089495-26-A-0047 F07 SOW - Attachment 14.pdf
PDF 100 KB Posted
- Attached to
- Milford, CT MPO Roof Replacement K96251
- Solicitation number
- 089495-26-A-0047
- Issued by
-
United States Postal Service
About this file
This is a Summary of Work document for a roof replacement project at the USPS Main Post Office in Milford, Connecticut (Project No. K96251), dated October 21, 2025.
The contractor must provide complete roof replacement services across three designated areas (A, B, and C). Work includes removal of the existing roof system down to the structural deck, inspection and repair of the structural deck and perimeter wood blocking, and refastening of existing structural decks where necessary. For Areas A and B, the contractor shall install two layers of 2-1/2 inch polyisocyanurate insulation (5 inches total), while Area C requires one layer of 2-inch polyisocyanurate insulation. A 1/2-inch high density polyiso cover board must be installed over all insulation, followed by a fully-adhered, nominal 60-mil EPDM roof system with sheet metal flashings and sealants as indicated in the project drawings. An alternate price is required for a 20-Year "Total System Warranty" for the roof system. Additional work includes removal and disposal of existing skylights and curbs in Area A with provision of new skylights and curbs, reinstallation of existing burglar bar systems, and replacement of clamping rings, bolts, and strainers on existing primary and overflow drains. The contractor must also address asbestos-containing materials (ACM) per referenced sections if identified in the project areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Coupa Supplier Registration Form.docx | DOCX document | |
| COUPA Supplier Registration Quick Reference Guide.pdf | ||
| Event management for suppliers - Coupa.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
011000-1
USPS – Main Post Office Date: 10/21/2025 SUMMARY OF WORK Roof Replacement Milford, CT USPS Project No. K96251
SECTION 011000
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SCOPE
A. The Contractor must provide all material, labor, tools, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the specified work, including all incidental work described in the contract documents. For purposes of this construction project, the terms “Offeror” and “Contractor” are interchangeable and refer to the party whose proposal is accepted by the Postal Service. It is the Owner’s sole responsibility to clarify design and construction responsibilities among the Owner’s designers, contractors and other agents.
B. The scope of work is listed within Articles 1.2 of this Section.
C. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard shall apply.
D. In case of conflict between the Project Manual and Project Drawings, the more stringent requirement shall apply.
1.2 SUMMARY OF ROOF REPLACEMENT WORK – AREAS A, B & C
A. Asbestos laboratory analysis report: Refer to Section 022623 for information relating to the location of ACM, if applicable, within project areas. If positive refer to Sections 013543 and 028233 for procedures and requirements related to the removal and disposal of non-friable asbestos related to this project.
B. Roof removal and substrate preparation: Remove existing roof system down to the structural deck, including roof membrane(s), and underlying insulation, underlayments, and additional roof membranes. Inspect the existing structural deck, and inform the Owner immediately of observed damage and or deterioration. Temporarily displace rooftop equipment as necessary to complete the specified work. Refer to Section 024100.
C. Provide an alternate price for complete refastening of existing structural decks; provide a unit price for areas of existing structural deck that require refastening. Note that refastening of perimeter wood blocking is required. Refer to Section 053123 for re-fastening requirements.
D. After roof removal and inspection of the existing structural deck and perimeter wood blocking, perform repairs to the structural deck, as determined necessary by the Owner. Refer to Section 053123. Replace damaged or deteriorated wood blocking, as determined necessary by the Owner. Refer to Section 061053.
E. Provide required wood blocking where indicated on the project drawings. Refer to Section 061053.
011000-2
USPS – Main Post Office Date: 10/21/2025 SUMMARY OF WORK Roof Replacement Milford, CT USPS Project No. K96251
F. Roof Area A & B: Provide two layers of 2-1/2 inch polyisocyanurate insulation (5-inches total). If indicated on the project drawings, provide insulation saddles and crickets where shown. Refer to Section 072223 for additional insulation product and installation requirements.
G. Roof Area C: Provide one layer of 2-inch polyisocyanurate insulation. If indicated on the project drawings, provide insulation saddles and crickets where shown. Refer to Section 072223 for additional insulation product and installation requirements.
H. Provide a 1/2-inch high density polyiso cover board over the underlying insulation. Refer to Section 072223 for additional product and installation requirements.
I. Provide a fully-adhered, nominal 60-mil EPDM roof system. After installation of specified insulation and cover board, install the EPDM roofing membrane in bonding adhesive. Provide EPDM and sheet metal flashings as specified. Provide an alternate price for a 20-Year, “Total System Warranty” for the roof system. Refer to Sections 075323 and 076205 for product and installation requirements.
J. Provide sealants at locations indicated on the project drawings. Refer to Section 079201.
K. Roof Area A: Contractor shall remove and dispose of all existing skylights and curbs. Provide new skylights and curbs where indicated on the project drawings. Reinstall the existing burglar bar system. Refer to Section 086200 for product and installation requirements.
L. Existing primary and overflow drains: Contractor shall remove and dispose of all clamping rings, bolts and strainers. Provide all new clamping rings, bolts and strainers. Refer to Section 024100 for product requirements
PART 2 – PRODUCTS
NOT USED
PART 3 – EXECUTION
NOT USED
END OF SECTION
USPS Master Specifications, issued: 10/1/2017 Last revised: 12/13/2017