1-2026-01-23 - Conewago Creek Phase 4 Construction Plans.pdf
PDF 16 MB Posted
- Attached to
- Conewago Creek Phase IV Floodplain Restoration
- Solicitation number
- US.217747
- Issued by
- Dauphin County, Milroy CDP, Pennsylvania
About this file
Conewago Creek Phase IV Floodplain Restoration Construction Plans
This document consists of construction plans and specifications for the Conewago Creek Phase IV Floodplain Restoration project in Londonderry Township, spanning Dauphin and Lancaster Counties, Pennsylvania. The project is sponsored by Londonderry Township with oversight by the consulting firm LandStudies Inc. The work involves selective site demolition, surveying, erosion and sediment controls, flow diversion, and removal of accumulated legacy sediment to restore a functional floodplain area. The scope includes installation of log sills, woody debris, and grade control structures to provide stability across the restored system, followed by native riparian buffer plantings. The project encompasses approximately 3.98 acres of wetland area across multiple parcels and extends along Conewago Creek and tributary reaches. Sealed bids for the project were due by 12:00 pm on Monday, February 23, 2026, through PennBid, with bid security required at 10% of the base bid. The contractor shall complete work during low-flow conditions and maintain all erosion and sediment control measures until permanent stabilization of all disturbed areas is achieved. The contract includes multiple inspection milestones throughout construction, including pre-construction meetings, stakeout verification, equipment installation inspections, and final site stabilization approval before the engineer authorizes demobilization.
The construction documents specify detailed technical requirements for floodplain reconstruction, including precise elevation targets based on NAVD 88 vertical datum and PA State Plane NAD 83 (South) coordinate system. The contractor bears responsibility for utility location verification, obtaining necessary permits from the municipality, providing all traffic control and trench barricading, and ensuring proper drainage during operations. Materials specifications include topsoil free of rocks and debris suitable for vegetative establishment, erosion control matting (ROLANKA BIOD-MAT 40 and 90), geotextile fabric, riprap in varying sizes (R-3, R-4, and R-6), and native seed mixes for permanent revegetation. The plans identify existing utilities including overhead electric lines on Route 230 and Hoffer Road, with the contractor required to call Pennsylvania One Call at least three days prior to commencing earth disturbance. Adaptive management strategies may be implemented at the engineer's direction to accommodate site-specific soil and groundwater conditions encountered during construction. All work shall comply with local, state, and federal regulations, permit conditions, and applicable grant requirements, with final project closeout requiring approval from the Dauphin County Conservation District and DEP Central Office.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-2026-01-22 - Conewago Creek Phase IV Floodplain Restoration Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .