0922-33-234.pdf

PDF 6 MB Posted

Attached to
Bridge Replacement
Solicitation number
0922-33-234
Issued by
Upton County, Little Cypress CDP, Texas

About this file

Summary

This is a Proposal to the Texas Transportation Commission for a bridge replacement project in Webb County, Texas, submitted as a state-let construction contract funded with federal aid. The project (Control 0922-33-234, Project BR 2025(627)) involves replacing a bridge on Mangana-Hein Road and includes 71 bid items ranging from site preparation and removal work through concrete structures, asphalt paving, drainage, signage, and traffic control measures. The work is estimated to require 244 working days for completion. Bidders must submit a proposal guaranty of $50,000.00 in the form of a cashier's check, teller's check, or bid bond. The document requires acknowledgment of any addenda issued prior to bid submission, with failure to acknowledge resulting in the bid not being read. Contractors must submit audited financial statements and experience questionnaires at least ten days prior to the letting date and provide unit prices for each bid item in accordance with the standard specifications.

The contract incorporates prevailing wage requirements under the Davis-Bacon Act and requires compliance with multiple federal and state regulations including E-Verify employment verification, nondiscrimination provisions, and certification regarding debarment, lobbying activities, and various boycott and conflict-of-interest requirements. A disadvantaged business enterprise (DBE) goal of 0% is established for this project. The contract is governed by the Texas Department of Transportation Standard Specifications (adopted September 1, 2024), multiple special provisions, and required contract provisions for federal-aid construction contracts (FHWA Form 1273). Federal domestic materials program requirements apply, and contractors must obtain necessary environmental permits and coordinate with U.S. Army Corps of Engineers and Texas Commission on Environmental Quality regarding jurisdictional waters and storm water regulations. The project is subject to liquidated damages as outlined in Special Provision 000-125.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Control 0922-33-234, ETC Project BR 2025(627), ETC Highway CR, ETC County WEBB, ETC

ADDENDUM ACKNOWLEDGMENT

Each bidder is required to acknowledge receipt of an addendum issued for a specific project. This page is provided for the purpose of acknowledging an addendum.

FAILURE TO ACKNOWLEDGE RECEIPT OF AN ADDENDUM WILL RESULT IN THE BID NOT

BEING READ.

In order to properly acknowledge an addendum, place a mark in the box next to the respective addendum.

ADDENDUM NO. 1

ADDENDUM NO. 2

ADDENDUM NO. 3

ADDENDUM NO. 4

ADDENDUM NO. 5

In addition, the bidder by affixing their signature to the signature page of the proposal is acknowledging that they have taken the addendum(s) into consideration when preparing their bid and that the information contained in the addendum will be included in the contract, if awarded by the Commission or other designees.

1-1

This page intentionally left blank.

Highway CR, ETC County WEBB, ETC

PROPOSAL TO THE TEXAS

TRANSPORTATION COMMISSION

2024 SPECIFICATIONS

Work Consisting of Bridge Replacement

WEBB COUNTY, TEXAS , ETC

The quantities in the proposal are approximate. The quantities of work and materials may be increased or decreased as considered necessary to complete the work as planned and contemplated.

This project is to be completed in 244 working days and will be accepted when fully completed and finished to the satisfaction of the Executive Director or designee.

Provide a proposal guaranty in the form of a Cashier’s Check, Teller’s Check (including an Official Check) or Bank Money Order on a State or National Bank or Savings and Loan Association, or State or Federally chartered Credit Union made payable to the Texas Transportation Commission in the following amount:

FIFTY THOUSAND AND 00/100 (Dollars) ( $50,000.00)

A bid bond may be used as the required proposal guaranty. The bond form may be detached from the proposal for completion. The proposal may not be disassembled to remove the bond form. The bond must be in accordance with Item 2 of the specifications.

Any addenda issued amending this proposal and/or the plans that have been acknowledged by the bidder, become part of this proposal.

By signing the proposal the bidder certifies:

1. the only persons or parties interested in this proposal are those named and the bidder has not directly or indirectly participated in collusion, entered into an agreement or otherwise taken any action in restraint of free competitive bidding in connection with the above captioned project.

2. in the event of the award of a contract, the organization represented will secure bonds for the full amount of the contract.

3. the signatory represents and warrants that they are an authorized signatory for the organization for which the bid is submitted and they have full and complete authority to submit this bid on behalf of their firm.

4. that the certifications and representations contained in the proposal are true and accurate and the bidder intends the proposal to be taken as a genuine government record.

• Signed: **

(1) (2) (3) Print Name:

(1) (2) (3) Title:

(1) (2) (3) Company:

(1) (2) (3)

• Signatures to comply with Item 2 of the specifications.

**Note: Complete (1) for single venture, through (2) for joint venture and through (3) for triple venture.

* When the working days field contains an asterisk (*) refer to the Special Provisions and General Notes.

NOTICE TO CONTRACTORS

ANY CONTRACTORS INTENDING TO BID ON ANY WORK TO BE AWARDED

BY THIS DEPARTMENT MUST SUBMIT A SATISFACTORY “AUDITED FINANCIAL

STATEMENT” AND “EXPERIENCE QUESTIONNAIRE” AT LEAST TEN DAYS

PRIOR TO THE LETTING DATE.

UNIT PRICES MUST BE SUBMITTED IN ACCORDANCE WITH ITEM 2 OF

THE STANDARD SPECIFICATIONS OR SPECIAL PROVISION TO ITEM 2 FOR

EACH ITEM LISTED IN THIS PROPOSAL.

TEXAS DEPARTMENT OF TRANSPORTATION

BID BOND

KNOW ALL PERSONS BY THESE PRESENTS,

That we, (Contractor Name)

Hereinafter called the Principal, and (Surety Name) a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety, are held and firmly bound unto the Texas Department of Transportation, hereinafter called the Obligee, in the sum of not less than two percent (2%) of the department’s engineer’s estimate, rounded to the nearest one thousand dollars, not to exceed one hundred thousand dollars ($100,000) as a proposal guaranty (amount displayed on the cover of the proposal), the payment of which sum will and truly be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the principal has submitted a bid for the following project identified as:

Control 0922-33-234, ETC

Project BR 2025(627), ETC

Highway CR, ETC

County WEBB, ETC

NOW, THEREFORE, if the Obligee shall award the Contract to the Principal and the Principal shall enter into the Contract in writing with the Obligee in accordance with the terms of such bid, then this bond shall be null and void. If in the event of failure of the Principal to execute such Contract in accordance with the terms of such bid, this bond shall become the property of the Obligee, without recourse of the Principal and/or Surety, not as a penalty but as liquidated damages.

Signed this Day of 20

By:

(Contractor/Principal Name)

(Signature and Title of Authorized Signatory for Contractor/Principal)

*By:

(Surety Name)

(Signature of Attorney-in-Fact) Impressed

*Attach Power of attorney (Surety) for Attorney-in-Fact Surety Seal Only

This form may be removed from the proposal

BIDDER’S CHECK RETURN

IMPORTANT

The space provided for the return address must be completed to facilitate the return of your bidder’s check. Care must be taken to provide a legible, accurate, and complete return address, including zip code. A copy of this sheet should be used for each different return address.

NOTE

Successful bidders will receive their guaranty checks with the executed contract.

RETURN BIDDERS CHECK TO (PLEASE PRINT):

Control 0922-33-234, ETC Project BR 2025(627), ETC Highway CR, ETC County WEBB, ETC

IMPORTANT

PLEASE RETURN THIS SHEET IN ITS ENTIRETY

Please acknowledge receipt of this check(s) at your earliest convenience by signing below in longhand, in ink, and returning this acknowledgement in the enclosed self-addressed envelope.

Check Received By: Date:

Title:

For (Contractor's Name):

Project: County:

NOTICE TO THE BIDDER

In the space provided below, please enter your total bid amount for this project. Only this figure will be read publicly by the Department at the public bid opening.

It is understood and agreed by the bidder in signing this proposal that the total bid amount entered below is not binding on either the bidder or the Department. It is further agreed that the official total bid amount for this proposal will be determined by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts.

Total Bid Amount

Control Project Highway County

ALT ITEM DESC SP Bid Item Description Unit Quantity Bid Price Amount Seq

Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________

Additional Signature for Joint Venture:

Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________

Total Bid Amount _______$2,664.00________

EXAMPLE OF BID PRICES SUBMITTED BY COMPUTER PRINTOUT

0001-03-030

STP 2000(938)HES

SH 20

EL PASO

104 509 REMOV CONC (SDWLK) SY 266.400 $10.000 $2,664.00 1

EXAMPLE EXAMPLE EXAMPLE EXAMPLE

EXAMPLES

BID PRICES SUBMITTED BY HAND WRITTEN FORMAT

Unit price for each plant in place

249 014 FLEX BASE(DEL)(DENSCOT)(TY A GR4 CL2) TON 56,787.00 14

ALT

ITEM-CODE

ITEM

NO

DESC

NO

S.P.

NO.

UNIT BID PRICE ONLY

WRITTEN IN WORDS UNIT

APPROX

QUANTITIES

DEPT

USE

ONLY

190 026 RED OAK 1 1/2” - 1 3/4” GAL BB EA 9.000 1

DLRS

CENTS

DLRS

CENTS

Unit price for each ton of Flexible Base

430 001 001 CL A CONC FOR EXT STR (CULV) CY 45.000 27

Unit price for each cubic yard of Concrete

DLRS

CENTS

610 007 001 RDWY ILL ASSEM(TY ST 50T-8-8)(.4 KW)S EA 13.000 7

Unit price of each Roadway Illumination Assembly

DLRS

CENTS

EXAMPLE EXAMPLE EXAMPLE EXAMPLE

BR 2025(627), ETC

Proposal Sheet

WEBB, ETC FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

100 7002

PREPARING ROW

STA 11.000 1 DOLLARS

and CENTS

104 7006

REMOV CONC (RIPRAP)

SY 134.000 2 DOLLARS

and CENTS

104 7017

REMOV CONC (CURB & GUTTER)

LF 349.000 3 DOLLARS

and CENTS

105 7014

RMV (14"-18") TRT/UNTRT BASE & ASPH PAV

SY 1,954.000 4 DOLLARS

and CENTS

105 7058

RMV (7"-13") TRT/UNTRT BASE & ASPH PAV

SY 572.000 5 DOLLARS

and CENTS

110 7001

EXCAV (ROADWAY)

CY 350.000 6 DOLLARS

and CENTS

110 7002

EXCAV (CHANNEL)

CY 1,540.000 7 DOLLARS

and CENTS

132 7006

EMBANK (FNL)(DC)(TY C)

CY 719.000 8 DOLLARS

and CENTS

216 7001

PROOF ROLLING

HR 24.000 9 DOLLARS

and CENTS

247 7044

FL BS (CMP IN PLC)(TY A GR 1-2) (6")

SY 1,051.000 10 DOLLARS

and CENTS

247 7067

FL BS (CMP IN PLC)(TY A GR 1-2) (8")

SY 1,724.000 11 DOLLARS

and CENTS

310 7004

PRIME COAT (MC-30)

GAL 529.000 12 DOLLARS

and CENTS

330 7005

LRA PAV TY-I GR-CC

TON 97.000 13 DOLLARS

and CENTS

1-6

WEBB, ETC FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

341 7002

D-GR HMA TY-B SAC-B PG64-22

TON 274.000 14 DOLLARS

and CENTS

341 7031

D-GR HMA TY-C SAC-A PG76-22

TON 169.000 15 DOLLARS

and CENTS

400 7010

CEM STABIL BKFL

CY 282.000 16 DOLLARS

and CENTS

401 7001

FLOWABLE BACKFILL

CY 185.000 17 DOLLARS

and CENTS

403 7001

TEMPORARY SPL SHORING

SF 2,775.000 18 DOLLARS

and CENTS

416 7002

DRILL SHAFT (18 IN)

LF 136.000 19 DOLLARS

and CENTS

416 7006

DRILL SHAFT (36 IN)

LF 537.000 20 DOLLARS

and CENTS

420 7012

CL C CONC (ABUT)

CY 83.400 21 DOLLARS

and CENTS

420 7022

CL C CONC (CAP)

CY 43.200 22 DOLLARS

and CENTS

420 7038

CL C CONC (COLUMN)

CY 15.800 23 DOLLARS

and CENTS

420 7069

CL E CONC (SEAL SLAB)

CY 79.000 24 DOLLARS

and CENTS

420 7150

CL A CONC (CHANNEL LINING)

CY 12.000 25 DOLLARS

and CENTS

420 7152

CL C CONC (CULV)

CY 148.000 26 DOLLARS

2-6

WEBB, ETC FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

422 7001

REINF CONC SLAB

SF 8,100.000 27 DOLLARS

and CENTS

422 7013

APPROACH SLAB

CY 108.000 28 DOLLARS

and CENTS

425 7001

PRESTR CONC GIRDER (TX28)

LF 1,337.260 29 DOLLARS

and CENTS

432 7001

RIPRAP (CONC)(4 IN)

CY 12.000 30 DOLLARS

and CENTS

432 7013

RIPRAP (MOW STRIP)(4 IN)

CY 44.000 31 DOLLARS

and CENTS

432 7041

RIPRAP (STONE PROTECTION)(12 IN)

CY 1,052.000 32 DOLLARS

and CENTS

450 7008

RAIL (TY T223)

LF 702.000 33 DOLLARS

and CENTS

454 7004

SEALED EXPANSION JOINT (4 IN) (SEJ - M)

LF 129.000 34 DOLLARS

and CENTS

466 7149

WINGWALL (FW - 0) (HW=7 FT)

EA 4.000 35 DOLLARS

and CENTS

496 7005

REMOV STR (WINGWALL)

EA 4.000 36 DOLLARS

and CENTS

496 7008

REMOV STR (BOX CULVERT)

LF 86.000 37 DOLLARS

and CENTS

496 7009

REMOV STR (BRIDGE 0 - 99 FT LENGTH)

EA 1.000 38 DOLLARS

and CENTS

496 7010

REMOV STR (BRIDGE 100 - 499 FT LENGTH)

EA 1.000 39 DOLLARS

3-6

WEBB, ETC FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

500 7001

MOBILIZATION

LS 1.000 40 DOLLARS

and CENTS

502 7001

BARRICADES, SIGNS AND TRAFFIC

HANDLING

MO 13.000 41 DOLLARS

and CENTS

506 7002

ROCK FILTER DAMS (INSTALL) (TY 2)

LF 210.000 42 DOLLARS

and CENTS

506 7011

ROCK FILTER DAMS (REMOVE)

LF 210.000 43 DOLLARS

and CENTS

506 7039

TEMP SEDMT CONT FENCE (INSTALL)

LF 1,350.000 44 DOLLARS

and CENTS

506 7041

TEMP SEDMT CONT FENCE (REMOVE)

LF 1,350.000 45 DOLLARS

and CENTS

529 7008

CONC CURB & GUTTER (TY I)

LF 31.000 46 DOLLARS

and CENTS

529 7009

CONC CURB & GUTTER (TY II)

LF 294.000 47 DOLLARS

and CENTS

530 7010

DRIVEWAYS (ACP)

SY 92.000 48 DOLLARS

and CENTS

540 7001

MTL W-BEAM GD FEN (TIM POST)

LF 600.000 49 DOLLARS

and CENTS

540 7006

MTL BEAM GD FEN TRANS (TL2)

EA 8.000 50 DOLLARS

and CENTS

540 7015

DOWNSTREAM ANCHOR TERMINAL

SECTION

EA 4.000 51 DOLLARS

and CENTS

542 7001

REMOVE METAL BEAM GUARD FENCE

LF 728.000 52 DOLLARS

4-6

WEBB, ETC FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

544 7001

GUARDRAIL END TREATMENT (INSTALL)

EA 4.000 53 DOLLARS

and CENTS

644 7001

IN SM RD SN SUP&AM TY10BWG(1)SA(P)

EA 2.000 54 DOLLARS

and CENTS

644 7073

REMOVE SM RD SN SUP&AM

EA 7.000 55 DOLLARS

and CENTS

658 7003

INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND

EA 12.000 56 DOLLARS

and CENTS

658 7004

INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)

EA 12.000 57 DOLLARS

and CENTS

658 7013

INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)

EA 6.000 58 DOLLARS

and CENTS

658 7032

INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)

EA 6.000 59 DOLLARS

and CENTS

658 7056

INSTL OM ASSM (OM-2Y)(WC)GND

EA 8.000 60 DOLLARS

and CENTS

658 7268

INSTL OM ASSM (OM-3L)(WFLX)GNDLL

EA 2.000 61 DOLLARS

and CENTS

658 7276

INSTL OM ASSM (OM-3R)(WFLX)GNDLL

EA 2.000 62 DOLLARS

and CENTS

662 7017

WK ZN PAV MRK NON-REMOV (W)24"(SLD)

LF 56.000 63 DOLLARS

and CENTS

666 7293

TY I HIGH PERF PM (W)6"(SLD)(100MIL)

LF 760.000 64 DOLLARS

and CENTS

666 7305

TY I HIGH PERF PM (Y)6"(SLD)(100MIL)

LF 960.000 65 DOLLARS

5-6

WEBB, ETC FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

666 7533

RE PM TY II (W)6"(SLD)(020 MIL)

LF 1,609.000 66 DOLLARS

and CENTS

666 7537

RE PM TY II (Y)6"(SLD)(020 MIL)

LF 466.000 67 DOLLARS

and CENTS

672 7002

REFL PAV MRKR TY I-C

EA 28.000 68 DOLLARS

and CENTS

678 7002

PAV SURF PREP FOR MRK (6")

LF 20.000 69 DOLLARS

and CENTS

681 7001

TEMP TRAF SIGNALS

EA 4.000 70 DOLLARS

and CENTS

3007 7001

BONDING COURSE

GAL 315.000 71 DOLLARS

6-6

CERTIFICATION OF INTEREST IN OTHER BID

PROPOSALS FOR THIS WORK

By signing this proposal, the bidding firm and the signer certify that the following information, as indicated by checking “Yes” or “No” below, is true, accurate, and complete.

A. Quotation(s) have been issued in this firm's name to other firm(s) interested in this work for consideration for performing a portion of this work.

________ YES

________ NO

B. If this proposal is the low bid, the bidder agrees to provide the following information prior to award of the contract.

1. Identify firms which bid as a prime contractor and from which the bidder received quotations for work on this project.

2. Identify all the firms which bid as a prime contractor to which the bidder gave quotations for work on this project.

DISCLOSURE OF LOBBYING ACTIVITIES

Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 (See reverse for public burden disclosure.)

1. Type of Federal Action:

a. contract

b. grant

c. cooperative agreement

d. loan

e. loan guarantee

f. loan insurance

2. Status of Federal Action:

a. bid/offer/application

b. initial award

c. post-award

3. Report Type:

a. initial filing

b. grant

For material change only:

year _______ quarter _____ date of last report ___________

4. Name and Address of Reporting Entity:

Prime Subawardee Tier __________, if known:

Congressional District, if known:

5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:

Congressional District, if known:

6. Federal Department/Agency: 7. Federal Program Name/Description:

CFDA Number, if applicable: _____________________________

8. Federal Action Number, if known: 9. Award Amount, if known:

10. a. Name and Address of Lobbying Entity (if individual, last name, first name, MI):

b. Individuals Performing Services (including address if different from No. 10a) (last name, first name, MI):

(attach Continuation Sheet(s) SF-LLL-A, if necessary)

11. Amount of Payment (check all that apply):

$ ___________________________ actual planned

13. Type of Payment (check all that apply):

a. retainer

b. one-time fee

c. commission

d. contingent fee

e. deferred

f. other; specify: _______________________________

12. Form of Payment (check all that apply)

a. cash

b. in-kind; specify: nature ____________________ value ____________________

14. Brief Description of Services Performed or to be Performed and Date(s) of Service, including officer(s), employee(s), or Member(s) contacted, for Payment Indicated in Item 11:

(attach Continuation Sheet(s) SF-LLL-A, if necessary)

15. Continuation Sheet(s) SF-LLL-A attached: Yes No

16. Information requested through this form is authorized by title 31 U.S.C. section 1352. This disclosure of lobbying activities is a material representation of fact upon which reliance was placed by the tier above when this transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to the Congress semi-annually and will be available for public inspection. Any person who fails to file the required dis-closure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

Signature: __________________________________________

Print Name: _________________________________________

Title: ______________________________________________

Telephone No: _____________________ Date: ___________

FEDERAL USE ONLY Authorized for Local Reproduction Standard Form - LLL

INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES

This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with a covered Federal action. Use the SF-LLL-A Continuation Sheet for additional information if the space on the form is inadequate. Com-plete all items that apply for both the initial filing and material change report. Refer to the implementing guidance pub-lished by the Office of Management and Budget for additional information.

1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action.

2. Identify the status of the covered Federal action.

3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity or this covered Federal action.

4. Enter the full name, address, city, state and zip code of the reporting entity. Include Congressional District, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the 1st tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.

5. If the organization filing the report in item 4 checks "Subawardee", then enter the full name, address, city, state and zip code of the prime Federal recipient. Include Congressional District, if known.

6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organizational level below agency name, if known. For example, Department of Transportation, United States Coast Guard.

7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments.

8. Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal (RFP) number; Invitation for Bid (IFB) number; grant announcement number, the contract, grant, or loan award number; the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."

9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitment for the prime entity identified in item 4 or 5.

10. (a) Enter the full name, address, city, state and zip code of the lobbying entity engaged by the reporting entity identified in item 4 to influence the covered Federal action.

(b) Enter the full names of the individual(s) performing services, and include full address if different from 10(a).

Enter Last Name, First Name, and Middle Initial (MI).

11. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (item 4) to the lobbying entity (item 10). Indicate whether the payment has been made (actual) or will be made (planned).

Check all boxes that apply. If this is a material change report, enter the cumulative amount of payment made or planned to be made.

12. Check the appropriate box(es). Check all boxes that apply. If payment is made through an in-kind contribution, specify the nature and value of the in-kind payment.

13. Check the appropriate box(es). Check all boxes that apply. If other, specify nature.

14. Provide a specific and detailed description of the services that the lobbyist has performed, or will be expected to perform, and the date(s) of any services rendered. Include all preparatory and related activity, not just time spent in actual contact with Federal officials. Identify the Federal official(s) or employee(s) contacted or the officer(s), employee(s), or Member(s) of Congress that were contacted.

15. Check whether or not a SF-LLL-A Continuation Sheet(s) is attached.

16. The certifying official shall sign and date the form, print his/her name, title, and telephone number.

Public reporting burdon for this collection of infromation is estimated to average 30 minutes per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments reguarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burdon, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503.

DISCLOSURE OF LOBBYING ACTIVITIES Approved by OMB 0348-0046

CONTINUATION SHEET

Authorized for Local Reproduction

Standard Form - LLL-A

Reporting Entity: ____________________________________ Page ______ of ______

CONTRACTOR’S ASSURANCE

(Subcontracts-Federal Aid Projects)

By signing this proposal, the contractor is giving assurances that each subcontract and further all lower tier subcontracts will incorporate the Standard Specification to Article 9.9, Payment

Provisions for Subcontractors and will also physically attach the following:

Form FHWA 1273

Wage Rates

Special Provision 000-001

Special Provision 000-002

Special Provision 000-007

Required Contract Provisions Federal-Aid Construction

Contracts

All Construction Projects

Nondiscrimination, Sections 3.1-3.6 (include materials and leases of equipment)

Certificate of Nondiscrimination in Employment

Cargo Preference Act Requirements in Federal-Aid

11-25

ENGINEER SEAL

Project BR 2025(627), ETC

Highway CR, ETC County WEBB, ETC

The enclosed Texas Department of Transportation Specifications, Special Specifications, Special Provisions, General Notes and Specification Data in this document have been selected by me, or under my responsible supervision as being applicable to this project.

Alteration of a sealed document without proper notification to the responsible engineer is an offense under the Texas Engineering Practice Act.

The seal appearing on this document was authorized by:

Aaron Arroyo P.E.

September 11, 2026

Seal Applies to CSJ(s):

All CSJs within the Contract

104889

Aaron Arroyo

Project Number: BR 2025(627) Sheet 6

County: Webb Control: 0922-33-234, etc.

Highway: Mangana-Hein Rd.

General Notes Sheet A

GENERAL NOTES:

The following standard detail has been modified:

FW-0 (MOD)

Contractor questions on this project are to be addressed to the following individual(s):

Aaron Arroyo – Aaron.Arroyo@txdot.gov

Angel Martinez – Angel.Martinez@txdot.gov

Questions may be submitted via the Letting Pre-Bid Q&A web page. This webpage can be accessed from the Notice to Contractors dashboard located at the following Address:

https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors

All contractor questions will be reviewed by the Engineer. All questions and any corresponding responses that are generated will be posted through the same Letting Pre-Bid Q&A web page.

The Letting Pre-Bid Q&A webpage for each project can be accessed by using the dashboard to navigate to the project you are interested in by scrolling or filtering the dashboard using the controls on the left. Hover over the blue hyperlink for the project you want to view the Q&A for and click on the link in the window that pops up.

Item 5 - Control of the Work The Contractor shall maintain and preserve the integrity of all “existing survey markers” by avoiding the disturbance of such markers, which include all control points (horizontal and/or vertical), stakes, marks, and right-of-way markers. The Department will repair all Contractor disturbed control points, stakes, marks, and right-of-way markers. The cost for any and all repairs to the “existing survey markers” will be deducted from money due or to become due to the Contractor.

Prior to construction must call 811 to verify any utilities located within project limits.

Contractor will also coordinate with utility owners listed below for any adjustments needed to sanitary sewer manholes, water valves, gas valve, telecommunication, television manhole located within project limits. The utility company is responsible mailto:Angel.Martinez@txdot.gov https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors

Highway: Mangana-Hein Rd.

General Notes Sheet B for any adjustment when necessary. The work should be performed in a manner as to not delay construction contractor work activity.

A precast concrete alternate may be submitted in accordance with the latest version of the Bridge Design Manual – LRFD. The Contractor must submit the alternate design for review and approval. Acceptance or denial of an alternate is at the sole discretion of the Engineer. All alternate designs must be signed and sealed by a Professional Engineer. Impacts to the project schedule and any additional costs resulting from the use of alternates are the sole responsibility of the Contractor.

Item 6 - Control of Materials

The Federal Domestic Materials Program (FDMP) is located at the below link:

https://www.txdot.gov/business/resources/materials/buy-america.html for clarification on material categorization.

Item 7 - Legal Relations and Responsibilities

No significant traffic generator events identified.

Jurisdictional Waters of the United States and Project Specific Locations (PSL) Coordination - This project requires permit(s) with environmental resource agencies. There is a high probability that environmentally sensitive areas will be encountered on contractor designated project specific locations (PSLS) for the project (including but not limited to haul roads, equipment staging areas, parking areas, etc.).

Requirements for Work within Jurisdictional Waters of the United States:

The department has been authorized to perform work within designated areas of the project under U.S. Army Corps of Engineers (USACE) nationwide permit (NWP) #14 and/or #3a and/or #3b.

The contractor will not initiate activities in a project specific location (PSL) associated with a U.S. Army Corps of Engineers (USACE) permit area (i.e. an area where the USACE has jurisdiction) that has not been previously evaluated by the USACE as part of the permitting for this project. Such activities include, but are not limited to, haul roads, equipment staging areas, borrow and disposal sites.

https://www.txdot.gov/business/resources/materials/buy-america.html

Highway: Mangana-Hein Rd.

General Notes Sheet C

Associated defined here includes materials delivered to or from the PSL. The permit area includes all waters of the U.S. and their associated wetlands affected by activities associated with this project. Special restrictions may be required for such work in these USACE jurisdictional areas. The contractor will be responsible for any and all consultations with the USACE regarding activities, including PSLs, which have not been previously evaluated by the USACE. The Contractor will provide the department with a copy of all consultation(s) or approval(s) from the USACE prior to initiating activities.

The contractor may proceed with activities in PSLs that do not affect a USACE permit area if a self-determination has been made that the PSL is non-jurisdictional or proper USACE clearances have been obtained in jurisdictional areas or have been previously evaluated by the USACE as part of the permit review of this project. The contractor is solely responsible for documenting any determination(s) that their activities do not affect a USACE permit area. The contractor will maintain copies of their determination(s) for review by the department and/or any regulatory agency.

The disturbed area for all project locations in the Contract, and the Contractor project specific locations (PSLs) within 1 mile of the project limits for the Contract, will further establish the authorization requirements for storm water discharges.

The Department will obtain an authorization to discharge storm water from the Texas Commission on Environmental Quality (TCEQ) for the construction activities shown on the plans. The Contractor is to obtain required authorization from the TCEQ for Contractor PSLs for construction support activities on or off the ROW.

When the total area disturbed in the Contract and PSLs within 1 mile of the project limits exceeds 5 acres, the Contractor shall provide a copy of the Contractor Notice of Intent (NOI) for the PSLs to the Engineer and to the local government operating a municipal separate storm sewer system (MS4) if applicable. If the total area of project disturbed areas and PSLs total between 1-acre but less than 5-acres, the Contractor shall post the appropriate Contractor Construction Site Notice for all Contractor PSLs to be in compliance with TCEQ storm water regulations.

In order to expedite the approval process for PSLs or to eliminate or minimize potential impacts to project progress, initiate coordination efforts with the U.S.A.C.E. within 30 days from the date of “authorization to begin work” for all PSLs that are in areas where the USACE has jurisdiction (i.e. USACE permit areas). If this is not done, the contractor waives the right to request any contract time considerations if project progress is impacted and PSL’S approval is still pending.

Requests submitted to the area engineer will be evaluated on this basis and will require documentation showing substantial early coordination efforts to expedite

General Notes Sheet D the approval process as herein stated. The request will include a detailed chronological summary status with dates of coordination activities with the resource agencies, including those occurring after the initial coordination, to be reviewed and confirmed by the district’s environmental section.

For PSLs that fall within USACE permit areas, the Contractor must document and coordinate with the USACE, if required, before any excavation hauled from or embankment hauled into a USACE permit area by either (1) or (2) below.

1. Restricted Use of Materials for Previously Evaluated Permit Areas. The

Contractor will document both the project specific location (PSL) and their authorization, and the Contractor will maintain copies for review by the Department and/or any regulatory agency. When an area within the project limits has been evaluated by the USACE as part of the permit process for this project, then:

a. Suitable excavation of required material in the areas shown on the plans and cross sections as specified in Item 110 is used for permanent or

b. Temporary fill (Item 132, Embankment) within a USACE permit area may be restricted.

c. Suitable embankment (Item 132) from within the USACE permit area is used as fill within a USACE evaluated area may be restricted; and,

d. Unsuitable excavation or excess excavation [“Waste”] (Item 110) that is disposed of at an approved location within a USACE evaluated area may be restricted.

2. Contractor Materials from Areas Other than Previously Evaluated Areas. The

Contractor will provide the Department with a copy of all USACE coordination or approvals before initiating any activities for an area within the project limits that has not been evaluated by the USACE or for any off-right-of-way locations used for the following, but not limited to, haul roads, equipment staging areas, borrow and disposal sites, including:

a. Item 132, Embankment, used for temporary or permanent fill within a

USACE permit area; and,

b. Unsuitable excavation or excess excavation [“Waste”] (Item 110, Excavation) that is disposed of outside a USACE evaluated area.

Storm Water Regulations Requirements:

The Contractor shall be responsible for (off ROW) PSLs applicable to the TCEQ Construction General Permit (CGP) requirements and will notify the Engineer of the disturbed acreage within one (1) mile of the project limits. The Contractor shall obtain any required authorization form the TCEQ for any Contractor PSLs for construction support activities on or off ROW.

General Notes Sheet E

The total disturbed areas within the ROW are anticipated at less than one (1) acre and/or this project is classified as “surface work” consisting of an asphalt overlay of an existing roadway without shoulder-up disturbances. Due to this type of construction, the project qualifies for exclusion under the Construction General Permit (CGP) issued by the Texas Commission on Environmental Quality (TCEQ) on March 5, 2023. However, should the sum of the Engineer’s anticipated disturbances and all of the Contractor’s (On ROW and off ROW) PSLs equal or exceed the one (1) acre threshold, both TxDOT and the Contractor shall have project responsibilities under the CGP that reverts to non-exclusion status. To ensure project compliance with all applicable water quality regulations, the Contractor shall obtain Engineer approval for all non-depicted areas of disturbance that increases the Engineer’s initial soil and vegetation disturbed area estimates before associated work operations start.

Item 8 - Prosecution and Progress

Before starting work, provide a sequence of work and estimated progress schedule meeting the requirements of Section 8.5.2, “Progress Schedule.”

No closures will be allowed on the weekends, which include the following holidays:

January 1, the last Monday in May, July 4, the first Monday in September, the fourth Thursday in November, December 25 and Easter weekend.

Item 9 - Measurement and Payment Submit Material on hand (MOH) payment requests at least 5 working days prior to the end of the month for payment on that month’s estimate. For out-of-town MOH submit requests at least 10 working days prior to the end of the month.

Item 100 - Preparing Right of Way

Burning of brush will not be permitted.

Removal of all existing vegetation and trees within the ROW will be subsidiary to prep ROW.

Do not begin any clearing operations until the trees and areas of vegetation that should not be removed or disturbed by construction activities have been identified.

General Notes Sheet F

To ensure that these areas are not disturbed, place protection fencing as shown in the plans or as directed/approved by the Engineer.

All right of way clearing operations will be coordinated with the project's SW3P and as directed/approved by the Engineer.

Trim and remove brush and trees to construct the project or to provide a horizontal clearance of approximately 2 feet inside the right of way line and a vertical clearance of at least 12 feet. For this operation, no vertical flailing equipment is allowed, and the Engineer will approve the method used. The limits are STA 12+00 to 15+00 on Mangana Hein at Dolores Creek.

Item 104 – Removing Concrete

When associated with a structure to be removed, removal of riprap, approach slabs, and shoulder drains are to be included in the unit bid price for Item 496, “Removing Structures”.

Item 132 - Embankment

The embankment material must be consistent and homogeneous, free from vegetation or other objectionable matter, reasonably free from lumps of earth and suitable for forming a stable embankment.

For fill sections from embankment finished grade line and below, to a depth of 4 feet:

Field compact density to ≥ 98% dry density.

Plasticity Index (PI) limit is: PI ≤ 20.

Liquid limit ≤ 45

Moisture content shall be greater than the optimum moisture content.

For the last two (2) feet, the sulfate content shall not exceed 5,000 ppm tested under TEX 145E.

For all other fill sections, Plasticity Index (PI) limit is less than or equal to 30.

It is the Contractor’s responsibility to advise the Engineer of the location of the source sufficiently in advance to avoid delay.

General Notes Sheet G

Item 247 - Flexible Base

Conform to the following flexible base (TY A GR 1-2) requirements:

A pre-placement meeting must be conducted at least 48 hours prior to flex base placing operations. If material doesn’t meet minimum requirements, and contractor would like to referee the material, the contractor will need to submit their results from the material tested to proceed with the referee process.

Ride quality will be required on the base. Provide all profile data to the Engineer in electronic data files within 3 days of measuring the ride quality using the format specified in Tex-1001-S. The Engineer will use Department software to evaluate longitudinal profiles to determine areas requiring corrective action. Correct 0.1-mi.

sections with an average international roughness index (IRI) value greater than 100 in. per mile to an IRI value of 100 in. per mile or less, unless otherwise shown on the plans. Re-profile and correct sections that fail to maintain ride quality before the placement of the surface treatment, as directed. Unless ride deterioration is due to environmental impact, traffic, or other incidents outside the Contractor’s control, perform this work at no additional expense to the Department, as approved. (This doesn’t apply to a concrete pavement section).

If the flexible base comes from a stockpile, test the stockpile before delivery to the project. Stockpile must be labeled and designated the contractor and the project.

Follow the department guide schedule for testing frequency. The Contractor’s attention is called to the fact that the preliminary test will require approximately 30 days and it is the Contractor’s responsibility to advise the Engineer of the location of the flexible base source sufficiently in advance to avoid delays. Blade the side slopes to remove all grass from the area of construction before placing flexible base on that portion of the roadway to be widened, level-up, seal coat, or HMAC overlay. Blade the sod back onto the side slopes after the proposed items of work have been completed. This work is subsidiary to pertinent work items.

PI (plasticity index) to be a minimum of 2.

Linear shrinkage to be a minimum of 3.

Density and Moisture Control. Compact to a minimum of 100% of the maximum dry density and within ±2.0% of the optimum moisture content as determined in accordance with Tex-113-E, unless otherwise shown on the plans. Provide the Engineer with the beginning and ending station numbers of the area completed for testing. The Engineer will determine roadway density and moisture content of completed sections in accordance with Tex-115-E, Part I. The Engineer will determine random locations for testing in accordance with Tex-115-E, Part IV. Do

General Notes Sheet H not achieve density by drying the material after compaction. When the density is less than 100% of the maximum dry density, the Engineer may perform additional testing to determine the extent of the area to correct. The Engineer may accept the section if no more than one of the five most recent density tests is below the specified density and the failing test is no more than 3 pcf below the specified density.

Item 310 - Prime Coat

Remove all loose and scabbed material from the surface prior to prime coat application. Allow the prime coat to cure for a minimum of 48-72 hours before placing any successive layers, unless otherwise approved by the Engineer. In winter weather, allow the prime to cure for a minimum of 72 hours.

Do not allow any type of traffic including construction vehicles to drive on the curing prime coat. Make necessary adjustments for driveways and accesses that need to be maintained during construction, as approved by the Engineer.

When a prime coat is left open to traffic for more than 14 days or when the application is visually inconsistent such as but not limited to streaking and tracking, then the surface shall be re-primed as directed by the Engineer at no additional cost to the Department.

Item 330 - Limestone Rock Asphalt Pavement

LRA TY I (Premix). Pavement can be opened to traffic as soon as the rollers finish, or as approved in writing by the Engineer

TY Grade Application Rate Lab Density

I CC 105 #/SY/IN 89% + 2

II CS 110 #/SY/IN 89% + 2

General Notes Sheet I

Contractor must submit a QCP plan and held a pre-pavement meeting before paving operations can commence.

Contractor will not be allowed to place LRA Pavement with moisture content of 8% or higher as determined by Tx103. When moisture content is 8% or higher, Contractor must let breathe LRA stockpile to bring moisture content down, or as approved by the Engineer.

Furnish 15-ton or heavier Pneumatic Roller, and 12-ton or heavier Steel Wheel Roller. Contractor must ensure that rollers water flow is shut off when stopping rollers on pavement.

LRA tack coat requirements are the same as for their HMACP counterparts, or as approved in writing by the Engineer.

Table of equivalence between HMACP and LRA

Item 341- Dense-Graded Hot-Mix Asphalt

Use aggregate that meets the SAC-A, only for the final riding surface.

Apply the Bonding Course in accordance with Item 3007.

Substitute Binders (grade dumping) will not be allowed on the final riding surface.

Refer to item 585 for ride quality requirements.

The use of RAP, up to 10%, will be allowed on the final riding surface; however, the use of RAS will not be allowed on the final riding surface or in any other specified locations shown on the plans and/or typicals.

Item 403 – Temporary Shoring

HMACP

Equivalent

TY Grade Application Rate PG Binder

Lab Density

TY D I CC 105 #/SY/IN 70 -22 89%

TY D II CS 110 #/SY/IN 70 -22 89%

TY F I D 105 #/SY/IN 70 -22 89%

TY F II DS 110 #/SY/IN 70-22 89%

TY A/B I AA 110 #/SY/IN 70 -22 89%

General Notes Sheet J

Payment under this item is pending receipt of documentation noted in the plan set and specifications.

Including details specific to each individual location.

Item 416 - Drilled Shaft Foundations

After drill shaft installation plan is approved by the Engineer, a pre-placement meeting shall be held at least 48 hours before beginning excavation operations.

Item 420 - Concrete Substructures

Sulfate resistant concrete shall be used in all situations for concrete structures in contact with the natural ground.

Check the sign plans for locations of clearance signs and brackets on structures which will require inserts in the pre-stressed beams. Forward such locations to the beam fabricator.

Do not use membrane curing for e.g. structural elements.

Item 432 - Riprap

Provide Class B Concrete for riprap.

For Mowstrip installation, any removal of HMA and sawcut will be subsidiary to this item.

Item 496 - Removing Structures

The structure(s) to be removed have surface coatings which may contain hazardous materials. Provide for the safety and health of employees and abide by all OSHA Standards and Regulations.

Item 500 - Mobilization

"Materials-on-Hand" payments will not be considered in determining percentages used to compute mobilization payments.

General Notes Sheet K

Item 502 - Barricades, Signs, and Traffic Handling

Designate, as the Contractor Responsible Person (CRP), an English-speaking employee on-call nights and weekends (or any other time that work is not in progress) with a local address and telephone number for maintenance of signs and barricades. This employee will be located within one (1) hour of traveling time to the project site. Notify the Engineer in writing of the name, address and telephone number of this employee. Furnish this information to local law enforcement officials.

When advanced warning flashing arrow panel(s) is/are specified, maintain one standby unit in good condition at the job site ready for immediate use is required.

Ensure equipment not in use, stockpile aggregate, and other working materials are:

A minimum of 30 feet from the edge of the travel lane;

Do not obstruct traffic or sight distance;

Do not interfere with the access from abutting property; or Do not interfere with roadway drainage.

Erect signs in locations not obstructing the traveling public’s view of the normal roadway signing or necessary sight distance at intersections and curves.

During the holiday time frame of December 21st through January 1st, every effort should be taken to ensure that all travel lanes remain open where possible.

The Contractor Force Account “Safety Contingency” that has been established for this project is intended to be utilized for work zone enhancements, to improve the effectiveness of the Traffic Control Plan, that could not be foreseen in the project planning and design stage. These enhancements will be mutually agreed upon by the Engineer and the Contractor’s Responsible Person based on weekly or more frequent traffic management reviews on the project. The Engineer may choose to use existing bid items if it does not slow the implementation of enhancement.

Item 503 - Portable Changeable Message Sign

Provide 2 electronic portable changeable message signs as required by the Engineer. Provide backups and keep operational and available on the jobsite at all times during traffic control operations. The electronic portable changeable message signs will be made available for utilization for the entire duration of the project, including all alternative locations.

General Notes Sheet L

Item 506 - Temporary Erosion, Sedimentation, and Environmental Controls

Concrete washout area(s) shall be installed prior to concrete placement on site.

The concrete washout area(s) shall be entirely self-contained. Location must be Approved by the Engineer. Concrete washout area(s) are subsidiary to pertinent Items.

Item 510 - One-Way Traffic Control

Flaggers shall be equipped with two-way radios for all undivided roadway locations as directed by the Engineer.

Item 512 - Portable Traffic Barrier

Do not use different types of Portable Traffic Barriers in a single continuous installation.

Place PTB at ½” GAP over SPAN BRIDGE DECKS for Expansion to AVOID THERMAL SLAB vs. PTB Extreme THERMAL Movement.

Item 540 – Metal Beam Guard Fence

Install cast-in place concrete curb Type II in the metal beam guard fence transition (Thrie-Beam Transition). Pre-cast concrete curb will not be allowed.

Item 636 - Signs

Upon removal of signs, deliver to the local TxDOT Maintenance Yard within three

(3) working days.

Item 644 - Small Roadside Sign Assemblies

Upon removal of signs, deliver to the local TxDOT Maintenance Yard within three

(3) working days.

Item 658 – Delineator and Object Marker Assemblies

Proposed delineators for this project will consist of oval shape tube flexible post with a quick release embedded anchor insert stub only, such as Flexstake Inc. – 650 series or Shur-Tite – SD series or equal flexible drivable delineators.

General Notes Sheet M

Provide and place delineator Type 1, 2, 3, 4, object markers/chevrons and large arrows signs project 4’ or 7’ above the pavement surface and not the ground line.

(Provide adequate length for proper anchor and projection above ground line).

Item 666 – Reflectorized Pavement Markings

Payment on Type I markings requiring retroreflective testing will be made at a 75% rate until passing test results are received.

Remove temporary pavement markings (flexible-reflective roadway marker tabs or removable prefabricated pavement markings) immediately after permanent markings are placed. This work will be subsidiary to this bid item.

Place pavement marking material on roadways at any time during the year. Use standard installation method as this material is subject to temperature and moisture limitations specified.

Quantities may be varied during actual operations to accommodate field conditions.

Sealer for Type I Markings will be exclusive for concrete areas. The pavement sealer must be acrylic unless otherwise shown on the plans.

Reflectivity requirements for Type I will be as per Item 666.

Pavement sealer for pavement markings will be a Type II marking and will be installed after a minimum time of seven (7) days and not later than 14 days after the placement of the surface treatment unless otherwise approved by the Engineer.

Install Type I pavement markings after a minimum of seven (7) days after the placement of pavement sealer unless otherwise approved by the Engineer.

Each call-out striping quantity will be incorporated into the work order over various sections of roadway. Completion date will be specified in work order issued.

Centerline and “No Passing Zones” are established by TxDOT. Other necessary markings (edge lines, gores, offset points, etc.) will be established by TxDOT.

General Notes Sheet N

Item 681 – Temporary Traffic Signals

Provide temporary traffic signals either generator or solar powered. Provide backup and keep operational and available on the job site at all times during traffic control. Provide temporary traffic signals with a minimum of two indications per approach.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .