089495-21-A-0003 F07 SOW - Attachment 14.pdf
PDF 21 KB Posted
- Attached to
- Hayward, CA MPO & VMF Roof Replacement
- Solicitation number
- 089495-21-A-0003
- Issued by
-
United States Postal Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Emptoris Registration.pdf | ||
| eSourcing User Guide Version 10.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
011000-1
USPS – MPO & VMF Date: 08/05/2020 SUMMARY OF WORK Roof Replacement Hayward, CA USPS Project No. J63037
SECTION 011000
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SCOPE
A. The Contractor must provide all material, labor, tools, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the specified work, including all incidental work described in the contract documents. For purposes of this construction project, the terms “Offeror” and “Contractor” are interchangeable and refer to the party whose proposal is accepted by the Postal Service. It is the Owner’s sole responsibility to clarify design and construction responsibilities among the Owner’s designers, contractors and other agents.
B. The scope of work is listed within Article 1.2 of this Section.
C. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard shall apply.
D. In case of conflict between the Project Manual and Project Drawings, the more stringent requirement shall apply.
1.2 SUMMARY OF ROOF REPLACEMENT WORK – AREAS MPO A-G & VMF A-D
A. Asbestos laboratory analysis report: Refer to Section 022623 for information relating to the location of ACM, if applicable, within project areas. If positive refer to Sections 013543 and 028233 for procedures and requirements related to the removal and disposal of non-friable asbestos related to this project.
B. Roof removal and substrate preparation: Remove existing roof system down to the structural deck, including roof membrane(s), and underlying insulation, underlayments, and additional roof membranes. Inspect the existing structural deck, and inform the Owner immediately of observed damage and or deterioration. Temporarily displace rooftop equipment as necessary to complete the specified work. Refer to Section 024100.
C. Roof Areas A, B, D, E, G. VMF-A, VMF-B, VMF-C & VMF-D: Provide an alternate price for complete refastening of existing structural decks; provide a unit price for areas of existing structural deck that require refastening. Note that refastening of perimeter wood blocking is required. Refer to Sections 053123 and 061516 for re-fastening requirements.
D. After roof removal and inspection of the existing structural deck and perimeter wood blocking, perform repairs to the structural deck, as determined necessary by the Owner. Refer to Sections 030150, 053123 and 061516. Replace damaged or deteriorated wood blocking, as determined necessary by the Owner. Refer to Section 061053.
E. Provide required wood blocking where indicated on the project drawings. Refer to Section 061053.
011000-2
USPS – MPO & VMF Date: 08/05/2020 SUMMARY OF WORK Roof Replacement Hayward, CA USPS Project No. J63037
F. Roof Areas C & F: Provide an underlayment consisting of a self-adhering membrane. Prior to application, prepare and prime the deck as required by the roofing membrane manufacturer.
Refer to Section 072215.
G. Roof Areas A, B, D, E, G & VMF-A: Provide an underlayment consisting of red rosin paper, mechanically-attached to the existing structural deck. Refer to Section 072215 for product and installation requirements.
H. Roof Areas A, D & G : Provide one layer of 2-inch polyisocyanurate insulation. If indicated on the project drawings, provide insulation saddles and crickets where shown. Refer to Section 072222 for additional insulation product and installation requirements.
I. Roof Areas B, C, F & VMF-A: Provide a tapered polyisocyanurate insulation system with an insulation system slope of 1/8-inch per foot, and a starting thickness of 1-inch, minimum. If indicated on the project drawings, provide insulation saddles and crickets where shown. Refer to Sections 072221 & 072222 for additional insulation product and installation requirements.
J. Roof Areas VMF-B, VMF-C & VMF-D: Provide a tapered polyisocyanurate insulation system with an insulation system slope of 1/4-inch per foot, and a starting thickness of 1-inch, minimum. If indicated on the project drawings, provide insulation saddles and crickets where shown. Refer to Section 072223 for additional insulation product and installation requirements.
K. Provide a 1/2-inch gypsum-based cover board over the underlying insulation. Refer to Sections 072221, 072222 & 072223 for additional product and installation requirements.
L. Provide a fully-adhered, minimum 60-mil PVC roof system meeting ASTM D4434, Type III. After installation of specified insulation and cover board, install the thermoplastic roofing membrane in bonding adhesive. Provide thermoplastic and sheet metal flashings as specified. Provide an alternate price for a 20-Year, “Total System Warranty” for the roof system. Refer to Sections 075419 and 076207 for product and installation requirements.
M. Provide sealants at locations indicated on the project drawings. Refer to Section 079201.
PART 2 – PRODUCTS
NOT USED
PART 3 – EXECUTION
NOT USED
END OF SECTION