Conewago Creek Phase IV Floodplain Restoration Construction Plans
This document consists of construction plans and specifications for the Conewago Creek Phase IV Floodplain Restoration project in Londonderry Township, spanning Dauphin and Lancaster Counties, Pennsylvania. The project is sponsored by Londonderry Township with oversight by the consulting firm LandStudies Inc. The work involves selective site demolition, surveying, erosion and sediment controls, flow diversion, and removal of accumulated legacy sediment to restore a functional floodplain area. The scope includes installation of log sills, woody debris, and grade control structures to provide stability across the restored system, followed by native riparian buffer plantings. The project encompasses approximately 3.98 acres of wetland area across multiple parcels and extends along Conewago Creek and tributary reaches. Sealed bids for the project were due by 12:00 pm on Monday, February 23, 2026, through PennBid, with bid security required at 10% of the base bid. The contractor shall complete work during low-flow conditions and maintain all erosion and sediment control measures until permanent stabilization of all disturbed areas is achieved. The contract includes multiple inspection milestones throughout construction, including pre-construction meetings, stakeout verification, equipment installation inspections, and final site stabilization approval before the engineer authorizes demobilization.
The construction documents specify detailed technical requirements for floodplain reconstruction, including precise elevation targets based on NAVD 88 vertical datum and PA State Plane NAD 83 (South) coordinate system. The contractor bears responsibility for utility location verification, obtaining necessary permits from the municipality, providing all traffic control and trench barricading, and ensuring proper drainage during operations. Materials specifications include topsoil free of rocks and debris suitable for vegetative establishment, erosion control matting (ROLANKA BIOD-MAT 40 and 90), geotextile fabric, riprap in varying sizes (R-3, R-4, and R-6), and native seed mixes for permanent revegetation. The plans identify existing utilities including overhead electric lines on Route 230 and Hoffer Road, with the contractor required to call Pennsylvania One Call at least three days prior to commencing earth disturbance. Adaptive management strategies may be implemented at the engineer's direction to accommodate site-specific soil and groundwater conditions encountered during construction. All work shall comply with local, state, and federal regulations, permit conditions, and applicable grant requirements, with final project closeout requiring approval from the Dauphin County Conservation District and DEP Central Office.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-2026-01-22 - Conewago Creek Phase IV Floodplain Restoration Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0' 2000' 4000' 6000'
SCALE: 1" = 2000'
CONEWAGO CREEK PHASE IV
FLOODPLAIN RESTORATION
CONSTRUCTION DRAWINGS
LONDONDERRY TOWNSHIP, DAUPHIN & LANCASTER COUNTY, PA
SITE MAP
1" = 300'
LOCATION MAP
1" = 2,000'
PROJECT
LOCATION
CLIENT ADDRESS:
LONDONDERRY TOWNSHIP - BRADY BOSWORTH,
MS4 ENVIRONMENTAL SPECIALIST
783 GEYERS CHURCH ROAD
MIDDLETOWN, PA 17057
PHONE: (717) 461-0027
EMAIL: bbosworth@londonderrypa.org
C O
U N
TY
PL
AN
D
AT
E:
P
R O
JE
C
T
PR
O
JE
C
T:
D
AU
PH
IN
LA
N C
AS
TE
R
D -1
.2
1-
C O
N
EW
AG
O
C R
EE
K
PH
AS
E
IV
R
EV
IS
IO
N
/2
3/
0' 300' 600' 900'
SCALE: 1" = 300'
717-627-4440 Ia[��717-627-4660 landstudies.com land#landstudies.com
�1��1oUtK�6tUeet�_�/itit]��3$��17�4�
3$�042�24
USGS QUADRANGLE: ELIZABETHTOWN &
MIDDLETOWN, PA
FL
O
O D
PL
AI
N R
ES
TO
R
AT
IO
N
PROJECT BOUNDARY
PENNSYLVANIA ONE CALL SYSTEM, INC.
CALL 3 BUSINESS DAYS BEFORE YOU DIG!
1-800-242-1776 OR 8-1-1
POCS SERIAL #20251153214-000
DATE: 04/25/2025
SCALE:
DATE:
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
SHEET NUMBER:
REVISIONS
NO. DATE DESCRIPTION
P R
O
JE
C T:
S H
E E
T
TI
TL
E
7-
7-la nd st ud ie s.
co m la nd la nd st ud ie s.
co m
�1 oU tK �6 tU ee t /i tit �3 �1 7�
4�
3$�042�24
SIGNATURE BLOCK
C O
N E
W A
G O
C R
E E
K P
H A
S E
IV
LO
N
D O
N D
E R
R Y
T O
W N
S H
IP
G
E
YE
R S
C H
U R
C H
R O
A D
M
ID
D
LE
TO
W
N , P
A
G E
N E
R A
L N
O
TE
S
D-131.21-25
KS
JS
01/23/2026
OF 18
N/A
SURVEY AND GENERAL PLAN NOTES
1. THE PURPOSE OF THIS PLAN IS TO REMOVE A LEGACY SEDIMENT IMPAIRMENT ALONG THE PROPOSED REACHES OF THE CONEWAGO CREEK AND AN UNNAMED TRIBUTARY TO THE CONEWAGO CREEK IN LONDONDERRY TOWNSHIP, DAUPHIN COUNTY, PA. THIS RESTORATION PLAN AIMS TO RECONSTRUCT THE HISTORICAL FLOODPLAIN TO CONDITIONS THAT RESEMBLE AS CLOSE OF AN APPROXIMATION TO THE PRE-SETTLEMENT CONDITIONS AS IS REASONABLY POSSIBLE GIVEN THE MODERN DAY SITE
CONSTRAINTS.
2. LANDSTUDIES INC. ASSUMES NO LIABILITY FOR USE OR REUSE OF THESE PLANS BY ANY INDIVIDUAL OR ENTITY OTHER THAN LANDSTUDIES' CLIENT: LONDONDERRY
TOWNSHIP.
3. REVISIONS MADE TO THIS PLAN SHALL NOT BE THE RESPONSIBILITY OF LANDSTUDIES INC. REVISIONS, SUBSTITUTION OF MATERIALS, OR OTHER CHANGES REQUIRES WRITTEN PERMISSION FROM LANDSTUDIES AND MAY BE SUBJECT TO GOVERNING BODY APPROVAL. SUCH APPROVAL OF REVISIONS OR FIELD CHANGES SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
4. EXISTING CONDITION SITE FEATURES AND TOPOGRAPHY ARE BASED ON PUBLICLY AVAILABLE UNITED STATES GEOLOGIC SURVEY (USGS) 1-METER RESOLUTION CONTOUR MODELS AND AS-BUILT SURFACE MODELS PROVIDED BY HERBERT, ROWLAND, & GRUBIC FOR THE PREVIOUSLY RESTORED FLOODPLAIN UPSTREAM.
SUPPLEMENTAL STREAM CHANNEL AND FLOODPLAIN TOPOGRAPHY WAS BASED ON FIELD SURVEYS BY LANDSTUDIES INC. CONDUCTED ON APRIL 15 & 16, 2025 USING
CONVENTIONAL SURVEY METHODS (TOTAL STATION).
5. ALL ELEVATIONS ARE BASED ON NAVD 88 VERTICAL DATUM. HORIZONTAL PROJECTIONS ARE BASED ON THE PA STATE PLANE NAD 83 (SOUTH) COORDINATE SYSTEM.
6. A WETLAND DELINEATION WAS CONDUCTED BY LANDSTUDIES INC. ON APRIL 28, 2025. THE RESULTS OF THAT INVESTIGATION INDICATE THE PRESENCE OF WETLANDS WITHIN THE PROJECT AREA. ALL IMPACTED WETLAND AREAS ARE BEING IMPROVED AS A RESULT OF THE FLOODPLAIN RESTORATION.
7. NO KNOWN UNDERGROUND UTILITIES EXIST ON THE PROJECT SITE. OVERHEAD UTILITY LINES ARE PRESENT ON ROUTE 230 AND HOFFER ROAD.
8. IT SHALL BE THE CONTRACTOR'S RESPONSIBILTY TO VERIFY THAT NO UTILITIES EXIST ON SITE PRIOR TO CONSTRUCTION.
9. FLUVIAL SYSTEMS ARE DYNAMIC AND CHANGE OVER TIME. THE EXISTING CONDITIONS TYPOGRAPHY REPRESENTS THE CONDITIONS AT THE TIME OF THE FIELD SURVEY.
DESIGN MODIFICATIONS MAY BE NECESSARY TO ACCOMMODATE CHANGES IN THE SITE CONDITIONS AT THE TIME OF CONSTRUCTION. LANDSTUDIES SHALL BE CONSULTED TO VERIFY THE EXISTING SITE CONDITIONS AND IDENTIFY CONSTRUCTION MODIFICATIONS THAT MAY BE NECESSARY BASED ON THOSE CONDITIONS.
10. EXISTING FLOODPLAIN AND FLOODWAY LINES AS SHOWN ON THESE PLANS WERE OBTAINED FROM FEMA'S NATIONAL FLOOD HAZARD LAYER (NFHL) COUNTY DATA ON 01/06/2025.
11. A COPY OF THE PROJECT SITE'S EROSION AND SEDIMENT POLLUTION CONTROL PLAN AND ITS ACCOMPANYING NARRATIVE MUST BE AVAILABLE ON-SITE DURING CONSTRUCTION UNTIL THE SITE HAS BEEN PERMANENTLY STABILIZED AND FOLLOWING VERIFICATION FROM THE APPLICABLE REGULATORY AUTHORITY.
12. PREDOMINANT SOILS WITHIN THE PROJECT AREA ARE:
12.1. Bc - BASHER SILT LOAM
12.2. Rd - ROWLAND SILT LOAM
12.3. Bo - BOWMANSVILLE SILT LOAM
13. SOILS INFORMATION WAS OBTAINED FROM THE USDA NRCS'S WEB SOIL SURVEY.
14. THE PENNDOT RIGHT OF WAY SHOWN ON THESE PLANS IS APPROXIMATE. THE RIGHT OF WAY WAS DRAFTED BASED ON THE 1968 PLANS PREPARED BY RUMMEL, KLEPPER, & KAHL CONSULTING ENGINEERS TITLED DRAWINGS AUTHORIZING CONDEMNATION OF RIGHT-OF-WAY AND CONSTRUCTION OF LEG. ROUTE 129 SECTION 19 & 18 IN DAUPHIN &
LANCASTER COUNTY.
PROJECT INSPECTION MILESTONES
THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING THE ENGINEER AT LEAST ONE WEEK PRIOR TO THE ANTICIPATED START OF EACH ACTIVITY SO THAT NECESSARY SITE INSPECTIONS CAN BE MADE AND GUIDANCE PROVIDED. THE ENGINEER MAY REQUIRE ADDITIONAL INSPECTION POINTS OR MULTIPLE INSPECTIONS OF A GIVEN FEATURE THROUGH THE COURSE OF CONSTRUCTION.
1. PRIOR TO CLEARING/ TREES MARKED FOR REMOVAL
2. STAKEOUT
3. E&S CONTROLS
4. CHANNEL BED GRAVEL HARVESTING
5. START OF EXCAVATION
6. START OF ISLAND EXCAVATION
7. FIRST BURIED LOG SILL INSTALLATION - SUBSEQUENT LOG SILL INSTALLATIONS THAT ARE NOT OBSERVED BY THE ENGINEER SHALL
BE FLAGGED OR OTHERWISE IDENTIFIED SO THAT SILL ELEVATIONS MAY BE EASILY CONFIRMED BY PROBING.
8. FIRST 10 WOODY DEBRIS INSTALLATIONS
9. FIRST 10 ROOT WAD INSTALLATIONS
10. ALL ROCK UNDERLAYMENT
11. CONSTRUCTION OF THE PROPOSED PLUNGE POOL (PP-1)
12. ADDITIONAL REVIEW OF FLOODPLAIN, CHANNEL, AND STRUCTURE INSTALLATION AS REQUESTED BY THE ENGINEER
13. PRIOR TO SEEDING AND MATTING (BY SECTION)
14. SEED, LABEL AND WEIGHT (BY SECTION)
15. AFTER SEEDING AND MATTING (BY SECTION)
16. TREE, SHRUB, PLUG MATERIAL ONSITE PRIOR TO AND FOLLOWING PLANTING
17. PRIOR TO DEMOBILIZATION
FLOODPLAIN RESTORATION NOTES
1. FLOODPLAIN RESTORATION REQUIRES DYNAMIC IMPLEMENTATION APPROACHES TO ACHIEVE OPTIMAL RESTORATION CONDITIONS. THE CONTRACTOR PERFORMING THE WORK SHALL HAVE RELATIVE EXPERIENCE WORKING WITH FLUVIAL SYSTEMS ON STREAM AND FLOODPLAIN RESTORATIONS. THE CONTRACTOR SHALL UNDERSTAND THAT VARIATIONS OF SOILS AND GROUNDWATER ELEVATION MAY IMPACT SITE AND SOIL CONDITIONS AND SHALL COORDINATE WITH THE ENGINEER TO IMPLEMENT ADAPTIVE MANAGEMENT STRATEGIES TO HANDLE SITE SPECIFIC CONDITIONS ARISING DURING CONSTRUCTION OR WHICH HAVE CHANGED SINCE THE INITIAL ASSESSMENT AND DATA COLLECTION UPON WHICH THE DESIGN IS BASED. ANY ADAPTIVE MANAGEMENT STRATEGIES THAT MAY BE IMPLEMENTED SHALL BE CONSIDERED INCIDENTAL TO THE RESTORATION CONSTRUCTION. A DETAILED DESCRIPTION OF THESE STRATEGIES MAY BE FOUND IN THE OPERATIONS AND MAINTENANCE PLAN. THESE STRATEGIES SHALL ONLY BE IMPLEMENTED AT THE DIRECTION OF THE ENGINEER. ADAPTIVE MANAGEMENT
STRATEGIES MAY INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING:
a. WOODY DEBRIS OR ROOT WAD PLACEMENT
b. LOG SILLS
c. STRAW BALES, FASCINES, BRUSH BUNDLES, COIR LOGS, WADDLES, AND MATTING ROLLS
d. SOD MAT PLACEMENT
e. ADDITIONAL ROCK UNDERLAYMENT
f. TARGETED MICROTOPOGRAPHY ADJUSTMENTS
g. RE-SEEDING/RE-MATTING
2. MINIMIZING COMPACTION TO THE PROPOSED FLOODPLAIN FOOTPRINT IS A KEY TENET OF CONSTRUCTION INTENDED TO MAINTAIN THE INTEGRITY OF THE RESTORATION. FOR THIS REASON, ALL EXCAVATION WITHIN 18” VERTICALLY OF THE PROPOSED FLOODPLAIN FOOTPRINT SHALL BE CONDUCTED WITH A TRACKHOE WORKING BACKWARDS OFF THE FOOTPRINT TO ACHIEVE FINAL GRADE. PROPOSED BASEFLOW CHANNELS, HABITAT POOLS, LOG SILLS, WOODY DEBRIS, BURIED LOGS, AND OTHER FLOODPLAIN FEATURES SHALL BE CONSTRUCTED IN A SIMILAR MANNER IN CONCURRENCE WITH THE FLOODPLAIN GRADING AND UNDER DIRECT SUPERVISION OF THE ENGINEER. IF CONSTRUCTION TRAFFIC ON THE FLOODPLAIN FOOTPRINT IS NECESSARY TO ACCOMMODATE PORTIONS OF CONSTRUCTION, TRAFFIC SHALL BE LIMITED TO ONE PASS AND EQUIPMENT SHALL BE APPROVED IN ADVANCE BY, AND SUBJECT TO OVERSIGHT OF THE ENGINEER.
3. IT IS ANTICIPATED THAT DIVERSE SOIL TYPES & SUBSURFACE MATERIALS WILL BE ENCOUNTERED DURING CONSTRUCTION. AT THE DIRECTION OF THE ENGINEER, THE CONTRACTOR SHALL SEGREGATE MATERIALS BASED ON OVERALL SCOPE OF WORK AND UTILIZE SOIL TYPES BASED ON MOST SUITABLE APPLICATIONS. (I.E. GRAVEL FOR CHANNEL FEATURES; SUITABLE GROWING MEDIUM AT PROPOSED GRADE).
4. TO THE EXTENT PRACTICAL, WORK SHALL BE PERFORMED DURING LOW-FLOW CONDITIONS, AVOIDING PERIODS DURING OR
IMMEDIATELY FOLLOWING HEAVY PRECIPITATION.
5. TO THE EXTENT PRACTICAL, NATIVE VEGETATION (FORBS, GRASSES, TREES AND SHRUBS) SHALL BE PRESERVED. NATIVE TREES AND SHRUBS SHALL BE WORKED AROUND AND/OR TRANSPLANTED IF SITE CONDITIONS PERMIT OR GRADING REVISIONS WILL BE WITHIN AN
ACCEPTABLE TOLERANCE. THE ENGINEER SHALL FIELD VERIFY.
6. ONCE FINAL GRADE HAS BEEN ACHIEVED, STABILIZATION SHOULD OCCUR WITHIN 48 HOURS IF CONDITIONS WOULD OTHERWISE RESULT IN SEDIMENT-LADEN RUNOFF LEAVING THE SITE. EXCEPTIONS INCLUDE TIE-INS TO THE EXISTING CHANNEL WHERE FLOW IS BEING MAINTAINED, WHEN RAIN IS FORECASTED, OR PROPOSED CHANNELS WITH ACTIVE BASELFOW. IN THESE INSTANCES, STABILIZATION MUST OCCUR THE SAME DAY IF CONDITIONS WOULD OTHERWISE RESULT IN SEDIMENT-LADEN RUNOFF LEAVING THE SITE.
7. PRIOR TO ANY DISTURBANCE IN AREAS OF THE TRIBUTARY THAT WOULD OTHERWISE BE EXPOSED TO ACTIVE FLOW, FLOW SHALL BE DIVERTED THROUGH IMPLEMENTATION OF A TEMPORARY PUMP-AROUND BYPASS IN ACCORDANCE WITH THE PLANS. THOUGH IT MAY BE NECESSARY DURING INSTALLATION OF BYPASS SYSTEMS OR IN OTHER LIMITED CIRCUMSTANCES, THE CONTRACTOR SHALL MINIMIZE VEHICLE TRAFFIC IN ACTIVE FLOWS. CONSTRUCTION ACTIVITIES OUTSIDE OF THE ACTIVE FLOW MAY BE CONDUCTED WITHOUT USE OF A BYPASS SYSTEM IF THE ACTIVITIES ARE CONDUCTED PRIOR TO FINAL CONNECTION WITH ACTIVE STREAM FLOW. ADDITIONAL LOCALIZED PUMPING MAY BE UTILIZED TO DE-WATER IN THE IMMEDIATE VICINITY OF WHERE WORK IS BEING DONE. ALTERNATIVE SOLUTIONS SHALL BE APPROVED BY THE ENGINEER. BYPASS PUMP SHALL PROVIDE CAPACITY TO SUFFICIENTLY CONVEY FLOWS AT THE TIME OF CONSTRUCTION OF THE TRIBUTARY. MULTIPLE PUMPS MAY BE USED IF NECESSARY. AS THE REACHES ARE DEWATERED, FISHES WITHIN THE DEWATERED AREA SHALL BE CAPTURED UTILIZING A SEINE OR OTHER NET, PLACED IN BUCKETS WITH WATER, AND IMMEDIATELY RELOCATED TO ACTIVE CHANNEL
FLOWS OUTSIDE OF THE WORK AREA.
8. THE SIZE, LOCATION AND ORIENTATION OF WOODY DEBRIS, LOG SILLS, ROOT WADS, AND OTHER FLOODPLAIN FEATURES ARE APPROXIMATE AND FINAL LOCATION AND ORIENTATION WILL BE DETERMINED BY THE ENGINEER BASED ON SITE CONDITIONS FOUND DURING CONSTRUCTION. ALL SUITABLE WOODY MATERIAL HARVESTED ON-SITE SHALL BE USED FOR LOG SILLS, WOODY DEBRIS, AND BURIED LOGS.
CONTRACTOR NOTES
1. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION & UNITED STATES ARMY CORP OF ENGINEERS OFFICIALS, AND THE E&S PLAN PREPARER TO AN
ON-SITE PRE-CONSTRUCTION MEETING.
1.1. THE ORANGE CONSTRUCTION FENCE SHOWN ON THE PLANS MUST BE INSTALLED PRIOR TO THIS MEETING AND INSPECTED BY
ATTENDING PARTIES.
2. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES. CONTRACTOR SHALL CALL PA ONE-CALL 3 DAYS PRIOR TO THE START OF CONSTRUCTION.
3. THE CONTRACTOR SHALL SCHEDULE ALL NECESSARY INSPECTIONS WITH THE MUNICIPALITY AND COMPLY WITH ALL REQUESTS AND DIRECTIVES INCLUDING CORRECTING DEFECTIVE WORK AS REQUIRED TO OBTAIN FINAL APPROVAL OF THE WORK AND CLOSING OUT
THE PROJECT.
4. CONTRACTOR SHALL ADHERE TO ALL LOCAL, STATE AND FEDERAL REGULATIONS AND SPECIFICATIONS INCLUDING SAFETY STANDARDS. ALL PERMIT CONDITIONS, AND ANY APPLICABLE GRANT REQUIREMENTS SHOULD THE PROJECT BE FUNDED BY ANY
GRANTS.
5. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, PROCEDURES, SAFETY PRECAUTIONS AND/OR PROGRAMS.
6. WORK WITHIN A DOT RIGHT-OF-WAY SHALL REQUIRE DOT APPROVAL AND SHALL BE CONSTRUCTED TO DOT STANDARDS.
7. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY WITH THE MUNICIPALITY IF CONSTRUCTION IMPROVEMENTS SHALL BE
SUBJECT TO MUNICIPAL IMPROVEMENT CONSTRUCTION MANUAL AND ADHERE TO THE CURRENT STANDARDS IN EFFECT.
8. PRIOR TO CLEARING AND GRUBBING, THE ENGINEER SHALL FLAG TREES NOT SUITABLE FOR INCORPORATION INTO THE
RESTORATION AS WOODY DEBRIS OR GRADE CONTROL STRUCTURES. ANY TREE SEGMENTS GREATER THAN 12” DBH AND 20' LONG SHALL BE STOCKPILED FOR USE AS LOG SILLS. ALL REMAINING ROOT WADS AND WOODY MATERIAL SHALL REMAIN AVAILABLE FOR
INCORPORATION INTO THE FLOODPLAIN.
9. PRODUCTS SPECIFIED ON THESE PLANS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS/SPECIFICATIONS UNLESS INDICATED OTHERWISE.
10. CONSTRUCTION OF ALL IMPROVEMENTS SHALL BE BASED ON ACTUAL FIELD STAKING BY A REGISTERED SURVEYOR, UNLESS APPROVED OTHERWISE. THE CONTRACTOR SHALL NOT DEVIATE FROM THE GEOMETRY OR DIMENSIONS INDICATED ON THE PLANS WITHOUT PRIOR APPROVAL FROM THE ENGINEER. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALL NECESSARY
STAKEOUT AND SURVEY CONTROL. EXISTING SURVEY CONTROL SHALL NOT BE USED.
11. CONTRACTOR SHALL INSPECT THE SITE TO VERIFY THE EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY LAYOUT AND DIMENSIONS ON SITE PRIOR TO CONSTRUCTION. ANY DISCREPANCIES REGARDING EXISTING CONDITIONS OR PROPOSED LAYOUT SHALL BE REPORTED TO LANDSTUDIES, INC. PRIOR TO CONSTRUCTION.
12. THE CONTRACTOR SHALL NOT CONSIDER DEMOLITION NOTES OR PLAN MARKINGS TO BE ALL-INCLUSIVE. IT IS THE CONTRACTORS RESPONSIBILITY TO ASSESS THE SITE AND PERFORM THE DEMOLITION AS REQUIRED TO PERFORM THE WORK/NEW CONSTRUCTION.
13. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO LOCATE AND PROTECT THE EXISTING UTILITIES WITHIN THE PROJECT AREA WHILE MAINTAINING UNINTERRUPTED SERVICE. CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES AND COORDINATE APPROPRIATE RELOCATION EFFORTS (AS MAY BE NECESSARY) WITH RESPECTIVE UTILITY COMPANIES. DAMAGE TO ANY UTILITY SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER OF THE UTILITY COMPANY OR AUTHORITY, AT THE
CONTRACTOR'S EXPENSE.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY PERMITS FROM THE MUNICIPALITY RELATIVE TO THE
CONSTRUCTION PROPOSED ON THIS PLAN THAT HAVE NOT PREVIOUSLY BEEN OBTAINED.
15. CONTRACTOR SHALL ENSURE THAT GRADING PLAN IS IMPLEMENTED CORRECTLY AND THAT PROPER DRAINAGE IS PROVIDED
DURING CONSTRUCTION OPERATIONS.
16. THE CONTRACTOR IS RESPONSIBLE TO VERIFY EARTHWORK QUANTITIES INCLUDING APPROPRIATE SOIL MATERIALS TO SATISFY THE
CONSTRUCTION REQUIREMENTS PRIOR TO THE START OF CONSTRUCTION.
17. TOPSOIL MUST BE FREE OF ROCKS, LARGE DEBRIS, WOODY OR VEGETATED MATERIAL, FROZEN PARTICLES OR OTHER FOREIGN OR OBJECTIONABLE MATERIAL THAT WOULD INHIBIT VEGETATIVE ESTABLISHMENT OR GROWTH. TOPSOIL MUST BE SUITABLE TO SUPPORT A DIVERSE AND HEALTHY VEGETATIVE COVER AND PLANTINGS AS REQUIRED BY THE PROJECT SCOPE.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL, TRENCH BARRICADES/COVERINGS, SHEETING AND SHORING
AS NECESSARY TO COMPLETE THE WORK.
19. CONTRACTOR SHALL PROVIDE DUST CONTROL TO AVOID NUISANCE TO SURROUNDING PROPERTY OWNERS, AND AS REQUIRED BY LOCAL AUTHORITIES. MAINTAIN ROADWAYS FREE OF DUST BUILD-UP BY MECHANICAL MEANS OR OTHER APPROVED METHODS.
FURNISH AND APPLY CLEAN WATER FOR THE PURPOSE OF ALLAYING DUST CONDITIONS AS REQUIRED.
20. SAW CUTTING OF PAVEMENT, IF REQUIRED, JOINTS SHALL BE STRAIGHT, NEAT AND CLEAN.
21. FAILURE TO SPECIFICALLY IDENTIFY ANY WORK WHICH WOULD NORMALLY BE REQUIRED TO COMPLETE THE PROJECT SHALL NOT
RELIEVE THE CONTRACTOR OF RESPONSIBILITY TO PERFORM SUCH WORK.
22. N.I.C. ABBREVIATION STANDS FOR "NOT IN CONTRACT" AND IS WORK NOT REQUIRED BY THE CONTRACTOR(S).
23. CONTRACTOR SHALL PRESERVE AND PROTECT EXISTING PLANT MATERIAL UNLESS INDICATED OTHERWISE.
BEDROCK
SLOPES UPWARD
AT EDGE OF VALLEY
PROPOSED FLOODPLAIN
PLANTINGS WITH GROUNDWATER
ACCESS
VEGETATED
BANK WITH
STABLE SLOPE
EXISTING RIPARIAN
VEGETATION
DISCONNECTED
FROM GROUNDWATER
BURIED ORGANIC
MATERIAL INDICATING
HISTORICAL
FLOODPLAIN
TYPICAL PROPOSED CONDITIONTYPICAL EXISTING CONDITION
LEGACY
SEDIMENT
IMPAIRMENT
HYDRIC SOIL LAYER
BASAL GRAVEL
WEATHERED BEDROCK
RESTORATION APPROACH OVERVIEW
NOTES:
1. THE LEGACY SEDIMENT LAYER CONSISTS OF MOSTLY HOMOGENOUS MATERIAL DEPOSITED IN RECENT GEOLOGIC HISTORY THROUGH UPLAND EROSION AND STREAM ENCROACHMENTS RESULTING FROM HUMAN IMPACTS. THE MAJORITY
OF EXCAVATION IS THIS LEGACY SEDIMENT.
2. THE HYDRIC SOIL LAYER REPRESENTS THE HISTORICAL FLOODPLAIN SURFACE PRIOR TO THE DEPOSITION OF LEGACY SEDIMENT. THIS SOIL LAYER WAS NOT ABLE TO BE OBSERVED DURING FIELD INVESTIGATIONS AND GIVEN THE MODERN DAY CONSTRAINTS THE PROPOSED FLOODPLAIN SURFACE IS STILL IN LEGACY SEDIMENT. THE LEGACY SEDIMENT ON THIS SITE IS A SANDY SILT COMPOSITION, SO THERE IS MORE CONNECTION WITH SUBSURFACE LAYERS IN THE PROPOSED
CONDITION.
3. A BASAL GRAVEL LAYER TYPICALLY FOLLOWS UNDERNEATH THE HYDRIC SOIL LAYER, BUT THIS SOIL LAYER WAS NOT ABLE TO BE VISUALLY OBSERVED DURING FIELD INVESTIGATIONS. THE BASAL GRAVEL LAYER WAS IDENTIFIED IN ISOLATED
LOCATIONS USING A TILE PROBE.
EXISTING
ENTRENCHED
CHANNEL
EXISTING
PERCHED
STREAMBED
EXISTING
NORMAL WATER
SURFACE
(UNCHANGED)
FL
O
O D
P
LA
IN
R
E S
TO
R
A
TI
O N
SYMPLOCARPUS FOETIDUS (SKUNK CABBAGE) HARVESTING
SKUNK CABBAGE IS PRESENT ON SITE IN SEVERAL AREAS IN THE EXISTING CONDITION. DURING
CONSTRUCTION IT IS THE CONTRACTORS RESPONSIBILITY TO HARVEST THIS EXISTING SKUNK
CABBAGE AND STAGE NEARBY TO THEN BE INCORPORATED INTO THE RESTORED FLOODPLAIN
ONCE FINAL GRADE IS ACHIEVED.
AbA
RdB
PeB2
At
PeC2 AsB2
Bo
Rd
Bo AbB
RaB
At
PeB2
Rd
Rd
Rd
RaB
RaB
RaB
RdB
RdB
RdB
Bc
Bc
Bc
Bc
Rd
Rd
Bc
W
PeB2
PeB2
PeB2
Bc Bo
Bo BuC
W
BcAt
At
W
W
W
W
W
PeB2
Bo
AsB2
375380385
385390395
379378
0 376
376373371
378379
385385
HOFFER ROAD
NORTH MARKET STREET
(STATE ROUTE 230)
INDUSTRIAL ROAD
ZAEGER, JAMES
34-026-030
MOSER, ERIC
LEE
34-026-019
CUSTER,
HOWARD
34-026-019
LONDONDERRY
TOWNSHIP
34-026-036
LONDONDERRY
TOWNSHIP
34-026-036
FW
FW
FW
99 INDUSTRIAL
ROAD LLC
34-026-019
COUNTY OF
LANCASTER
34-026-019
LANCASTER
COUNTY
CONSERVANCY
34-026-019
COUNTY OF
LANCASTER
34-026-019
COUNTY OF
LANCASTER
34-026-019
C O
N
EW
AG
O
C R
EE
K
(W W
F/ M
F)
HOFFER ROAD
UNT 1 TO
CONEW
AGO CREEK
(W W
F/M F)
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
OE
OE
OE
OE
OE
OE
OE
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FP500
FP500
FP500
FP
FP
FP
FP500
FP500
FP500
FP500
FP
FP500
FP
FP
FP500
FP500
FP500
FP
FP
FP
FP
FP100
FP100
FP100FP100
FP100
FP100
FP
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP500
FP500
FP500
FP500
FP500
FP500
FP500
FP500
FP
FP500
FP500
FP
FP500
FP500
FP
FP500
FP500
FP500
FP
FP500
FP500
FP500 FP500
FP500
FP500
FP
FP500
FP
FP10
FP10
FP100
FP10
FP
FP
FP50
FP500
FW
FW
FW
FW FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FP100
FP100
FP100
FP
FP100
FP
FP
FP100
FP100
FP
FP100
FP100
FP100
FP100
FP
FP
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
LOD LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
WETLAND B
(PEM)
0.82 AC
WETLAND H
(PEM)
0.20 AC WETLAND G
(PEM)
0.68 AC
WETLAND F
(PEM)
0.01 AC
WETLAND D
(PFO)
0.14 AC
UNT 3 TO
CONEWAGO CREEK
(WWF/MF)
WETLAND C
(PEM)
0.61 AC
WETLAND E
(PEM)
0.31 AC
WETLAND A
(PEM)
0.81 AC
UNT 2 TOCONEWAGO CREEK
(WWF/MF)
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LO
D
EXISTING
GRAVEL PAD
MATCHLINE 1
0+00
1+00
2+00
3+
4+
5+
6+
7+00
8+00
9+00
10+00 11+00
12+00
+0
+0
+0
+0
+0
+7
0+00
1+00
2+00
3+
3+
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING APPROX. ROAD RIGHT-OF-WAY (PENNDOT)
EXISTING 500-YEAR FLOODPLAIN (FEMA)
EXISTING 100-YEAR FLOODPLAIN (FEMA)
EXISTING FLOODWAY (FEMA)
EXISTING EDGE OF CHANNEL
EXISTING GUIDE RAIL
EXISTING OVERHEAD ELECTRIC
EXISTING PROPERTY BOUNDARY
SOILS
EXISTING TREE LINE
EXISTING WETLAND
LIMIT OF DISTURBANCE
PROPOSED MAJOR CONTOURS
PROPOSED MINOR CONTOURS
EX-ROW
FP100
OE OE
LOD
HaB
FW
FP500
SCALE:
DATE:
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
SHEET NUMBER:
REVISIONS
NO. DATE DESCRIPTION
P R
O
JE
C T:
S H
E E
T
TI
TL
E
7-
7-la nd st ud ie s.
co m la nd la nd st ud ie s.
co m
�1 oU tK �6 tU ee t /i tit �3 �1 7�
4�
3$�042�24
SIGNATURE BLOCK
C O
N E
W A
G O
C R
E E
K P
H A
S E
IV
LO
N
D O
N D
E R
R Y
T O
W N
S H
IP
G
E
YE
R S
C H
U R
C H
R O
A D
M
ID
D
LE
TO
W
N , P
A
0' 100' 200' 300'
SCALE: 1" = 100'
K E
Y M
A P
D-131.21-25
KS
JS
01/23/2026
OF 18
1" = 100'
APPROXIMATE PENNDOT ROW
APPROXIMATE PENNDOT ROW
APPROXIMATE PENNDOT ROW
APPROXIMATE PENNDOT ROW
SHEETS: 4, 6, 11, & 15
SHEETS: 5, 7, 12, & 16
FL
O
O D
P
LA
IN
R
E S
TO
R
A
TI
O N
PeB2 Bo
Rd
Rd
Bc
Bc
Rd
Rd
Bc
W
Bo
W
W
0 376
373371
372.17
LSI BM2 2025
375.57
LSI BM3 2025
380.99
LSI BM6
377.69
LSI BM5
18" SLCPP
-L
F
" C
ON
CR
ET
E
PI
PE
.0 5%
90-LF 24" CONCRETE
INV 373.5'; PIPE @ 2.20%
HOFFER ROAD
NORTH MARKET STREET
(STATE ROUTE 230)
ZAEGER, JAMES
34-026-030
LONDONDERRY TOWNSHIP
34-026-036
FW
FW
FW FW
FW
FW
FW
FW
FW
COUNTY OF LANCASTER
34-026-019
C O
N
EW
AG
O
C R
EE
K
(W W
F/ M
F)
UNT 1 TO
CONEW
AGO CREEK
(W W
F/M F)
X
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
FW
FW
FW
FW
FW
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FP100
FP
FP
FP
APPROXIMATE PENNDOT ROW
APPROXIMATE PENNDOT ROW
EXISTING
BILLBOARD
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
WETLAND B
(PEM)
0.82 AC
WETLAND H
(PEM)
0.20 AC
WETLAND G
(PEM)
0.68 AC
WETLAND F
(PEM)
0.01 AC
WETLAND D
(PFO)
0.14 AC
UNT 3 TO
CONEWAGO CREEK
(WWF/MF)
EXISTING
ENDWALL &
RIPRAP SCOUR
HOLE
WETLAND C
(PEM)
0.61 AC
WETLAND E
(PEM)
0.31 AC
WETLAND A
(PEM)
0.81 AC
UNT 2 TOCONEWAGO CREEK
(WWF/MF)
APPROXIMATE PENNDOT ROW
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
EXISTING CONCRETE
PIPE TO BE REMOVED
EXISTING MEMORIAL TREE
TO BE RELOCATED OUTSIDE
GRADING AREA
EXISTING 18" SLCPP
TO BE TRIMMED AT
PROPOSED 373'
CONTOURINV. 373.33'
MATCHLINE
TP-R
370.52
TP-R
368.62
TP-R
368.43
TP-R
369.09
TP-R
368.94
TP-R
368.60
TP-R
370.61
TP-R
370.20
TP-R
369.80
TOP GLEY
372.09
372.42
TP-GRV
371.23
TP-GRV
TP-R
369.49
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING APPROX. ROAD RIGHT-OF-WAY (PENNDOT)
EXISTING 500-YEAR FLOODPLAIN (FEMA)
EXISTING 100-YEAR FLOODPLAIN (FEMA)
EXISTING FLOODWAY (FEMA)
EXISTING EDGE OF CHANNEL
EXISTING GUARD RAIL
EXISTING ROAD
EXISTING OVERHEAD ELECTRIC
EXISTING PARCEL LINES (COUNTY GIS)
SOILS
EXISTING TREE LINE
EXISTING AREA TO BE CLEARED AND GRUBBED
EXISTING WETLAND
EXISTING TREE TO BE RELOCATED
BENCHMARK LOCATION
EX-ROW
FP100
OE OE
HaB
FW
FP500
X
100.00
LSI BM #
SCALE:
DATE:
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
SHEET NUMBER:
REVISIONS
NO. DATE DESCRIPTION
P R
O
JE
C T:
S H
E E
T
TI
TL
E
7-
7-la nd st ud ie s.
co m la nd la nd st ud ie s.
co m
�1 oU tK �6 tU ee t /i tit �3 �1 7�
4�
3$�042�24
SIGNATURE BLOCK
C O
N E
W A
G O
C R
E E
K P
H A
S E
IV
LO
N
D O
N D
E R
R Y
T O
W N
S H
IP
G
E
YE
R S
C H
U R
C H
R O
A D
M
ID
D
LE
TO
W
N , P
A
0' 40' 80' 120'
SCALE: 1" = 40'
E X
IS
TI
N G
C O
N D
IT
IO
N S
D
E M
O
LI
TI
O
N P
LA
N
D-131.21-25
KS
JS
01/23/2026
OF 18
1" = 40'
FL
O
O D
P
LA
IN
R
E S
TO
R
A
TI
At
PeC2
AsB2
At
Rd
Rd
RdB
Bc
Bc
PeB2
PeB2
BcAt
At
W
W
W
PeB2
385385
384.61
LSI BM1 2025
372.17
LSI BM2 2025
MOSER, ERIC LEE
34-026-019
LONDONDERRY TOWNSHIP
34-026-036
HOFFER ROAD
FP
FP100
FP100
FP
FP
FP
FP
FP
FP
FP
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP500 FP500
FP500
FP500
FP500
FP500
FP500
FP500
FP500
FP
FP
FP500
FP500
FP500
FP
FP50
FP100FP100
FP100
FP10
FP10
FP100
FP
FP
FP500
FP
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
EXISTING BUILDING
EXISTING
ENDWALL &
RIPRAP SCOUR
HOLE
LOD
LOD
LOD
LOD
LOD
LOD
EXISTING
GRAVEL PAD
MATCHLINE
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING APPROX. ROAD RIGHT-OF-WAY (PENNDOT)
EXISTING 500-YEAR FLOODPLAIN (FEMA)
EXISTING 100-YEAR FLOODPLAIN (FEMA)
EXISTING FLOODWAY (FEMA)
EXISTING EDGE OF CHANNEL
EXISTING GUARD RAIL
EXISTING ROAD
EXISTING OVERHEAD ELECTRIC
EXISTING PARCEL LINES (COUNTY GIS)
SOILS
EXISTING TREE LINE
EXISTING AREA TO BE CLEARED AND GRUBBED
EXISTING WETLAND
EXISTING TREE TO BE RELOCATED
BENCHMARK LOCATION
EX-ROW
FP100
OE OE
HaB
FW
FP500
X
100.00
LSI BM #
SCALE:
DATE:
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
SHEET NUMBER:
REVISIONS
NO. DATE DESCRIPTION
P R
O
JE
C T:
S H
E E
T
TI
TL
E
7-
7-la nd st ud ie s.
co m la nd la nd st ud ie s.
co m
�1 oU tK �6 tU ee t /i tit �3 �1 7�
4�
3$�042�24
SIGNATURE BLOCK
C O
N E
W A
G O
C R
E E
K P
H A
S E
IV
LO
N
D O
N D
E R
R Y
T O
W N
S H
IP
G
E
YE
R S
C H
U R
C H
R O
A D
M
ID
D
LE
TO
W
N , P
A
0' 40' 80' 120'
SCALE: 1" = 40'
E X
IS
TI
N G
C O
N D
IT
IO
N S
D
E M
O
LI
TI
O
N P
LA
N
D-131.21-25
KS
JS
01/23/2026
OF 18
1" = 40'
FL
O
O D
P
LA
IN
R
E S
TO
R
A
TI
O N
AREA WITHIN LOD SHOWN HERE SHALL
BE CONSIDERED THE WORK AREA FOR
ADDITIVE ALTERNATE 2 (A2) AND
DEDUCTIVE ALTERNATE 1 (D1)
PeB2 Bo
Rd
Rd
Bc
Bc
Rd
Rd
Bc
W
Bo
W
W
0 376
373371
372.17
LSI BM2 2025
375.57
LSI BM3 2025
380.99
LSI BM6
377.69
LSI BM5
18" SLCPP
90-LF 24" CONCRETE
INV 373.5'; PIPE @ 2.20%
HOFFER ROAD
NORTH MARKET STREET
(STATE ROUTE 230)
ZAEGER, JAMES
34-026-030
LONDONDERRY TOWNSHIP
34-026-036
FW
FW
FW FW
FW
FW
FW
FW
FW
COUNTY OF LANCASTER
34-026-019
C O
N
EW
AG
O
C R
EE
K
(W W
F/ M
F)
UNT 1 TO
CONEW
AGO CREEK
(W W
F/M F)
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
FW
FW
FW
FW
FW
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FP100
FP
FP
FP
APPROXIMATE PENNDOT ROW
APPROXIMATE PENNDOT ROW
EXISTING
BILLBOARD
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
WETLAND B
(PEM)
0.82 AC
WETLAND H
(PEM)
0.20 AC
WETLAND G
(PEM)
0.68 AC
WETLAND F
(PEM)
0.01 AC
WETLAND D
(PFO)
0.14 AC
UNT 3 TO
CONEWAGO CREEK
(WWF/MF)
EXISTING
ENDWALL &
RIPRAP SCOUR
HOLE
WETLAND C
(PEM)
0.61 AC
WETLAND E
(PEM)
0.31 AC
WETLAND A
(PEM)
0.81 AC
UNT 2 TOCONEWAGO CREEK
(WWF/MF)
APPROXIMATE PENNDOT ROW
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
MATCHLINE
6 37
3+
4+
5+
6+
7+00
8+00
9+00
10+00
11+00
12+00
+0
+0
+0
+0
0+00
1+00
2+00
3+
3+
0+00
1+00
2+00
3+00
4+00
4+50
0+00
1+00
2+00
3+00
0+
1+
0+
1+
1+
TP-R
370.52
TP-R
368.62
TP-R
368.43
TP-R
369.09
TP-R
368.94
TP-R
368.60
TP-R
370.61
TP-R
370.20
TP-R
369.80
TOP GLEY
372.09
372.42
TP-GRV
371.23
TP-GRV
0+00
1+00
2+00
2+30
TP-R
369.49
370.85
371.03
371.27
1 371.69
371.85
372.76
371.93
372.32
372.55
372.32
372.12
371.83
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING APPROX. ROAD RIGHT-OF-WAY (PENNDOT)
EXISTING 500-YEAR FLOODPLAIN (FEMA)
EXISTING 100-YEAR FLOODPLAIN (FEMA)
EXISTING FLOODWAY (FEMA)
EXISTING EDGE OF CHANNEL
EXISTING GUARD RAIL
EXISTING ROAD
EXISTING OVERHEAD ELECTRIC
EXISTING PARCEL LINES (COUNTY GIS)
SOILS
EXISTING TREE LINE
EXISTING WETLAND
BENCHMARK LOCATION
EX-ROW
FP100
OE OE
LOD LOD
HaB
FW
FP500
PROPOSED SPOT ELEVATION
LIMIT OF DISTURBANCE
PROPOSED TREELINE
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED LOGSILL
PROPOSED ROCK UNDERLAYMENT
TEMPORARY STOCKPILE AREA
TEMPORARY STAGING AREA
PROPOSED WOODY DEBRIS
100.00
LSI BM #
LS LS LS
375.00
SCALE:
DATE:
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
SHEET NUMBER:
REVISIONS
NO. DATE DESCRIPTION
P R
O
JE
C T:
S H
E E
T
TI
TL
E
7-
7-la nd st ud ie s.
co m la nd la nd st ud ie s.
co m
�1 oU tK �6 tU ee t /i tit �3 �1 7�
4�
3$�042�24
SIGNATURE BLOCK
C O
N E
W A
G O
C R
E E
K P
H A
S E
IV
LO
N
D O
N D
E R
R Y
T O
W N
S H
IP
G
E
YE
R S
C H
U R
C H
R O
A D
M
ID
D
LE
TO
W
N , P
A
0' 40' 80' 120'
SCALE: 1" = 40'
R E
S
TO
R A
TI
O
N G
R A
D
IN
G P
LA
N
D-131.21-25
KS
JS
01/23/2026
OF 18
1" = 40'
TYP.
LOGSILLD-1
TYP.
WOODY DEBRISD-2
TYP.
CHANNEL BANK GRADINGD-3
TYP.
ROOT WADD-4
TYP.
FLOODPLAIN CONSTRUCTIOND-5
RU-1: R-6, 36" DEPTH
ROCK UNDERLAYMENTD-6
RU-2: R-4, 18" DEPTH
ROCK UNDERLAYMENTD-6
PP-1
PLUNGE POOLD-7
MAINSTEM VALLEY STA 6+28
CROSS SECTION 1X-1
MAINSTEM VALLEY STA 12+43
CROSS SECTION 2X-2
TRIBUTARY VALLEY STA 0+65
CROSS SECTION 3X-3
TRIBUTARY VALLEY STA 0+99
CROSS SECTION 4X-4
MAINSTEM
PROPOSED VALLEY ALIGNMENTP-1
TRIBUTARY
PROPOSED VALLEY ALIGNMENTP-2
RA-1
RIPRAP APRON AT PIPE OUTLET WITH ENDWALLE-11
RA-2; PIPE INV. 373'
RIPRAP APRON AT PIPE OUTLET WITH ENDWALLE-11
EXISTING ISLAND
(VALLEY STA 10+80 - 13+00)
PROPOSED FLOODPLAIN OBSTRUCTIONTRIBUTARY VALLEY STA 1+90
CROSS SECTION 5X-5
FL
O
O D
P
LA
IN
R
E S
TO
R
A
TI
O N
RU-4: R-3, 9" DEPTH
ROCK UNDERLAYMENTD-6
RU-5: R-3, 9" DEPTH
ROCK UNDERLAYMENTD-6
RU-6: R-3, 9" DEPTH
ROCK UNDERLAYMENTD-6
RU-3: R-4, 18" DEPTH
ROCK UNDERLAYMENTD-6
TYP.
TYPE D-W ENDWALLE-10
FINAL GRADE OF ISLAND WILL BE
DEPENDENT UPON WATER SURFACE
ELEVATION AT TIME OF CONSTRUCTION,
AsB2
At
Rd
Rd
RdB
Bc
Bc
PeB2
PeB2
BcAt
At
W
W
W
PeB2
385385
384.61
LSI BM1 2025
372.17
LSI BM2 2025
MOSER, ERIC LEE
34-026-019
LONDONDERRY TOWNSHIP
34-026-036
HOFFER ROAD
FP
FP100
FP100
FP
FP
FP
FP
FP
FP
FP
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP500 FP500
FP500
FP500
FP500
FP500
FP500
FP500
FP500
FP
FP
FP500
FP500
FP500
FP
FP50
FP100FP100
FP100
FP10
FP10
FP100
FP
FP
FP500
FP
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
EXISTING BUILDING
EXISTING
ENDWALL &
RIPRAP SCOUR
HOLE
LOD
LOD
LOD
LOD
LOD
LOD
EXISTING
GRAVEL PAD
MATCHLINE
0+00
1+00
2+00
3+
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING APPROX. ROAD RIGHT-OF-WAY (PENNDOT)
EXISTING 500-YEAR FLOODPLAIN (FEMA)
EXISTING 100-YEAR FLOODPLAIN (FEMA)
EXISTING FLOODWAY (FEMA)
EXISTING EDGE OF CHANNEL
EXISTING GUARD RAIL
EXISTING ROAD
EXISTING OVERHEAD ELECTRIC
EXISTING PARCEL LINES (COUNTY GIS)
SOILS
EXISTING TREE LINE
EXISTING WETLAND
BENCHMARK LOCATION
EX-ROW
FP100
OE OE
LOD LOD
HaB
FW
FP500
PROPOSED SPOT ELEVATION
LIMIT OF DISTURBANCE
PROPOSED TREELINE
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED LOGSILL
PROPOSED ROCK UNDERLAYMENT
TEMPORARY STOCKPILE AREA
TEMPORARY STAGING AREA
PROPOSED WOODY DEBRIS
100.00
LSI BM #
LS LS LS
375.00
SCALE:
DATE:
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
SHEET NUMBER:
REVISIONS
NO. DATE DESCRIPTION
P R
O
JE
C T:
S H
E E
T
TI
TL
E
7-
7-la nd st ud ie s.
co m la nd la nd st ud ie s.
co m
�1 oU tK �6 tU ee t /i tit �3 �1 7�
4�
3$�042�24
SIGNATURE BLOCK
C O
N E
W A
G O
C R
E E
K P
H A
S E
IV
LO
N
D O
N D
E R
R Y
T O
W N
S H
IP
G
E
YE
R S
C H
U R
C H
R O
A D
M
ID
D
LE
TO
W
N , P
A
0' 40' 80' 120'
SCALE: 1" = 40'
R E
S
TO
R A
TI
O
N G
R A
D
IN
G P
LA
N
D-131.21-25
KS
JS
01/23/2026
OF 18
1" = 40'
FL
O
O D
P
LA
IN
R
E S
TO
R
A
TI
O N
TEMPORARY STAGING AREA
TEMPORARY STOCKPILE AREA
AREA WITHIN LOD SHOWN HERE SHALL
BE CONSIDERED THE WORK AREA FOR
Station
3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50
0.13%
ST
A
4+
.1
EL
EV
.5
M
AI
N
ST
EM
U
PS
TR
EA
M
TI
E
IN
ST
A
+1 0.
EL
EV
.4
0.24%
ST
A
+6 3.
EL
EV
.3
ST
AR
T
IS
LA
N
D G
R
AD
E
BR
EA
K
ST
A
+0 7.
EL
EV
.7
EN
D
IS
LA
N D
G R
AD
E
BR
EA
K
M
AI
N
ST
EM
D
O W
N
ST
R
EA
M
TI
E
IN
TR
IB
U
TA
R Y
PR
O
FI
LE
P-
TILE PROBE
RESISTANCE
ELEV = 370.52
TILE PROBE
RESISTANCE
ELEV = 368.62
TILE PROBE
RESISTANCE
ELEV = 368.43
TILE PROBE
RESISTANCE
ELEV = 369.09
TILE PROBE
RESISTANCE
ELEV = 368.94
TILE PROBE
RESISTANCE
ELEV = 368.60
TILE PROBE
GRAVEL
ELEV = 371.23
Station
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+23
0.00% 0.00%
0.00%
1.29%
ST
A
0+
.3
EL
EV
.3
TR
IB
U
TA
R Y
U
PS
TR
EA
M
TI
E
IN
ST
A
0+
.0
EL
EV
.0
G R
AD
E
BR
EA
K
ST
A
0+
.7
EL
EV
.0
G R
AD
E
BR
EA
K
ST
A
0+
.7
EL
EV
.0
G R
AD
E
BR
EA
K
ST
A
1+
.5
EL
EV
.0
G R
AD
E
BR
EA
K
ST
A
1+
.8
EL
EV
.5
G R
AD
E
BR
EA
K
ST
A
2+
.0
EL
EV
.8
TR
IB
U
TA
R Y
D O
W N
ST
R
EA
M
TI
E
IN
ST
A
0+
.6
EL
EV
.0
G R
AD
E
BR
EA
K
ST
A
0+
.7
EL
EV
.0
G R
AD
E
BR
EA
K
TILE PROBE
RESISTANCE
ELEV = 369.80
TILE PROBE
RESISTANCE
ELEV = 369.49
TILE PROBE
RESISTANCE
ELEV = 370.61
HYDRIC SOIIL OBSERVED
IN STREAMBANK
ELEV = 372.09
TILE PROBE
GRAVEL
ELEV = 372.42
SCALE:
DATE:
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
SHEET NUMBER:
REVISIONS
NO. DATE DESCRIPTION
P R
O
JE
C T:
S H
E E
T
TI
TL
E
7-
7-la nd st ud ie s.
co m la nd la nd st ud ie s.
co m
�1 oU tK �6 tU ee t /i tit �3 �1 7�
4�
3$�042�24
SIGNATURE BLOCK
C O
N E
W A
G O
C R
E E
K P
H A
S E
IV
LO
N
D O
N D
E R
R Y
T O
W N
S H
IP
G
E
YE
R S
C H
U R
C H
R O
A D
M
ID
D
LE
TO
W
N , P
A
P R
O
FI
LE
S
D-131.21-25
KS
JS
01/23/2026
OF 18
AS SHOWN
H: 1"=40' V: 1"=4'
PROPOSED VALLEY ALIGNMENT - MAINSTEM - PROFILE VIEWP-1
H: 1"=40' V: 1"=4'
PROPOSED VALLEY ALIGNMENT - TRIBUTARY - PROFILE VIEWP-2
EXISTING GRADE
PROPOSED FLOODPLAIN GRADE
PROPOSED FLOODPLAIN GRADE
EXISTING GRADE
TYP.
LOGSILLD-1
TYP.
LOGSILLD-1
PP-1
PLUNGE POOLD-7
RU-1: R-6, 36" DEPTH
ROCK UNDERLAYMENTD-6
EXISTING ISLAND
EXISTING WATER
SURFACE
PROPOSED ISLAND
GRADING PROFILE FL
O O
D P
LA
IN
R E
S
TO
R A
TI
Station
Mainstem Cross Section #2
0+00 0+50 1+00 1+50 2+00 2+50 3+00
90-LF 24"
CONCRETE
PIPE @ 2.20%
Station
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50
.3
3%
4.84%
20.00%
0.00%
371.05 10
.00
20.00%
0.00% 10.00%
.00
% 0.00%
.0
0%
LIMIT OF DISTURBANCE
HOFFER
ROAD
LIMIT OF DISTURBANCE
HOFFER
ROAD
FEMA 100-YR FLOODPLAIN
+ 61' TO FEMA FLOODWAY
WETLAND A
FEMA FLOODWAY
& 100-YR FLOODPLAIN
+ 12' TO FEMA FLOODWAY FEMA FLOODWAY
+ 478' + 285'
+ 737' TO FEMA
100-YR FLOODPLAIN
Station
0+00 0+50 1+00
Station
0+00 0+50 1+00 1+50
Station
0+00 0+50 1+00 1+50 2+00 2+30
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE
FEMA 100-YR FLOODPLAIN FEMA 100-YR FLOODPLAIN
WETLAND
D
TILE PROBE
RESISTANCE
ELEV = 370.61 TILE PROBE
RESISTANCE
ELEV = 370.20
TILE PROBE
RESISTANCE
ELEV = 369.49
18.16%
0.00%
.8
1%
WETLAND B
WETLAND
D
+ 18' TO
50' FLOODWAY 50' FLOODWAY
50' FLOODWAY
WETLAND B
FEMA 100-YR FLOODPLAIN
50' FLOODWAY
LIMIT OF DISTURBANCE
WETLAND B
ENTIRE CROSS SECTION CONTAINED WITHIN CONEWAGO CREEK FLOODPLAINENTIRE CROSS SECTION CONTAINED WITHIN CONEWAGO CREEK FLOODPLAINENTIRE CROSS SECTION CONTAINED
WITHIN CONEWAGO CREEK FLOODPLAIN
SCALE:
DATE:
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
SHEET NUMBER:
REVISIONS
NO. DATE DESCRIPTION
P R
O
JE
C T:
S H
E E
T
TI
TL
E
7-
7-la nd st ud ie s.
co m la nd la nd st ud ie s.
co m
�1 oU tK �6 tU ee t /i tit �3 �1 7�
4�
3$�042�24
SIGNATURE BLOCK
C O
N E
W A
G O
C R
E E
K P
H A
S E
IV
LO
N
D O
N D
E R
R Y
T O
W N
S H
IP
G
E
YE
R S
C H
U R
C H
R O
A D
M
ID
D
LE
TO
W
N , P
A
C R
O S
S S
E C
TI
O
N S
D-131.21-25
KS
JS
01/23/2026
OF 18
AS SHOWN
EXISTING GRADE
PROPOSED FLOODPLAIN GRADE
RA-1: R-3, 9" DEPTH
RIPRAP APRON AT PIPE OUTLETD-8
H: 1"=40' V: 1"=4'
CROSS SECTION 1 - MAINSTEM VALLEY STA 6+28 - PROFILE VIEWX-1
H: 1"=40' V: 1"=4'
CROSS SECTION 2 - MAINSTEM VALLEY STA 12+43 - PROFILE VIEWX-2
H: 1"=40' V: 1"=4'
CROSS SECTION 3 - TRIBUTARY VALLEY STA 0+65 - PROFILE VIEWX-3
PROPOSED FLOODPLAIN GRADE
PROPOSED FLOODPLAIN GRADE
PROPOSED FLOODPLAIN GRADE
EXISTING GRADE
EXISTING ISLAND
EXISTING GRADE EXISTING GRADE
PP-1
PLUNGE POOLD-7
RU-1: R-6, 36" DEPTH
ROCK UNDERLAYMENTD-6
PROPOSED FLOODPLAIN OBSTRUCTION
H: 1"=40' V: 1"=4'
CROSS SECTION 4 - TRIBUTARY VALLEY STA 0+99 - PROFILE VIEWX-4 H: 1"=40' V: 1"=4'
CROSS SECTION 5 - TRIBUTARY VALLEY STA 1+90 - PROFILE VIEWX-5
RU-1: R-6, 36" DEPTH
ROCK UNDERLAYMENTD-6 PROPOSED FLOODPLAIN GRADE
EXISTING GRADE
FL
O
O D
P
LA
IN
R
E S
TO
R
A
TI
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
SHEET NUMBER:
REVISIONS
NO. DATE DESCRIPTION
P R
O
JE
C T:
S H
E E
T
TI
TL
E
7-
7-la nd st ud ie s.
co m la nd la nd st ud ie s.
co m
�1 oU tK �6 tU ee t /i tit �3 �1 7�
4�
3$�042�24
SIGNATURE BLOCK
C O
N E
W A
G O
C R
E E
K P
H A
S E
IV
LO
N
D O
N D
E R
R Y
T O
W N
S H
IP
G
E
YE
R S
C H
U R
C H
R O
A D
M
ID
D
LE
TO
W
N , P
A
R E
S
TO
R A
TI
O
N D
E
TA
IL
S
D-131.21-25
KS
JS
01/23/2026
OF 18
N/A
NOT TO SCALE
FLOODPLAIN CONSTRUCTIOND-5
FLOODPLAIN
DESIGN GRADE
MICROTOPOGRAPHY;
DO NOT DEVIATE FROM
DESIGN GRADES MORE
THAN +/- 0.5'
NOTES:
1. FOR SITES WHERE OVEREXCAVATION IS ANTICIPATED TO BE BROADLY REQUIRED - TOPSOIL SHALL BE SALVAGED WITHIN PROPOSED
FLOODPLAIN AND STOCKPILED FOR USE AS TOP DRESSING TO FINAL GRADE.
2. EXCAVATE PROPOSED FLOODPLAIN TO DESIGN ELEVATIONS AND PROCEED WITH THE NECESSARY APPROACH, DEPENDANT UPON WHAT TYPE OF MATERIAL IS PRESENT AT THE DESIGN ELEVATIONS AS DETERMINED AND APPROVED BY THE ENGINEER:
2.1. OPTION A - IF SUITABLE GROWING MATERIAL IS PRESENT AT FINAL FLOODPLAIN ELEVATIONS, LEAVE THE MATERIAL IN PLACE AND
PROCEED WITH CONSTRUCTION.
2.2. OPTION B - IF UNSUITABLE GROWING MATERIAL IS PRESENT AT FINAL FLOODPLAIN ELEVATIONS, OVER-EXCAVATE BY 6" AND
REPLACE WITH SALVAGED TOPSOIL TO FINAL FLOODPLAIN GRADE.
3. CHANNELS AND FLOODPLAIN FEATURES SHALL BE CONSTRUCTED AND INSTALLED WITH MINIMAL TRAFFIC ON THE FLOODPLAIN FOOTPRINT BY WORKING BACKWARDS OFF THE EXISTING GRADE. THE USE OF EQUIPMENT ON THE FINISHED FLOODPLAIN GRADE MUST
BE APPROVED BY THE ENGINEER.
4. IRREGULARITIES IN FINAL GRADE ARE DESIRABLE TO CREATE MICRO-TOPOGRAPHY (NOT TO EXCEED +/- 0.5' FROM DESIGN ELEVATIONS), WHICH IS NOT DEPICTED BY PROPOSED CONTOURS. THIS MICRO-TOPOGRAPHY IS NOT TO BE CONSIDERED AN OVERALL TOLERANCE WHEN GRADING THE FLOODPLAIN. PROPOSED GRADES SHOULD BE MET FIRST AND THEN ROUGHENED ACROSS THE FULL WIDTH OF
THE FLOODPLAIN.
5. WHERE IT IS NECESSARY TO TRAVERSE ACROSS THE FLOODPLAIN, ALL RUTS LEFT BY EQUIPMENT SHALL BE FILLED IF DEEMED
NECESSARY BY THE PROJECT DESIGNER. DO NOT COMPACT THE FLOODPLAIN.
CROSS SECTION VIEW SALVAGED SOIL PLACED AT THE
DIRECTION OF THE ENGINEER
UNDISTURBED SUBGRADE UNDISTURBED SUBGRADE
NOT TO SCALE
LOG SILLD-1
FLOW
PROFILE VIEW
FLOODPLAIN WIDTH (VARIES)
LIMIT OF FLOODPLAIN GRADING (VARIES)
LOGS SHALL BE
PLACED APPROX. 0.5'
BELOW PROPOSED
FLOODPLAIN GRADE
PROPOSED FLOODPLAIN SURFACE
EXTEND LOGS INTO SIDE
SLOPES & KEY IN (5' MIN.)
CROSS-SECTION VIEW
SUBGRADE
LOG SILL NOTES:
1. LOGS SHALL BE 12" MIN. DIAMETER AND OF MOSTLY STRAIGHT FORM.
2. ALL PROPOSED LOG SILL STRUCTURES SHALL BE INSTALLED UNDER THE DIRECT SUPERVISION OF AND/OR
SUBJECT TO THE APPROVAL OF THE ENGINEER. IF STRUCTURE INSTALLATION AND PERFORMANCE ARE NOT IN ACCORDANCE WITH THE DETAILS AND SPECIFICATIONS, THE STRUCTURE SHALL BE RE-SET OR REINSTALLED IN ACCORDANCE WITH THE DESIGN DETAILS AND SPECIFICATIONS. ALL LOGS MUST BE APPROVED FOR DURABILITY BY THE ENGINEER PRIOR TO PLACEMENT. THE TOP SURFACE ELEVATION (INVERT ELEVATION) OF PROPOSED LOG SILL STRUCTURES SHALL NOT DEVIATE VERTICALLY GREATER THAN 0.2' FROM GRADE CONTROL INVERT DESIGN
ELEVATIONS.
3. THE SIZE, LOCATION AND ORIENTATION OF PROPOSED LOG SILL STRUCTURES ARE APPROXIMATE AND FINAL LOCATION/ORIENTATION MAY BE MODIFIED BY THE ENGINEER BASED ON SITE CONDITIONS DURING
CONSTRUCTION.
4. LOG SILLS SHALL BE CONSTRUCTED OF LOGS HARVESTED ON SITE. IF SITE CLEARING DOES NOT RESULT IN AN
ADEQUATE SUPPLY OF LOGS, THEN LOGS WILL BE IMPORTED.
5. THE TOP SURFACE OF THE LOG SILL SHALL BE PLACED APPROXIMATELY 0.5' BELOW PROPOSED FLOODPLAIN GRADE. AS A RESULT, THE TOP SURFACE OF THE LOG WILL NOT BE VISIBLE ACROSS THE FLOODPLAIN.
5. ADJOINING LOGS SHALL OVERLAP A MINIMUM OF 2 FT.
6. LOG SILLS SHALL EXTEND ACROSS THE ENTIRE FLOODPLAIN AND SHALL BE KEYED INTO FLOODPLAIN SIDE SLOPES
BY A MINIMUM OF 5 FT OR AS DETERMINED BY THE ENGINEER.
7. NO SIGNIFICANT VOIDS SHALL EXIST BETWEEN ADJOINING LOGS OR UNDER THE GEOTEXTILE FABRIC. IN ORDER
TO PREVENT WATER-PIPING BETWEEN OR UNDER THE LOGS, THE CONTRACTOR SHALL CHOKE (BY HAND IF NECESSARY) ALL UNDESIRABLE VOIDS WITH CLAY AND ROCK FRAGMENTS IN COMBINATION WITH GEOTEXTILE
FABRIC. FILL ALL VOIDS GREATER THAN OR EQUAL TO 3 INCHES IN SIZE.
8. NONWOVEN GEOTEXTILE (8 OZ OR HEAVIER) MUST BE LAID ON THE UPSTREAM SIDE OF THE LOG AND EXTEND A DEPTH OF 2' BELOW THE LOG OR TO BEDROCK (WHICHEVER IS SHALLOWER). GEOTEXTILE IS TO BE NAILED 1' ON
CENTER WITH 1 12 INCH (OR LONGER) ROOFING NAILS.
9. THE LOGSILLS PROPOSED ALONG THE MAINSTEM CONEWAGO CREEK SHALL NOT PROJECT INTO OR UNDER THE
EXISTING STREAM CHANNEL.
NON-WOVEN
GEOTEXTILE
OVERLAP LOGS 2' MINIMUM
LIMIT OF
FLOODPLAIN
GRADING
(VARIES)
EXTEND LOGS INTO
FLOODPLAIN SIDE
SLOPES & KEY IN (5'
MIN.)
GRADE LOGS (TYP.)
OVERLAP GRADE LOGS
(2' MIN.)
PLAN VIEW
NOTE: SEE LOG SILL NOTES FOR SPECIFIC LOG SIZES
AA AA'
UNDISTURBED
EARTH
LOG 12" DIA. MIN.
(OR LARGEST LOGS
HARVESTED ON SITE)
TOP OF LOG 0.5' MAX.
FLOODPLAIN GRADE
FILL MATERIAL
(NO VOIDS)
FLOW FLOW
20° - 30°
FROM
BANK
NOTES:
1. LOGS MUST BE AT LEAST 12" IN DIAMETER AND 10' IN LENGTH WITH ROOT
BALL ATTACHED.
2. THE MAJORITY OF THE ROOT WAD MUST BE INSTALLED BELOW THE
NORMAL WATER SURFACE ELEVATION.
3. ROOT WADS MUST BE PLACED AT AN ANGLE OF 20°-30° FROM THE BANK.
NOT TO SCALE
ROOT WADD-4
NORMAL
WATER
SURFACE
FOOTER
ROCK
OR LOG
ROOT WAD
(10-15' LONG)
WOODY DEBRIS NOTES:
1. WOODY DEBRIS SHALL BE INSTALLED AT LOCATIONS SHOWN ON THE PROPOSED GRADING PLAN. SIZE, LOCATION, AND ORIENTATION OF STRUCTURES MAY BE ADJUSTED AT THE DIRECTION OF THE ENGINEER.
2. WOODY DEBRIS SHALL CONSIST OF A COMBINATION OF INDIVIDUAL LOGS, ROOT WADS, AND BRANCHES HARVESTED
FROM TREES/BRUSH THAT HAS BEEN CLEARED FROM THE SITE. ALL AVAILABLE ON-SITE WOODY MATERIAL SHALL BE USED. IF THE QUANTITY OF AVAILABLE MATERIAL IS DETERMINED TO BE INSUFFICIENT TO CONSTRUCT ALL STRUCTURES AS DESIGNED, THE INSTALLATION OF IN-CHANNEL WOODY DEBRIS SHALL BE PRIORITIZED (SEE DETAIL
D-4 ROOTWAD).
3. TYPES AND SIZES OF STRUCTURES WILL BE DEPENDENT UPON AVAILABLE MATERIAL. ALL STRUCTURES AND MATERIALS ARE SUBJECT TO THE APPROVAL OF THE ENGINEER. A MINIMUM OF 8 LINEAL FEET TOTAL OF LOG
AND/OR BRANCHES SHALL BE ASSUMED FOR EACH STRUCTURE.
4. ALL WOODY DEBRIS SHALL BE BURIED MIN. 60% AND/ OR PINNED WITH UPRIGHT SNAGS SO AS NOT BE DISPLACED
BY HIGH FLOWS.
5. INVASIVE AND UNDESIRABLE SPECIES SHALL NOT BE USED IN THE CONSTRUCTED FLOODPLAIN AND MUST BE
PROPERLY DISPOSED OF OFF SITE. EXAMPLE: TREE OF HEAVEN, BLACK WILLOW.
FLOODPLAIN
GRADE
EXISTING SUBGRADE
UPRIGHT SNAGUPRIGHT SNAG
BURIED ROOT
WADS, BRANCHES
AND LOGS
BASEFLOW
CHANNEL
BURIED ROOT WAD
OR BRANCHES AND LOGS
CROSS SECTION VIEW - IN FLOODPLAINPLAN VIEW
FLOW
NOT TO SCALE
WOODY DEBRISD-2
FLOODPLAIN
GRADE
EXISTING SUBGRADE
UPRIGHT SNAG
BURY ROOT WADS
AND BRANCHES MIN
50% BY MASS
CROSS SECTION VIEW - IN CHANNEL
MATTING EDGE AT OR
BELOW BASEFLOW WSE
ROLANKA BIOD-MAT 40
(OR EQUIVALENT)
EROSION CONTROL
MATTING, PER E&S
PLAN
1' MIN.
ROLANKA BIOD-MAT 40
(OR EQUIVALENT)
EROSION CONTROL
MATTING
18" LONG 2"X2" OAK STAKES
CHANNEL BANK GRADING NOTES:
1. 10:1 SLOPE SHALL TIE-IN TO EXISTING CHANNEL BANKS A MINIMUM OF 1' BELOW BASEFLOW W.S.E.
2. 18" LONG 2"X2" OAK STAKES USED TO SECURE MATTING ALONG EACH EDGE IN ADDITION TO
MANUFACTURER RECOMMENDED STAPLES. SPACING OF GRADE STAKES SHALL BE NO MORE
THAN 4' O.C.
3. ANY GRADING IN AND IMMEDIATELY ADJACENT TO ACTIVE STREAM FLOW MUST HAVE
STABILIZATION MATTING INSTALLED BEFORE THE END OF THE WORK DAY.
EXISTING
CHANNEL
PROPOSED FLOODPLAIN (WIDTH VARIES)
NOT TO SCALE
CHANNEL BANK GRADINGD-3
UNDISTURBED
SUBGRADE
W.S.E.
(VARIES)
10:1 TYP.
LIMIT OF
FLOODPLAIN
GRADING
(VARIES)
EXTEND ROCK 1' UP
SIDE SLOPES
RIPRAP CHOKED IN
WITH GRAVEL, SAND,
AND SILT
PROPOSED
FLOODPLAIN
SURFACE
PROPOSED
FLOODPLAIN
PROFILE VIEW
FLOW
RIPRAP CHOKED IN WITH
GRAVEL, SAND, AND SILT
SEE SCHEDULE FOR RIPRAP
PLACEMENT DEPTH AND SIZE
CROSS SECTION VIEW
NOT TO SCALE
ROCK UNDERLAYMENTD-6
NOTE:
1. RIPRAP SHALL BE CHOKED WITH SAND, SILT, AND GRAVEL TO FILL ALL VOIDS. FINAL MIX SHALL CONSIST OF 65%
RIPRAP AND 35% OTHER MATERIAL (SAND, SILT, AND GRAVEL), BY VOLUME. MIX MATERIALS PRIOR TO PLACEMENT.
2. ALL PROPOSED ROCK UNDERLAYMENT SHALL BE INSTALLED UNDER THE DIRECT SUPERVISION OF AND/OR SUBJECT
TO THE APPROVAL OF THE ENGINEER. IF INSTALLATION AND PERFORMANCE ARE NOT IN ACCORDANCE WITH THE DETAILS AND SPECIFICATIONS, THE STRUCTURE SHALL BE RE-SET OR REINSTALLED IN ACCORDANCE WITH THE
DESIGN DETAILS AND SPECIFICATIONS.
UNDISTURBED
EARTH
ROCK UNDERLAYMENT SCHEDULE
NO. RIPRAP SIZE PLACEMENT DEPTH
RU-1 R-6 36"
RU-2 R-4 18"
SEE SCHEDULE FOR RIPRAP
PLACEMENT DEPTH AND SIZE
PROFILE VIEW
FLOW
PLUNGE POOL NOTES:
1. RIPRAP THICKNESS SHALL BE 1.5 TIMES THE MAXIMUM STONE SIZE.
2. RIPRAP SHALL BE CHOKED WITH SAND, SILT, AND GRAVEL TO FILL ALL VOIDS.
FINAL MIX SHALL CONSIST OF 65% RIPRAP AND 35% OTHER MATERIAL (SAND,
SILT, AND GRAVEL), BY VOLUME.
3. CONSTRUCT IN ACCORDANCE WITH DESIGN ELEVATIONS AS SHOWN ON
TRIBUTARY VALLEY PROFILE P-2.
4. POOL BOTTOM WIDTH SHOWN IS A RANGE FROM NARROWEST TO LARGEST
ALONG THE TRIBUTARY VALLEY PROFILE P-2
LENGTH
(SEE GRADING PLAN)
R-4 RIPRAP PLACED TO 18" DEPTH
WITH NON-WOVEN
GEOTEXTILE UNDERLAY
BOTTOM ELEV.
INVERT OUT
SEE PROFILE P-2
INVERT IN
SEE PROFILE P-2
CROSS SECTION VIEW
WIDTH VARIES ALONG POOL
(SEE GRADING PLAN)
R-4 RIPRAP PLACED TO 18" DEPTH
WITH NON-WOVEN
GEOTEXTILE UNDERLAY
BASE FLOW
WATER SURFACE
BOTTOM WIDTH (BW)
BOTTOM LENGTH (BL)
NOT TO SCALE
PLUNGE POOLD-7
PLUNGE POOL DIMENSIONS
POOL BOTTOM
LENGTH
BOTTOM
WIDTH
BOTTOM
ELEVATION
PP-1 9.6' 3-4' 372.0'
FL
O
O D
P
LA
IN
R
E S
TO
R
A
TI
O N
RU-3 R-4 18"
RU-4 R-3 9"
RU-5 R-3 9"
RU-5 R-3 9"
PeB2 Bo
Rd
Rd
Bc
Bc
Rd
Rd
Bc
W
Bo
W
W
0 376
373371
372.17
LSI BM2 2025
375.57
LSI BM3 2025
380.99
LSI BM6
377.69
LSI BM5
HOFFER ROAD
NORTH MARKET STREET
(STATE ROUTE 230)
ZAEGER, JAMES
34-026-030
LONDONDERRY TOWNSHIP
34-026-036
FW
FW
FW FW
FW
FW
FW
FW
FW
COUNTY OF LANCASTER
34-026-019
C O
N
EW
AG
O
C R
EE
K
(W W
F/ M
F)
UNT 1 TO
CONEW
AGO CREEK
(W W
F/M F)
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
EX-ROW
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
FW
FW
FW
FW
FW
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FP100
FP
FP
FP
APPROXIMATE PENNDOT ROW
APPROXIMATE PENNDOT ROW
EXISTING
BILLBOARD
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
WETLAND B
(PEM)
0.82 AC
WETLAND H
(PEM)
0.20 AC
WETLAND G
(PEM)
0.68 AC
WETLAND F
(PEM)
0.01 AC
WETLAND D
(PFO)
0.14 AC
UNT 3 TO
CONEWAGO CREEK
(WWF/MF)
EXISTING
ENDWALL &
RIPRAP SCOUR
HOLE
WETLAND C
(PEM)
0.61 AC
WETLAND E
(PEM)
0.31 AC
WETLAND A
(PEM)
0.81 AC
UNT 2 TOCONEWAGO CREEK
(WWF/MF)
APPROXIMATE PENNDOT ROW
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
TSC
TS
C
OCF
O C
F O
C F
O
CF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
O C
F
OCF
OCF
OCFOCFOCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
O C
F
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCFOCFOCFOCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
TSC
O
CF OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
O C
F O
C F
O C
F
OCF
OCF OCF
OCF
OCF
OCF
OCF
OCF
OCF MATCHLINE
6 37
3+
4+
5+
6+
7+00
8+00
9+00
10+00
11+00
12+00
+0
+0
+0
+0
0+00
1+00
2+00
3+
3+
371.51
WS
373.96
WS
372.98
WS
370.85
371.03
371.27
1 371.69
371.85
372.76
371.93
372.32
372.55
372.32
372.12
371.83
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING ROAD RIGHT-OF-WAY (PENNDOT)
EXISTING 500-YEAR FLOODPLAIN (FEMA)
EXISTING 100-YEAR FLOODPLAIN (FEMA)
EXISTING FLOODWAY (FEMA)
EXISTING EDGE OF CHANNEL
EXISTING GUARD RAIL
EXISTING ROAD
EXISTING OVERHEAD ELECTRIC
EXISTING PARCEL LINES (COUNTY GIS)
SOILS
EXISTING TREE LINE
EXISTING WETLAND
BENCHMARK LOCATION
EX-ROW
FP100
OE OE
LOD LOD
HaB
FW
FP500
LIMIT OF DISTURBANCE
PROPOSED TREELINE
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CONSTRUCTION SAFETY FENCE
PROPOSED FILTER SOCK
PROPOSED SPOT ELEVATION
PROPOSED EROSION CONTROL
MATTING (BIOD-MAT 40)
PROPOSED EROSION CONTROL
MATTING (BIOD-MAT 90)
TEMPORARY STOCKPILE AREA
TEMPORARY STAGING AREA
PROPOSED ROCK
CONSTRUCTION ENTRANCE
PROPOSED TEMPORARY
STREAM CROSSING
PROPOSED TEMPORARY PUMP-AROUND
BYPASS SYSTEM
100.00
LSI BM #
TSC
OCF OCF
FS12 FS12
SCALE:
DATE:
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
SHEET NUMBER:
REVISIONS
NO. DATE DESCRIPTION
P R
O
JE
C T:
S H
E E
T
TI
TL
E
7-
7-la nd st ud ie s.
co m la nd la nd st ud ie s.
co m
�1 oU tK �6 tU ee t /i tit �3 �1 7�
4�
3$�042�24
SIGNATURE BLOCK
C O
N E
W A
G O
C R
E E
K P
H A
S E
IV
LO
N
D O
N D
E R
R Y
T O
W N
S H
IP
G
E
YE
R S
C H
U R
C H
R O
A D
M
ID
D
LE
TO
W
N , P
A
0' 40' 80' 120'
SCALE: 1" = 40'
E
S P
LA
N
D-131.21-25
KS
JS
01/23/2026
OF 18
1" = 40'
BIOD-MAT 40
EROSION CONTROL BLANKET - FLOODPLAINE-1
BIOD-MAT 40
EROSION CONTROL BLANKET - FLOODPLAINE-1
BIOD-MAT 90
EROSION CONTROL BLANKET - FLOODPLAINE-1
TYP.
CONSTRUCTION SAFETY FENCEE-4
TYP.
CONSTRUCTION SAFETY FENCEE-4
TYP.
COFFERDAME-5
TPB-1
TEMPORARY PUMP-AROUND BYPASSE-8
RCE-1
ROCK CONSTRUCTION ENTRANCEE-7
TSC-1
TEMPORARY STREAM CROSSINGE-12
TSC-2
TEMPORARY STREAM CROSSINGE-12
TSC-3
TEMPORARY STREAM CROSSINGE-6
FL
O
O D
P
LA
IN
R
E S
TO
R
A
TI
O N
TEMPORARY STAGING AREA
TPB-2
TEMPORARY PUMP-AROUND BYPASSE-8
TYP.
COFFERDAME-5
TYP.
COFFERDAME-5
AsB2
At
Rd
Rd
RdB
Bc
Bc
PeB2
PeB2
BcAt
At
W
W
W
PeB2
385385
384.61
LSI BM1 2025
372.17
LSI BM2 2025
MOSER, ERIC LEE
34-026-019
LONDONDERRY TOWNSHIP
34-026-036
HOFFER ROAD
FP
FP100
FP100
FP
FP
FP
FP
FP
FP
FP
FP100
FP100
FP100
FP100
FP100
FP100
FP100
FP500 FP500
FP500
FP500
FP500
FP500
FP500
FP500
FP500
FP
FP
FP500
FP500
FP500
FP
FP50
FP100FP100
FP100
FP10
FP10
FP100
FP
FP
FP500
FP
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
EXISTING BUILDING
EXISTING
ENDWALL &
RIPRAP SCOUR
HOLE
LOD
LOD
LOD
LOD
LOD
LOD
EXISTING
GRAVEL PAD
FS18
FS18
FS18
FS18 FS18
FS18
FS18
FS18
FS18
FS18
FS18
FS18
FS
FS18
FS18
FS18
FS18
FS18
FS18
FS18
FS18
FS
FS18
OCF
OCF OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
O C
F
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF
OCF MATCHLINE
0+00
1+00
2+00
3+
LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING ROAD RIGHT-OF-WAY (PENNDOT)
EXISTING 500-YEAR FLOODPLAIN (FEMA)
EXISTING 100-YEAR FLOODPLAIN (FEMA)
EXISTING FLOODWAY (FEMA)
EXISTING EDGE OF CHANNEL
EXISTING GUARD RAIL
EXISTING ROAD
EXISTING OVERHEAD ELECTRIC
EXISTING PARCEL LINES (COUNTY GIS)
SOILS
EXISTING TREE LINE
EXISTING WETLAND
BENCHMARK LOCATION
EX-ROW
FP100
OE OE
LOD LOD
HaB
FW
FP500
LIMIT OF DISTURBANCE
PROPOSED TREELINE
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
CONSTRUCTION SAFETY FENCE
PROPOSED FILTER SOCK
PROPOSED SPOT ELEVATION
PROPOSED EROSION CONTROL
MATTING (BIOD-MAT 40)
PROPOSED EROSION CONTROL
MATTING (BIOD-MAT 90)
TEMPORARY STOCKPILE AREA
TEMPORARY STAGING AREA
PROPOSED ROCK
CONSTRUCTION ENTRANCE
PROPOSED TEMPORARY
STREAM CROSSING
PROPOSED TEMPORARY PUMP-AROUND
BYPASS SYSTEM
100.00
LSI BM #
TSC
OCF OCF
FS12 FS12
SCALE:
DATE:
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
SHEET NUMBER:
REVISIONS
NO. DATE DESCRIPTION
P R
O
JE
C T:
S H
E E
T
TI
TL
E
7-
7-la nd st ud ie s.
co m la nd la nd st ud ie s.
co m
�1 oU tK �6 tU ee t /i tit �3 �1 7�
4�
3$�042�24
SIGNATURE BLOCK
C O
N E
W A
G O
C R
E E
K P
H A
S E
IV
LO
N
D O
N D
E R
R Y
T O
W N
S H
IP
G
E
YE
R S
C H
U R
C H
R O
A D
M
ID
D
LE
TO
W
N , P
A
0' 40' 80' 120'
SCALE: 1" = 40'
E
S P
LA
N
D-131.21-25
KS
JS
01/23/2026
OF 18
1" = 40'
TYP.
CONSTRUCTION SAFETY FENCEE-4
RCE-2
ROCK CONSTRUCTION ENTRANCEE-7
TYP.
COMPOST FILTER SOCKE-2
FL
O
O D
P
LA
IN
R
E S
TO
R
A
TI
O N
TEMPORARY STAGING AREA
TEMPORARY STOCKPILE AREA
ROCK FILTER TO BE FIELD
ADJUSTED IF NECESSARY
ROCK FILTER OUTLETE-9
AREA WITHIN LOD SHOWN HERE SHALL
BE CONSIDERED THE WORK AREA FOR
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
SHEET NUMBER:
REVISIONS
NO. DATE DESCRIPTION
P R
O
JE
C T:
S H
E E
T
TI
TL
E
7-
7-la nd st ud ie s.
co m la nd la nd st ud ie s.
co m
�1 oU tK �6 tU ee t /i tit �3 �1 7�
4�
3$�042�24
SIGNATURE BLOCK
C O
N E
W A
G O
C R
E E
K P
H A
S E
IV
LO
N
D O
N D
E R
R Y
T O
W N
S H
IP
G
E
YE
R S
C H
U R
C H
R O
A D
M
ID
D
LE
TO
W
N , P
A
E
S D
E
TA
IL
S
D-131.21-25
KS
JS
01/23/2026
OF 18
N/A
NOTES:
1. MULTIPLE PIPES AND MULTIPLE SPAN BRIDGES AND CULVERTS WHICH MAY
TEND TO COLLECT DEBRIS, CONTRIBUTE TO THE…