3-Pricing Section BT-15CJ-Wildwood.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Wildwood Terrace Paving Project
- Solicitation number
- US.194839
- Issued by
- Luzerne County, Wolfdale CDP, Pennsylvania
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Contract Documents and Specifications.pdf | ||
| 1-Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| Wright Township - Wildwood Terrace Paving Project | American Asphalt Paving | H&K Group, Inc. | Kriger Construction | Lehigh Asphalt Paving | Robert C. Young, Inc. | kobalt construction inc | |
| Based Bid Total | $276,812.50 | $271,566.38 | $348,987.50 | $270,107.00 | $343,618.75 | $472,262.50 |
| # | Items | PennDOT | |
| Ref# | Unit |
of
| Measure | Qty | |
| Req | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total | |
| Cost | Unit | |
| Price | Total |
Cost
| 1 | Base Bid Pricing (11) | $ 276,812.50 | $ 271,566.38 | $ 348,987.50 | $ 270,107.00 | $ 343,618.75 | $ 472,262.50 | |||||||||
| #1-1 | Mobilzation (Entire Project) | 0608-0001 | LS | 1 | $ 12,000.00 | $ 12,000.00 | $ 4,576.63 | $ 4,576.63 | $ 7,500.00 | $ 7,500.00 | $ 1,612.00 | $ 1,612.00 | $ 17,500.00 | $ 17,500.00 | $ 10,000.00 | $ 10,000.00 |
| #1-2 | Maintencance & Protection of Traffic (Entire Project) | 0901-0001 | LS | 1 | $ 6,000.00 | $ 6,000.00 | $ 9,532.50 | $ 9,532.50 | $ 20,000.00 | $ 20,000.00 | $ 8,090.00 | $ 8,090.00 | $ 4,800.00 | $ 4,800.00 | $ 3,000.00 | $ 3,000.00 |
| #1-3 | Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, 0.3 To <3 Million ESALs, 9.5 MM Mix, 1 ½” Depth, SRL-E (Terrace TR-465) | 0413-0244 | SYD | 5150 | $ 8.00 | $ 41,200.00 | $ 7.89 | $ 40,633.50 | $ 10.00 | $ 51,500.00 | $ 8.75 | $ 45,062.50 | $ 11.00 | $ 56,650.00 | $ 13.00 | $ 66,950.00 |
| #1-4 | Superpave Asphalt Mixture Design, Base Course, PG 64S-22, 0.3 To <3 Million ESALs, 25 MM Mix, 3” Depth (Terrance TR-465) | 0313-0420 | SYD | 5150 | $ 13.20 | $ 67,980.00 | $ 13.71 | $ 70,606.50 | $ 22.00 | $ 113,300.00 | $ 15.00 | $ 77,250.00 | $ 17.00 | $ 87,550.00 | $ 28.00 | $ 144,200.00 |
| #1-5 | Asphalt Tack Coat (Terrance TR-465) | 0460-0001 | SYD | 5150 | $ 0.50 | $ 2,575.00 | $ 0.43 | $ 2,214.50 | $ 0.60 | $ 3,090.00 | $ 0.50 | $ 2,575.00 | $ 0.65 | $ 3,347.50 | $ 0.50 | $ 2,575.00 |
| #1-6 | Milling of Asphalt Pavement Surface, 4.5" Depth, Milled Material Retained by Contractor (Terrance TR-465) | 0491-0018 | SYD | 5150 | $ 7.40 | $ 38,110.00 | $ 7.02 | $ 36,153.00 | $ 3.50 | $ 18,025.00 | $ 5.00 | $ 25,750.00 | $ 7.40 | $ 38,110.00 | $ 10.00 | $ 51,500.00 |
| #1-7 | Asphalt Concrete Curb (Terrance TR-465) | 0636-0001 | LF | 275 | $ 2.00 | $ 550.00 | $ 62.62 | $ 17,220.50 | $ 4.00 | $ 1,100.00 | $ 2.95 | $ 811.25 | $ 5.00 | $ 1,375.00 | $ 8.00 | $ 2,200.00 |
| #1-8 | Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, 0.3 To <3 Million ESALs, 9.5 MM Mix, 1 ½” Depth, SRL-E (Oak TR-471) | 0413-0244 | SYD | 3725 | $ 8.00 | $ 29,800.00 | $ 4.17 | $ 15,533.25 | $ 10.00 | $ 37,250.00 | $ 8.75 | $ 32,593.75 | $ 11.00 | $ 40,975.00 | $ 13.00 | $ 48,425.00 |
| #1-9 | Superpave Asphalt Mixture Design, Base Course, PG 64S-22, 0.3 To <3 Million ESALs, 25 MM Mix, 3” Depth (Oak TR-471) | 0313-0420 | SYD | 3725 | $ 13.20 | $ 49,170.00 | $ 12.83 | $ 47,791.75 | $ 22.00 | $ 81,950.00 | $ 15.00 | $ 55,875.00 | $ 17.00 | $ 63,325.00 | $ 28.00 | $ 104,300.00 |
| #1-10 | Asphalt Tack Coat (Oak TR-471) | 0460-0001 | SYD | 3725 | $ 0.50 | $ 1,862.50 | $ 0.52 | $ 1,937.00 | $ 0.60 | $ 2,235.00 | $ 0.50 | $ 1,862.50 | $ 0.65 | $ 2,421.25 | $ 0.50 | $ 1,862.50 |
| #1-11 | Milling of Asphalt Pavement Surface, 4.5" Depth, Milled Material Retained by Contractor (Oak TR-471) | 0491-0018 | SYD | 3725 | $ 7.40 | $ 27,565.00 | $ 6.81 | $ 25,367.25 | $ 3.50 | $ 13,037.50 | $ 5.00 | $ 18,625.00 | $ 7.40 | $ 27,565.00 | $ 10.00 | $ 37,250.00 |
| 2 | Alternate 1 (6) | $ 25,520.00 | $ 37,070.00 | $ 40,785.00 | $ 29,110.15 | $ 33,517.50 | $ 46,775.00 | |||||||||
| #2-1 | Mobilization (Terrance TR-465) | 0608-0001 | LS | 1 | $ 500.00 | $ 500.00 | $ 1,537.50 | $ 1,537.50 | $ 2,500.00 | $ 2,500.00 | $ 627.15 | $ 627.15 | $ 1,975.00 | $ 1,975.00 | $ 2,000.00 | $ 2,000.00 |
| #2-2 | Maintencance & Protection of Traffic (Terrance TR-465) | 0901-0001 | LS | 1 | $ 200.00 | $ 200.00 | $ 1,906.50 | $ 1,906.50 | $ 2,500.00 | $ 2,500.00 | $ 1,011.00 | $ 1,011.00 | $ 900.00 | $ 900.00 | $ 1,000.00 | $ 1,000.00 |
| #2-3 | Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, 0.3 To <3 Million ESALs, 9.5 MM Mix, 1 ½” Depth, SRL-E (Terrace TR-465) | 0413-0244 | SYD | 850 | $ 8.00 | $ 6,800.00 | $ 13.46 | $ 11,441.00 | $ 12.00 | $ 10,200.00 | $ 9.75 | $ 8,287.50 | $ 11.00 | $ 9,350.00 | $ 13.00 | $ 11,050.00 |
| #2-4 | Superpave Asphalt Mixture Design, Base Course, PG 64S-22, 0.3 To <3 Million ESALs, 25 MM Mix, 3” Depth (Terrance TR-465) | 0313-0420 | SYD | 850 | $ 13.20 | $ 11,220.00 | $ 16.48 | $ 14,008.00 | $ 26.00 | $ 22,100.00 | $ 15.32 | $ 13,022.00 | $ 17.00 | $ 14,450.00 | $ 28.00 | $ 23,800.00 |
| #2-5 | Asphalt Tack Coat (Terrance TR-465) | 0460-0001 | SYD | 850 | $ 0.50 | $ 425.00 | $ 1.05 | $ 892.50 | $ 0.60 | $ 510.00 | $ 0.50 | $ 425.00 | $ 0.65 | $ 552.50 | $ 0.50 | $ 425.00 |
| #2-6 | Milling of Asphalt Pavement Surface, 4.5" Depth, Milled Material Retained by Contractor (Terrance TR-465) | 0491-0018 | SYD | 850 | $ 7.50 | $ 6,375.00 | $ 8.57 | $ 7,284.50 | $ 3.50 | $ 2,975.00 | $ 6.75 | $ 5,737.50 | $ 7.40 | $ 6,290.00 | $ 10.00 | $ 8,500.00 |
| 3 | Alternate 2 (3) | $ 785.00 | $ 29,189.05 | $ 5,800.00 | $ 2,547.50 | $ 5,485.00 | $ 4,800.00 | |||||||||
| #3-1 | Mobilization (Oak TR-471) | 0608-0001 | LS | 1 | $ 75.00 | $ 75.00 | $ 871.25 | $ 871.25 | $ 1,000.00 | $ 1,000.00 | $ 230.00 | $ 230.00 | $ 610.00 | $ 610.00 | $ 1,000.00 | $ 1,000.00 |
| #3-2 | Maintencance & Protection of Traffic (Oak TR-471) | 0901-0001 | LS | 1 | $ 50.00 | $ 50.00 | $ 1,271.00 | $ 1,271.00 | $ 1,500.00 | $ 1,500.00 | $ 288.00 | $ 288.00 | $ 420.00 | $ 420.00 | $ 500.00 | $ 500.00 |
| #3-3 | Asphalt Concrete Curb (Oak TR-471) | 0636-0001 | LF | 330 | $ 2.00 | $ 660.00 | $ 81.96 | $ 27,046.80 | $ 10.00 | $ 3,300.00 | $ 6.15 | $ 2,029.50 | $ 13.50 | $ 4,455.00 | $ 10.00 | $ 3,300.00 |
| 4 | Alternate 3 (5) | $ 25,562.50 | $ 28,391.75 | $ 32,142.50 | $ 26,803.75 | $ 36,613.75 | $ 36,687.50 | |||||||||
| #4-1 | Mobilization (Oak TR-471) | 0608-0001 | LS | 1 | $ 500.00 | $ 500.00 | $ 1,537.50 | $ 1,537.50 | $ 2,500.00 | $ 2,500.00 | $ 625.00 | $ 625.00 | $ 1,800.00 | $ 1,800.00 | $ 2,000.00 | $ 2,000.00 |
| #4-2 | Maintencance & Protection of Traffic (Oak TR-471) | 0901-0001 | LS | 1 | $ 1,000.00 | $ 1,000.00 | $ 1,271.00 | $ 1,271.00 | $ 2,500.00 | $ 2,500.00 | $ 4,330.00 | $ 4,330.00 | $ 1,800.00 | $ 1,800.00 | $ 1,000.00 | $ 1,000.00 |
| #4-3 | Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, 0.3 To <3 Million ESALs, 9.5 MM Mix, 1 ½” Depth, SRL-E (Oak TR-471) | 0413-0244 | SYD | 1925 | $ 8.00 | $ 15,400.00 | $ 8.45 | $ 16,266.25 | $ 11.00 | $ 21,175.00 | $ 9.00 | $ 17,325.00 | $ 11.50 | $ 22,137.50 | $ 13.00 | $ 25,025.00 |
| #4-4 | Asphalt Tack Coat (Oak TR-471) | 0460-0001 | SYD | 1925 | $ 0.50 | $ 962.50 | $ 0.58 | $ 1,116.50 | $ 0.60 | $ 1,155.00 | $ 0.50 | $ 962.50 | $ 0.65 | $ 1,251.25 | $ 0.50 | $ 962.50 |
| #4-5 | Milling of Asphalt Pavement Surface, 1.5" Depth, Milled Material Retained by Contractor (Oak TR-471) | 0491-0012 | SYD | 1925 | $ 4.00 | $ 7,700.00 | $ 4.26 | $ 8,200.50 | $ 2.50 | $ 4,812.50 | $ 1.85 | $ 3,561.25 | $ 5.00 | $ 9,625.00 | $ 4.00 | $ 7,700.00 |