1-100 2026-IFB-025 CIP-2411 Penn Center WLR IFB Doc.pdf
PDF 2 MB Posted
- Attached to
- CIP-2411 Penn Center Waterline Replacement
- Solicitation number
- 2026-IFB-025
- Issued by
- Barnwell County, South Carolina
About this file
This is an Invitation for Bids (IFB) document issued by the Beaufort-Jasper Water & Sewer Authority (BJWSA) for the CIP-2411 Penn Center Waterline Replacement project located on St. Helena Island in Beaufort County, South Carolina. The project requires installation of approximately 1,950 linear feet of eight-inch and four-inch water mains with associated isolation valves, five tie-ins to existing water lines, one watermain installation via jack and bore under State Road S-7-45, five fire hydrants with appurtenances, new service lines with BJWSA-supplied meter boxes, and relocation and reconnection of existing meter boxes. Additional work includes removal of concrete sidewalks, abandonment of existing water main lines, and restoration of roads and properties. The solicitation was issued on April 28, 2026, with a mandatory pre-bid conference and site visit scheduled for May 14, 2026, at 10:30 a.m. EST. The deadline for submitting written questions is May 19, 2026, at 4:00 p.m. EST, and sealed bids are due electronically through the BJWSA Procurement Portal by May 27, 2026, at 2:00 p.m. EST. All work must be completed and billed by December 31, 2026.
Bidders must submit sealed bids electronically and are required to complete a Good Faith Effort packet demonstrating efforts to recruit Small, Minority, and Women-Owned Business (SMWBE) participation, unless self-performing 100 percent of the work. A bid bond equal to 5 percent of the bid amount is required for bids of $100,000 or more, along with performance and payment bonds equal to 100 percent of the contract price. The contract will be awarded to the responsive and responsible bidder with the lowest total cost. Contractors must comply with South Carolina's Illegal Immigration Reform Act through E-Verify participation and must submit insurance certificates, including commercial general liability coverage of $1,000,000, automobile liability of $1,000,000, and workers' compensation of $500,000. The contract will utilize EJCDC C-Series Contract Documents as modified by BJWSA. All submittals, including shop drawings, product data, samples, and schedules, must be made in accordance with Section 01330 Submittal Procedures. Contractors are prohibited from communicating with BJWSA staff or board members regarding the IFB except during scheduled pre-bid conferences or through the procurement portal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page | 1
2026-IFB-025
Beaufort-Jasper Water
& Sewer Authority
Invitation for Bids Construction
Solicitation:
Date Issued:
Procurement Manager:
Phone:
Email:
Office:
2026-IFB-025
04/28/2026 Tammy Holman, NIGP-CPP, CPPB
(843) 987-8087 Bonfire@bjwsa.org BJWSA Procurement Office 6 Snake Rd.
Okatie, SC 29909
Table of Contents
I. TITLE & DESCRIPTION
II. SMWBE GOOD FAITH EFFORT REQUIREMENTS
III. PROJECT TIMELINE/KEY DATES
IV. GENERAL INFORMATION AND INSTRUCTIONS
A. BJWSA Rights/Acceptance of Bids
B. Addenda
C. Submission of Bids
D. Contractor Communications
E. Opening of Bids
F. Construction and Safety Standards
G. Bonds
H. South Carolina Freedom of Information Act
I. Contractor Illegal Immigration Compliance
J. Insurance
V. SCOPE OF WORK/SERVICES
VI. BID REQUIREMENTS AND FORMATTING
VII. EVALUATION CRITERIA AND CONTRACT AWARD
VIII. EXHIBITS
mailto:Tammy.Holman@bjwsa.org
Page | 2
I. TITLE & DESCRIPTION
CIP-2411 Penn Center Waterline Replacement 2026-IFB-025
Installation of approximately 1,950-LF of eight (8)-inch and four (4)-inch water mains and associated isolation valves, including five (5) tie-ins to existing water lines. Installation of a watermain via jack and bore under State Road S-7-45. Installation of five (5) fire hydrants and all necessary appurtenances, installation of new service lines and BJWSA-supplied meter boxes, as well as relocation of existing meter boxes and reconnections to residential service lines, as directed. Estimated quantities are provided in the bid tab.
II. SMWBE GOOD FAITH EFFORT REQUIREMENTS
Bidders must complete BJWSA’s Good Faith Effort packet for Small, Minority and Women-Owned Business (SMWBE) Participation that is provided with this solicitation. If your firm is intending to self-perform 100% of the work/services, you simply need to return the Self-performance Affidavit with your Bid. If you will be utilizing subcontractors, please take special notice that there is a requirement for Bidders to send written notice at least fifteen (15) calendar days prior to the response due date to the agencies listed in the packet informing them of: (1) your company’s intent to submit a Bid, and (2) request their assistance in the recruitment of small, minority and women-owned businesses as potential subcontractors.
III. PROJECT TIMELINE/KEY DATES
Solicitation Issued: April 28, 2026
Deadline for Good Faith Effort Written Notice Requirement: (see paragraph above)
May 12, 2026
Pre-Bid Conference/Site Visit – MANDATORY Location: BJWSA Admin Training Room 6 Snake Road, Okatie, SC 29909 (See statement below.)
May 14, 2026, 10:30 (AM) (EST)
Deadline for Questions: Questions must be submitted electronically at: BJWSA Procurement Portal
May 19, 2026, 4:00 (PM) (EST) https://bjwsa.bonfirehub.com/
Page | 3
Bids Due by: Submit Bids Electronically at:
BJWSA Procurement Portal Responses received after the deadline or at any other location will not be accepted.
May 27, 2026 @ 2:00 (PM) (EST)
MANDATORY PRE-BID MEETING:
Due to the construction occurring within proximity of historic live oak trees and on National Park property, it is extremely important expectations of the tree protection standards are expressed and understood by all potential bidders.
The site visit will be utilized to express expectations with the visual of being on site. All potential bidders are expected to travel to the construction site immediately after the 6 Snake Road pre-bid meeting . The address of the site visit is 16 Penn Center Circle West, St. Helena Island, South Carolina.
IV. GENERAL INFORMATION AND INSTRUCTIONS
The Beaufort Jasper Water & Sewer Authority (“BJWSA”) is soliciting sealed bids from qualified firms (“Bidders or “Contractors”) to perform the scope of work or services in accordance with the terms and conditions as set forth herein. This IFB is referenced on BJWSA’s website and posted to its Procurement Portal. Bidders must log in to the BJWSA Procurement Portal and register (free registration) in order to download the IFB and related documents. IFB copies obtained through any other source are considered unofficial and should not be relied upon.
A. BJWSA Rights/Acceptance of Bids
It shall be understood that this Invitation for Bid (IFB) is a request for information only and is not to be construed as an instruction or agreement to execute the work. BJWSA reserves the right to accept or reject any or all bids, to award multiple contracts for all or part of the scope of work, or to cancel in part or in whole this solicitation, if in the best interests of BJWSA. BJWSA reserves the right to refuse any and all bids and to waive any technicalities and formalities. BJWSA reserves the right to waive any requirement in this solicitation including material requirements, if such material requirement is unmet by all Bidders, and a waiver is determined to be in the best interests of BJWSA. Should BJWSA choose to proceed with this scope of work, a contract and/or purchase order will be awarded to the responsive and responsible Bidder whose Bid has the lowest total cost.
Page | 4
B. Addenda
No oral or written statements made by Authority personnel shall be considered addenda to this IFB unless the statement is confirmed in writing and identified as a written addendum to this IFB. BJWSA requires that all issued addenda be acknowledged in the Contractor’s Bid submission to be considered responsive.
C. Submission of Bids
BIDS FOR THIS PROJECT WILL BE ACCEPTED ONLY ON THE BONFIRE PROCUREMENT
PLATFORM PRIOR TO THE BID DUE DATE/TIME. Please login to the following website to register (free registration) to submit a Bid for this project. Each Bid must be submitted electronically via the BJWSA Procurement Portal and include all required documents and information. In the event you are having technical issues with your submission, Bonfire Support can be found at Technical Support.
BJWSA will not be liable for any expenses incurred by Bidders in the preparation of Bids.
All Bids become the property of BJWSA once submitted.
D. Contractor Communications
Commencing on the date of this IFB is issued and until BJWSA makes public notice of contract award, Contractor communications with any BJWSA staff or Board member regarding this IFB is expressly prohibited, except communications occurring during a scheduled pre-Bid conference or through the submission of questions via the BJWSA Procurement Portal. Failure to comply with this restriction may result in the disqualification of the offending Contractor from consideration for contract award under this IFB, and exclusion from future BJWSA business opportunities.
E. Opening of Bids
There will be no onsite meeting for the opening of Bids. Instead the opening of Bids will be held virtually. A public link for live video and audio access to virtual opening is available BJWSA Virtual Openings. Only the names of Bidders will be shared during the opening and no other information will be shared that time. This virtual opening will go active for registration and log-in starting at 1:45 PM with the actual reading or Bidders to commence at 2:00 PM. The video and communication stream will be one-way.
BJWSA reserves the right to seek clarification from any Bidder to assist in making decisions.
https://bjwsa.bonfirehub.com/portal/support https://bjwsa.bonfirehub.com/ https://bjwsa.org/241/Bid-Openings
Page | 5
F. Construction and Safety Standards
For all construction related projects, the standards of construction shall be in accordance with all applicable specifications and details provided in the BJWSA Technical Specifications. Contractors shall submit with their Bid their Experience Modifier Rate as well as their Health and Safety Plan. This information will be reviewed by BJWSA’s Safety Division and may factor into the determination of Bidder’s responsibility for purposes of contract award.
G. Bonds
If Contractor bid is $100,000 or more, Contractor shall meet the bonding requirements as follows:
A. Bid Bond - Contractor shall submit a Bid Bond for 5% of the bid amount provided on the Bid Form (Exhibit H).
B. Performance & Payment Bonds - The awarded Contractor shall furnish a 100 percent performance bond and a 100 percent payment bond as security for the faithful performance of this contract, as security for payment of all persons performing labor under this contract and furnishing materials in connection with this contract. The performance bond and payment bond shall be in separate instruments. Before final acceptance, each bond must be approved by BJWSA.
H. South Carolina Freedom of Information Act
BJWSA is a political subdivision of the State of South Carolina. As such, BJWSA is subject to the South Carolina Freedom of Information Act (“FOIA, SC Code Ann.
Section 30-4-10, et seq). Under SC Code Ann. Section 30-4-40(5), documents incidental to proposed contractual arrangements are exempt from disclosure UNTIL such time as a contract has been entered into. Accordingly, once a contract has been executed, all submitted Bids are subject to disclosure by BJWSA upon receipt of a FOIA request. Regardless of materials that may be marked as “Confidential”, “Proprietary” or other similar labeling, only materials that meet the criteria established by SC Code Ann. Section 30-4-40 can be exempted from disclosure in response to a FOIA request.
BJWSA, in consultation with its legal counsel, shall sole determiner of which materials and information satisfy the exemption criteria under Section 30-4-40.
I. Contractor Illegal Immigration Compliance
Each Contractor shall submit a completed and signed Contractor Illegal Immigration Compliance Affidavit, attached as Exhibit B, and remain in compliance with the requirements of the Affidavit throughout the term of its contract with BJWSA.
https://bjwsa.org/172/Technical-Specifications https://bjwsa.org/172/Technical-Specifications https://www.scstatehouse.gov/code/t30c004.php
Page | 6
J. Insurance
If awarded a contract, the Contractor shall not commence work until it has obtained all insurance required as stated under this paragraph and such insurance has been approved by BJWSA. The Contactor shall not allow any subcontractor it has engaged for services under an awarded contract to commence work until the subcontractor has also obtained the required coverage.
The Contractor shall, at his sole expense, maintain in effect at all times, during the performance of work, insurance coverage with limits not less than those set forth below. However, the required Insurance limits may be increased depending on the scope and size of the project. All insurance procured must include both ongoing operations and completed operations coverage. Additionally, all insurance coverage, including the Additional Insured coverage required below, must be maintained for a period of eight (8) years from the date of the Certificate of Substantial Completion or the Certificate of Occupancy, whichever is dated later.
As evidence that the required insurance coverage and limits are in full force and effect, the Contractor shall deliver Certificates of Insurance to BJWSA prior to execution on the contract by BJWSA, and prior to commencing work under an awarded contract.
Certificates shall provide that not less than thirty (30) days advance written notice will be given to BJWSA prior to cancellation, termination or material alteration of said policies of insurance. Certificates shall identify the “Project Title”.
Required Coverages
Medium Risk Profile (Authority’s Standard Requirement) Requirement
Commercial General Liability Products/Completed Operation
$1,000,000*
Automobile Liability
Workers’ Compensation
$500,000
Employers Liability
500/500/500*
Page | 7
Waiver of Subrogation on WC
Required if available
Umbrella /Liability
May be required depending on the size and scope of the project.
Professional Liability
Environmental/Pollution Liability (required if demolition, use of hazardous materials or environmentally sensitive)
Fidelity Bond (required for contracts such as Banking, Janitorial, Fund Raising, TPA’s and similar)
$500,000*
*Insurance limits may be increased depending on the size and scope of the work.
Additional Insured: The Commercial General Liability and Excess Liability (Umbrella) insurance policies shall be endorsed to include BJWSA as an additional insured. Such insurance shall be primary and not be contributory with any other insurance maintained by BJWSA. Additional Insured Coverage must be purchased for ongoing and completed operations for a period of eight (8) years from the date of the Certificate of Substantial Completion or the Certificate of Occupancy, whichever is dated later.
The Contractor or any approved subcontractor or sub-subcontractor shall name BJWSA, its officers, officials, agents and employees as an Additional Insureds on every required policy of insurance and shall provide BJWSA with a copy of the necessary Certificate of Insurance which reflects the designation of BJWSA, its officers, officials, agents and employees as an Additional Insured under the policy.
Contractor shall also provide, upon request, a copy of the Declarations Page of the applicable policy also noting BJWSA, its officers, officials, agents and employees as Additional Insureds under the policy. This Additional Insured coverage shall be primary and noncontributory over BJWSA’s own policies of insurance and shall include both
Page | 8 ongoing operations and completed operations coverage for a period of eight (8) years from the date of the Certificate of Substantial Completion or the Certificate of Occupancy, whichever is dated last.
K. Artificial Intelligence (AI) Use Policy
Each Contractor shall submit a completed and signed Vendor Artificial Intelligence (AI) Use Attestation, attached as Exhibit I, and remain in compliance with the requirements of the Affidavit throughout the term of its contract with BJWSA.
V. SCOPE OF WORK/SERVICES
A detailed Scope of Work/Services is provided in Exhibit G.
All work must be completed and billed by December 31, 2026. All invoices must be emailed to invoices@bjwsa.org.
VI. BID REQUIREMENTS AND FORMATTING
Bidder shall provide the following and comply with any formatting restrictions stated herein.
BJWSA requests Bidders to provide a list of at least 3 client references for which the have provides similar services.
Pricing shall be submitted as a separate electronic file using the Bid Form, Exhibit H . All Bid fees and pricing shall be valid and honored for a period of at least sixty (60) days from the Bid Submittal Deadline.
VII. EVALUATION CRITERIA AND CONTRACT AWARD
Bids will be reviewed to determine which Bidders are responsive and responsible. If a contract and/or purchase is awarded, it will be awarded to the responsive and responsible Bidder whose bid has the lowest total cost.
The resulting contract will utilize EJCDC C-Series Contract Documents as modified by BJWSA which have been included as Exhibit A of this IFB, adjusted by project specifics and contract negotiations.
VIII. EXHIBITS
EXHIBIT A: CONTRACT TERMS AND CONDITIONS
mailto:invoices@bjwsa.org
Page | 9
EXHIBIT B: SC ILLEGAL IMMIGRATION ACT AFFIDAVIT
EXHIBIT C: ACKNOWLEDGEMENT OF ADDENDA
EXHIBIT D: NON-COLLUSION STATEMENT
EXHIBIT E: SMALL & MINORITY BUSINESS GOOD FAITH PACKET
EXHIBIT F: SUBMITTAL CHECKLIST
EXHIBIT G: SCOPE OF WORK/SERVICES
EXHIBIT H: BID FORM
EXHIBIT I: BJWSA VENDOR ARTIFICIAL INTELLIGENCE (AI) USE ATTESTATION
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or modification. This document should be adapted to the particular circumstances of the contemplated Project and the controlling Laws and Regulations.
AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR
CONSTRUCTION CONTRACT (STIPULATED PRICE)
Prepared By
Endorsed By
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Guidelines Page 1 of 1
Copyright© 2018
National Society of Professional Engineers
1420 King Street, Alexandria, VA 22314-2794
(703) 684-2882 www.nspe.org
American Council of Engineering Companies
1015 15th Street N.W., Washington, DC 20005
(202) 347-7474 www.acec.org
American Society of Civil Engineers
1801 Alexander Bell Drive, Reston, VA 20191-4400
(800) 548-2723 www.asce.org
The copyright for this EJCDC document is owned jointly by the three sponsoring organizations listed above. The National Society of Professional Engineers is the Copyright Administrator for the EJCDC documents; please direct all inquiries regarding EJCDC copyrights to NSPE.
NOTE: EJCDC publications may be purchased at www.ejcdc.org, or from any of the sponsoring organizations above.
http://www.nspe.org/ http://www.acec.org/ http://www.asce.org/ http://www.ejcdc.org/
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
AGREEMENT BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)
This Agreement is by and between Beaufort-Jasper Water & Sewer Authority (“Owner”) and [name of contracting entity] (“Contractor”).
Terms used in this Agreement have the meanings stated in the General Conditions and the Supplementary Conditions.
Owner and Contractor hereby agree as follows:
ARTICLE 1—WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: [Brief description of Work]
ARTICLE 2—THE PROJECT
2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: [Brief description of Project]
ARTICLE 3—ENGINEER
3.01 The Owner has retained [insert name of engineering firm] (“Engineer”) to act as Owner’s representative, assume all duties and responsibilities of Engineer, and have the rights and authority assigned to Engineer in the Contract.
3.02 The part of the Project that pertains to the Work has been designed by [insert “Engineer” if an entity has been identified as such in Paragraph 3.01, and that same entity prepared the design;
or indicate by name the entity other than Engineer that prepared the design].
ARTICLE 4—CONTRACT TIMES
4.01 Time is of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Contract Times: Dates
A. The Work will be substantially complete on or before [date], and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before [date].
4.03 Contract Times: Days
A. The Work will be substantially complete within [number] days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within [number] days after the date when the Contract Times commence to run.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
4.04 Milestones
A. Parts of the Work must be substantially completed on or before the following Milestone(s):
1. Milestone 1 [event & date/days]
2. Milestone 2 [event & date/days]
3. Milestone 3 [event & date/days]
4.05 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the Contract Times, as duly modified. The parties also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by Owner if the Work is not completed on time.
Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty):
1. Substantial Completion: Contractor shall pay Owner $[number] for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete.
2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $[number] for each day that expires after such time until the Work is completed and ready for final payment.
3. Milestones: Contractor shall pay Owner $[number] for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for achievement of Milestone 1, until Milestone 1 is achieved, or until the time specified for Substantial Completion is reached, at which time the rate indicated in Paragraph 4.05.A.1 will apply, rather than the Milestone rate.
4. Liquidated damages for failing to timely attain Milestones, Substantial Completion, and final completion are not additive, and will not be imposed concurrently.
4.06 Special Damages
A. Contractor shall reimburse Owner (1) for any fines or penalties imposed on Owner as a direct result of the Contractor’s failure to attain Substantial Completion according to the Contract Times, and (2) for the actual costs reasonably incurred by Owner for engineering, construction observation, inspection, and administrative services needed after the time specified in Paragraph 4.02 for Substantial Completion (as duly adjusted pursuant to the Contract), until the Work is substantially complete.
B. After Contractor achieves Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times, Contractor shall reimburse Owner for the actual costs reasonably incurred by Owner for engineering, construction observation, inspection, and administrative services needed after the time specified in Paragraph 4.02 for Work to be completed and ready for final payment (as duly adjusted pursuant to the Contract), until the Work is completed and ready for final payment.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
C. The special damages imposed in this paragraph are supplemental to any liquidated damages for delayed completion established in this Agreement.
ARTICLE 5—CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents, the amounts that follow, subject to adjustment under the Contract:
A. For all Work other than Unit Price Work, a lump sum of $[number].
All specific cash allowances are included in the above price in accordance with Paragraph 13.02 of the General Conditions.
B. For all Unit Price Work, an amount equal to the sum of the extended prices (established for each separately identified item of Unit Price Work by multiplying the unit price times the actual quantity of that item).
Unit Price Work Item No. Description Unit Estimated
Quantity Unit Price
Extended Price
Total of all Extended Prices for Unit Price Work (subject to final adjustment based on actual quantities) $
The extended prices for Unit Price Work set forth as of the Effective Date of the Contract are based on estimated quantities. As provided in Paragraph 13.03 of the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by Engineer.
C. Total of Lump Sum Amount and Unit Price Work (subject to final Unit Price adjustment) $[number].
D. For all Work, at the prices stated in Contractor’s Bid, attached hereto as an exhibit.
ARTICLE 6—PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments on the basis of Contractor’s Applications for Payment on or about the [ordinal number, such as 5th] day of each month during performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract. All such payments will be measured by the Schedule of Values established as provided in the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no Schedule of Values, as provided elsewhere in the Contract.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Owner may withhold, including but not limited to liquidated damages, in accordance with the Contract.
a. [number] percent of the value of the Work completed (with the balance being retainage).
1) If 50 percent or more of the Work has been completed, as determined by Engineer, and if the character and progress of the Work have been satisfactory to Owner and Engineer, then as long as the character and progress of the Work remain satisfactory to Owner and Engineer, there will be no additional retainage;
and
b. [number] percent of cost of materials and equipment not incorporated in the Work (with the balance being retainage).
B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to [number] percent of the Work completed, less such amounts set off by Owner pursuant to Paragraph 15.01.E of the General Conditions, and less [number] percent of Engineer’s estimate of the value of Work to be completed or corrected as shown on the punch list of items to be completed or corrected prior to final payment.
6.03 Final Payment
A. Upon final completion and acceptance of the Work, Owner shall pay the remainder of the Contract Price in accordance with Paragraph 15.06 of the General Conditions.
6.04 Consent of Surety
A. Owner will not make final payment, or return or release retainage at Substantial Completion or any other time, unless Contractor submits written consent of the surety to such payment, return, or release.
6.05 Interest
A. All amounts not paid when due will bear interest at the rate of [number] percent per annum.
ARTICLE 7—CONTRACT DOCUMENTS
7.01 Contents
A. The Contract Documents consist of all of the following:
1. This Agreement.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
2. Bonds:
a. Performance bond (together with power of attorney).
b. Payment bond (together with power of attorney).
3. General Conditions.
4. Supplementary Conditions.
5. Specifications as listed in the table of contents of the project manual (copy of list attached).
6. Drawings (not attached but incorporated by reference) consisting of [number] sheets with each sheet bearing the following general title: [title on Drawings].
7. Drawings listed on the attached sheet index.
8. Documents required per Owner’s Development Policy & Procedure Manual.
8. Addenda (numbers [number] to [number], inclusive).
9. Exhibits to this Agreement (enumerated as follows):
a. [list exhibits]
10. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto:
a. Notice to Proceed.
b. Work Change Directives.
c. Change Orders.
d. Field Orders.
e. Warranty Bond, if any.
f. Certificates of Insurance.
B. The Contract Documents listed in Paragraph 7.01.A are attached to this Agreement (except as expressly noted otherwise above).
C. There are no Contract Documents other than those listed above in this Article 7.
D. The Contract Documents may only be amended, modified, or supplemented as provided in the Contract.
ARTICLE 8—REPRESENTATIONS, CERTIFICATIONS, AND STIPULATIONS
8.01 Contractor’s Representations
A. In order to induce Owner to enter into this Contract, Contractor makes the following representations:
1. Contractor has examined and carefully studied the Contract Documents, including Addenda.
https://bjwsa.org/DocumentCenter/View/151/Development-Policy-and-Procedure-Manual-PDF?bidId=
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
2. Contractor has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Contractor is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
4. Contractor has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
5. Contractor has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, with respect to Technical Data in such reports and drawings.
6. Contractor has considered the information known to Contractor itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Contract Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and (c) Contractor’s safety precautions and programs.
7. Based on the information and observations referred to in the preceding paragraph, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.
8. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents.
9. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.
10. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work to the standard required of BJWSA.
11. Contractor’s entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents.
8.02 Contractor’s Certifications
A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 8.02:
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
1. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process or in the Contract execution;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner,
(b) to establish Bid or Contract prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
8.03 Standard General Conditions
A. Owner stipulates that if the General Conditions that are made a part of this Contract are EJCDC® C-700, Standard General Conditions for the Construction Contract (2018), published by the Engineers Joint Contract Documents Committee, and if Owner is the party that has furnished said General Conditions, then Owner has plainly shown all modifications to the standard wording of such published document to the Contractor, through a process such as highlighting or “track changes” (redline/strikeout), or in the Supplementary Conditions.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement.
This Agreement will be effective on [indicate date on which Contract becomes effective].
Owner: Contractor:
Beaufort-Jasper Water & Sewer Authority (typed or printed name of organization) (typed or printed name of organization)
By: By:
(individual’s signature) (individual’s signature)
Date: Date:
(date signed) (date signed)
Name: Name:
(typed or printed) (typed or printed)
Title: Title:
(typed or printed) (typed or printed)
(If [Type of Entity] is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.)
Attest: Attest:
(individual’s signature) (individual’s signature)
Title: Title:
(typed or printed) (typed or printed)
Address for giving notices: Address for giving notices:
Designated Representative: Designated Representative:
Name: Name:
(typed or printed) (typed or printed)
Title: Title:
(typed or printed) (typed or printed)
Address: Address:
Phone: Phone:
Email: Email:
(If [Type of Entity] is a corporation, attach evidence of authority to sign. If [Type of Entity] is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of this Agreement.)
License No.:
(where applicable)
State:
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or modification. This document should be adapted to the particular circumstances of the contemplated Project and the controlling Laws and Regulations.
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
Prepared By
Endorsed By
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Guidelines Page 1 of 1
Copyright© 2018
National Society of Professional Engineers
1420 King Street, Alexandria, VA 22314-2794
(703) 684-2882 www.nspe.org
American Council of Engineering Companies
1015 15th Street N.W., Washington, DC 20005
(202) 347-7474 www.acec.org
American Society of Civil Engineers
1801 Alexander Bell Drive, Reston, VA 20191-4400
(800) 548-2723 www.asce.org
The copyright for this EJCDC document is owned jointly by the three sponsoring organizations listed above. The National Society of Professional Engineers is the Copyright Administrator for the EJCDC documents; please direct all inquiries regarding EJCDC copyrights to NSPE.
NOTE: EJCDC publications may be purchased at www.ejcdc.org, or from any of the sponsoring organizations above.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
TOC Page 1 of 5
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1—Definitions and Terminology
1.01 Defined Terms
1.02 Terminology
Article 2—Preliminary Matters
2.01 Delivery of Performance and Payment Bonds; Evidence of Insurance
2.02 Copies of Documents
2.03 Before Starting Construction
2.04 Preconstruction Conference; Designation of Authorized Representatives
2.05 Acceptance of Schedules
2.06 Electronic Transmittals
Article 3—Contract Documents: Intent, Requirements, Reuse
3.01 Intent
3.02 Reference Standards
3.03 Reporting and Resolving Discrepancies
3.04 Requirements of the Contract Documents
3.05 Reuse of Documents
Article 4—Commencement and Progress of the Work
4.01 Commencement of Contract Times; Notice to Proceed
4.02 Starting the Work
4.03 Reference Points
4.04 Progress Schedule
4.05 Delays in Contractor’s Progress
Article 5—Site; Subsurface and Physical Conditions; Hazardous Environmental Conditions
5.01 Availability of Lands
5.02 Use of Site and Other Areas
5.03 Subsurface and Physical Conditions
5.04 Differing Subsurface or Physical Conditions
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
TOC Page 2 of 5
5.05 Underground Facilities
5.06 Hazardous Environmental Conditions at Site
Article 6—Bonds and Insurance
6.01 Performance, Payment, and Other Bonds
6.02 Insurance—General Provisions
6.03 Contractor’s Insurance
6.04 Builder’s Risk and Other Property Insurance
6.05 Property Losses; Subrogation
6.06 Receipt and Application of Property Insurance Proceeds
Article 7—Contractor’s Responsibilities
7.01 Contractor’s Means and Methods of Construction
7.02 Supervision and Superintendence
7.03 Labor; Working Hours
7.04 Services, Materials, and Equipment
7.05 “Or Equals”
7.06 Substitutes
7.07 Concerning Subcontractors and Suppliers
7.08 Patent Fees and Royalties
7.09 Permits
7.10 Taxes
7.11 Laws and Regulations
7.12 Record Documents
7.13 Safety and Protection
7.14 Hazard Communication Programs
7.15 Emergencies
7.16 Submittals
7.17 Contractor’s General Warranty and Guarantee
7.18 Indemnification
7.19 Delegation of Professional Design Services
Article 8—Other Work at the Site
8.01 Other Work
8.02 Coordination
8.03 Legal Relationships
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
TOC Page 3 of 5
Article 9—Owner’s Responsibilities
9.01 Communications to Contractor
9.02 Replacement of Engineer
9.03 Furnish Data
9.04 Pay When Due
9.05 Lands and Easements; Reports, Tests, and Drawings
9.06 Insurance
9.07 Change Orders
9.08 Inspections, Tests, and Approvals
9.09 Limitations on Owner’s Responsibilities
9.10 Undisclosed Hazardous Environmental Condition
9.11 Evidence of Financial Arrangements
9.12 Safety Programs
Article 10—Engineer’s Status During Construction
10.01 Owner’s Representative
10.02 Visits to Site
10.03 Resident Project Representative
10.04 Engineer’s Authority
10.05 Determinations for Unit Price Work
10.06 Decisions on Requirements of Contract Documents and Acceptability of Work
10.07 Limitations on Engineer’s Authority and Responsibilities
10.08 Compliance with Safety Program
Article 11—Changes to the Contract
11.01 Amending and Supplementing the Contract
11.02 Change Orders
11.03 Work Change Directives
11.04 Field Orders
11.05 Owner-Authorized Changes in the Work
11.06 Unauthorized Changes in the Work
11.07 Change of Contract Price
11.08 Change of Contract Times
11.09 Change Proposals
11.10 Notification to Surety
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
TOC Page 4 of 5
Article 12—Claims
12.01 Claims
Article 13—Cost of the Work; Allowances; Unit Price Work
13.01 Cost of the Work
13.02 Allowances
13.03 Unit Price Work
Article 14—Tests and Inspections; Correction, Removal, or Acceptance of Defective Work
14.01 Access to Work
14.02 Tests, Inspections, and Approvals
14.03 Defective Work
14.04 Acceptance of Defective Work
14.05 Uncovering Work
14.06 Owner May Stop the Work
14.07 Owner May Correct Defective Work
Article 15—Payments to Contractor; Set-Offs; Completion; Correction Period
15.01 Progress Payments
15.02 Contractor’s Warranty of Title
15.03 Substantial Completion
15.04 Partial Use or Occupancy
15.05 Final Inspection
15.06 Final Payment
15.07 Waiver of Claims
15.08 Correction Period
Article 16—Suspension of Work and Termination
16.01 Owner May Suspend Work
16.02 Owner May Terminate for Cause
16.03 Owner May Terminate for Convenience
16.04 Contractor May Stop Work or Terminate
Article 17—Final Resolution of Disputes
17.01 Methods and Procedures
Article 18—Miscellaneous
18.01 Giving Notice
18.02 Computation of Times
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
TOC Page 5 of 5
18.03 Cumulative Remedies
18.04 Limitation of Damages
18.05 No Waiver
18.06 Survival of Obligations
18.07 Controlling Law
18.08 Assignment of Contract
18.09 Successors and Assigns
18.10 Headings
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
ARTICLE 1—DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in the Bidding Requirements or Contract Documents, a term printed with initial capital letters, including the term’s singular and plural forms, will have the meaning indicated in the definitions below. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms.
1. Addenda—Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents.
2. Agreement—The written instrument, executed by Owner and Contractor, that sets forth the Contract Price and Contract Times, identifies the parties and the Engineer, and designates the specific items that are Contract Documents.
3. Application for Payment—The document prepared by Contractor, in a form acceptable to Engineer, to request progress or final payments, and which is to be accompanied by such supporting documentation as is required by the Contract Documents.
4. Bid—The offer of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed.
5. Bidder—An individual or entity that submits a Bid to Owner.
6. Bidding Documents—The Bidding Requirements, the proposed Contract Documents, and all Addenda.
7. Bidding Requirements—The Advertisement or invitation to bid, Instructions to Bidders, Bid Bond or other Bid security, if any, the Bid Form, and the Bid with any attachments.
8. Change Order—A document which is signed by Contractor and Owner and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Times, or other revision to the Contract, issued on or after the Effective Date of the Contract.
9. Change Proposal—A written request by Contractor, duly submitted in compliance with the procedural requirements set forth herein, seeking an adjustment in Contract Price or Contract Times; contesting an initial decision by Engineer concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents;
challenging a set-off against payments due; or seeking other relief with respect to the terms of the Contract.
10. Claim
a. A demand or assertion by Owner directly to Contractor, duly submitted in compliance with the procedural requirements set forth herein, seeking an adjustment of Contract Price or Contract Times; contesting an initial decision by Engineer concerning the
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
requirements of the Contract Documents or the acceptability of Work under the Contract Documents; contesting Engineer’s decision regarding a Change Proposal;
seeking resolution of a contractual issue that Engineer has declined to address; or seeking other relief with respect to the terms of the Contract.
b. A demand or assertion by Contractor directly to Owner, duly submitted in compliance with the procedural requirements set forth herein, contesting Engineer’s decision regarding a Change Proposal, or seeking resolution of a contractual issue that Engineer has declined to address.
c. A demand or assertion by Owner or Contractor, duly submitted in compliance with the procedural requirements set forth herein, made pursuant to Paragraph 12.01.A.4, concerning disputes arising after Engineer has issued a recommendation of final payment.
d. A demand for money or services by a third party is not a Claim.
11. Constituent of Concern—Asbestos, petroleum, radioactive materials, polychlorinated biphenyls (PCBs), lead-based paint (as defined by the HUD/EPA standard), hazardous waste, and any substance, product, waste, or other material of any nature whatsoever that is or becomes listed, regulated, or addressed pursuant to Laws and Regulations regulating, relating to, or imposing liability or standards of conduct concerning, any hazardous, toxic, or dangerous waste, substance, or material.
12. Contract—The entire and integrated written contract between Owner and Contractor concerning the Work.
13. Contract Documents—Those items so designated in the Agreement, and which together comprise the Contract.
14. Contract Price—The money that Owner has agreed to pay Contractor for completion of the Work in accordance with the Contract Documents.
15. Contract Times—The number of days or the dates by which Contractor shall: (a) achieve Milestones, if any; (b) achieve Substantial Completion; and (c) complete the Work.
16. Contractor—The individual or entity with which Owner has contracted for performance of the Work.
17. Cost of the Work—See Paragraph 13.01 for definition.
18. Drawings—The part of the Contract that graphically shows the scope, extent, and character of the Work to be performed by Contractor.
19. Effective Date of the Contract—The date, indicated in the Agreement, on which the Contract becomes effective.
20. Electronic Document—Any Project-related correspondence, attachments to correspondence, data, documents, drawings, information, or graphics, including but not limited to Shop Drawings and other Submittals, that are in an electronic or digital format.
21. Electronic Means—Electronic mail (email), upload/download from a secure Project website, or other communications methods that allow: (a) the transmission or communication of Electronic Documents; (b) the documentation of transmissions, including sending and receipt; (c) printing of the transmitted Electronic Document by the
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
recipient; (d) the storage and archiving of the Electronic Document by sender and recipient; and (e) the use by recipient of the Electronic Document for purposes permitted by this Contract. Electronic Means does not include the use of text messaging, or of Facebook, Twitter, Instagram, or similar social media services for transmission of Electronic Documents.
22. Engineer—The individual or entity named as such in the Agreement.
23. Field Order—A written order issued by Engineer which requires minor changes in the Work but does not change the Contract Price or the Contract Times.
24. Hazardous Environmental Condition—The presence at the Site of Constituents of Concern in such quantities or circumstances that may present a danger to persons or property exposed thereto.
a. The presence at the Site of materials that are necessary for the execution of the Work, or that are to be incorporated into the Work, and that are controlled and contained pursuant to industry practices, Laws and Regulations, and the requirements of the Contract, is not a Hazardous Environmental Condition.
b. The presence of Constituents of Concern that are to be removed or remediated as part of the Work is not a Hazardous Environmental Condition.
c. The presence of Constituents of Concern as part of the routine, anticipated, and obvious working conditions at the Site, is not a Hazardous Environmental Condition.
25. Laws and Regulations; Laws or Regulations—Any and all applicable laws, statutes, rules, regulations, ordinances, codes, and binding decrees, resolutions, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction in State of South Carolina.
26. Liens—Charges, security interests, or encumbrances upon Contract-related funds, real property, or personal property.
27. Milestone—A principal event in the performance of the Work that the Contract requires Contractor to achieve by an intermediate completion date, or by a time prior to Substantial Completion of all the Work.
28. Notice of Award—The written notice by Owner to a Bidder of Owner’s acceptance of the Bid.
29. Notice to Proceed—A written notice by Owner to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .