1-2025.09.16 Construction Drawings.pdf
PDF 10 MB Posted
- Attached to
- Zerby Ave LSA Grant Paving Project
- Solicitation number
- Not on record
- Issued by
- Luzerne County, Pennsylvania
About this file
These are construction drawings for the Keiper Park Tennis & Pickleball Project located in Kingston Borough, Luzerne County, Pennsylvania. The project involves renovating existing tennis courts and adding pickleball facilities at Keiper Park, with a total project work area of 0.90 acres. The project is funded through a Department of Conservation and Natural Resources (DCNR) grant (BRC-PRD-28-192) and includes resurfacing existing tennis courts, adding pickleball striping, installing new chain-link fencing, constructing an ADA-accessible walkway, adding site lighting, and implementing various site improvements. The drawings provide detailed specifications for court layouts, pavement construction, fencing, accessibility features, and site details.
The project documents outline specific technical requirements including tennis and pickleball court dimensions, net specifications, pavement composition, erosion control measures, and accessibility standards. The site will include two tennis courts with divider nets, pickleball court markings, a 6-foot wide asphalt walkway, and two ADA parking spaces. Technical specifications cover soil limitations, construction sequencing, utility installations, and environmental management protocols. The design incorporates specific materials such as bituminous pavement, concrete foundations, and specified aggregate base courses. Additional site improvements include tree root pruning, site lighting with LED fixtures, and comprehensive erosion and sediment control plans to manage environmental impact during construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
CONSTRUCTION DRAWINGS
KINGSTON BOROUGH, LUZERNE COUNTY, PENNSYLVANIA
MUNICIPALITY OF KINGSTON
KEIPER PARK TENNIS COURT & PICKLEBALL PROJECT
PROJECT LOCATION
C001
2023.5936.001 2025.09.16
SAS
SAS
KI
NG
ST
ON
B
OR
OU
GH
, L
UZ
ER
NE
C
OU
NT
Y, P
EN
NS
YL
VA
NI
A
KE
IP
ER
P
AR
K
TE
NN
IS
P
IC
KL
EB
AL
L P
RO
JE
CT
KI
NG
ST
ON
B
OR
OU
GH
CO
VE
R verdantas
DRAWING TITLE & PROJECT NAME
DRAWING NO.
SEALS
REVISIONS
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
PROJECT STATUS
Th is dr aw ing re pr es en ts a d es ign in ten t a nd co nc ep t o nly
. T his do cu me nt an d a ll a ss oc iat ed do cu me nts ar e p re pa re d f or a sp ec ific si te an d e ve nt, an d i nc or po ra te ca lcu lat ion s a nd m ea su re me nts av ail ab le fro m tim e o f d ra ftin g.
Us e o f th is de sig n i s g ra nte d t o t he cl ien t fo r t he sp ec ifii ed an d n am ed ev en t o nly
2 3 4 5 6 7 8
B
C
D
E
F
A
DA
TE
NO
DE
SC
RI
PT
IO
N
Wilkes-Barre 613 Baltimore Dr. Suite 300
Wilkes-Barre, PA 18702 570-821-1999
GENERAL NOTES:
1. ALL DISTANCES SHOWN ARE IN FEET AND DECIMALS THEREOF.
2. ALL MARKERS (IRON PINS) SHOWN HEREON HAVE BEEN OR WILL BE SET UPON APPROVAL OF THIS
PLAN.
3. HORIZONTAL DATUM: PENNSYLVANIA STATE PLANE COORDINATE SYSTEM, NORTH ZONE, NAD83.
VERTICAL DATUM: NAVD 88
4. ANY EXISTING HAZARDOUS WASTE ENCOUNTERED IN THE PREPARATION OF THE PROJECT SITE
MUST BE REMOVED BY A LICENSED HAZARDOUS MATERIAL CONTRACTOR AND DISPOSED OF AT AN
APPROVED FACILITY.
5. THE LOCATIONS OF THE EXISTING UTILITIES SHOWN ON THESE PLANS HAVE BEEN DEVELOPED FROM
EXISTING UTILITY RECORDS, MARKINGS PLACED AS A RESULT OF PA ONE CALL AND/OR
ABOVE-GROUND EXAMINATIONS OF THE SITE. COMPLETENESS, ACCURACY, LOCATION, AND DEPTH
OF UNDERGROUND UTILITIES OR STRUCTURES CANNOT BE GUARANTEED. THE CONTRACTOR, AT
LEAST THREE (3) DAYS PRIOR TO PERFORMING ANY EXCAVATIONS, SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATIONS AND DEPTHS OF ALL UNDERGROUND FACILITIES LOCATED WITHIN THE
VICINITY OF THE PROJECT SITE.
6. PRIOR TO ANY EXCAVATIONS, A "PA ONE CALL" MUST BE MADE FOR VERIFICATION OF UTILITY TYPE
AND FOR FIELD LOCATIONS.
PROJECT COORDINATION AND SAFETY NOTES:
1. CONTRACTOR IS RESPONSIBLE TO MAINTAIN A SECURE AND SAFE SITE AT ALL TIMES.
2. CONTRACTOR SHALL PROVIDE TEMPORARY SIGNAGE, BARRICADES, FLAGMEN, TEMPORARY ROUTES, AND/OR MEANS TO SAFELY DIRECT TRAFFIC AND PEDESTRIANS AROUND CLOSED SIDEWALKS AND ROADS AS NEEDED. ALL CLOSURES MUST RECEIVE PRIOR APPROVAL BY THE OWNER AT THE PROJECT START, CONTRACTOR SHALL SUBMIT ANTICIPATED TIMES AND PROCEDURES FOR ALL CLOSURES.
3. CONTRACTOR SHALL PROVIDE ALL TEMPORARY EQUIPMENT AND LABOR NECESSARY TO MAINTAIN
STORM SEWER AND STORMWATER CONVEYANCE AT ALL TIMES WITH UNINTERRUPTED SERVICE.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING AND MAINTENANCE OF SURFACE DRAINAGE
DURING THE COURSE OF WORK.
5. CONTRACTOR SHALL IMPLEMENT MEASURES FOR WILDLIFE MANAGEMENT WHICH INCLUDE BUT ARE NOT LIMITED TO PROPERLY DISPOSING OF ANY TRASH AND FOOD SCRAPS, REMEDYING ANY STANDING
WATER IMMEDIATELY, AND MAINTAINING FENCING AND GATES.
6. THE CONTRACTOR SHALL IMPLEMENT MEASURES FOR FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT WHICH INCLUDE BUT ARE NOT LIMITED TO PROTECTION OF DEBRIS DURING HAULING, TARPING
STOCKPILED AND SECURING MATERIALS, AND PAVEMENT SWEEPING.
Sheet List Table Sheet Number Sheet Title
C001 COVER
C101 EXISTING CONDITIONS
C201 PROPOSED CONDITIONS
C901 DETAILS
C902 DETAILS
C903 DETAILS
C904 DETAILS
C905 DETAILS
C906 DETAILS
DCNR GRANT NUMBER: BRC-PRD-28-192
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
LOUIS S. SPACIANO
AutoCAD SHX Text
NO. PE080706
EXISTING TENNIS
COURTS TO BE
DEMOLISHED
0' 50' 100' 150'
WATERSHED & CLASSIFICATION
SUSQUEHANNA RIVER WATERSHED
DESIGNATED USE: WARM WATER FISHES (WWF), MIGRATORY
FISHES (MF)
EXISTING USE: NONE
SOIL TYPES ARE TAKEN FROM A BOOK ENTITLED
"SOIL SURVEY BOOK OF LUZERNE COUNTY"
SOIL DATA:
Ps POPE SOILS
PROPERTY LINE
LEGEND
MAJOR CONTOUR
ADJOINING PROPERTY LINE
MINOR CONTOUR
C101
2023.5936.001 2025.09.16
SAS
SAS
KI
NG
ST
ON
B
OR
OU
GH
, L
UZ
ER
NE
C
OU
NT
Y, P
EN
NS
YL
VA
NI
A
KE
IP
ER
P
AR
K
TE
NN
IS
P
IC
KL
EB
AL
L P
RO
JE
CT
KI
NG
ST
ON
B
OR
OU
GH
EX
IS
TI
NG
C
ON
DI
TI
ON
S verdantas
DRAWING TITLE & PROJECT NAME
DRAWING NO.
SEALS
REVISIONS
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
PROJECT STATUS
Th is dr aw ing re pr es en ts a d es ign in ten t a nd co nc ep t o nly
. T his do cu me nt an d a ll a ss oc iat ed do cu me nts ar e p re pa re d f or a sp ec ific si te an d e ve nt, an d i nc or po ra te ca lcu lat ion s a nd m ea su re me nts av ail ab le fro m tim e o f d ra ftin g.
Us e o f th is de sig n i s g ra nte d t o t he cl ien t fo r t he sp ec ifii ed an d n am ed ev en t o nly
2 3 4 5 6 7 8
B
C
D
E
F
A
DA
TE
NO
DE
SC
RI
PT
IO
N
Wilkes-Barre 613 Baltimore Dr. Suite 300
Wilkes-Barre, PA 18702 570-821-1999
EXISTING CONDITIONS NOTES:
1. THE SITE PLANS AND DETAILS DEPICT THE GENERAL LAYOUT, LENGTH, SCOPE AND LIMITS OF WORK.
THEY MAY NOT INDICATE ALL SITE SPECIFIC CONDITIONS THAT WILL NEED TO BE ADDRESSED ON AN INDIVIDUAL BASIS DURING CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE TO THOROUGHLY EXAMINE ALL EXISTING CONDITIONS PRIOR TO SUBMITTING A BID SO AS TO IDENTIFY ANY SITE SPECIFIC
CONDITIONS THAT MAY AFFECT THEIR BID. PRIOR TO BIDDING, CONTRACTOR AND ITS
SUBCONTRACTORS, IF ANY, SHALL VISIT THE SITE TO BECOME FAMILIAR WITH THE EXISTING
CONDITIONS.
2. THE INTENT OF THE VISIT FOR THE CONTRACTOR TO:
2.1. INCLUDE SUFFICIENT FUNDS IN ITS PROPOSAL TO COVER ANTICIPATED INTERFERENCES AND
DELAYS THAT MIGHT BE EXPECTED;
2.2. BECOME FAMILIAR WITH PHYSICAL LAYOUT OF WORK AREA ENCOMPASSED BY THIS
SPECIFICATION;
2.3. REQUEST ANY ADDITIONAL INFORMATION OR DATA TO SATISFY ITSELF OR EXISTING CONDITIONS;
2.4. REVIEW DRAWINGS AND SPECIFICATIONS
3. THE LOCATIONS OF THE EXISTING UTILITIES SHOWN ON THESE PLANS ARE APPROXIMATE AND BASED ON AVAILABLE RECORDS, VERBAL INFORMATION, AND/OR PHYSICAL FEATURES. COMPLETENESS, ACCURACY, LOCATION, AND DEPTH OF UNDERGROUND UTILITIES OR STRUCTURES CANNOT BE
GUARANTEED. THE CONTRACTOR SHALL VERIFY THE LOCATIONS AND DEPTHS OF ALL UNDERGROUND
FACILITIES AT LEAST THREE (3) DAYS PRIOR TO PERFORMING ANY EXCAVATIONS.
4. SINCE THE LOCATION OF EXISTING UTILITIES CANNOT BE VERIFIED, THE CONTRACTOR IS RESPONSIBLE FOR ACCURATELY IDENTIFYING ALL EXISTING UTILITIES BY ANY NECESSARY MEANS BEFORE ORDERING
MATERIALS TO AVOID REORDERING DUE TO DESIGN CHANGES.
5. THE DRAWINGS HAVE BEEN PREPARED BASED ON THE BEST AVAILABLE INFORMATION. THE ENGINEER CANNOT VERIFY THE ACCURACY BETWEEN VISIBLE AND MARKED POINTS OF UNDERGROUND UTILITIES AND SHALL NOT BE RESPONSIBLE FOR ANY ERRORS OR OMISSIONS. THE CONTRACTOR SHALL CONFIRM
UTILITY LOCATIONS AS NECESSARY TO PERFORM PROJECT WORK AND/OR PREVENT DAMAGE OR
INTERRUPTION.
6. THE CONTRACTOR SHALL CONFIRM LOCATION, SIZE, AND INVERTS PRIOR TO ORDERING ANY MATERIALS
OR STARTING ANY WORK ON ANY SUBSEQUENT UTILITY.
DEMOLITION NOTES:
1. ALL ITEMS IN BLACK TO BE DEMOLISHED.
2. RETURN SITE ITEMS TO BE REMOVED (SIGNS, LIGHT POLES, LANDSCAPING, ETC.) THAT THE
OWNER WISHES TO RETAIN.
3. ALL DEMOLITION MATERIAL REMOVED FROM THE SITE IS TO BE DISPOSED OF AT A FACILITY
LICENSED TO ACCEPT THAT TYPE OF MATERIAL.
4. ADDITIONAL DEMOLITION MAY BE REQUIRED TO CONSTRUCT THE PROJECT. CONTRACTOR
SHALL VERIFY THE EXTENT OF DEMOLITION REQUIRED.
5. BLASTING IS PROHIBITED WITHOUT APPROVAL FROM THE OWNER AND ENGINEER.
6. REMOVE ALL EXISTING UTILITIES WITHIN THE BUILDING FOOTPRINT AND BACKFILL THE
EXCAVATION. CAP AND ABANDON IN PLACE ANY OTHER UTILITIES SCHEDULED FOR REMOVAL.
THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH EACH APPLICABLE UTILITY
COMPANY REGARDING THE UTILITIES THAT NEED TO BE MOVED, REMOVED, OR ABANDONED.
AutoCAD SHX Text Ps
AutoCAD SHX Text
580770559 MUNICIPALITY OF KINGSTON 8.62 ACRES
AutoCAD SHX Text
580770575 KINGSTON BOROUGH 1.38 ACRES
AutoCAD SHX Text
580770574 KINGSTON BOROUGH 0.43 ACRES
AutoCAD SHX Text
580770558 MUNICIPALITY OF KINGSTON 0.97 ACRES
AutoCAD SHX Text
580773061 KINGSTON BORO 0.15 ACRES
AutoCAD SHX Text
HAMILTON AVE
AutoCAD SHX Text
E DORRANCE ST
AutoCAD SHX Text
E DORRANCE ST
AutoCAD SHX Text
N GATES AVE
AutoCAD SHX Text
TIOGA AVE
AutoCAD SHX Text
HAMILTON DR
AutoCAD SHX Text
LATHROP ST
AutoCAD SHX Text
JOSEPH DR
AutoCAD SHX Text
JOSEPH DR
AutoCAD SHX Text
NANDY DR
AutoCAD SHX Text
BASEBALL FIELD
AutoCAD SHX Text
BASEBALL FIELD
AutoCAD SHX Text
COMMUNITY POOL
AutoCAD SHX Text
BASKETBALL COURT
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
WALKING PATH
AutoCAD SHX Text
CONCESSION STAND
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
PLAYGROUND
AutoCAD SHX Text
BOLLARDS
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
WALKING PATH
AutoCAD SHX Text
BOLLARDS
AutoCAD SHX Text
CLOSED OFF ROAD
AutoCAD SHX Text
PAVILION
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SOCCER FIELD
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
RAILROAD TRACKS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
HAMILTON PARK
AutoCAD SHX Text
ADA RAMPS AND CROSSWALK
AutoCAD SHX Text
SOCCER FIELD
AutoCAD SHX Text
CHANGING/LOCKER BUILDING
AutoCAD SHX Text
PAVILION
AutoCAD SHX Text
ADA ACCESSIBLE RAMPS
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
PAVILION
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
BASEBALL FIELD
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
LIGHTS
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
LIGHTS
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
UTILITY POLES
AutoCAD SHX Text
MEMORIAL PARK SIGN
AutoCAD SHX Text
WALKING PATH
AutoCAD SHX Text
FUTURE TRAIL
AutoCAD SHX Text
ADA PARKING
AutoCAD SHX Text
ADA PARKING
AutoCAD SHX Text
ADA ACCESS TO WALKING PATH FROM PARKING LOTS
AutoCAD SHX Text
ADA ACCESSIBLE WALKWAY TO TENNIS COURTS
AutoCAD SHX Text
FILTER BLDG
AutoCAD SHX Text
ADA PARKING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
LOUIS S. SPACIANO
SITE LIGHTING (TYP.)
NEW CHAINLINK FENCING
RESURFACE TENNIS COURTS
MATCH EXISTING SLOPE. SLOPE
SHALL BE BETWEEN 0.833% AND 1.00%
NEW TENNIS STRIPING (TYP.)
PICKLEBALL STRIPING (TYP.)
PROJECT WORK LIMITS = 0.90 ACRES
REPAVE ADA ACCESSIBLE
WALKWAY TO TENNIS COURTS
SEE DETAIL
5' GATE
12' GATE
5' GATE
INLET FILTER PROTECTION
ON EXISTING INLET
FOUNDATION AND POSTS FOR "DIVIDER NET" TYP ALL 4
LOCATION. TO BE CENTERED BETWEEN COURTS
TRIM TREE ROOTS AS NEEDED
UNDERGROUND ELEC
2#12, 1#12G IN 1"C
ELECTRIC TIE IN
LOCATION SEE NOTE 1
15" COMPOST FILTER SOCK
15" COMPOST FILTER SOCK
PERMANENT PROJECT SIGN
TO BE ADHERED TO FENCE.
SEE SPECIFICATIONS FOR SIGN DETAILS
STRIPE EXISTING STALLS TO
PROVIDE 2 ADA STALLS.
INCLUDE SIGNAGE
NEW 6' WIDE ASPHALT WALKWAY
5' GATE
DIVIDER NET TYPICAL
SEE DETAIL
12' GATE
EXISTING TENNIS
COURTS TO BE
DEMOLISHED
0' 50' 100' 150'
WATERSHED & CLASSIFICATION
SUSQUEHANNA RIVER WATERSHED
DESIGNATED USE: WARM WATER FISHES (WWF), MIGRATORY
FISHES (MF)
EXISTING USE: NONE
C201
2023.5936.001 2025.09.16
SAS
SAS
KI
NG
ST
ON
B
OR
OU
GH
, L
UZ
ER
NE
C
OU
NT
Y, P
EN
NS
YL
VA
NI
A
KE
IP
ER
P
AR
K
TE
NN
IS
P
IC
KL
EB
AL
L P
RO
JE
CT
KI
NG
ST
ON
B
OR
OU
GH
PR
OP
OS
ED
C
ON
DI
TI
ON
S verdantas
DRAWING TITLE & PROJECT NAME
DRAWING NO.
SEALS
REVISIONS
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
PROJECT STATUS
Th is dr aw ing re pr es en ts a d es ign in ten t a nd co nc ep t o nly
. T his do cu me nt an d a ll a ss oc iat ed do cu me nts ar e p re pa re d f or a sp ec ific si te an d e ve nt, an d i nc or po ra te ca lcu lat ion s a nd m ea su re me nts av ail ab le fro m tim e o f d ra ftin g.
Us e o f th is de sig n i s g ra nte d t o t he cl ien t fo r t he sp ec ifii ed an d n am ed ev en t o nly
2 3 4 5 6 7 8
B
C
D
E
F
A
DA
TE
NO
DE
SC
RI
PT
IO
N
Wilkes-Barre 613 Baltimore Dr. Suite 300
Wilkes-Barre, PA 18702 570-821-1999
SOIL TYPES ARE TAKEN FROM A BOOK ENTITLED
"SOIL SURVEY BOOK OF LUZERNE COUNTY"
SOIL DATA:
Ps POPE SOILS
PROPERTY LINE
LEGEND
MAJOR CONTOUR
ADJOINING PROPERTY LINE
PROPOSED
MINOR CONTOUR
PROJECT WORK LIMITS
TENNIS COURTS
RESURFACING
TENNIS STRIPING
PICKLEBALL STRIPING
SITE LIGHTING
CHAINLINK FENCE
DCNR FUNDING
ACKNOWLEDGEMENT SIGN
NOTES:
1. TURN UP CONDUIT AT EXTERIOR WALL AND PENETRATE INTO
FILTER BUILDING. ROUTE CONDUIT TO EXISTING FILTER
BUILDING PANEL AND PROVIDE 20A-2P BREAKER IN EXISTING
SPACES FOR CONNECTION OF NEW TENNIS COURT
PATHWAY LIGHTS.
AutoCAD SHX Text Ps
AutoCAD SHX Text
580770559 MUNICIPALITY OF KINGSTON 8.62 ACRES
AutoCAD SHX Text
580770575 KINGSTON BOROUGH 1.38 ACRES
AutoCAD SHX Text
580770574 KINGSTON BOROUGH 0.43 ACRES
AutoCAD SHX Text
580770558 MUNICIPALITY OF KINGSTON 0.97 ACRES
AutoCAD SHX Text
580773061 KINGSTON BORO 0.15 ACRES
AutoCAD SHX Text
HAMILTON AVE
AutoCAD SHX Text
E DORRANCE ST
AutoCAD SHX Text
E DORRANCE ST
AutoCAD SHX Text
N GATES AVE
AutoCAD SHX Text
TIOGA AVE
AutoCAD SHX Text
HAMILTON DR
AutoCAD SHX Text
LATHROP ST
AutoCAD SHX Text
JOSEPH DR
AutoCAD SHX Text
JOSEPH DR
AutoCAD SHX Text
NANDY DR
AutoCAD SHX Text
BASEBALL FIELD
AutoCAD SHX Text
BASEBALL FIELD
AutoCAD SHX Text
COMMUNITY POOL
AutoCAD SHX Text
BASKETBALL COURT
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
WALKING PATH
AutoCAD SHX Text
CONCESSION STAND
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
PLAYGROUND
AutoCAD SHX Text
BOLLARDS
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
WALKING PATH
AutoCAD SHX Text
BOLLARDS
AutoCAD SHX Text
CLOSED OFF ROAD
AutoCAD SHX Text
PAVILION
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SOCCER FIELD
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
RAILROAD TRACKS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
RESIDENTIAL PROPERTY
AutoCAD SHX Text
HAMILTON PARK
AutoCAD SHX Text
ADA RAMPS AND CROSSWALK
AutoCAD SHX Text
SOCCER FIELD
AutoCAD SHX Text
CHANGING/LOCKER BUILDING
AutoCAD SHX Text
PAVILION
AutoCAD SHX Text
ADA ACCESSIBLE RAMPS
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
PAVILION
AutoCAD SHX Text
BLEACHERS
AutoCAD SHX Text
BASEBALL FIELD
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
LIGHTS
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
LIGHTS
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
LIGHT
AutoCAD SHX Text
UTILITY POLES
AutoCAD SHX Text
MEMORIAL PARK SIGN
AutoCAD SHX Text
WALKING PATH
AutoCAD SHX Text
FUTURE TRAIL
AutoCAD SHX Text
ADA PARKING
AutoCAD SHX Text
ADA PARKING
AutoCAD SHX Text
ADA ACCESS TO WALKING PATH FROM PARKING LOTS
AutoCAD SHX Text
ADA ACCESSIBLE WALKWAY TO TENNIS COURTS
AutoCAD SHX Text
FILTER BLDG
AutoCAD SHX Text
ADA PARKING
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
LOUIS S. SPACIANO
AutoCAD SHX Text
NO. PE080706
AutoCAD SHX Text
EXISTING
TOPSOIL PLACEMENT
DEPTH INCHES PER 1,000 SF PER ACRE
1 3.1 134 2 6.2 268 3 9.3 403 4 12.4 537 5 15.5 672 6 18.6 806 7 21.7 940 8 24.8 1074
PREPAREDNESS, PREVENTION AND CONTINGENCY
(PPC)PLAN GENERAL NOTES
1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PREPARE A PREPAREDNESS, PREVENTION AND CONTINGENCY (PPC)
PLAN FOR THE PROPOSED CONSTRUCTION ACTIVITIES TO CONTROL THE POTENTIAL DISCHARGE OF POLLUTANTS
CARRIED IN STORM WATER.
2. BOTH THE E&S PLAN AND THE PPC PLAN ARE TO BE MAINTAINED ONSITE FOR THE DURATION OF THE PERMIT.
3. A PPC PLAN IS REQUIRED IF CHEMICALS, SOLVENTS, HAZARDOUS WASTES, OR ANY MATERIAL WITH THE POTENTIAL FOR CAUSING ACCIDENTAL POLLUTION OF AIR, LAND, OR WATER, ARE STORED OR UTILIZED ON THE SITE.
4. FOLLOW THIS FORMAT AND INCLUDE THESE ELEMENTS FOR THE PPC PLAN:
A. GENERAL DESCRIPTION OF THE CONSTRUCTION ACTIVITY:
INCLUDE DRAWINGS SHOWING GENERAL LAYOUT OF SITE, PROPERTY BOUNDARIES, MATERIALS STORAGE AREAS, LOADING AND UNLOADING OPERATION SITES, TRUCK WASHING AREAS, IN ADDITION TO THE FEATURES OF THE E&S
PLANS.
B. EMERGENCY RESPONSE PROGRAM:
DESCRIBE THE ORGANIZATIONAL STRUCTURE, CHAIN OF COMMAND, EMERGENCY COORDINATORS AND CONTACTS.
INCLUDE DESCRIPTIONS OF EACH INDIVIDUAL'S DUTIES AND RESPONSIBILITIES WITHIN THE CHAIN OF COMMAND
FOR IMPLEMENTATION OF THE PPC PLAN.
IDENTIFY ON THE ORGANIZATIONAL CHART A LIST OF EMERGENCY COORDINATORS THAT MUST BE CONTACTED IN
THE EVENT OF AN EMERGENCY OR SPILL.
DESCRIBE THE DUTIES AND RESPONSIBILITIES OF THE EMERGENCY COORDINATOR SPECIFIC TO THE SITE OR
ACTIVITY IN THE EVENT OF AN EMINENT OR ACTUAL EMERGENCY.
INCLUDE ON THE ORGANIZATIONAL CHART OR ON AN ATTACHMENT, A LIST OF AGENCIES AND PHONE NUMBERS
THAT MUST BE CONTACTED IN THE EVENT OF AN EMERGENCY OR SPILL.
SUCH A LIST INCLUDES AS APPLICABLE:
PA DEP
PA EMERGENCY MANAGEMENT AGENCY
COUNTY HEALTH DEPARTMENT
PA FISH COMMISSION
THE NATIONAL RESPONSE CENTER (U.S. EPA AND U.S. COAST GUARD)
LOCAL POLICE AND FIRE DEPARTMENTS
LOCAL SEWAGE TREATMENT PLANT
DOWN STREAM PUBLIC WATER SUPPLIES
INDUSTRIAL WATER USERS
RECREATION AREAS
INTERNAL AND EXTERNAL COMMUNICATIONS AND ALARM SYSTEMS.
EMPLOYEE TRAINING PROGRAM.
LIST OF EMERGENCY EQUIPMENT. INCLUDE THE LOCATION, PHYSICAL DESCRIPTION, INTENDED USE AND
CAPABILITIES OF EACH ITEM.
MAINTENANCE PROCEDURES AND DECONTAMINATION PROCEDURES OF EMERGENCY EQUIPMENT.
EVACUATION PLAN FOR INSTALLATION PERSONNEL (IF DEEMED NECESSARY).
ARRANGEMENTS WITH EMERGENCY RESPONSE CONTRACTORS. PROVIDE LIST WITH PHONE NUMBERS AND THE
SERVICES EACH CONTRACTOR WILL PROVIDE.
INFORM LOCAL EMERGENCY RESPONSE AGENCIES AND HOSPITALS CONCERNING THE TYPE OF POTENTIAL
EMERGENCIES THAT MAY OCCUR AND THE NEED FOR SERVICES.
FAMILIARIZE LOCAL POLICE, FIRE DEPARTMENTS, EMERGENCY RESPONSE TEAMS AND THE COUNTY EMERGENCY
MANAGEMENT COORDINATOR WITH THE LAYOUT OF THE CONSTRUCTION SITE, THE PROPERTIES AND DANGERS ASSOCIATED WITH THE HAZARDOUS MATERIALS (IF ANY) HANDLED, PLACES WHERE PERSONNEL WOULD BE NORMALLY WORKING, ENTRANCES TO ACCESS ROADS INSIDE THE FACILITY, AND ANY POSSIBLE EVACUATION
ROUTES.
C. MATERIAL AND WASTE INVENTORY:
IDENTIFY BY COMMON CHEMICAL NAME AND TRADE NAME TO INCLUDE LOCATIONS, SOURCES, AND QUANTITIES USED
OR STORED ON THE SITE.
FOR EACH HAZARDOUS CHEMICAL STORED AT THE CONSTRUCTION SITE, THE LOCATION AND MATERIAL SAFETY DATA
SHEET OR SIMILAR INFORMATION IS TO BE CLEARLY CITED IN THE PPC PLAN.
D. SPILL AND LEAK PREVENTION AND RESPONSE:
DESCRIBE THE SOURCE AND AREAS FOR POTENTIAL LEAKS AND SPILLS, THE PROBABLE DIRECTION OF FLOW OF
SPILLED MATERIALS AND THE POLLUTION INCIDENT MEASURE SPECIFIC TO THE SOURCE OR AREA.
PROVIDE SEPARATE DRAWINGS OR PLOT PLANS TO SUPPLEMENT THE ABOVE.
E. INSPECTION PROGRAM:
DESCRIBE THE INSPECTION PROGRAM AND MONITORING PROCEDURES TO ASSESS THE INTEGRITY OF EQUIPMENT, STORAGE AREAS AND SIMILAR AREAS.
F. HOUSEKEEPING PROGRAM:
IDENTIFY THE AREAS AND THE ASSOCIATED TYPE OF HOUSEKEEPING PRACTICES TO MINIMIZE THE POSSIBILITY OF
ACCIDENTAL SPILLS AND SAFETY HAZARDS TO PERSONNEL.
G. SECURITY MEASURES:
DESCRIBE SECURITY PROCEDURES AND SYSTEMS AT THE SITE TO PREVENT ACCIDENTAL OR INTENTIONAL ENTRY
THAT COULD RESULT IN A VIOLATION OF DEPARTMENTAL REGULATIONS, AND/OR INJURY TO PERSONS AND DAMAGE
TO EQUIPMENT.
H. EXTERNAL FACTORS:
DESCRIBE THE POSSIBLE AFFECTS OF EXTERNAL FACTORS SUCH AS POWER OUTAGES, STRIKES, FLOODS, SNOWSTORMS ETC. AND ANY ACTION TO BE TAKEN TO ALLEVIATE ANY RESULTING EFFECTS TO PUBLIC HEALTH AND
SAFETY OR THE ENVIRONMENT.
E&S MAINTENANCE NOTES:
1. EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMP'S) MUST BE CONSTRUCTED, STABILIZED, AND
FUNCTIONAL BEFORE SITE DISTURBANCE WITHIN THE TRIBUTARY AREAS OF THOSE BMP'S. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT CONTROL BMP'S MUST BE MAINTAINED PROPERLY. ALL EROSION AND SEDIMENT CONTROL BMP'S SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEANOUT, REPAIR, REPLACEMENT, RE-GRADING, RE-SEEDING, RE-MULCHING, AND RE-NETTING MUST BE
PERFORMED IMMEDIATELY.
2. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO ANY ROADWAY OR ANY PUBLIC RIGHT-OF-WAY SHALL
IMMEDIATELY BE REMOVED. WASHING SEDIMENT FROM THE PAVEMENT IS PROHIBITED.
3. ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE. ANY COMPOST SILT SOCK SECTION THAT HAS BEEN UNDERMINED OR OVERTOPPED MUST BE IMMEDIATELY REPLACED WITH A ROCK FILTER OUTLET. SEDIMENT SHALL BE REMOVED WHEN ACCUMULATIONS REACH 1/2 THE ABOVE GROUND HEIGHT OF COMPOST SILT SOCK AND 1/3 THE ABOVE GROUND HEIGHT OF ROCK FILTERS. INLET FILTER BAGS SHOULD BE CLEANED AND/OR REPLACED WHEN THE BAG IS 1/2 FULL.
DAMAGED FILTER BAGS SHALL BE REPLACED.
4. ACCUMULATED SEDIMENT MAY BE INCORPORATED INTO THE FILL OR REMOVED FROM THE SITE AND DISPOSED OF IN A LAWFUL MANNER (AN APPROVED EROSION AND SEDIMENT CONTROL PLAN WILL BE REQUIRED FOR ANY OFFSITE DISPOSAL
AREA).
5. SHOULD UNFORESEEN EROSIVE CONDITIONS DEVELOP, IT IS THE CONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY
CORRECT THE PROBLEM.
6. OWNER IS RESPONSIBLE FOR MAINTENANCE OF PERMANENT CONTROLS.
7. THE CONTRACTOR SHALL, PERIODICALLY OR AS DIRECTED DURING THE PROGRESS OF THE WORK, REMOVE AND LEGALLY
DISPOSE OF ALL SURPLUS MATERIAL AND DEBRIS AND KEEP THE PROJECT AREA AND PUBLIC RIGHTS-OF-WAY REASONABLY CLEAR. SURPLUS OR DEMOLITION MATERIALS SHALL BE RECYCLED DURING THE COURSE OF THE WORK, WHENEVER
PRACTICAL AND APPROVED BY THE DESIGN ENGINEER.
8. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL REMOVE ALL TEMPORARY CONSTRUCTION FACILITIES, DEBRIS AND UNUSED MATERIALS, PROVIDED FOR THE WORK, AND PUT ALL OF THE SITES OF THE WORK AND PUBLIC RIGHTS-OF-WAY IN A NEAT AND CLEAN CONDITION. TRASH BURNING ON THE SITE OF THE WORK WILL NOT BE PERMITTED. OFF-SITE DISPOSAL OF SOIL OR ROCK WILL REQUIRE AN EROSION AND SEDIMENT CONTROL PLAN SUBMISSION, BY THE CONTRACTOR, TO THE
APPROPRIATE CONSERVATION DISTRICT.
GENERAL NOTES
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE
DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES.
THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF
THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.
2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND
GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER,
APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE PCSM PLAN PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL STAGES OF IMPLEMENTATION OF THE PCSM
PLAN, AND A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT TO AN ON-SITE
PRECONSTRUCTION MEETING.
3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776
FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE LOCAL
CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO IMPLEMENTATION.
5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED
IN THIS E&S PLAN.
7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND
FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
8. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET.
STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER.
9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE REGIONAL OFFICE OF THE DEPARTMENT.
10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE
260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING
MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
11. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL.
FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE
DESCRIBED IN THIS PLAN, OVER UNDISTURBED VEGETATED AREAS.
14. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY.
MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR
MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
15. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO
REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION.
16. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
17. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN
DRAWINGS.
18. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES -- 6 TO 12
INCHES ON COMPACTED SOILS -- PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL
HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.
19. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
20. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS.
21. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR
OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY
FILLS.
22. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE
INCORPORATED INTO FILLS.
23. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
24. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE
STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
25. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE.
CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED
ACCORDING TO THE STANDARDS OF THIS PLAN.
26. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE
STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
27. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR
OTHER MOVEMENTS.
28. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION
DISTRICT OR THE DEPARTMENT.
29. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT
FOR AN INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE E&S BMPS.
30. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS.
AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS ARE TO BE
DONE ONLY DURING THE GERMINATING SEASON.
31. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT
TO SCHEDULE A FINAL INSPECTION.
32. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW.
THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH
VIOLATION.
33. CONCRETE WASH WATER SHALL BE HANDLED IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS. IN NO
CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE WATERS OR GROUNDWATER SYSTEMS.
34. ALL CHANNELS SHALL BE KEPT FREE OF OBSTRUCTIONS INCLUDING BUT NOT LIMITED TO FILL, ROCKS, LEAVES, WOODY DEBRIS, ACCUMULATED SEDIMENT, EXCESS VEGETATION, AND CONSTRUCTION
MATERIAL/WASTES.
35. UNDERGROUND UTILITIES CUTTING THROUGH ANY ACTIVE CHANNEL SHALL BE IMMEDIATELY BACKFILLED AND THE CHANNEL RESTORED TO ITS ORIGINAL CROSS-SECTION AND PROTECTIVE LINING. ANY BASE FLOW WITHIN THE CHANNEL SHALL BE CONVEYED PAST THE WORK AREA IN THE MANNER DESCRIBED IN THIS PLAN
UNTIL SUCH RESTORATION IS COMPLETE.
36. CHANNELS HAVING RIPRAP, RENO MATTRESS, OR GABION LININGS MUST BE SUFFICIENTLY OVER-EXCAVATED SO THAT THE DESIGN DIMENSIONS WILL BE PROVIDED AFTER PLACEMENT OF THE
PROTECTIVE LINING
37. SEDIMENT BASINS AND/OR TRAPS SHALL BE KEPT FREE OF ALL CONSTRUCTION WASTE, WASH WATER, AND OTHER DEBRIS HAVING POTENTIAL TO CLOG THE BASIN/TRAP OUTLET STRUCTURES AND/OR POLLUTE THE
SURFACE WATERS.
38. SEDIMENT BASINS SHALL BE PROTECTED FROM UNAUTHORIZED ACTS BY THIRD PARTIES.
39. ANY DAMAGE THAT OCCURS IN WHOLE OR IN PART AS A RESULT OF BASIN OR TRAP DISCHARGE SHALL BE
IMMEDIATELY REPAIRED BY THE PERMITTEE IN A PERMANENT MANNER SATISFACTORY TO THE
MUNICIPALITY, LOCAL CONSERVATION DISTRICT, AND THE OWNER OF THE DAMAGED PROPERTY.
37. EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H:1V OR STEEPER WITHIN 50 FEET OF A SURFACE WATER AND ON ALL OTHER DISTURBED AREAS SPECIFIED ON THE PLAN MAPS AND/OR DETAIL ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS.
38. FILL MATERIAL FOR EMBANKMENTS SHALL BE FREE OF ROOTS, OR OTHER WOODY VEGETATION, ORGANIC MATERIAL, LARGE STONES, AND OTHER OBJECTIONABLE MATERIALS. THE EMBANKMENT SHALL BE
COMPACTED IN MAXIMUM 9 INCH LAYERED LIFTS AT 95% DENSITY.
39. NOTIFY THE LUZERNE CONSERVATION DISTRICT 72 HOURS IN ADVANCE OF ANY LAND DISTURBANCE
ACTIVITIES AT THE FOLLOWING ADDRESS:
LUZERNE CONSERVATION DISTRICT
325 SMITHS POND ROAD
SHAVERTOWN, PA 18708
PHONE: 570-674-7991
MAINTENANCE PROGRAM:
1. THE CONTRACTOR IS REQUIRED TO INCORPORATE ALL TEMPORARY AND PERMANENT CONTROL MEASURES AND FACILITIES INDICATED IN THE APPROVED PLAN INTO THE PROJECT AT THE EARLIEST PRACTICABLE TIME.
THE CONTRACTOR IS RESPONSIBLE FOR APPLYING, CLEANING, AND MAINTAINING ALL CONTROL FEATURES DURING CONSTRUCTION. APPROPRIATE EROSION AND SEDIMENT POLLUTION CONTROL FEATURES SHALL BE APPLIED TO SECTIONS SUCH AS BORROW PITS AND MATERIAL STORAGE AREAS UNFORESEEN PRIOR TO CONSTRUCTION. PERMANENT EROSION CONTROL FACILITIES WILL BE MAINTAINED BY THE OWNER.
2. THE TEMPORARY FACILITIES FOR EROSION AND SEDIMENT POLLUTION CONTROL SHALL BE INSPECTED A MINIMUM OF ONCE PER WEEK AND AFTER EVERY RAINFALL EVENT. SEDIMENT SHALL BE REMOVED WHEN ACCUMULATIONS REACH 1/2 THE ABOVE GROUND HEIGHT OF COMPOST FILTER SOCKS AND 1/3 ABOVE GROUND HEIGHT FOR ROCK FILTERS. ANY COMPOST FILTER SOCK SECTION THAT HAS BEEN UNDERMINED OR OVERTOPPED MUST BE IMMEDIATELY REPLACED WITH A ROCK FILTER. AS CONSTRUCTION PROGRESSES AND DISTURBED AREAS HAVE BEEN STABILIZED, TEMPORARY EROSION CONTROL STRUCTURES ARE TO BE CLEANED
AND REMOVED.
3. A WRITTEN REPORT DOCUMENTING THE INSPECTIONS AND REPAIRS MADE TO THE EROSION AND SEDIMENT
CONTROL BMP'S MUST BE KEPT ON SITE AT ALL TIMES.
E&S NOTES:
ANTICIPATED CONSTRUCTION WASTES:
PROJECT WASTES INCLUDE BUT NOT LIMITED TO: BUILDING MATERIALS, BITUMINOUS ASPHALT, VEGETATION.
RECYCLING AND DISPOSAL OF WASTE MATERIALS:
1. ALL ACCUMULATED SEDIMENT WILL BE INCORPORATED INTO THE FILL AND REUSED ON-SITE. UNSUITABLE MATERIAL WILL BE REMOVED FROM THE SITE
AND DISPOSED OF IN A LAWFUL MANNER ACCORDING TO THE PA DEPARTMENT OF ENVIRONMENTAL PROTECTION'S SOLID WASTE MANAGEMENT REGULATIONS (PA CODE TITLE 25, CHAPTER 260.1 ET SEQ, 271.1 ET SEQ. AND 287.1 ET SEQ). THE DISPOSAL SITE MUST HAVE A SEPARATE EROSION CONTROL PLAN AND MUST BE APPROVED BY THE ENGINEER AND THE COUNTY CONSERVATION DISTRICT.
RESPONSIBILITIES FOR FILL MATERIALS:
THE IMPLEMENTATION OF FILL MATERIALS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. UPON FINAL SITE ACCEPTANCE, THE OWNER SHALL BE
RESPONSIBLE FOR FILL MATERIALS.
OWNER: KINGSTON BOROUGH
CLEAN FILL:
1. THE CONTRACTOR OF THE SITE WILL PERFORM ENVIRONMENTAL DUE DILIGENCE ON ALL IMPORTED SOILS THAT WILL BE UTILIZED ON THE PROJECT SITE.
2. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS.
3. ANALYTICAL TESTING IS REQUIRED FOR FILL MATERIAL SUSPECTED OF BEING SUBJECTED TO A SPILL OR RELEASE OF A REGULATED SUBSTANCE BASED UPON COMPLETION OF VISUAL INSPECTION AND/OR REVIEW OF PAST LAND USES AS PART OF ENVIRONMENTAL DUE DILIGENCE. FILL MATERIAL DETERMINED TO NOT QUALIFY AS CLEAN FILL THROUGH ANALYTICAL TESTING IS CONSIDERED REGULATED FILL AND MUST BE MANAGED AS A WASTE IN ACCORDANCE WITH APPLICABLE MUNICIPAL OR RESIDUAL WASTE REGULATIONS OF THE DEPARTMENT.
4. CLEAN FILL IS DEFINED AS: UNCONTAMINATED NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT SOLID. THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIALS, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE COMMONWEALTH UNLESS
OTHERWISE AUTHORIZED.
TOPSOIL APPLICATION:
GRADED AREAS SHOULD BE SCARIFIED OR OTHERWISE LOOSENED TO A DEPTH OF 3 TO 5
INCHES TO PERMIT BONDING OF THE TOPSOIL TO THE SURFACE AREAS AND TO PROVIDE A
ROUGHENED SURFACE TO PREVENT TOPSOIL FROM SLIDING DOWN SLOPE.
TOPSOIL SHOULD BE UNIFORMLY DISTRIBUTED ACROSS THE DISTURBED AREA TO A DEPTH AS
SHOWN ON THE CAPPING PLAN. SPREADING SHOULD BE DONE IN SUCH A MANNER THAT
SODDING OR SEEDING CAN PROCEED WITH A MINIMUM OF ADDITIONAL PREPARATION OR
TILLAGE. IRREGULARITIES IN THE SURFACE RESULTING FROM TOPSOIL PLACEMENT SHOULD BE
CORRECTED IN ORDER TO PREVENT FORMATION OF DEPRESSIONS UNLESS SUCH
DEPRESSIONS ARE PART OF THE PCSM PLAN.
TOPSOIL SHOULD NOT BE PLACED WHILE THE TOPSOIL OR SUBSOIL IS IN A FROZEN OR MUDDY
CONDITION, WHEN THE SUBSOIL IS EXCESSIVELY WET, OR IN A CONDITION THAT MAY
OTHERWISE BE DETRIMENTAL TO PROPER GRADING AND SEEDBED PREPARATION. COMPACTED
SOILS SHOULD BE SCARIFIED 6 TO 12 INCHES ALONG CONTOUR WHEREVER POSSIBLE PRIOR TO
SEEDING.
LIME SHOULD BE ADDED TO THE SOIL TO RAISE THE SOIL TO A NEAR-NEUTRAL (7) pH. ANY SOIL-SUBSOIL INTERFACE WILL BE SUBJECT TO ACIDIC SOIL DUE TO THE EXISTING SUBSTRATE
BEING CULM MATERIAL.
SEEDING SPECIFICATIONS:
FOR TEMPORARY CONTROL MEASURES:
FOR FINAL MEASURES:
1. SEED FORMULA: PENNDOT FORMULA E 100% ANNUAL RYEGRASS
2. APPLY FORMULA E SEED @ 10 LBS. PER 1000 SQ. YD. (48.4 LB./AC).
3. PERFORM SEEDING BETWEEN MARCH 15 AND OCTOBER 15. APPLY HAY
OR STRAW MULCH @ 3.0 TONS PER ACRE.
4. APPLY GROUND LIMESTONE @ 1 T / AC
5. APPLY 10-10-10 ANALYSIS FERTILIZER @ 500 LB / AC
SEED FORMULA (SLOPES LESS THAN 3:1 OR FLATTER): PENNDOT FORMULA B
20% PERENNIAL RYEGRASS
30% CREEPING RED FESCUE OR CHEWINGS FESCUE
50% KENTUCKY BLUEGRASS MIXTURE
1. APPLY GROUND LIMESTONE @ 2 T / AC
2. APPLY 10-20-20 ANALYSIS FERTILIZER @ 677.6 LB / AC
3. APPLY FORMULA D SEED @ 101.6 LB / AC
4. APPLY HAY OR STRAW MULCH @ 3 TONS PER ACRE.
5. APPLY 38-0-0 UNIFORM FERTILIZER @ 242 LB / AC
6. ANCHOR SEED WITH NONASPHALTIC EMULSION AS SPECIFIED IN PENNDOT PUB 408, SECTION 805, APPLIED AT THE
MANUFACTURER'S RECOMMENDED RATE.
7. PERFORM SEEDING FROM MARCH 15 TO JUNE 1 AND AUGUST 1 TO OCTOBER 15.
SEED FORMULA (3:1 SLOPES OR STEEPER): PENNDOT FORMULA D
70% TALL FESCUE
30% CREEPING RED FESCUE OR CHEWINGS FESCUE
1. APPLY GROUND LIMESTONE @ 2 T / AC
2. APPLY 10-20-20 ANALYSIS FERTILIZER @ 677.6 LB / AC
3. APPLY FORMULA D SEED @ 101.6 LB / AC
4. APPLY HAY OR STRAW MULCH @ 3 TONS PER ACRE
5. APPLY 38-0-0 UNIFORM FERTILIZER @ 242 LB / AC
6. ANCHOR SEED WITH NONASPHALTIC EMULSION AS SPECIFIED IN PENNDOT PUB. 408, SECTION 805, AT THE MANUFACTURER'S
RECOMMENDED RATE.
7. PERFORM RYEGRASS SEEDING FROM MARCH 1 TO OCTOBER 15. PERFORM CROWNVETCH SEEDING ANYTIME EXCEPT SEPTEMBER
AND OCTOBER.
NOTE: WHEN STABILIZING SITE OUTSIDE OF SPECIFIED SEEDING GERMINATION PERIODS (WINTER MONTHS), STABILIZE DISTURBED AREAS WITH EROSION CONTROL BLANKETS (ERONET S75, STAPLE PATTERN C) AND WINTER RYEGRASS.
6" UNCOMPACTED
TOPSOIL MINIMUM
APPLY SEED, MULCH, AND
AMENDMENTS AS PER
SEEDING SPECIFICATIONS
UNCOMPACTED SUBGRADE
VEGETATIVE STABILIZATION - GENERAL
NOT TO SCALE
verdantas
DRAWING TITLE & PROJECT NAME
DRAWING NO.
SEALS
REVISIONS
DRAWN BY
CHECKED BY
DATE
PROJECT NO.
PROJECT STATUS
Th is dr aw ing re pr es en ts a d es ign in ten t a nd co nc ep t o nly
. T his do cu me nt an d a ll a ss oc iat ed do cu me nts ar e p re pa re d f or a sp ec ific si te an d e ve nt, an d i nc or po ra te ca lcu lat ion s a nd m ea su re me nts av ail ab le fro m tim e o f d ra ftin g.
Us e o f th is de sig n i s g ra nte d t o t he cl ien t fo r t he sp ec ifii ed an d n am ed ev en t o nly
2 3 4 5 6 7 8
B
C
D
E
F
A
DA
TE
NO
DE
SC
RI
PT
IO
N
Wilkes-Barre 613 Baltimore Dr. Suite 300
Wilkes-Barre, PA 18702 570-821-1999
C901
2023.5936.001 2025.09.16
SAS
SAS
KI
NG
ST
ON
B
OR
OU
GH
, L
UZ
ER
NE
C
OU
NT
Y, P
EN
NS
YL
VA
NI
A
KE
IP
ER
P
AR
K
TE
NN
IS
P
IC
KL
EB
AL
L P
RO
JE
CT
KI
NG
ST
ON
B
OR
OU
GH
DE
TA
ILS
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
LOUIS S. SPACIANO
SOIL LIMITATIONS AND RESOLUTIONS
SOIL
LIMITATION SOIL RESOLUTION
CUT BANK
CAVING
OVER-EXCAVATE MATERIAL AND
REPLACE WITH SUITABLE MATERIAL
CONSTRUCT APPROPRIATE ROCK
SLOPE PROTECTION OR BENCHING AS
DIRECTED BY ENGINEER
CORROSIVE TO
CONCRETE/STEEL
USE CORROSION RESISTANT PIPE
MATERIALS
APPLY CORROSION RESISTANT
PRODUCTS TO SURFACE OF
CONSTRUCTED FEATURES
OVER EXCAVATE AND REPLACE
CORROSIVE SOILS
DROUGHTY INSTALL SLOPE BLANKETS ON SLOPES
3:1 OR STEEPER
ADD SOIL AMENDMENTS TO
PROMOTE VEGETATIVE GROWTH -
ERODIBLE SOILS INSTALL SLOPE BLANKETS ON SLOPES
3:1 OR STEEPER
STABILIZE DISTURBED AREAS WITH
SEEDING AND SOIL SUPPLEMENTS
PROTECT DOWNSTREAM AREAS FROM
SEDIMENT LADEN SHEET FLOW WITH
COMPOST FILTER SOCK OR SILT FENCE
FLOODING ENSURE THAT THE SITE HAS PROPER
DRAINAGE - -
HIGH WATER
TABLE
USE PUMP WATER FILTER BAG TO
DEWATER EXCAVATION, USE TRENCH
BOXES
AVOID SEEPS OR WET SPOTS ENSURE POSITIVE DRAINAGE AWAY
FROM EXCAVATIONS
HYDRIC
SOILS/HYDRIC
INCLUSIONS
MARK WETLAND AREAS WITH
TEMPORARY PROTECTIVE FENCING
AND AVOID WETLANDS/WET AREAS
ENSURE POSITIVE DRAINAGE AWAY
FROM POTENTIALLY HYDRIC AREAS
RETURN STORMWATER CONVEYANCE
TO SHEETFLOW
LOW STRENGTH CONSULT WITH ENGINEER
COMPACT FILL WITH A VIBRATORY
ROLLER DELIVERING 50,000 POUNDS
TOTAL DYNAMIC FORCE
OVER-EXCAVATE TO FIRM MATERIAL
AND BACKFILL WITH SUITABLE ON-SITE
EXCAVATED MATERIAL
SLOW
PERCOLATION
AVOID PLACING STORMWATER
INFILTRATION BASINS IN THESE AREAS
AVOID PLACING ON-LOT SEPTIC
SYSTEMS IN THESE AREAS -
PIPING INSTALL END SECTIONS OR
HEADWALLS ON ALL NEW PIPES
COMPACT FILL WITH A VIBRATORY
ROLLER DELIVERING 50,000 POUNDS
TOTAL DYNAMIC FORCE
IN LIEU OF EXTENDING EXISTING
FEATURE REPLACE WITH NEW PIPE
AND END SECTION/END WALL
POOR SOURCE OF
TOPSOIL
STRIP AND STOCKPILE MATERIAL
ONSITE. REMOVE STONE AND COARSE
FRAGMENT
USE FOR BULK FILL AND REMOVE
EXCESS MATERIAL FROM SITE.
IMPORT SUITABLE TOPSOIL IF EXISTING
MATERIAL IS INADEQUATE.
FROST ACTION
CONSTRUCTION SHALL BE LIMITED
WHEN THERE IS A RISK OF FREEZING
TO NON-OBSTRUCTIVE MEASURES
CONTRACTOR SHALL CONSULT
PROJECT ENGINEER FOR EARTHWORK
WHICH IS TO OCCUR DURING PERIODS
OF FROST
WETNESS ENSURE THAT THE SITE HAS PROPER
DRAINAGE AVOID SEEPS OR WET SPOTS ENSURE POSITIVE DRAINAGE AWAY
FROM EXCAVATIONS
FILTER BAG
WELL VEGETATED, GRASSY AREA
FILTER BAG
INTAKE HOSE
PUMP
DISCHARGE HOSE
CLAMPS
HEAVY DUTY LIFTING STRAPS
(RECOMMENDED)
CLAMPS
INTAKE HOSE
PUMP
DISCHARGE HOSE
WELL VEGETATED, GRASSY AREA
NOTES:
1. LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL
SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE
OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME FILTER BAGS SHALL
BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS:
2. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL
PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME
1/2 FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF
THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO
FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.
3. BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO
STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE
UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER
STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES
GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE
AND NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE
STEEPNESS.
4. NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST
BERM OR COMPOST FILTER SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV
WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING SURFACE WATER OR GRASSY AREA IS
NOT AVAILABLE.
5. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER
SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS
RECOMMENDED FOR THIS PURPOSE.
6. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED
BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND
SCREENED.
7. FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL
CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED.
PLAN VIEW
ELEVATION VIEW
PROPERTY TEST METHOD MINIMUM STANDARD
AVG. WIDE WIDTH STRENGTH ASTM D-4884 60 LB/IN
GRAB TENSILE ASTM D-4632 205 LB
PUNCTURE ASTM D-4833 110 LB
MULLEN BURST ASTM D-3786 350 PSI
UV RESISTANCE ASTM D-4355 70%
AOS % RETAINED ASTM D-4751 80 SIEVE
STANDARD CONSTRUCTION DETAIL # 3-16
PUMPED WATER FILTER BAG
NOT TO SCALE
NOTES:
1. AREA CHOSEN FOR STOCKPILING OPERATIONS SHALL BE DRY AND
STABLE. STOCKPILE MATERIAL AT LOCATIONS SHOWN ON PLANS.
2. STOCKPILE TOPSOIL OR EXCAVATED SOIL MATERIAL AT LOCATIONS
SHOWN FOR EACH PHASE OF CONSTRUCTION.
3. HEIGHT AND SIDE SLOPES SHALL NOT EXCEED MAXIMUM VALUES
SHOWN ABOVE.
4. INSTALL COMPOST FILTER SOCK PRIOR TO STOCKPILING OF MATERIAL.
REPLACE ANY COMPOST FILTER SOCK REMOVED FOR VEHICULAR
ACCESS AFTER EACH WORK DAY.
5. ALL ACTIVE STOCKPILES SHALL BE ACCESSED FROM THE UPHILL SIDE.
6. SEE DETAILS FOR INSTALLATION OF COMPOST FILTER SOCK.
7. APPLY A TEMPORARY SEED MIX AND MULCH WHEN PILE WILL REMAIN
UNDISTURBED FOR 4 DAYS OR MORE.
8. ALL SLOPES TO BE CONSTRUCTED NO STEEPER THAN 2H:1V.
9. DIRECT SURFACE WATER AWAY FROM STOCKPILE TO PREVENT
EROSION DETERIORATION OF MATERIAL. PLACE, GRADE AND SHAPE
STOCKPILES TO DRAIN SURFACE WATERS. COVER, AS NEEDED, TO
PREVENT WIND BLOWN DUST OR SATURATION OF MATERIALS
COMPOST FILTER SOCK
COMPOST FILTER SOCK ON LOW SIDE AND AROUND BOTH
ENDS OF STOCKPILE, WITH STONE FILTER AT LOW POINT(S).
MAINTAIN AS SPECIFIED ON DETAILS.
' M
AX
. 1 SLOPE OR LESS
TEMPORARY SEED
AND MULCH ON ALL
SURFACES
SOIL STOCKPILE DETAIL
NOT TO SCALE
SEQUENCE OF…
This is the start of the file's text. The full file is on GovTribe.