0947-03-034.pdf

PDF 6 MB Posted

Attached to
Hazard Elimination & Safety Improvements
Solicitation number
0947-03-034
Issued by
Jefferson County, Texas

About this file

This is a proposal and specification document for a Texas Department of Transportation (TxDOT) construction contract involving hazard elimination and safety improvements on FM 1004 in Jasper County, Texas. The project, designated as Control 0947-03-034 and Project STP 2B26(012)HRR, consists of constructing paved shoulders (1-4 feet wide), eliminating hazards, and providing safety improvements over a 2.0-mile stretch from 0.27 miles north of CR 634 to 2.27 miles north of CR 634. The work includes multiple bid items totaling 67 line items covering site preparation, concrete removal, subgrade widening, embankment work, seeding and erosion control, asphalt paving, culvert installation, guardrail installation, pavement markings, and traffic control measures. The project must be completed within 128 working days. A proposal guaranty of $46,000.00 is required, submitted as a cashier's check, teller's check, bank money order, or bid bond. Addenda acknowledgment is mandatory, with failure to acknowledge addenda resulting in bid rejection. Contractors must submit audited financial statements and experience questionnaires at least ten days prior to the letting date.

Pricing shall be submitted on a unit price basis for each bid item listed in the proposal form, with the total bid amount determined by multiplying unit prices by estimated quantities and totaling extended amounts. The project is federal-aid funded, requiring compliance with the Federal Domestic Material Program and Buy America provisions, including notarized Buy America Certification Forms for all construction materials. A 0% Disadvantaged Business Enterprises (DBE) goal has been established. Contractors and subcontractors must register with and utilize the E-Verify system, comply with Davis-Bacon wage requirements, and provide certifications regarding nondiscrimination, conflict of interest, child support obligations, and prohibition on boycotts of Israel and energy companies. Additional requirements include compliance with prevailing wage determinations, traffic control plan approval with a minimum seven-day advance notice for lane closures, environmental and erosion control measures, and on-site laboratory facilities for testing of hot mix asphalt. No lane closures are permitted on specified national holidays in 2027. The contract incorporates TxDOT standard specifications, special provisions, and federal requirements under Form FHWA-1273.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Control 0947-03-034 Project STP 2B26(012)HRR Highway FM 1004 County JASPER

ADDENDUM ACKNOWLEDGMENT

Each bidder is required to acknowledge receipt of an addendum issued for a specific project. This page is provided for the purpose of acknowledging an addendum.

FAILURE TO ACKNOWLEDGE RECEIPT OF AN ADDENDUM WILL RESULT IN THE BID NOT

BEING READ.

In order to properly acknowledge an addendum, place a mark in the box next to the respective addendum.

ADDENDUM NO. 1

ADDENDUM NO. 2

ADDENDUM NO. 3

ADDENDUM NO. 4

ADDENDUM NO. 5

In addition, the bidder by affixing their signature to the signature page of the proposal is acknowledging that they have taken the addendum(s) into consideration when preparing their bid and that the information contained in the addendum will be included in the contract, if awarded by the Commission or other designees.

1-1

This page intentionally left blank.

Highway FM 1004 County JASPER

PROPOSAL TO THE TEXAS

TRANSPORTATION COMMISSION

2024 SPECIFICATIONS

Work Consisting of Hazard Elimination & Safety

JASPER COUNTY, TEXAS

The quantities in the proposal are approximate. The quantities of work and materials may be increased or decreased as considered necessary to complete the work as planned and contemplated.

This project is to be completed in 128 working days and will be accepted when fully completed and finished to the satisfaction of the Executive Director or designee.

Provide a proposal guaranty in the form of a Cashier’s Check, Teller’s Check (including an Official Check) or Bank Money Order on a State or National Bank or Savings and Loan Association, or State or Federally chartered Credit Union made payable to the Texas Transportation Commission in the following amount:

FORTY SIX THOUSAND AND 00/100 (Dollars) ( $46,000.00)

A bid bond may be used as the required proposal guaranty. The bond form may be detached from the proposal for completion. The proposal may not be disassembled to remove the bond form. The bond must be in accordance with Item 2 of the specifications.

Any addenda issued amending this proposal and/or the plans that have been acknowledged by the bidder, become part of this proposal.

By signing the proposal the bidder certifies:

1. the only persons or parties interested in this proposal are those named and the bidder has not directly or indirectly participated in collusion, entered into an agreement or otherwise taken any action in restraint of free competitive bidding in connection with the above captioned project.

2. in the event of the award of a contract, the organization represented will secure bonds for the full amount of the contract.

3. the signatory represents and warrants that they are an authorized signatory for the organization for which the bid is submitted and they have full and complete authority to submit this bid on behalf of their firm.

4. that the certifications and representations contained in the proposal are true and accurate and the bidder intends the proposal to be taken as a genuine government record.

• Signed: **

(1) (2) (3) Print Name:

(1) (2) (3) Title:

(1) (2) (3) Company:

(1) (2) (3)

• Signatures to comply with Item 2 of the specifications.

**Note: Complete (1) for single venture, through (2) for joint venture and through (3) for triple venture.

* When the working days field contains an asterisk (*) refer to the Special Provisions and General Notes.

NOTICE TO CONTRACTORS

ANY CONTRACTORS INTENDING TO BID ON ANY WORK TO BE AWARDED

BY THIS DEPARTMENT MUST SUBMIT A SATISFACTORY “AUDITED FINANCIAL

STATEMENT” AND “EXPERIENCE QUESTIONNAIRE” AT LEAST TEN DAYS

PRIOR TO THE LETTING DATE.

UNIT PRICES MUST BE SUBMITTED IN ACCORDANCE WITH ITEM 2 OF

THE STANDARD SPECIFICATIONS OR SPECIAL PROVISION TO ITEM 2 FOR

EACH ITEM LISTED IN THIS PROPOSAL.

TEXAS DEPARTMENT OF TRANSPORTATION

BID BOND

KNOW ALL PERSONS BY THESE PRESENTS,

That we, (Contractor Name)

Hereinafter called the Principal, and (Surety Name) a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety, are held and firmly bound unto the Texas Department of Transportation, hereinafter called the Obligee, in the sum of not less than two percent (2%) of the department’s engineer’s estimate, rounded to the nearest one thousand dollars, not to exceed one hundred thousand dollars ($100,000) as a proposal guaranty (amount displayed on the cover of the proposal), the payment of which sum will and truly be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the principal has submitted a bid for the following project identified as:

Control 0947-03-034

Project STP 2B26(012)HRR

Highway FM 1004

County JASPER

NOW, THEREFORE, if the Obligee shall award the Contract to the Principal and the Principal shall enter into the Contract in writing with the Obligee in accordance with the terms of such bid, then this bond shall be null and void. If in the event of failure of the Principal to execute such Contract in accordance with the terms of such bid, this bond shall become the property of the Obligee, without recourse of the Principal and/or Surety, not as a penalty but as liquidated damages.

Signed this Day of 20

By:

(Contractor/Principal Name)

(Signature and Title of Authorized Signatory for Contractor/Principal)

*By:

(Surety Name)

(Signature of Attorney-in-Fact) Impressed

*Attach Power of attorney (Surety) for Attorney-in-Fact Surety Seal Only

This form may be removed from the proposal

BIDDER’S CHECK RETURN

IMPORTANT

The space provided for the return address must be completed to facilitate the return of your bidder’s check. Care must be taken to provide a legible, accurate, and complete return address, including zip code. A copy of this sheet should be used for each different return address.

NOTE

Successful bidders will receive their guaranty checks with the executed contract.

RETURN BIDDERS CHECK TO (PLEASE PRINT):

Control 0947-03-034 Project STP 2B26(012)HRR Highway FM 1004 County JASPER

IMPORTANT

PLEASE RETURN THIS SHEET IN ITS ENTIRETY

Please acknowledge receipt of this check(s) at your earliest convenience by signing below in longhand, in ink, and returning this acknowledgement in the enclosed self-addressed envelope.

Check Received By: Date:

Title:

For (Contractor's Name):

Project: County:

NOTICE TO THE BIDDER

In the space provided below, please enter your total bid amount for this project. Only this figure will be read publicly by the Department at the public bid opening.

It is understood and agreed by the bidder in signing this proposal that the total bid amount entered below is not binding on either the bidder or the Department. It is further agreed that the official total bid amount for this proposal will be determined by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts.

Total Bid Amount

Control Project Highway County

ALT ITEM DESC SP Bid Item Description Unit Quantity Bid Price Amount Seq

Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________

Additional Signature for Joint Venture:

Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________

Total Bid Amount _______$2,664.00________

EXAMPLE OF BID PRICES SUBMITTED BY COMPUTER PRINTOUT

0001-03-030

STP 2000(938)HES

SH 20

EL PASO

104 509 REMOV CONC (SDWLK) SY 266.400 $10.000 $2,664.00 1

EXAMPLE EXAMPLE EXAMPLE EXAMPLE

EXAMPLES

BID PRICES SUBMITTED BY HAND WRITTEN FORMAT

Unit price for each plant in place

249 014 FLEX BASE(DEL)(DENSCOT)(TY A GR4 CL2) TON 56,787.00 14

ALT

ITEM-CODE

ITEM

NO

DESC

NO

S.P.

NO.

UNIT BID PRICE ONLY

WRITTEN IN WORDS UNIT

APPROX

QUANTITIES

DEPT

USE

ONLY

190 026 RED OAK 1 1/2” - 1 3/4” GAL BB EA 9.000 1

DLRS

CENTS

DLRS

CENTS

Unit price for each ton of Flexible Base

430 001 001 CL A CONC FOR EXT STR (CULV) CY 45.000 27

Unit price for each cubic yard of Concrete

DLRS

CENTS

610 007 001 RDWY ILL ASSEM(TY ST 50T-8-8)(.4 KW)S EA 13.000 7

Unit price of each Roadway Illumination Assembly

DLRS

CENTS

EXAMPLE EXAMPLE EXAMPLE EXAMPLE

STP 2B26(012)HRR

Proposal Sheet

JASPER FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

100 7002

PREPARING ROW

STA 10.000 1 DOLLARS

and CENTS

104 7011

REMOV CONC (DRIVEWAYS)

SY 16.000 2 DOLLARS

and CENTS

104 7028

REMOV CONC (WINGWALL)

CY 2.000 3 DOLLARS

and CENTS

112 7001

SUBGR WIDEN (OC)

STA 106.000 4 DOLLARS

and CENTS

132 7005

EMBANK (FNL)(OC)(TY C)

CY 187.000 5 DOLLARS

and CENTS

134 7004

BACKFILL (TY A OR B)

STA 106.000 6 DOLLARS

and CENTS

158 7002

SPEC EXCAV WORK (HYD EXCAVATOR)

HR 88.000 7 DOLLARS

and CENTS

164 7005

BROADCAST SEED (TEMP_WARM)

SY 7,070.000 8 DOLLARS

and CENTS

164 7006

BROADCAST SEED (TEMP_COOL)

SY 7,070.000 9 DOLLARS

and CENTS

164 7018

HYDRO MULCH SEED

(PERM_RURAL_CLAY)

SY 14,140.000 10 DOLLARS

and CENTS

168 7001

VEGETATIVE WATERING

TGL 119.000 11 DOLLARS

and CENTS

316 7004

ASPH (AC-10-2TR)

GAL 1,696.000 12 DOLLARS

and CENTS

316 7148

AGGR (TY-PD, GR-4)(SAC-A)

CY 34.000 13 DOLLARS

and CENTS

1-6

JASPER FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

344 7001

SP MIXES SP-B PG64-22

TON 3,142.000 14 DOLLARS

and CENTS

344 7030

SP MIXES SP-C SAC-A PG76-22

TON 4,210.000 15 DOLLARS

and CENTS

344 7077

TACK COAT

GAL 3,123.000 16 DOLLARS

and CENTS

351 7006

FLEXIBLE PAVEMENT STRUCTURE REPAIR

(7")

SY 1,000.000 17 DOLLARS

and CENTS

354 7002

PLANE & TEXT ASPH CONC PAV(0" TO 2")

SY 1,244.000 18 DOLLARS

and CENTS

400 7010

CEM STABIL BKFL

CY 56.000 19 DOLLARS

and CENTS

402 7001

TRENCH EXCAVATION PROTECTION

LF 80.000 20 DOLLARS

and CENTS

403 7001

TEMPORARY SPL SHORING

SF 538.000 21 DOLLARS

and CENTS

420 7055

CL C CONC (RAC-R)

CY 6.700 22 DOLLARS

and CENTS

420 7070

CL E CONC (SEAL SLAB)(NON-REINF)

CY 38.000 23 DOLLARS

and CENTS

432 7013

RIPRAP (MOW STRIP)(4 IN)

CY 108.000 24 DOLLARS

and CENTS

450 7008

RAIL (TY T223)

LF 167.000 25 DOLLARS

and CENTS

462 7032

CONC BOX CULV (10 FT X 4 FT)

LF 80.000 26 DOLLARS

2-6

JASPER FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

464 7003

RC PIPE (CL III)(18 IN)

LF 268.000 27 DOLLARS

and CENTS

466 7176

WINGWALL (PW - 1) (HW=6 FT)

EA 2.000 28 DOLLARS

and CENTS

467 7308

SET (TY II) (18 IN) (RCP) (6: 1) (P)

EA 78.000 29 DOLLARS

and CENTS

496 7001

REMOV STR (BOX CULVERT)

EA 1.000 30 DOLLARS

and CENTS

496 7005

REMOV STR (WINGWALL)

EA 2.000 31 DOLLARS

and CENTS

500 7001

MOBILIZATION

LS 1.000 32 DOLLARS

and CENTS

502 7001

BARRICADES, SIGNS AND TRAFFIC

HANDLING

MO 9.000 33 DOLLARS

and CENTS

503 7001

PORTABLE CHANGEABLE MESSAGE SIGN

DAY 60.000 34 DOLLARS

and CENTS

505 7001

TMA (STATIONARY)

DAY 107.000 35 DOLLARS

and CENTS

505 7003

TMA (MOBILE OPERATION)

DAY 20.000 36 DOLLARS

and CENTS

506 7004

ROCK FILTER DAMS (INSTALL) (TY 4)

LF 200.000 37 DOLLARS

and CENTS

506 7011

ROCK FILTER DAMS (REMOVE)

LF 200.000 38 DOLLARS

and CENTS

506 7044

BIODEG EROSN CONT LOGS (INSTL) (12")

LF 1,000.000 39 DOLLARS

3-6

JASPER FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

506 7046

BIODEG EROSN CONT LOGS (REMOVE)

LF 1,000.000 40 DOLLARS

and CENTS

530 7002

INTERSECTIONS (ACP)

SY 209.000 41 DOLLARS

and CENTS

530 7006

DRIVEWAYS (CONC)

SY 16.000 42 DOLLARS

and CENTS

530 7015

DRIVEWAYS (BASE)

SY 900.000 43 DOLLARS

and CENTS

530 7018

TURNOUTS (ACP)

SY 647.000 44 DOLLARS

and CENTS

533 7001

MILL RUMBLE STRIPS (ASPHALT) (SHLDR)

LF 21,200.000 45 DOLLARS

and CENTS

533 7002

MILL RUMBLE STRIPS (ASPH)

(CENTERLINE)

LF 10,600.000 46 DOLLARS

and CENTS

540 7001

MTL W-BEAM GD FEN (TIM POST)

LF 575.000 47 DOLLARS

and CENTS

540 7003

MTL THRIE-BEAM GD FEN (TIM POST)

LF 150.000 48 DOLLARS

and CENTS

540 7005

MTL BEAM GD FEN TRANS (THRIE-BEAM)

EA 8.000 49 DOLLARS

and CENTS

544 7001

GUARDRAIL END TREATMENT (INSTALL)

EA 6.000 50 DOLLARS

and CENTS

545 7014

CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)

EA 2.000 51 DOLLARS

and CENTS

560 7001

MAILBOX INSTALL-M (TWG-POST) TY 1

EA 5.000 52 DOLLARS

4-6

JASPER FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

560 7002

MAILBOX INSTALL-S (TWG-POST) TY 2

EA 20.000 53 DOLLARS

and CENTS

644 7001

IN SM RD SN SUP&AM TY10BWG(1)SA(P)

EA 14.000 54 DOLLARS

and CENTS

644 7004

IN SM RD SN SUP&AM TY10BWG(1)SA(T)

EA 1.000 55 DOLLARS

and CENTS

644 7073

REMOVE SM RD SN SUP&AM

EA 15.000 56 DOLLARS

and CENTS

658 7002

INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2(BI)

EA 74.000 57 DOLLARS

and CENTS

658 7059

INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)

EA 8.000 58 DOLLARS

and CENTS

658 7078

REMOVE DELIN & OBJECT MARKER ASSMS

EA 8.000 59 DOLLARS

and CENTS

658 7317

INSTL OM SM RD SIGN (1-OM-PW)Y

EA 10.000 60 DOLLARS

and CENTS

658 7318

INSTL OM SM RD SIGN (1-OM-PW)R

EA 5.000 61 DOLLARS

and CENTS

662 7114

WK ZN PAV MRK SHT TERM (TAB)TY Y-2

EA 1,150.000 62 DOLLARS

and CENTS

666 7411

REFL PAV MRK TY I (W)6"(SLD)(100MIL)

LF 21,200.000 63 DOLLARS

and CENTS

666 7420

REFL PAV MRK TY I (Y)6"(BRK)(100MIL)

LF 2,290.000 64 DOLLARS

and CENTS

666 7423

REFL PAV MRK TY I (Y)6"(SLD)(100MIL)

LF 8,630.000 65 DOLLARS

5-6

JASPER FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

668 7089

PREFAB PM TY C (W)(24")(SLD)

LF 60.000 66 DOLLARS

and CENTS

672 7004

REFL PAV MRKR TY II-A-A

EA 800.000 67 DOLLARS

6-6

CERTIFICATION OF INTEREST IN OTHER BID

PROPOSALS FOR THIS WORK

By signing this proposal, the bidding firm and the signer certify that the following information, as indicated by checking “Yes” or “No” below, is true, accurate, and complete.

A. Quotation(s) have been issued in this firm's name to other firm(s) interested in this work for consideration for performing a portion of this work.

________ YES

________ NO

B. If this proposal is the low bid, the bidder agrees to provide the following information prior to award of the contract.

1. Identify firms which bid as a prime contractor and from which the bidder received quotations for work on this project.

2. Identify all the firms which bid as a prime contractor to which the bidder gave quotations for work on this project.

DISCLOSURE OF LOBBYING ACTIVITIES

Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 (See reverse for public burden disclosure.)

1. Type of Federal Action:

a. contract

b. grant

c. cooperative agreement

d. loan

e. loan guarantee

f. loan insurance

2. Status of Federal Action:

a. bid/offer/application

b. initial award

c. post-award

3. Report Type:

a. initial filing

b. grant

For material change only:

year _______ quarter _____ date of last report ___________

4. Name and Address of Reporting Entity:

Prime Subawardee Tier __________, if known:

Congressional District, if known:

5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:

Congressional District, if known:

6. Federal Department/Agency: 7. Federal Program Name/Description:

CFDA Number, if applicable: _____________________________

8. Federal Action Number, if known: 9. Award Amount, if known:

10. a. Name and Address of Lobbying Entity (if individual, last name, first name, MI):

b. Individuals Performing Services (including address if different from No. 10a) (last name, first name, MI):

(attach Continuation Sheet(s) SF-LLL-A, if necessary)

11. Amount of Payment (check all that apply):

$ ___________________________ actual planned

13. Type of Payment (check all that apply):

a. retainer

b. one-time fee

c. commission

d. contingent fee

e. deferred

f. other; specify: _______________________________

12. Form of Payment (check all that apply)

a. cash

b. in-kind; specify: nature ____________________ value ____________________

14. Brief Description of Services Performed or to be Performed and Date(s) of Service, including officer(s), employee(s), or Member(s) contacted, for Payment Indicated in Item 11:

(attach Continuation Sheet(s) SF-LLL-A, if necessary)

15. Continuation Sheet(s) SF-LLL-A attached: Yes No

16. Information requested through this form is authorized by title 31 U.S.C. section 1352. This disclosure of lobbying activities is a material representation of fact upon which reliance was placed by the tier above when this transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to the Congress semi-annually and will be available for public inspection. Any person who fails to file the required dis-closure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

Signature: __________________________________________

Print Name: _________________________________________

Title: ______________________________________________

Telephone No: _____________________ Date: ___________

FEDERAL USE ONLY Authorized for Local Reproduction Standard Form - LLL

INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES

This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with a covered Federal action. Use the SF-LLL-A Continuation Sheet for additional information if the space on the form is inadequate. Com-plete all items that apply for both the initial filing and material change report. Refer to the implementing guidance pub-lished by the Office of Management and Budget for additional information.

1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action.

2. Identify the status of the covered Federal action.

3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity or this covered Federal action.

4. Enter the full name, address, city, state and zip code of the reporting entity. Include Congressional District, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the 1st tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.

5. If the organization filing the report in item 4 checks "Subawardee", then enter the full name, address, city, state and zip code of the prime Federal recipient. Include Congressional District, if known.

6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organizational level below agency name, if known. For example, Department of Transportation, United States Coast Guard.

7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments.

8. Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal (RFP) number; Invitation for Bid (IFB) number; grant announcement number, the contract, grant, or loan award number; the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."

9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitment for the prime entity identified in item 4 or 5.

10. (a) Enter the full name, address, city, state and zip code of the lobbying entity engaged by the reporting entity identified in item 4 to influence the covered Federal action.

(b) Enter the full names of the individual(s) performing services, and include full address if different from 10(a).

Enter Last Name, First Name, and Middle Initial (MI).

11. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (item 4) to the lobbying entity (item 10). Indicate whether the payment has been made (actual) or will be made (planned).

Check all boxes that apply. If this is a material change report, enter the cumulative amount of payment made or planned to be made.

12. Check the appropriate box(es). Check all boxes that apply. If payment is made through an in-kind contribution, specify the nature and value of the in-kind payment.

13. Check the appropriate box(es). Check all boxes that apply. If other, specify nature.

14. Provide a specific and detailed description of the services that the lobbyist has performed, or will be expected to perform, and the date(s) of any services rendered. Include all preparatory and related activity, not just time spent in actual contact with Federal officials. Identify the Federal official(s) or employee(s) contacted or the officer(s), employee(s), or Member(s) of Congress that were contacted.

15. Check whether or not a SF-LLL-A Continuation Sheet(s) is attached.

16. The certifying official shall sign and date the form, print his/her name, title, and telephone number.

Public reporting burdon for this collection of infromation is estimated to average 30 minutes per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments reguarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burdon, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503.

DISCLOSURE OF LOBBYING ACTIVITIES Approved by OMB 0348-0046

CONTINUATION SHEET

Authorized for Local Reproduction

Standard Form - LLL-A

Reporting Entity: ____________________________________ Page ______ of ______

CONTRACTOR’S ASSURANCE

(Subcontracts-Federal Aid Projects)

By signing this proposal, the contractor is giving assurances that each subcontract and further all lower tier subcontracts will incorporate the Standard Specification to Article 9.9, Payment

Provisions for Subcontractors and will also physically attach the following:

Form FHWA 1273

Wage Rates

Special Provision 000-001

Special Provision 000-002

Special Provision 000-007

Required Contract Provisions Federal-Aid Construction

Contracts

All Construction Projects

Nondiscrimination, Sections 3.1-3.6 (include materials and leases of equipment)

Certificate of Nondiscrimination in Employment

Cargo Preference Act Requirements in Federal-Aid

11-25

ENGINEER SEAL

Project STP 2B26(012)HRR

Highway FM 1004 County JASPER

The enclosed Texas Department of Transportation Specifications, Special Specifications, Special Provisions, General Notes and Specification Data in this document have been selected by me, or under my responsible supervision as being applicable to this project.

Alteration of a sealed document without proper notification to the responsible engineer is an offense under the Texas Engineering Practice Act.

The seal appearing on this document was authorized by:

James D Horne P.E.

September 03, 2026

Seal Applies to CSJ(s):

All CSJs within the Contract

141323

James D Horne

County: Jasper Sheet:

Highway: FM 1004 Control: 0947-03-034

General Notes Sheet A

GENERAL NOTES:

Contractor questions on this project are to be addressed to the following individual(s):

Name Richard Bradley P.E.

Email Richard.Bradley@txdot.gov

Name Jim Grissom P.E.

Email Jim.Grissom@txdot.gov

Questions may be submitted via the Letting Pre-Bid Q&A web page. This webpage can be accessed from the Notice to Contractors dashboard located at the following Address:

https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors

All contractor questions will be reviewed by the Engineer. All questions and any corresponding responses that are generated will be posted through the same Letting Pre-Bid Q&A web page.

The Letting Pre-Bid Q&A web page for each project can be accessed by using the dashboard to navigate to the project you are interested in by scrolling or filtering the dashboard using the controls on the left. Hover over the blue hyperlink for the project you want to view the Q&A for and click on the link in the window that pops up.

NOTICE

The following standard sheets have been modified: RAC-R (MOD)

Item 4 Scope of Work

It is the contractors responsibility to field verify all drainage structure’s shown in the plans.

It is the contractors responsibility to mark the location of all existing striping and place proposed striping back in the same location or as shown in the plans.

Item 5 Control of the Work

Station the project before commencing work. Mark the stations every 100 feet. Maintain stationing throughout the duration of the project. Remove the station markings at the completion of the project. Consider this work to be subsidiary to the various bid items of the contract.

Verify all horizontal and vertical control, approach grades to structures and driveways before beginning work.

Notify the Engineer immediately if discrepancies are discovered.

A precast concrete alternate may be submitted in accordance with the latest version of the Bridge Design Manual

– LRFD. The Contractor must submit the alternate design for review and approval. Acceptance or denial of an

General Notes Sheet B alternate is at the sole discretion of the Engineer. All alternate designs must be signed and sealed by a Professional Engineer. Impacts to the project schedule and any additional costs resulting from the use of alternates are the sole responsibility of the Contractor.

Item 6 Control of Materials

Flammable/combustible materials must be stored at a designated location as approved.

Do not store flammable/combustible materials under or adjacent to Bridge class structures. Daily removal of these materials will be considered incidental work.

The Federal Domestic Material Program (FDMP) applies to this project. The contractor must ensure compliance with this program. Refer to SP 006-009, included in this project. The contractor can review a prerecorded webinar for additional guidance.

https://www.youtube.com/watch?v=UG6caaMfO1U

Item 7 Legal Relations and Responsibilities

Furnish all materials, labor and incidentals required to provide for traffic across the highway and for temporary ingress and egress to private property in accordance with article 7.2.4 of the standard specifications at no additional cost to the state. Maintain ingress and egress to the adjacent property at all times. Consider this work to be subsidiary to the various bid items of the contract.

The Contractor will be completely responsible for the immediate removal of any material that gets upon any vehicle as a result of their operation.

State contract mowers will mow the right of way during the growing season. The Contractor will be notified by the Engineer one week in advance of the anticipated time when mowers will be in the limits of the project.

Clean the right of way to such a condition that allows the mowing contractors to safely mow.

Personal vehicles of the contractor’s employees will not be parked within the right of way at any time including any section closed to public traffic, unless the vehicle is being used for construction procedures. However, the Contractor’s employees may park on the right of way at sites where the contractor has their office, equipment and materials storage yard.

The Contractor will be familiar with the right of way map and the location of all the right of way monumentation.

Care will be taken by the Contractor and its subcontractors to protect and avoid disturbance to the right of way monumentation. Any monument disturbed by the Contractor will be repaired and/or replaced to the satisfaction of the Engineer. This work will be corrected at the contractor’s expense.

No significant traffic generator events have been identified in the project limits.

General Notes Sheet C

Item 8 Prosecution and Progress

Compute and charge working days in accordance with Section 8.3.1.4 Standard Workweek.

Submit monthly progress schedules in accordance with 8.5.5.2.3. Failure to supply updated project schedule may result in the Engineer withholding progress (monthly) payments.

Adjoining projects may be in progress during the construction of a portion of this project. Plan and prosecute the sequence of construction and the traffic control plan with adjacent construction projects, if applicable. Manage construction of all phases to minimize disruption to traffic.

Notify the Engineer 7 days in advance of any temporary or permanent lane, ramp or connector affected by closures, detours, or restrictions to lane widths, alterations to vertical clearances or modifications to alignment/radii. Any other modification to the roadway that may adversely affect the mobility of oversized/overweight trucks will also require 7 business day advance written notice to the Engineer.

No lane closure will be allowed on the National Holidays shown on the table below.

EVENTS DATE LANE CLOSURE RESTRICTIONS

New Year Holiday Traffic

Friday, January 1, 2027 No Lane Closures

Saturday, January 2, 2027 Lane Closure Resume at 7:00 AM

Memorial Day Holiday Traffic

Friday, May 21, 2027 No Lane Closures After 5:00 PM

Saturday, May 22, 2027 No Lane Closures

Sunday, May 23, 2027 No Lane Closures

Monday, May 24, 2027 No Lane Closures

Tuesday, May 25, 2027 Lane Closure Resume at 7:00 AM

Independence Day Holiday Traffic

Friday, July 2, 2027 No Lane Closures After 5:00 PM

Saturday, July 3, 2027 No Lane Closures

General Notes Sheet D

Sunday, July 4, 2027 No Lane Closures

Monday, July 5, 2027 Lane Closure Resume at 7:00 AM

Labor Day Holiday Traffic

Friday, September 3, 2027 No Lane Closures After 5:00 PM

Saturday, September 4, 2027 No Lane Closures

Sunday, September 5, 2027 No Lane Closures

Monday, September 6, 2027 No Lane Closures

Tuesday, September 7, 2027 Lane Closure Resume at 7:00 AM

Thanksgiving Holiday Traffic

Wednesday, November 24, 2027 No Lane Closures After Noon

Thursday, November 25, 2027 No Lane Closures

Friday, November 26, 2027 No Lane Closures

Saturday, November 27, 2027 No Lane Closures

Sunday, November 28, 2027 No Lane Closures

Monday, November 29, 2027 Lane Closure Resume at 7:00 AM

Christmas and New Year Holiday Traffic

Thursday, December 23, 2027 No Lane Closures After Noon

Friday, December 24, 2027 No Lane Closures

Saturday, December 25, 2027 No Lane Closures

Sunday, December 26, 2027 No Lane Closures

Monday, December 27, 2027 Lane Closures Resume at 7:00 AM;

Contractor's Optional Lane Closure

Tuesday, December 28, 2027 Contractor's Optional Lane Closure

General Notes Sheet E

Wednesday, December 29, 2027 Contractor's Optional Lane Closure

Thursday, December 30, 2027 Contractor's Optional Lane Closure

For all travel lanes, ramps, or connector closures, provide information regarding dates, times, typical work hours, type of closure, reason for closure, and expected project duration to the Orange Area Office. This information will be provided 7 days in advance of the closure to the Orange Area Office. If approved, the Orange Area Office will forward the information to the Public Information Officer for the Beaumont District.

Night work will not be allowed.

Maintain one lane open to traffic during construction, unless otherwise approved.

Limit lane closures to 1 mile unless otherwise approved.

The Contractor will be expected to schedule this work so that the base placement operations will follow the subgrade work as closely as practical in order to reduce the hazard to the traveling public and prevent undue delay from wet weather.

All edges must be backfilled by the end of the day with a 3:1 or flatter slope. No drop offs will be left overnight.

Submit a work schedule to the Engineer at the preconstruction meeting indicating completion dates for each location, and the number of crews required for the completion of the contract within the contract time period. If at any time during the contract the work progress is behind the initial schedule, submit documentation indicating how the project will be accelerated to ensure project completion in the remaining contract time.

Provide a sequence of work with an estimated project schedule to the Engineer at the preconstruction meeting.

By noon of each Wednesday, provide the Engineer a written outline of the proposed work schedule for the following week. This outline will also list the times and places for any proposed traffic control changes.

For this project, create and maintain the critical path method (CPM) schedule.

Work will not be permitted when impending bad weather or low temperatures may impair the quality of work.

Where road closures or detours around structures are necessary to accomplish proposed work, the removal of existing structures and/or cutting of existing pavement will not be permitted until all pre-cast members for the proposed structure have been cast, tested and approved for use.

HURRICANE

In the event of the declaration of a hurricane watch, warning, other severe weather warning or national or state emergency that requires the roadways in the vicinity be used as evacuation routes, General Notes Sheet F cease all work that requires the Contractor’s, sub-contractors’ or material suppliers’ vehicles to enter the stream of traffic on these primary or secondary evacuation routes. This work includes material hauling and delivery, and mobilization or demobilization of equipment.

Item 100 Preparing Right of Way

When bridge demolition, tree trimming or tree/brush removal is required from February 15 to September 30, the contractor will provide a qualified biologist with a Bachelor’s Degree in biology and demonstrated bird nest survey experience to conduct nesting surveys before work can begin and until vegetation work is completed to ensure compliance with the Migratory Bird Treaty Act (MBTA). See EPIC sheet for details.

Chipping and disposal on right of way of smaller debris will be allowed. Depth of the chipped material will not exceed 2 inches. Direct discharge of chipped material towards the right of way line in non-residential areas only. Chipping will not be allowed in front of residences.

Heavy equipment rutting will be graded to the existing terrain profile. Consider this work to be subsidiary to the various bid items of the contract.

The Contractor's attention is directed to potential regulations against burning within the project limits. Abide by all local ordinances and county imposed burn bans. When burning is prohibited, dispose of material in accordance with regulations set forth by other regulatory agencies including the Texas Commission for Environmental Quality. The cost of burning disposal of any product is subsidiary to various bid items. During burn bans obtain written approval from the Commissioners Court before burning brush.

Do not burn trash, debris, etc. within the City limits.

Item 112 Subgrade Widening

Remove excess material daily unless otherwise directed. Fill all excavated areas by the end of the work day.

Material is to be removed by milling or saw cutting or Pavement Widener.

Provide a clean vertical edge by saw cutting full depth. Consider this work to be subsidiary to the various bid items of the contract.

Subgrade widening will be used to excavate material from earth shoulders and to correct minor deficiencies, such as adding embankment on high sides of horizontal curves. It is not expected that additional embankment will be required. No buildup of material that impedes drainage from the roadway will be allowed.

General Notes Sheet G

Item 132 Embankment

Compaction method specified as “ordinary” compaction.

It is the Contractor's responsibility to advise the Engineer of the location of the material source enough in advance to avoid delay due to testing requirements.

Embankment Type C will conform to the following specification requirements:

1. Liquid Limit – 40 maximum

2. Plasticity Index – 21 maximum, 8 minimum

3. A cohesionless sand will not be permitted

Item 134 Backfilling Pavement Edges

Embankment quantity by station includes both sides of the roadway. No deduction in payment will be made when in the opinion of the Engineer only one side of a roadbed section requires backfilling.

As base is placed, backfill the pavement edges daily so that no drop-off conditions exist. Type A or B material will meet one of the following requirements:

1. Item 132, Type C

2. Use material from subgrade widening for backfilling pavement edges.

Item 164 Seeding for Erosion Control

Final grading and stabilization (seeding) will be achieved as soon as possible and not scheduled only for the end of the project. Final grading and stabilization should be initiated as the overall work progresses.

Multiple mobilizations of the seeding crews will be expected to comply with the Construction General Permit of the Texas Pollution Elimination Discharge System requirements for re- vegetating disturbed soils.

Item 168 Vegetative Watering

Equip water trucks with sprinkler systems capable of covering the entire area to be seeded or sodded from the roadway.

General Notes Sheet H

Water all newly placed sod or seeded areas the same day of installation. Thereafter, maintain the sod or seeded areas in a well-watered condition and at no time allow the areas to dry to the condition that water stress is evident.

Mechanical watering may not be required during periods of adequate moisture as determined.

Furnish and apply water at a rate of 6.788 Thousand Gallons per acre per cycle or as directed on the plans.

Comply with stabilization requirements for 70% grass coverage; uniform vegetative coverage is required. During this period, meter and operate water equipment under pumping pressure capable of delivering the required quantities of water necessary. For Permanent seeding each cycle will be executed weekly for 12 weeks, unless directed otherwise. For Temporary seeding each cycle will be executed weekly for 6 weeks, unless directed otherwise.

Provide a log book showing daily water usage and receipts of water applied, in addition to metering the water equipment.

1. Wait 14 calendar days following application of the herbicide and then rough-cut mow the grass. Remove clippings after mowing.

2. Repeat herbicide application as described in item 2 above.

3. Wait 14 calendar days following second herbicide application and then scalp the grass.

4. Completely remove all clippings immediately after scalping and before seeding.

5. Broadcast wildflower seeding. Broadcast seeding will consist of four parts masonry sand and one part seed. Use a roller on seeded areas to ensure seed-to-ground contact.

6. Consider this work to be subsidiary to the various bid items of the contract.

Do not mow existing or newly planted wildflower areas from January through July unless directed otherwise.

Item 316 Seal Coat

Furnish medium pneumatic-tire rollers in accordance with Item 210, “Rolling.”

All trucks hauling materials to be paid for by truck measurement will be “struck off” before delivery to the project.

Base bids on the following cure times for the One Course Surface Treatment (OCST) before subsequent overlays, and additional seal coats:

OCST placed June through September 15 – Three (3) Day Cure.

OCST placed all other times – Seven (7) Day Cure.

General Notes Sheet I

The Area Engineer may reduce the cure time based on atmospheric conditions such as consecutive high ambient temperature, less humidity, and low rain fall amounts.

Seal intersections and driveways before sealing the main lanes. Seal all existing roadway surfaces, including extra widths, crossovers, roadside parks, picnic areas, mailbox turnouts, public road intersections, and public drives, within the limits of each project. Do not seal intersections or driveways surfaced with ACP or constructed of concrete.

Sweep all roadways with a powered rotary broom before placement of the surface treatment to remove all loose or excess material or debris. After rolling, sweep as soon as aggregate has sufficiently bonded to remove excess.

Use a vacuum broom on all roadway sections with curb and gutter and all roadway sections within the city limits of any city.

Protect all existing bridges, curbs and other exposed concrete surfaces within the limits of the project from asphalt materials by any method that is acceptable. Remove any excessive asphalt materials deposited on these surfaces in a manner approved at the Contractor’s expense.

Cover or protect any sealed expansion joints or rail on bridges and any railroad tracks encountered on this project, as directed. Clean any of these items not properly protected. This work will not be paid for directly but will be considered subsidiary to Item 316/318.

Vehicles used to haul aggregate from the stockpile to the chip spreader will not be overloaded. Any damage to the roadway caused by the vehicles will be repaired by the Contractor at his expense and subsequent loads will be reduced so as not to cause further damage.

Item 344 Superpave Mixtures

Provide a separate Laboratory space, building or testing area, large enough to accommodate TxDOT equipment and testing on site at the Hot Mix Plant near or within the area of Contractor’s testing equipment. The contractor will provide the SGC” Superpave Gyratory Compactor”. All other equipment must be provided by TxDOT. TxDOT will be responsible for maintaining state provided equipment. The Contractor will provide TxDOT with the Calibration paperwork on the shared equipment that they provide.

Provide an all-weather parking area for the sole use of at least 2 State-owned vehicles. Situate the parking area near the Laboratory area at an acceptable location. Maintain the parking area until the project is completed and restore the area to a condition acceptable to the Engineer upon project completion.

Laboratory area shall have a roof, floor, doors, and screened windows. Ensure the floor is strong enough to support testing equipment and has an impervious floor covering. Ensure that the Laboratory area is tied down, weatherproof, piped for water and fuel, and electrically wired by personnel meeting the requirements of Article 7.18., “Electrical Requirements.”

General Notes Sheet J

Provide secured and controlled access to the Laboratory area through security measures such as bars, locks, alarms, or security fencing for the Laboratory area.

Furnish and install adequate equipment, outlets, lighting, air-conditioning, heating, and ventilation for the Laboratory area. Heating and Air Conditioning shall maintain the Laboratory working area temperature within a range of (68oF through 72oF).

Provide partitioned restroom furnished with restroom supplies, a lavatory, and a flush toilet connected to a sewer or septic tank within the Laboratory area.

Laboratory area will have the use of an internet service provider (ISP) that can provide more than one computer access to ISP account at one time. ISP provider must be able to supply a minimum 100 gigabyte download speed per account.

Required appurtenances within the Laboratory Area:

1. A 10lb ABC fire extinguisher with up-to-date inspection tag and a working smoke detector.

2. Additional workbench and tables at least 3 ft. wide, 6 ft. long, and 3 ft. high.

3. Minimum two chairs and one desk, filing cabinets, solar screen blinds or shades.

4. An operational telephone system.

5. Water fountain or bottled water fountain able to provide cold water and have cup dispenser and cups.

6. Water (for testing purposes) from an approved source

7. Adequately power ventilate the room for the ignition oven. Provide a NEMA 6-50R (208/240 volt, 50 amp) outlet within 2.25 ft. of the ignition oven location and an independent exhaust outlet to the outside located a maximum of 8 ft. from the oven. Provide a level, sturdy and

8. fireproof surface for the ignition oven with a minimum of 6 in. clearance between the furnace and other vertical surfaces. Vent the ignition oven to the outside.

9. A minimum of 20 ft. of total work counter length at least 3 ft. wide and 3 ft. above the floor and strong enough to support required testing equipment

10. A laboratory sink measuring 24 × 30 in. and 12 in. deep

11. Door openings for the Laboratory area must be 48-inches minimum width. If steps are required to gain access to the facility’s then a landing dock will be provided with minimum dimensions of 60 inches wide by 60 inches deep. The strong floor and landing of the facility shall support the weight of all equipment and personnel providing a stable, essentially zero deflection during testing operations acceptable to the Engineer.

12. Provide multifunction color printer/fax/scanner/copier capable of reproducing 11 X 17

General Notes Sheet K

For the Laboratory area the work performed, materials furnished, utilities, and utility services (including phone and internet), appurtenances including office equipment testing equipment, labor, tools, and incidentals will not be paid measured or paid for directly but will be subsidiary to pertinent items.

Use aggregate that meets the SAC requirement of class A for all surface mixes.

Remove all vegetation from pavement edges, intersections, curbs and gutters and driveways before planning or ACP operations. This work will not be paid for directly but will be subsidiary to the various bid items.

Operate the spreading and finishing machine at a uniform forward speed consistent with the plant production rate, hauling capability, and roller train capacity to result in a continuous operation. The speed will be slow enough, so that stopping between trucks is not ordinarily required. If the Engineer determines sporadic delivery of material is adversely affecting the HMA placement, the Engineer may require paving operations to cease until acceptable methods are employed to minimize starting and stopping of the paver.

A material transfer device (MTD) will be required for all surface courses of HMA on this project. An MTD is defined as a self-propelled, wheel-mounted vehicle capable of receiving HMA from the haul trucks separate from the paver. The MTD will have a minimum storage capacity of approximately 25 tons and will be equipped with a pivoting discharge conveyor and a means of completely remixing the HMA before placement. The Engineer may approve an alternative device on a trial basis for the surface course. This device will be capable of receiving HMA separate from the paver and must have remixing capabilities. For all other courses of HMA, other than the surface, an alternative device may be used as long as it is capable of receiving HMA separate from the paver.

Station limits may be adjusted as directed to meet varying field conditions

Item 351 Flexible Pavement Structure Repair

The repair areas will require full depth saw-cut when milling is not used. Consider this work to be subsidiary to the various bid items of the contract.

Provide Flexible Pavement Repair with Item 344,SP- B (PG 64-22) Exempt unless approved otherwise. Place Hot Mix with a constant longitudinal surface grade and tie in flush with the existing surface at each end and both sides of the repair area.

Unless otherwise directed, place new SP-B with maximum 4” lifts. The minimum patch sizes will be 6’ in width and 10’ in length.

Match the existing cross slope in the repair areas, unless directed otherwise.

All repair locations must be filled the same day they are excavated. No open cut areas will be allowed overnight.

General Notes Sheet L

All excavated materials will be removed from the project daily.

Ordinary compaction will be used on this project.

Station limits may be adjusted as directed to meet varying field conditions

For repair locations located in areas to be planed, perform flexible pavement repairs after planing operations.

Seal the perimeter of the repair areas with hot poured rubber in accordance with Item 712. Consider this work to be subsidiary to the various bid items of the contract.

Item 354 Planing and Texturing Pavement

Where the underlying flexible base is exposed during the planing operation, prime this area with an asphalt at a rate as directed and patch with an approved HMA material, at the end of the day’s operation in which it occurs.

These items of work will not be paid for directly but will be subsidiary to Item 354.

Complete planing operations in adjacent lanes and shoulders to the same point at the end of each day.

Item 400 Excavation and Backfill for Structures

Cut and restore pavement to the depth and dimensions shown on the plans with: SP-B, SP-C & Cement Stabilized Backfill.

Item 403 Temporary Special Shoring Submit design calculations and detail sheets bearing the seal of a licensed professional Engineer for all temporary shoring no later than two (2) weeks before beginning work. Do not begin work until the design calculations and detail sheets have been approved. The contractor will be responsible for the complete design, fabrication and removal of the temporary shoring.

Item 466 Headwalls and Wingwalls

Do not use precast headwalls/wingwalls.

Item 467 Safety End Treatment

At driveway locations where the contract requires modifying pipe installations, provide a 6:1 maximum embankment slope from the edge of the driveway to the top of the SET.

Grading required for shaping driveways and side road turnouts, including embankment for pipe culverts at these access locations, will be considered subsidiary to various bid items.

General Notes Sheet M

Item 502 Barricades, Signs, and Traffic Handling

Construct all work zone signs, sign supports, and barricades from material other than wood unless approved otherwise. Metal posts, if used, are to be galvanized. Aluminum signs, if used, will meet the following minimum thickness requirements:

Square Feet…