This document is a Summary of Work section for a USPS Postal Processing and Distribution Center (P&DC) roof replacement and repair project in North Charleston, SC, scheduled for 08/19/2025 under USPS Project No. K39059. The project involves comprehensive roof work across multiple areas (A-J for replacement, K-U for repair), including complete roof system removal, structural deck inspection and potential repairs, installation of new insulation and roofing materials, and specific technical requirements. Key technical specifications include installing two layers of 2-1/2 inch polyisocyanurate insulation, a 1/2-inch high-density polyisocyanurate cover board, and a fully-adhered, minimum 80-mil PVC roof system meeting ASTM D4434, Type III standards. The contractor will also perform additional work such as lightning protection and provide alternate pricing for a 20-Year "Total System Warranty" for the roof system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

011000-1

USPS – P&DC Date: 08/19/2025 SUMMARY OF WORK Roof Replacement and Repair North Charleston, SC USPS Project No. K39059

SECTION 011000

SUMMARY OF WORK

PART 1 - GENERAL

1.1 SCOPE

A. The Contractor must provide all material, labor, tools, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the specified work, including all incidental work described in the contract documents. For purposes of this construction project, the terms “Offeror” and “Contractor” are interchangeable and refer to the party whose proposal is accepted by the Postal Service. It is the Owner’s sole responsibility to clarify design and construction responsibilities among the Owner’s designers, contractors and other agents.

B. The scope of work is listed within Articles 1.2 and 1.3 of this Section.

C. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard shall apply.

D. In case of conflict between the Project Manual and Project Drawings, the more stringent requirement shall apply.

1.2 SUMMARY OF ROOF REPLACEMENT WORK – AREAS A, B, C, D, E, F, G, H, I AND J

A. Provide an alternate price for temporary interior protection. Refer to Section 015617.

B. Asbestos laboratory analysis report: Refer to Section 022623 for information relating to the location of ACM, if applicable, within project areas. If positive refer to Sections 013543 and 028233 for procedures and requirements related to the removal and disposal of non-friable asbestos related to this project.

C. Roof removal and substrate preparation: Remove existing roof system down to the structural deck, including roof membrane(s), and underlying insulation, underlayments, and additional roof membranes. Inspect the existing structural deck and inform the Owner immediately of observed damage and or deterioration. Temporarily displace rooftop equipment as necessary to complete the specified work. Refer to Section 024100.

D. Existing roof drain assemblies: Contractor shall remove and discard all clamping rings, bolts and strainers. Provide new clamping rings, bolts and strainers at all roof drain assemblies. Refer to Section 024100.

E. Provide an alternate price for complete refastening of existing structural decks; provide a unit price for areas of existing structural deck that require refastening. Note that refastening of perimeter wood blocking is required. Refer to Section 053123 for re-fastening requirements.

F. After roof removal and inspection of the existing structural deck and perimeter wood blocking, perform repairs to the structural deck, as determined necessary by the Owner. Refer to Section 053123.

011000-2

USPS – P&DC Date: 08/19/2025 SUMMARY OF WORK Roof Replacement and Repair North Charleston, SC USPS Project No. K39059

G. Provide required wood blocking where indicated on the project drawings. Refer to Section 061053.

H. Provide two layers of 2-1/2 inch polyisocyanurate insulation (5-inches total). If indicated on the project drawings, provide insulation saddles and crickets where shown. Refer to Section 072223 for additional insulation product and installation requirements.

I. Provide a 1/2-inch high-density polyisocyanurate cover board over the underlying insulation.

Refer to Section 072223 for additional product and installation requirements.

J. Provide a fully-adhered, minimum 80-mil PVC roof system meeting ASTM D4434, Type III. After installation of specified insulation and cover board, install the PVC roofing membrane in bonding adhesive. Provide PVC and sheet metal flashings as specified. Provide an alternate price for a 20-Year, “Total System Warranty” for the roof system. Refer to Sections 075419 and 076207 for product and installation requirements.

K. Provide sealants at locations indicated on the project drawings. Refer to Section 079201.

1.3 SUMMARY OF ROOF REPAIR WORK – AREAS K, L, M, N, O, P, Q, R, T AND U

A. Provide a spray-applied acrylic elastomeric roof coating over existing sheet metal roofing systems. Prior to application of the coating, prepare and prime (if required) the metal roofing system. Spray-apply a base coat and finish coat to the metal roofing. Provide an alternate price for a 10-Year manufacturer’s warranty for the coating system. Refer to Section 075603 for product and installation requirements.

1.4 SUMMARY OF ADDITIONAL PROJECT WORK

A. Areas A, B, C, D, E, F, G, H, I and J: Perform specified lightning protection work. Refer to Section 264113 for product requirements and repair procedures.

PART 2 – PRODUCTS

NOT USED

PART 3 – EXECUTION

NOT USED