE POLYESTER REINFORCEMENT IS EXPOSED AFTER WELDING. A 1/8" (3.18 MM) BEAD IS APPLIED FROM A PLASTIC
SQUEEZE BOTTLE TO THE CUT EDGE OF THE TPO MEMBRANE.
JM TPO EDGE SEALANT IS REQUIRED ON ALL CUT OR NON ENCAPSULATED EDGES OF REINFORCED MEMBRANE.
THIS INCLUDES FACTORY CUT MEMBRANE.
A
FU
LL
-S
ER
VI
CE
C
IV
IL
E
NG
IN
EE
RI
NG
F
IR
M
W W
W .G
AT
EW
AY
EN
G
IN
EE
RS
.C
TS
BU
RG
H
B
U
TL
ER
5-
4-
PR
EP
AR
ED
F O
R
R
EV
IS
IO
N R
EC
O
R D
N o
D at e
Pa th
F ile na m e=
G :\P ro je ct s\
Be th el
P ar k\
ST
P
R oo fs \D w g\
-S he et
\C -9
B et he l P ar k
- S
TP
R oo fs .d w g
Pl ot
D at e=
/2 6/
2:
P
M A sh le y A.
S w ee ne y Sa ve D at e=
/2
6/
1:
A M
Project Number:
Drawing Scale:
Date Issued:
Index Number:
Drawn By:
Checked By:
Project Manager:
22.0
G at ew ay E ng in ee rs
In c.
A ll
R ig ht s
R es er ve d
THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. S202
KMN
KMN
AAS
10/26/2026 N.T.S.
C-90064
TYPICAL DETAILS
BE
TH
EL
P
AR
K, P A
SO
U
TH
P
AR
K
TO
W
N
SH
IP
, P
A
W
ES
T
LI
BR
AR
Y
AV
EN
U
E
P
IN
EY
F
O R
K R
O
AD
M U
N
IC
IP
AL
IT
Y
O F
BE
TH
EL
P
AR
K
R O
O F
R
EP
LA
C
EM
EN
T
SCALE:
BASE FLASHING WITH HORIZONTAL REINFORCED TERMINATION STRIP
MANUFACTURER DETAILS202
NOT TO SCALE SCALE:
CUT EDGE SEALANT
MANUFACTURER DETAILS202
NOT TO SCALE
SCALE:
PRIMARY DRAIN SUMP (LOW SLOPE)
MANUFACTURER DETAILS202
CURB
JM TPO
MEMBRANE
1. REFER TO JOHNS MANVILLE WEBSITE (www.jm.com) FOR MOST UP-TO-DATE INFORMATION.
2. PLEASE SEE SINGLE PLY FLASHING SPECIFICATIONS FOR A FULL DESCRIPTION OF INSTALLATION
INSTRUCTIONS AND REQUIREMENTS WHICH ARE CONSIDERED A PART OF THIS DETAIL.
3. ANY CARPENTRY OR METAL WORK SHOULD BE DESIGNED AND CONSTRUCTED IN ACCORDANCE
WITH LOCAL CODE REQUIREMENTS AND/OR PROJECT SPECIFICATIONS. THESE COMPONENTS SHOULD
BE REVIEWED AND APPROVED BY A LICENSED DESIGN PROFESSIONAL.
4. IF GAP OR CUT IN MEMBRANE IS GREATER THAN 1" UNDER TPO UNIVERSAL CORNER, AN "L" PATCH THAT EXTENDS OUT ONTO THE MEMBRANE A MINIMUM OF 2" MUST BE INSTALLED AT OUTSIDE CORNER.
("L" PATCH SHOWN AT RIGHT WITHOUT TPO UNIVERSAL CORNER)
5. JM TPO EDGE SEALANT IS REQUIRED ON ALL CUT OR NON ENCAPSULATED EDGES OF REINFORCED
MEMBRANE. THIS INCULDES FACTORY CUT MEMBRANE (SEE DETAIL T-MS-01).
1 1/2" (40 mm)
MINIMUM
CONTINUOS WELD
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
REPLACES TF-62A JM TPO
N.T.S 1-2-15 30 YEAR
T-FC-03 OUTSIDE CORNER
1 1/2" (40 mm)
MINIMUM
CONTINUOUS
WELD
JM TPO
MEMBRANE
MECHANICALLY
FA
STENED
AT PE
RIMETER OF C
URB
IF GAP IS GREATER
THAN 1" (25 mm)
SEE NOTE 4
JM TPO UNIVERSAL
CORNER WELDED TO
FLASHING SHEET &
FIELD MEMBRANE
'L' PATCH UNDER FLASHING,
WELDED SOLID
NOTES:
JM TPO EDGE SEALANT
IF REQUIRED
OPTIONAL "L" PATCH
UNDER UNIVERSAL
COVER
JM APPROVED FASTENER
AND PLATE 12" (304 mm) O.C. MAX.
PENETRATION DEPENDANT
ON DECK MATERIAL(S).
SEE SPECIFICATIONS FOR
FURTHER INFORMATION
JM TPO FLASHING
"A"
JM TPO FLASHING
"B"
JM TPO
MEMBRANE
MECHANICALLY
ATTACHED
AT PE
RIMETER
COPIN
G
COPIN
G
FLA
SHING
"A"
"B" FLASHING
FIELD
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
CURB & CORNER JM TPO
N.T.S 03-15-19 30 YEAR
T-FC-04 INSIDE CORNER
90° BEND IN FLASHING
90° BEND IN FLASHING
APPROPRIATE VERTICAL
JM FASTENERS
12" (304 mm) O.C. MAX.
REQUIRED FOR WALLS
GREATER THAN
5 FT. IN HEIGHT
INCISE & CUT OUT
TPO FLASHING AND
POSITION AS SHOWN
1 1/2" (38 mm)
MINIMUM CONTINUOUS WELD
JM TPO
MEMBRANE
MECHANICALLY
FA
STENED
AT PE
RIMETER
FOLD AND WELD
SIMILAR TO THIS
FOLD LINE
(VISIBLE)
JM TPO UNIVERSAL CORNER
WELDED TO FLASHING SHEET
(FOLDED AS SHOWN)
JM IN
SULATION / C
OVER BOARD
APPR
OVED DECK
TPO MEMBRANE ADHESIVE
BETWEEN OVERLAP (NOT SHOWN)
JM IN
SULATION / C
OVER BOARD
APPR
OVED DECK
1. REFER TO JOHNS MANVILLE WEBSITE (www.jm.com) FOR MOST UP-TO-DATE INFORMATION.
2. PLEASE SEE SINGLE PLY FLASHING SPECIFICATIONS FOR A FULL DESCRIPTION OF INSTALLATION INSTRUCTIONS AND
REQUIREMENTS WHICH ARE CONSIDERED A PART OF THIS DETAIL.
3. ANY CARPENTRY OR METAL WORK SHOULD BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH LOCAL CODE REQUIREMENTS
4. JM TPO EDGE SEALANT IS REQUIRED ON ALL CUT OR NON ENCAPSULATED EDGES OF REINFORCED
MEMBRANE. THIS INCLUDES FACTORY CUT EDGES (SEE DETAIL T-MS-01).
INCISE & CUT OUT
TPO FLASHING AND
POSITION AS SHOWN
NOTES:
JM APPROVED FASTENER AND PLATE
PENETRATION DEPENDANT ON DECK
MATERIAL(S). SEE SPECIFICATIONS
FOR FURTHER INFORMATION
JM TPO EDGE
SEALANT IF
REQUIRED
PLAN VIEW OF FLASHING
"B" STEP 2
PLAN VIEW OF FLASHING
"A"
STEP 1
STEP 3 AT INSIDE
CORNER
AND/OR PROJECT SPECS. THESE COMPONENTS SHOULD BE REVIEWED AND APPROVED BY A LICENSED DESIGN PROFESSIONAL.
APPROVED
WALL / SUBSTRATE
APPROVED
WALL / SUBSTRATE
APPROPRIATE
JM FASTENERS
12" (304 mm)
O.C. MAX.
JM INSULATION
DRAWING NO.
Johns Manville is a manufacturer of commercial roofing products and offers this general conceptual information to you as a courtesy. This complimentary assistance is not to be used or relied upon by anyone as a substitute for professional engineering design and documentation required by building code, contract, or applicable law. By accepting these comments you agree they do not constitute any representations, endorsements of, or an assumption by Johns Manville of any liability for either the adequacy of the design of this building or any other material not supplied by Johns Manville.
MAXIMUM GUARANTEE TERM:ISSUE DATESCALE
MEMBRANE TYPE:
PENETRATION JM TPO
N.T.S 08-09-22 30 YEAR
T-FP-01 TPO PIPE BOOT
APPROVED DECK
JM TPO
MEMBRANE
JM APPROVED FASTENER AND PLATE
MIN. 4 AROUND PIPE
PENETRATION DEPENDANT ON DECK
MATERIAL(S). SEE SPECIFICATIONS
FOR FURTHER INFORMATION
PIPE PENETRATION
JM SINGLE PLY LVOC CAULK (AT TOP
OF CLAMP - SLOPED TO SHED WATER)
STAINLESS STEEL CLAMP AND SCREW
JM SEALING MASTIC
(BETWEEN PIPE AND NECK OF BOOT)
PRE-MOLDED JM TPO PIPE BOOT
1 1/2" (38 mm) MIN. WELD
(CONTINUOUS AROUND
BOOT PERIMETER)
NOTES:
1.
2.
3.
REFER TO JOHNS MANVILLE WEBSITE (www.jm.com) FOR MOST UP-TO-DATE INFORMATION.
PLEASE SEE JM TPO APPLICATION GUIDE FOR A FULL DESCRIPTION OF INSTALLATION
INSTRUCTIONS AND REQUIREMENTS WHICH ARE CONSIDERED A PART OF THIS DETAIL.
ANY CARPENTRY OR METAL WORK SHOULD BE DESIGNED AND CONSTRUCTED IN ACCORDANCE
WITH LOCAL CODE REQUIREMENTS AND/OR PROJECT SPECIFICATIONS. THESE COMPONENTS
SHOULD BE REVIEWED AND APPROVED BY A LICENSED DESIGN PROFESSIONAL.
COVER BOARD
A
FU
LL
-S
ER
VI
CE
C
IV
IL
E
NG
IN
EE
RI
NG
F
IR
M
W W
W .G
AT
EW
AY
EN
G
IN
EE
RS
.C
TS
BU
RG
H
B
U
TL
ER
5-
4-
PR
EP
AR
ED
F O
R
R
EV
IS
IO
N R
EC
O
R D
N o
D at e
Pa th
F ile na m e=
G :\P ro je ct s\
Be th el
P ar k\
ST
P
R oo fs \D w g\
-S he et
\C -9
B et he l P ar k
- S
TP
R oo fs .d w g
Pl ot
D at e=
/2 6/
2:
P
M A sh le y A.
S w ee ne y Sa ve D at e=
/2
6/
1:
A M
Project Number:
Drawing Scale:
Date Issued:
Index Number:
Drawn By:
Checked By:
Project Manager:
22.0
G at ew ay E ng in ee rs
In c.
A ll
R ig ht s
R es er ve d
THE GATEWAY ENGINEERS, INC. RETAINS OWNERSHIP RIGHTS OF ALL DATA WITHIN THE PLANS. DATA CONTAINED WITHIN IS ONLY TO BE USED FOR ITS INTENDED PURPOSE BY ITS RESPONSIBLE PARTY. THE USE, REPLICATION, REPRODUCTION, OR REDISTRIBUTION OF DATA CONTAINED WITHIN IS STRICTLY PROHIBITED AND SUBJECT TO LEGAL ACTION. S203
KMN
KMN
AAS
10/26/2026 N.T.S.
C-90064
TYPICAL DETAILS
BE
TH
EL
P
AR
K, P A
SO
U
TH
P
AR
K
TO
W
N
SH
IP
, P
A
W
ES
T
LI
BR
AR
Y
AV
EN
U
E
P
IN
EY
F
O R
K R
O
AD
M U
N
IC
IP
AL
IT
Y
O F
BE
TH
EL
P
AR
K
R O
O F
R
EP
LA
C
EM
EN
T
SCALE:
OUTSIDE CORNER
MANUFACTURER DETAILS203
NOT TO SCALE SCALE:
INSIDE CORNER
MANUFACTURER DETAILS203
NOT TO SCALE SCALE:
TPO PIPE BOOT
MANUFACTURER…