2-Contract 2025-01 Documents.pdf
PDF 5 MB Posted
- Attached to
- Sheridan St. Stormwater Improvement
- Solicitation number
- US.196104
- Issued by
- Wyoming County, Troxelville CDP, Pennsylvania
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Contract 2025-01 Drawings.pdf | ||
| 1-Contract 2025-01 Revised Advertisement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Documents
Sheridan St. Stormwater Tidioute Borough
Warren County, Pennsylvania Community Development Block Grant dneill Placed Image
Index
Invitation For Bids ……………………………………………………………………………………………………………………………………………… 3 Bid Form ………………………………………………………………………………………………………………………………………………………….… 4 Notice To Bidders …………………………………………………………………………………………………………………………………………… Instructions To Bidders …………………………………………………………………………………………………………………………………….… 6 Statement Of Bidder’s Qualifications ……………………………………………………………………………………………………………….. 11 General Specifications – General Conditions, Part I ………………………………………………………………………….……………… 14 General Conditions Part II – Federal Requirements ………………………………………………………………………………………..… 31 Special Conditions For Site Preparation – Part III ……………………………………………………………………………………………… 53 *Bid Specifications Supplied by the Engineer (page 100 or later)
Forms
• Certification of Non Segregated Facilities ………………………………………………………………………………. 59
• Non-collusion Affidavit of Prime Bidder ………………………..……………………………………………………….. 60
• Non-collusion Affidavit of Subcontractor ………………………………..……………………………………………… 61
• Certification of Bidder Regarding EEO ………………………………………………………………………………….… 62
• Certification of Subcontractor Regarding EEO ………………………………………………………………………… 62
• MBE/WBE Search Instructions ………………………………………………………………………………………………… 65
• DCED-OCD-001 MBE/WBE Solicitation and Commitment Statement ……………………………………… 66
• Minority Business Utilization Certification.……………………………………………………………………………... 68
• Sample Contract Agreement …………………………………………………………………………………………………… 69
• MBE/WBE Requirements For Bid Submittal ……………………………………………………………………………. 72
• MBE/WBE Contractor Unavailability Certificate ……………………………………………………………………… 75
• MBE/WBE Disclosure Affidavit ……………………………………………………………………………………………….. 76
• Non-Discrimination Clause ……………………………………………………………………………………………………… 77
• Manpower Utilization Training Table ……………………………………………………………………………………… 79
• Section 3 Work Force Needs Table …………………………………………………………………………………………. 80
• Prime Contractor MBE/WBE Utilization Report ………………………………………………………………………. 84
• Public Works Employment Verification Form ……………………………………………………………………….… 85
• Section 3 Clause ……………………………………………………………………………………………………………………… 87
• Section 3 Contract Solicitation and Commitment Statement ………………………………………..………… 88
• Prime Contractor Section 3 Utilization Report ………………………………………………………………………… 89
• Subcontractor Section 3 Utilization Report ……………………………………………………………..……………… 90
• Performance Bond ……………………………………………………………………………………………………..………….. 91
• Labor & Materialman’s Bond (Payment Bond) ……………………………………………………………………….. 93
• Maintenance Bond ………………………………………………...………………………………………………………………. 96
General Wage Decision ………………………………………………………………………………………………………………………………….…. xx Technical Specifications and Drawings ……………………………………………………………………………………………………………… xx
INVITATION FOR BIDS
SHERIDAN ST. STORMWATER PROJECT
TIDIOUTE BOROUGH, WARREN COUNTY, PENNSYLVANIA
Sealed bids for the construction of a stormwater system and reconstruction of the roadway of Sheridan St., Tidioute Borough, will be received by the Warren County Commissioners until 11 a.m. on September 12, 2025 via PennBid. The bids will be publicly opened and read aloud at the commissioner’s work session scheduled for September 12, 2025 at noon in the Commissioners Conference Room (first floor) of the Warren County Courthouse, 204 Fourth Ave., Warren, Pa.
The project area is residential and coordination will be required to maintain access for residents during construction.
Plans, specifications and bid forms are available online through PennBid. All bids, questions and document requests must be submitted through the PennBid platform.
A certified check or bank draft, payable to the order of the Warren County Commissioners or negotiable U.S.
government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to 10 (ten) percent of the total of the Bid shall be submitted with each bid. A performance bond and payment bond in the amount of 100 percent of the contract as awarded will be required as security for faithful performance of the contract.
The project is being carried out with funding from the Warren County CDBG Program allocation coming from the Pennsylvania Department of Community and Economic Development. Full compliance with prevailing Davis- Bacon wage rates, equal employment opportunity, Copeland Anti-Kickback Act and all other applicable federal, state or municipal regulations is required.
Attention is called to the fact that not less than the minimum salaries and wages as set forth in the contract documents must be paid on this project; that the contractor must ensure that employees and applicants for employment are not discriminated against because of their race, age, color, religion, sex, national origin or handicap; that a mandatory ratio of apprentices and trainees to journeymen is required in each craft and the contractor (and any subcontractor) is obligated to make a “diligent effort” to achieve these rations; and that to the great extent feasible opportunities for training and employment by given to lower income residents of the project area and must to the greatest feasible extent utilize project area businesses located in or owned in substantial part by project area residents.
In addition to the Equal Employment requirements of Executive Order 11246, the contractor must also establish a three (3) percent goal for women business enterprises and a five (5) percent goal for minority business enterprises in their aggregate on-site construction work force.
Proposals must be submitted through PennBid. Warren County reserves the right, as its interest may require, to reject any and all proposals or waive any formalities or technicalities.
A non-mandatory Pre Bid Meeting is scheduled for September 3, 2025 at 10:00 AM at the Tidioute Borough Building, 129 Main Street, Tidioute, PA 16351.
Kenneth L. Klakamp, commissioner, chair (Publication Dates)
Bid Form
This form MUST be submitted via the PennBid Program (https://pennbid.bonfirehub.com)
Name of Bidder:____________________________________________
Amount of Bid:_____________________________________________
Project Name:______________________________________________
Please check the following items that are enclosed:
BID BOND/OR CHECK
CERTIFICATE OF INSURANCE
No. Description Quantity Unit Unit Price Total Price
1 General Requirements 1 LS $_________ $_________
2 Municipal Requirements 1 LS $_________ $_________
3 Furnish and Install Storm Sewer Pipe
a. 15" SLCPP (All Depths) 410 LF $_________ $_________
4 Select Backfill 300 CY $_________ $_________
5 Test Pit 5 EA $_________ $_________
6 Furnish and Install Catch Basins
a. 2'x4' Catch Basin 6 EA $_________ $_________
7 Concrete Curb (Full and Depressed) 685 LF $_________ $_________
8 Inlet Removal 2 EA $_________ $_________
9 Restoration - Municipal Roadway (Trench area) 250 SY $_________ $_________
10 Restoration - Gravel Drive 20 SY $_________ $_________
11 Restoration - Unpaved Areas 1 LS $_________ $_________
TOTAL BASE BID : $
TIDIOUTE BOROUGH CONTRACT NO. 1
SHERIDAN STREET STORMWATER
SEPTEMBRER 15, 2025 11:00 AM
BASE BID SCHEDULE
BID FORM: CONTRACT 2025-ST-01
No. Description Quantity Unit Unit Price Total Price
1 Furnish and Install Storm Sewer Pipe
a. 15" SLCPP (All Depths) 135 LF $_________ $_________
2 Select Backfill 100 CY $_________ $_________
3 Test Pit 3 EA $_________ $_________
4 Furnish and Install Catch Basins
a. 2'x4' Catch Basin 4 EA $_________ $_________
5 Concrete Curb (Full and Depressed) 350 LF $_________ $_________
6 Connect to existing inlet 1 EA $_________ $_________
7 Restoration - Municipal Roadway (Trench area) 85 SY $_________ $_________
8 Restoration - Gravel Drive 10 SY $_________ $_________
9 Restoration - Unpaved Areas 1 LS $_________ $_________
TOTAL ADDITIVE ALTERNATE 1 BID : $
1 Municipal Roadway 1.5" Mill 1050 SY $_________ $_________
2 Municipal Road Overlay 1050 SY $_________ $_________
TOTAL ADDITIVE ALTERNATE 2 BID: $
1 Municipal Roadway 1.5" Mill 330 SY $_________ $_________
2 Municipal Road Overlay 330 SY $_________ $_________
TOTAL ADDITIVE ALTERNATE 3 BID: $
TOTAL BID CONTRACT NO. 1: $
A.
____________________________________________________________________Dollars
_____________________________________________________Cents
Bidder acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparison of
Bids, and final payment for all Unit Price Bid items will be based on actual quantities, determined as provided in the contract Documents.
ADDITIVE ALTERNATE 3
TIDIOUTE BOROUGH CONTRACT NO. 1
SHERIDAN STREET STORMWATER
SEPTEMBRER 15, 2025 11:00 AM
ADDITIVE ALTERNATE 2
ADDITIVE ALTERNATE 1
ADD/ALTERNATE BID SCHEDULE
BID FORM: CONTRACT 2025-ST-01
Notice to Bidders
All bidders must submit with their bid. Failure to submit these forms can be construed as lack of bidder responsibility and constitute an invalid bid.
1. MBE/WBE Contact Solicitation and Commitment Statement
2. SECTION 3 Contact Solicitation and Commitment Statement
3. Certification of Non-Segregated Facilities
4. Non-Collusion Affidavit of Prime Bidder
5. Non-Collusion Affidavit of proposed Subcontractor*
6. Certification of Bidder regarding Equal Employment Opportunity
7. Non-Discrimination Clause*
8. Required Bid Security
9. Statement of Bidder’s Qualifications
10. Minority Business Utilization Certification
11. Public Works Employment Verification Form*
12. Section 3 Workforce Needs Table (if the bid is over $200,000)
Prior to award of contract, the apparent low bidder must submit:
1. Certification of Subcontractor regarding Equal Employment Opportunity*
2. Manpower Utilization Training Table (if Section 3 applies)
*These items are also to be submitted by proposed subcontractors of the apparent low bidder
Instruction to Bidders
1. Bids or Proposals
The Bid Form is included with the Bidding Documents for Reference. Bidders shall complete the electronic bid form within PennBid, inclusive of all pricing items and required supporting documents as identified.
2. Interpretations of Addenda
No oral interpretation will be made to any Bidder as to the meaning of the Contract Documents. Every interpretation made to a Bidder will be in the form of an Addendum to Bidders shall be bound by such Addenda, whether or not reviewed by the Bidders. All such Addenda shall become part of the Contract and all Bidders shall be bound by such Addenda, whether or not reviewed by the Bidders. All questions related to project documents should be submitted via PennBid.
3. Inspection of Site
Each Bidder should visit the site of the proposed work and fully acquaint himself with the existing conditions there relating to construction and installation and should fully inform himself as to the facilities involved, the difficulties and restrictions attending the performance of the Contract. The Bidder should thoroughly examine and familiarize himself with the Drawings, Technical Specifications, and all other Contract Documents. The Contractor by the execution of the Contract shall in no way be relieved of any obligation under it due to his failure to receive or examine any form or legal instrument or to visit the site and acquaint himself with the conditions there existing and the County of Warren and/or Owner will be justified in rejecting any claim based on facts regarding which he should have been on notice as a result thereof.
4. Alternative Bids
No alternative bids will be considered unless alternative bids are specifically requested.
5. Bids
A. Bids shall be submitted online via the PennBid platform (https://pennbid.bonfirehub.com) by the date and time indicated in the Invitation for Bids along with the Bid security and the other documents required to be submitted as identified herein, and subject to all requirements of the Contract Documents, including the Drawings, and these instructions to bidders. All bids must be regular in every respect and no interlineations, excisions or special conditions shall be made or included in the Bid Form by the Bidder.
B. The County of Warren and/or Owner may consider any irregular Bid on which there is an alteration of or departure from the Bid Form hereto attached and at its option may reject the same.
C. If the Contract is awarded, it will be awarded by the County of Warren and/or Owner to a responsible Bidder on the basis of the lowest Bid and the Selected Alternative Bid items, if any.
The Contract will require the completion of the work according to the Contract Documents.
https://pennbid.bonfirehub.com/
D. Each Bidder shall include in his bid the following information:
Principals
Names Home addresses, including City, State and Zip Code
Firm
Employer Identification Number
Address City, State and Zip Code
6. Bid Guarantee
A. The Bid must be accompanied by a Bid Guarantee which shall not be less than ten percent (10%) of the amount of the Bid. At the option of the Bidder, the guarantee may be a certified check, bank draft, negotiable U. S. Government Bonds (at par value), or a standard Bid Bond form. The Bid Bond shall be secured by a guarantee or a surety company listed in the latest issue of U. S.
Treasury Circular 570. The amount of such Bid Bond shall be within the maximum amount specified for such Company in said Circular 570. No Bid will be considered unless it is accompanied by the required guarantee. Certified Check or Bank Draft must be payable to the County of Warren and/or Owner. Cash deposits will not be accepted. The Bid Guarantee shall insure the execution of the Agreement and the furnishing of the Surety Bond or Bonds by the successful Bidder, all as required by the Contract Documents.
B. A Bid may be withdrawn or modified at any time within PennBid prior to the due date and time identified in the Invitation for Bids.
C. Certified Checks or Bank Drafts, or the amount thereof, Bid Bonds, and negotiable U. S.
Government Bonds of unsuccessful Bidders will be returned as soon as practical after the opening of the Bids.
7. Collusive Agreements
A. Each Bidder submitting a Bid to the County of Warren and/or Owner for any portion of the work contemplated by the documents on which bidding is based shall execute and attach thereto, an affidavit substantially in the form herein provided, to the effect that he has not colluded with any other person, firm, or corporation in regard to any Bid submitted.
B. Before executing any subcontract the successful Bidder shall submit the name of any proposed subcontractor for prior approval and an affidavit substantially in the form provided in Section 103 – Subcontracts.
8. Statement of Bidder’s Qualifications
Each Bidder shall submit on the form furnished for that purpose (a copy of which is included in the Contract Documents), a statement of the Bidder’s qualifications, his experience record in construction, the type of improvements embraced in the Site Preparation, and his organization and equipment available for the work contemplated; and, when specifically requested by the County of Warren and/or Owner, a detailed financial statement. The County of Warren and/or Owner shall have the right to take such steps as it deems necessary to determine the ability of the Bidder to perform his obligations, under the Contract and the Bidder shall furnish the County of Warren and/or Owner all such information and data for this purpose as it may request. The right is reserved to reject any Bid where an investigation of the available evidence or information does not satisfy the County of Warren and/or Owner that the Bidder is qualified to carry out properly the terms of the Contract.
9. Unit Prices (If Applicable)
The unit price for each of the several items in the proposal of each Bidder shall include its prorated share of overhead so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price bid represents the Total Bid. Any Bid not conforming to these requirements may be rejected as informal. The special attention of all Bidders is called to this provision, for should conditions make it necessary to revise the quantities, no limit will be fixed for such increased or decreased quantities no extra compensation allowed, provided the net monetary value of all such additive and subtractive changes in quantities of such items of work (i.e., difference in cost) shall not increase or decrease the original Contract price by more than twenty-five percent (25%), except for work not covered in the Drawings and Technical Specifications as provided for in Section 109 – Changes in the Work.
10. Modifications of Bids
Bid may be withdrawn or modified at any time within PennBid prior to the due date and time identified in the Invitation for Bids.
11. Opening of Bids
After bid opening, the time of which is listed in the Invitation to Bid, a public notice will be issued via PennBid containing any available bid results. It should be noted that bid results are subject to further review and should not be construed as issuance of an award.
12. Withdrawal of Bids
Bids may be withdrawn or modified at any time within PennBid prior to the due date and time identified in the Invitation for Bids. The Bid guarantee of any Bidder withdrawing his Bid in accordance with the foregoing conditions will be returned promptly.
13. Award of Contract – Rejection of Bids
A. The Contract will be awarded to the responsible Bidder submitting the lowest Bid complying with the conditions of the Invitation for Bids. The Bidder to whom the award is made will be notified at the earliest possible date. The County of Warren and/or Owner however, reserves the right to reject any and all Bids and to waive any informality in Bids received whenever such rejection or waiver is in its interest.
B. The County of Warren and/or Owner reserves the right to consider as unqualified to do the work of general construction any Bidder who does not habitually perform with his own forces the major portions of the work involved in construction of the improvements embraced in this Contract.
14. Execution of Agreements – Performance, Payment and Maintenance Bonds
A. Subsequent to the award and within ten (10) days after the prescribed forms are presented for signature, the successful bidder shall execute and deliver to the County of Warren and/or Owner an Agreement in the form included in the Contract Documents in such number of copies as the County of Warren and/or Owner may require.
B. Having satisfied all conditions of award as set forth elsewhere in these documents, the successful Bidder shall, within the period specified in paragraph “A” above, furnish a surety bond in a penal sum not less than the amount of the Contract as awarded, as security for the faithful performance of the Contract, and for the payment of all persons, firms or corporations to whom the Contractor may become legally indebted for labor, materials, tools, equipment, or services of any nature including utility and transportation services, employed; or used by him in performing the work. When the successful Bidder provides the performance and payment bonds specified above, the Bidder shall also furnish a maintenance bond guaranteeing against defective work or materials for a period of 12 months in amount equal to 100% percent of the total price bid. The effective date of the maintenance bond is the date of final acceptable of the work. All bonds shall be in the form as that included in the Contract Documents and shall bear the same date as, or a date subsequent to that of the Agreement. (see pages 93-99) The current power of attorney for the person who signs for any surety company shall be attached to such bonds. Bonds shall be signed by a guarantee or surety company listed in the latest issue of the U. S. Treasury Circular 570 and the penal sum shall be within the maximum specified for such company in said Circular 570.
C. The failure of the successful Bidder to execute such Agreement and to supply the required bond or bonds within ten (10) days after the prescribed forms are presented for signature, or within such extended period as the County of Warren and/or Owner may grant, based upon reasons determined sufficient by the County of Warren and/or Owner may either award the Contract to the next lowest responsible Bidder or readvertise for Bids, and may charge against the Bidder the difference between the amount of the Bid and the amount for which a contract for the work is subsequently executed, irrespective of whether the amount thus done exceeds the amount of the Bid Bond. If a more favorable Bid is received by readvertising, the defaulting Bidder shall have no claim against the County of Warren and/or Owner for a refund.
15. Wages and Salaries
A. Attention of Bidders is particularly called to the requirement concerning the payment of not less than the prevailing wage and salary rates specified in the Contract Documents and the conditions of employment with respect to certain categories and classification of employees.
B. The rates of pay set forth under General Conditions, are the minimum to be paid during the life of the Contract. It is therefore, the responsibility of Bidders to inform themselves as to local labor conditions, such as the length of work day and work week, overtime compensation, health and welfare contributions, labor supply and prospective changes or adjustments of rates.
16. Equal Employment Opportunity
Attention of Bidders is particularly called to the requirement for ensuring that employees and applicants for employment are not discriminated against because of their race, sex, color, national origin, or religion. Each Bidder must submit a completed Certification of Bidder Regarding Equal Employment Opportunity.
17. Employment of Lower Income Residents and Business Utilization
Attention of Bidders is particularly called to special requirements regarding employment of lower income residents of, and utilization of businesses in the locality where the work is to be done.
18. Compliance With Federal, State and Local Laws
Attention of Bidders is particularly called to the necessity of complying with all Federal, State and Local laws and regulations including but not limited to the following: Act 247 – 1972; Act 287 – 1974 ; Federal Occupational Safety and Health Act of 1970.
Statement of Bidder’s Qualifications
All questions must be answered and the date given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires.
1. Name of Bidder
2. Permanent main office address and employer identification number
3. When Organized
4. If a corporation, where incorporated
5. How many years have you been engaged in the contracting business under your present firm or trade name?
6. Contracts on hand: (Schedule these, showing amount of each contract and the appropriate anticipated dates of completion).
7. General character of work performed by your company.
8. Have you ever failed to complete any work awarded to you? If so, where and why?
9. Have you ever defaulted on a contract? If so, where and why?
10. List the more important projects recently completed by your company, stating the approximate cost for each and the month and year completed.
11. List your major equipment available for this contract
12. Experience in construction work similar in importance to this project
13. Background and experience of the principal members of your organization, including the officers?
14. Credit available: $
15. Give bank reference
16. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the
17. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the in verification of the recitals comprising this statement of Bidder’s Qualifications.
18. The undersigned certifies for itself, it has no unsatisfied tax liabilities or other commonwealth obligations.
Dated at this day of , 20 .
By
Title
State of _____________________________)
County of____________________________)
__________________________________ being duly sworn deposes and says that he is
___________________________ of _________________________________ and that the answers to the foregoing questions and all statements therein contained are true and correct.
Subscribed and sworn to before me this
__________ day of _____________, 20_____.
Notary Public
General Specifications General Conditions
Part I
101. Definitions
Whenever used in any of the Contract Documents, the following meanings shall be given to the terms herein defined:
A. The term “Contract” means the contract executed by the County of Warren, as administering agency and CDBG Grantee; Tidioute Borough, as the Owner, and the Contractor, of which these GENERAL CONDITIONS, PARTS I, II, and III, form a part.
B. The term “Administering Agency” means the County of Warren, which is authorized to undertake this contract as a CDBG Grantee.
C. The term “Contractor” means the person, firm or corporation entering into the Contract with the County of Warren and the Owner to construct and install the improvements embraced in this Contract.
D. The term “Project Area” means Sheridan St., Tidioute Borough and surrounding areas, which are the specified Contract limits of the improvements contemplated to be constructed in whole or in part under this Contract.
E. The term “Engineer” means The EADS Group, Inc. in charge, serving the County of Warren and/or Owner with Engineering Services, his successor, or any person or persons, employed by said County of Warren and/or Owner for the purpose of directing or having in charge the work of Site Preparation embraced in this Contract, the said Architect acting directly or indirectly through any assistant having immediate charge of a portion thereof limited by the particular duties entrusted to him.
F. The term “Owner” means municipality within whose property the Project Area is situated.
G. The term “Contract Documents” means and shall include the following: Executed Agreement, Addenda (if any), Invitation for Bids, Instructions to Bidders, Signed Copy of Bid, General Conditions, Parts I, II and III, Special Conditions, Technical Specifications, and Drawings (as listed in the Schedule of Drawings).
H. The term “Drawings” means the drawings listed in the Schedule of Drawings.
I. The term “Technical Specifications” means that part of the Contract Documents which describes, outlines and stipulates the quality of the materials to be furnished; the quality of workmanship required; and the methods to be used in carrying out the construction work to be performed under this Contract.
J. The term “Addendum” or Addenda” means any changes, revisions or clarifications of the
Contract Documents which have been duly issued by the County of Warren and/or Owner to prospective Bidders prior to the time of receiving bids.
102. Superintendence by Contractor
At the site of the work the Contractor shall provide a superintendent or foreman who shall have full authority to act for the Contractor, except where the Contractor is an individual and gives his personal superintendence to the work. It is understood that such representative shall be acceptable to the Owner. The Contractor shall also provide an adequate staff for the proper coordination and expediting of his work.
103. Subcontracts
A. The Contractor shall not award any work to any Subcontractor until each has completed and submitted a non-Collusion Affidavit and a Certification by Proposed Subcontractor Regarding Equal Employment Opportunity to the Contractor. It shall also be the responsibility of the Contractor to employ only subcontractors who have certified their eligibility in written contracts containing Federal Labor Standards Provisions. Subcontractors must submit to County of Warren, and/or Owner a Section 3 Certificate of Compliance, an Affirmative Action Plan and a Section 3 Business Utilization Table.
B. Should any Subcontractor be found ineligible after award of a Contract, its Contract shall be terminated.
C. The Contractor shall be as fully responsible to the County of Warren and/or Owner for the acts and omissions of his subcontractors, and of persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed by him.
D. The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to require compliance by each Subcontractor with the applicable provisions of the
E. Nothing contained in the Contract shall create any contractual relation between any
Subcontractor and the County of Warren and/or Owner.
104. Separate Contracts
The County of Warren and/or Owner may award, or may have awarded other contracts for additional work, and the Contractor shall coordinate his operations with those of other Contractors. The Contractor shall not commit or permit any act which will interfere with the performance of work by any other Contractor as scheduled.
105. Fitting and Coordination of the Work
The Contractor shall be responsible for the proper fitting of all work and for the coordination of the operations of all trades, subcontractors or materialmen engaged upon this Contract. He shall be prepared to guarantee to each of his subcontractors the locations and measurements which they may require for the fitting of their work to all surrounding work.
106. Mutual Responsibility of Contracts
If, through acts of neglect on the part of the Contractor, any other Contractor or any Subcontractor shall suffer loss or damage on the work, the Contractor shall settle with such other Contractor or Subcontractor by agreement or arbitration, if such other Contractor or Subcontractor will so settle. If such other Contractor or Subcontractor shall assert any claim against the County of Warren and/or Owner on account of any damage alleged to have been so sustained, the County of Warren and/or Owner will notify this Contractor, who shall defend at his own expense any suit based upon such claim, and, if any judgment or claims against the County of Warren and/or Owner shall be allowed, the Contractor shall pay or satisfy such judgment or claim and pay all costs and expenses in connection therewith.
107. Construction Schedule
A. Immediately after execution and delivery of the Contract, the Contractor shall submit to the County of Warren and/or Owner an estimated construction progress schedule, showing the proposed dates of commencement and completion of each of the various sections of work required under the Contract, the anticipated amount of each monthly payment to become due to the Contractor and the accumulated percent of progress each month.
B. The Contractor shall submit to the County of Warren and/or Owner a breakdown of his estimated cost of all work, so arranged and itemized as to meet the approval of the County of Warren and/or Owner. This breakdown shall be submitted promptly after execution of the agreement and before any payment is made to the Contractor for the work performed under the Contract. After approval by the County of Warren and/or Owner the unit prices established in the breakdown shall be used in estimating the amount of partial payments to be made to the Contractor. (Note: This paragraph B is to be used only with a lump sum Contract.)
108. Payments to Contractor
A. Partial Payments
The Contractor shall prepare his requisition for partial payment at the last day of the month and submit it, with the required number of copies, to the Architect for his approval. The amount of the payment due the Contractor shall be determined by adding to the total value of work completed to date, the value of materials properly stored on the site and deducting (1) 10 percent of the total amount, to be retained until final payment and (2) the amount of all previous payments. If the Contract is for a lump sum, the total value of work completed to date shall be based upon the estimated quantities of work completed to date on each item and the unit prices established in the Cost Breakdown and adjusted in accordance with the value of work completed to date on approved change orders. Payment to Contractor to be made no more than 45 days from receipt by County of requisition for payment approved by Architect.
1. The County of Warren and/or Owner, before paying the final estimate, may require the Contractor to furnish releases or receipts from all Subcontractors having performed any work and all persons having supplied materials, equipment (installed on the Project) and services to the Contractor, if the County of Warren and/or Owner deems the same necessary in order to protect its interest. The County of Warren and/or Owner deems the same necessary in order to protect its interest. The County of Warren and/or Owner, however, may if it deems such action advisable, make payment in part or in full to the Contractor without requiring the furnishing of such releases or receipts and any payments so made shall in no way impair the obligations of any surety or sureties furnished under this Contract.
2. Withholding of any amount due the County of Warren and/or Owner under the Section entitled “Liquidated Damages” under Special Conditions, shall be deducted from the final payment due the Contractor.
B. Withholding Payments
The County of Warren and/or Owner may from any payment otherwise due the contractor so much as may be necessary to protect the County of Warren and/or Owner and if it so elects may also withhold any amounts due from the Contractor to any Subcontractors or material dealers, for work performed or material furnished by them. The foregoing provisions shall be construed solely for the benefit of the County of Warren and/or Owner and the benefit of the County of Warren and/or Owner to determine or adjust any claims or disputes between the Contractor and his Subcontractors or material dealers, or to withhold any monies for their protection unless the County of Warren and/or Owner elects to do so. The failure or refusal of the County of Warren and/or Owner to withhold any monies from the Contractor shall in no way impair the obligations of any surety or sureties under any bond or bonds furnished under this Contract.
C. Payments Subject to Submission of Certification
Each payment to the Contractor by the County of Warren and/or Owner shall be made subject to submission by the Contractor of all written certifications required of him and his Subcontractors by the Section entitled “Contractor’s Certification” under General Conditions.
109. Changes in the Work
A. The County of Warren and/or Owner may make changes in the scope of the work required to be performed by the Contractor under the Contract or making additions thereto, or by omitting work therefrom, without invalidating the Contract, and without relieving or releasing the Contractor from any of his obligations under the Contract or any guarantee given by him pursuant to the Contract provisions, and without affecting the validity of the guarantee bonds, and without relieving or releasing the surety or sureties of said bonds. All such work shall be executed under the terms of the original Contract unless it is expressly provided otherwise.
B. Except for the purpose of affording protection against any emergency endangering life or property, the Contractor shall make no change in the materials used or in the specified manner of constructing and/or installing the improvements or supply additional labor, services or materials beyond that actually required for the execution of the Contract, unless in pursuance of a written order from the County of Warren and/or Owner authorizing the Contractor to proceed with the change. No claim for an adjustment of the Contract Price, will be valid unless so ordered.
C. If applicable, unit prices are contained in the Agreement (established as a result of either a unit price bid or a Supplemental Schedule of Unit Prices) the County of Warren and/or Owner may order the Contractor to proceed with desired changes in the work, the value of such changes to be determined by the measured quantities involved and the applicable unit prices specified in the Contract; provided that in case of a unit price Contract the net value of all changes does not increase or decrease the original total amount shown in Agreement by more than 25 percent in accordance with the Section entitled “Unit Prices” under “Instructions to Bidders.”
D. If applicable, unit prices are not contained in the Agreement or if the total net change increases or decreases the total Contract Price more than 25 percent the County of Warren and/or Owner shall, before ordering the Contractor to proceed with desired changes, request an itemized proposal from him covering the work involved in the change after which the procedure shall be as follows:
1. If the proposal is acceptable, the County of Warren and/or Owner will prepare the change order in accordance therewith for acceptance by the Contractor, and;
2. If the proposal is not acceptable and prompt agreement between the two parties cannot be reached, the County of Warren and/or Owner may order the Contractor to proceed with the work on a cost-plus-limited basis. A cost-plus-limited basis is defined as the net cost of the Contractor’s labor, materials and insurance plus 15 percent of said net cost to cover overhead and profit, the total cost not to exceed a specified limit.
E. Each change order shall include in its final form:
1. A detailed description of the change in the work.
2. The Contractor’s proposal (if any) or a conformed copy thereof.
3. A definite statement as to the resulting change in the contract price and/or time.
4. The statement that all work involved in the change shall be performed in accordance with contract requirements except as modified by the change order.
110. Claims for Extra Cost
A. If the Contractor claims that any instructions by drawings or otherwise involve extra cost or extension of time, he shall, within ten days after the receipt of such instructions, and in any event before proceeding to execute the work, submit his protest thereto in writing to the County of Warren and/or Owner stating such claim will be considered unless so made.
B. Claims for additional compensation for extra work, due to alleged errors in ground elevations, contour lines, or bench marks, will not be recognized unless accompanied by certified survey data, made prior to the time the original ground was disturbed, clearly showing that errors exist which resulted, or would result, in handling more material, or performing more work, then would be reasonable estimated from the Drawings and map issued.
C. Any discrepancies which may be discovered between actual conditions and those represented by the Drawings and maps shall at once be reported to the County of Warren and/or Owner and work shall not proceed except at the Contractor’s risk, until written instructions have been received by him from the County of Warren and/or Owner.
D. If, on the basis of the available evidence, the County of Warren and/or Owner determines that an adjustment of the Contract Price and/or time is justifiable, the procedure shall be as provided in the section entitled “Changes in the Work” under “General Conditions Part I.”
111. Termination, Delays and Liquidated Damages
A. Termination of Contract
If the Contractor refuses or fails to prosecute the work with such diligence as will ensure its completion within the time specified in these Contract Documents, or as modified as provided in these Contract Documents, the County of Warren and/or Owner, by written notice to the Contractor, may terminate the Contractor’s right to proceed with the work. Upon such termination, the County of Warren and/or Owner may take over the work and prosecute the same to completion, by Contract or otherwise, and the Contractor and his sureties shall be liable to the County of Warren and/or Owner for liquidated damages for any delay in the completion of the work as provided below. If the Contractor’s right to proceed is so terminated, the County of Warren and/or Owner may take possession of and utilize in completing the work such material, tools, equipment, and plant as may be on the site of the work and necessary therefore.
B. Liquidated Damages for Delays
If the work is not completed within the time stipulated in “Time for Completion,” including any extensions of time for excusable delays as herein provided, the Contractor shall pay to the County of Warren and/or Owner as fixed, agreed, and liquidated damages (it being impossible to determine the actual damages occasioned by the delay) for each calendar day of delay, until the work is completed, the amount as set forth in “Liquidated Damages” and the Contractor and his sureties shall be liable to the County of Warren and/or Owner for the amount thereof.
C. Excusable Delays
The right of the Contractor to proceed shall not be terminated nor shall the Contractor be charged with liquidated damages for any delays in the completion of the work due:
1. To any acts of the Government, including controls or restrictions upon or requisitioning of materials, equipment, tools, or labor by reason of war, National Defense, or any other national emergency;
2. To any acts of the County of Warren and/or Owner;
3. To causes not reasonably foreseeable by the parties to the Contract at the time of the execution of the Contract which are beyond the control and without the fault or negligence of the Contractor, including, but not restricted to, acts of God or the public enemy, acts of another Contractor in the performance of some other contracts with the County of Warren and/or Owner, fires, floods, epidemics, quarantine, restrictions, strikes, freight embargoes, and weather of unusual severity such as hurricanes, tornadoes, cyclones and other extreme weather conditions; and
4. To any delay of any Subcontractor occasioned by any of the causes specified in subparagraphs 1, 2 and 3 of this paragraph C. Provided, however, that the Contractor promptly notify the County of Warren and/or Owner within ten days in writing of the cause of the delay. Upon receipt of such notification the County of Warren and/or Owner shall ascertain the facts and the cause and extent of delay. If, upon the basis of the facts and the terms of this Contract, the delay is properly excusable, the County of Warren and/or Owner shall extend the time for completing the work for a period of time commensurate with the period of excusable delay.
112. Assignment or Novation
The Contractor shall not assign or transfer, whether by an assignment or novation, any of its rights, duties, benefits, obligations, liabilities, or responsibilities under this Contract without the written consent of the County of Warren and/or Owner; provided, however, that assignments to banks, trust companies, or other financial institutions may be made without the consent of the County of Warren and/or Owner. No assignment or novation of this Contract shall be valid unless the assignment or novation expressly provides that the assignment of any of the Contractor’s rights or benefits under the Contract is subject to a prior lien for labor performed, services rendered, and materials, tools, and equipment supplied for the performance of the work under this Contract in favor of all persons, firms, or corporations rendering such labor or services or supplying such materials, tools, or equipment.
113. Disputes
A. All disputes arising under this Contract or its interpretation except those disputes covered by Federal Labor Standards Provisions, “General Conditions – Part II” whether involving law or fact or both, or extra work, and all claims for alleged breach of contract shall within ten days of commencement of the dispute be presented by the Contractor to the County of Warren and/or Owner for decision. All papers pertaining to claims shall be filed in quadruplicate. Such notice need not detail the amount of the claim but shall state the facts surrounding in the claim in sufficient detail to identify the claim, together with its character and scope. In the mean time the Contractor shall proceed with the work as directed. Any claim not presented within the time limit specified this paragraph shall be deemed to have been waived, except that if the claim is of a continuing character and notice of the claim is not given within ten days of its commencement, the claim will be considered only for a period commencing ten days prior to the receipt by the County of Warren and/or Owner of notice thereof.
B. If the Claim is not resolved by negotiation, the Court of Common Pleas of Warren County shall be the exclusive venue and jurisdiction for any litigation claims under this contract. Contractor to pay Owner’s costs and expenses, to include cost of suit, attorney’s fees, and expert fees, in the event of a dispute or claim, and in the event the Owner is the prevailing party, or
C. The Contractor shall submit in detail his claim and his proof thereof. Each decision by governing body of the County of Warren and/or Owner will be in writing and will be mailed to the Contractor by registered mail, return receipt requested.
D. If the Contractor does not agree with any decision of the County of Warren and/or Owner, he shall in no case allow the dispute to delay the work but shall notify the County of Warren and/or
Owner promptly that he is proceeding with the work under protest and he may then except the matter in question from the final release.
114. Technical Specifications and Drawings
Anything mentioned in the Technical Specifications and not shown in the Drawings or shown on the Drawings and not mentioned in the Technical Specifications, shall be of like effect as if shown on or mentioned in both. In case of difference between Drawings and Technical Specification, the Technical Specifications shall govern. In case of any discrepancy in Drawings, or Technical Specifications, the matter shall be immediately submitted to the County of Warren and/or Owner, without whose decision, said discrepancy shall not be adjusted by the Contractor, save only at his own risk and expense.
115. Shop Drawings
A. All required shop drawings, machinery details, layout drawings, etc., shall be submitted to the Owner in two copies for approval sufficiently in advance of requirements to afford ample time for checking, including time for correcting, resubmitting and re-checking if necessary. The Contractor may proceed, only at his own risk, with manufacture or installation of any equipment or work covered by said shop drawings, etc., until they are approved and no claim, by the Contractor, for extension of the Contract time will be granted by reason of his failure in this respect.
B. Any drawings submitted without the Contractor’s stamp of approval will not be considered and will be returned to him for proper resubmission. If any drawings show variations from the requirements of the Contract because of standard shop practice or other reasons, the Contractor shall make specific mention of such variation in his letter of transmittal in order that, if acceptable, suitable action may be taken for proper adjustment of Contract price and/or time otherwise the Contractor will not be relieved of the responsibility for executing the work in accordance with the Contract even though the drawings have been approved.
C. If a shop drawing is in accord with the Contract or involved only a minor adjustment in the interest of the County of Warren and/or Owner not involving a change in Contract price or time, the Owner may approve the drawing. The approval shall be general, shall not relieve the Contractor, from his responsibility for adherence to the Contract or for any error in the drawing and shall contain in substance the following:
“The modification shown on the attached drawing is approved in the interest of the County of Warren and/or Owner to effect an improvement for the Project and is ordered with the understanding that it does not involve any change in the Contract Price or time; that it is subject generally to all Contract Stipulation and covenants; and that it is without prejudice to any and all rights of the County of Warren and/or Owner under the Contract and surety bond or bonds.”
116. Requests for Supplementary Information
It shall be the responsibility of the Contractor to make timely requests of the County of Warren and/or Owner for any additional information not already in his possession which should be furnished by the County of Warren and/or Owner under the terms of this Contract, and which he will require in the planning and execution of the work. Such requests may be submitted from time to time as the need is approached, but each shall be filed in ample time to permit appropriate action to be taken by all parties involved so as to avoid delay. Each request shall be in writing, and list the various items and the latest date by which each will be required by the Contract award and shall be as complete as possible at that time. The Contractor shall, if requested, furnish promptly any assistance and information the Owner may require in responding to these requests of the Contractor. The Contractor shall be fully responsible for any delay in his work or to others arising from his failure to comply fully with the provisions of this Section.
117. Materials and Workmanship
A. Unless otherwise specifically provided for in the Technical Specifications, all workmanship, equipment, materials and articles incorporated in the work shall be new and the grade of the respective kinds for the purpose. Where equipment, materials, articles or workmanship are referred in the Technical Specifications as “equal to” any particular standard, the Owner shall decide the question of equality.
B. The Contractor shall furnish to the County of Warren and/or Owner for approval the manufacturer’s detailed specifications for all machinery, mechanical and other special equipment, which he…
This is the start of the file's text. The full file is on GovTribe.