090426 - Addendum 01.pdf
PDF 79 KB Posted
- Attached to
- Landfill Collection Facility
- Solicitation number
- IFB-127676
- Issued by
- Floyd County, Virginia
About this file
This is Addendum #1 to a sealed bid solicitation issued by Franklin County, Virginia for construction and improvements at a landfill collection facility. The project involves improvements to an existing solid waste collection facility including grading, paving, concrete pad, and electrical conduits. A mandatory Pre-Bid Conference is scheduled for Thursday, September 10th at 1:00 PM at the project site off Sontag Road. The scope of work has been reduced by this addendum to eliminate the top course and base course of asphalt from bidder responsibility. The Owner has self-performed certain sitework currently shown on the plans, which will be reviewed during the mandatory pre-bid meeting. Fencing is available as an add alternate at the Owner's option, while dumpsters, scales, lighting, and the attendant's building will be performed by the Owner and are not included in the bid scope.
A second addendum is anticipated to be issued following the mandatory pre-bid meeting to address bidding of the remaining sitework and placement of stone on the lot. Bidders should anticipate further scope clarifications and modifications prior to bid submission. This phased addendum approach indicates an evolving project scope that will be finalized through the pre-bid conference and subsequent documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Landfill Collection Site - Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 4, 2026
Addendum #1 Landfill Collection Facility
This addendum is hereby made a part of the bid documents for the referenced project. The scope of work has been reduced to eliminate the top course and base course of asphalt. The Owner has self-performed some of the sitework currently shown on the plans which will be reviewed at the mandatory pre-bid meeting.
There will be an Addendum #2 issued after the mandatory pre-bid meeting to address bidding of the remaining sitework and placement of stone on the lot.
File details come from the government source that posted it. Updated .