This document is a Summary of Work for a roof replacement project at a USPS Carrier Annex facility in Bismarck, ND, under USPS Project No. C08185. The key details are:
The scope of work includes removing the existing roof system down to the structural deck, performing any necessary repairs to the deck, installing new insulation and a fully-adhered 60-mil EPDM roof system. The contractor must provide an alternate price for completely refastening the existing structural decks and a unit price for areas requiring refastening. The contractor must also provide an alternate price for a 20-year total system warranty. The work must be performed in accordance with applicable codes and local regulations. The document provides detailed requirements for the roof removal, insulation, roofing membrane, and other related work.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
011000-1
USPS – Carrier Annex Date: 04/10/2024 SUMMARY OF WORK Roof Replacement Bismarck, ND USPS Project No. C08185
SECTION 011000
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SCOPE
A. The Contractor must provide all material, labor, tools, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the specified work, including all incidental work described in the contract documents. For purposes of this construction project, the terms “Offeror” and “Contractor” are interchangeable and refer to the party whose proposal is accepted by the Postal Service. It is the Owner’s sole responsibility to clarify design and construction responsibilities among the Owner’s designers, contractors and other agents.
B. The scope of work is listed within Articles 1.2 of this Section.
C. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard shall apply.
D. In case of conflict between the Project Manual and Project Drawings, the more stringent requirement shall apply.
1.2 SUMMARY OF ROOF REPLACEMENT WORK – AREAS A & B
A. Asbestos laboratory analysis report: Refer to Section 022623 for information relating to the location of ACM, if applicable, within project areas. If positive refer to Sections 013543 and 028233 for procedures and requirements related to the removal and disposal of non-friable asbestos related to this project.
B. Roof removal and substrate preparation: Remove existing roof system down to the structural deck, including roof membrane(s), and underlying insulation, underlayments, and additional roof membranes. Inspect the existing structural deck, and inform the Owner immediately of observed damage and or deterioration. Temporarily displace rooftop equipment as necessary to complete the specified work. Refer to Section 024100.
C. Provide an alternate price for complete refastening of existing structural decks; provide a unit price for areas of existing structural deck that require refastening. Note that refastening of perimeter wood blocking is required. Existing metal panel roof system is to be fasten through the underlying insulation and metal panel roof system into the existing structural purlins. Refer to Section 053123 for re-fastening requirements.
D. After roof removal and inspection of the existing structural deck and perimeter wood blocking, perform repairs to the structural deck, as determined necessary by the Owner. Refer to Section 053123. Replace damaged or deteriorated wood blocking, as determined necessary by the Owner. Refer to Section 061053.
E. Provide required wood blocking where indicated on the project drawings. Refer to Section 061053.
011000-2
USPS – Carrier Annex Date: 04/10/2024 SUMMARY OF WORK Roof Replacement Bismarck, ND USPS Project No. C08185
F. Provide two layers of 2-inch polyisocyanurate insulation (4-inches total). If indicated on the project drawings, provide insulation saddles and crickets where shown. Bottom layer of polyiso is to be cut to fit in-between metal panel ribs. Refer to Section 072223 for additional insulation product and installation requirements.
G. Provide a 1/2-inch high density polyiso cover board over the underlying insulation. Refer to Section 072223 for additional product and installation requirements.
H. Provide a fully-adhered, nominal 60-mil EPDM roof system. After installation of specified insulation and cover board, install the EPDM roofing membrane in bonding adhesive. Provide EPDM and sheet metal flashings as specified. Provide an alternate price for a 20-Year, “Total System Warranty” for the roof system. Refer to Sections 075323 and 076205 for product and installation requirements.
I. Provide sealants at locations indicated on the project drawings. Refer to Section 079201.
PART 2 – PRODUCTS
NOT USED
PART 3 – EXECUTION
NOT USED
END OF SECTION