View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

T

S S

S

D

WV

N78°34'44"E 2089.20'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e

\D o c u m e n ts

\C h ill ic o th e B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:2

P

M

GI-001

COVER SHEET

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

CHILLICOTHE VAMC

RENOVATE THERAPEUTIC POOL

AND RECREATION HALL

DEPARTMENT OF VETERANS AFFAIRS

17273 STATE ROUTE 104

CHILLICOTHE, OH 45601

D R A W I N G I N D E X

19. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK. DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW WORK. SEAL TIGHT TO

ALL PENETRATIONS AND CAULK.

20. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE PROOFED TO ACHIEVE THE PROPER FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH DAY.

21. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING ALL REQUIRED ROUGH OPENINGS, AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT

MANUFACTURER, OWNER AND ARCHITECT PRIOR TO CONSTRUCTION.

22. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL AUTHORITIES, CODES, RULES AND REGULATIONS.

23. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF WORK EXPECTED. MORE STRINGENT REQUIREMENTS STIPULATED WITHIN RELEVANT MANUFACTURER’S INSTALLATION

INSTRUCTIONS WILL SUPERSEDE.

24. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE ARCHITECT AND C.O.R. PRIOR TO

PROCEEDING WITH WORK.

25. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE C.O.R. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL WRITTEN CLARIFICATION FROM THE

ARCHITECT IS RECEIVED.

26. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT ARE TO BE INSTALLED PER THE APPLICABLE

PROVISIONS OF THESE DOCUMENTS AND THE MANUFACTURER’S INSTRUCTIONS.

27. ALL MATERIALS USED ARE REQUIRED TO BE NEW UNLESS OTHERWISE NOTED.

28. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR

CONSTRUCTION.

29. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING BUT NOT LIMITED TO THE

ADHERENCE TO OSHA REGULATIONS.

30. ALL ELECTRICAL, PLUMBING AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE

STATE WHERE THIS PROJECT IS LOCATED.

31. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS OR INTO DUMPSTERS FOR REMOVAL. DISPOSE OF DEBRIS LEGALLY. DO NOT BURN DEBRIS ON THE SITE. DO NOT ALLOW DEBRIS TO ENTER SEWERS. DO NOT ALLOW PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK EXISTS OR ROADWAYS.

COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE HAZARD SHALL NOT BE PERMITTED TO ACCUMULATE IN OR

AROUND THE CONSTRUCTION SITE.

32. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES. SEAL CONSTRUCTION TIGHT TO ALL PENETRATIONS AND CAULK. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRE SAFE'D IN ACCORDANCE WITH

THE SPECIFICATIONS.

33. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH FACE OF

CONSTRUCTION.

34. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.

G E N E R A L N O T E S

V I C I N I T Y M A P

S I T E M A P

BUILDING 9

BUILDING 247

NTS

NTS

PROJECT # 538-20-201

N

N

SHEET NO. SHEET NAME

GENERAL

GI-001 COVER SHEET

GI-002 LIFE SAFETY PLAN - BUILDING 9

GI-003 LIFE SAFETY PLAN - BUILDING 247

GI-004 ACCESSIBILITY DETAILS AND NOTES

CIVIL

CS-100 SITE PLAN - B9

ARCHITECTURE

AD-100 BASEMENT DEMOLITION PLAN - 9

AD-101 FIRST FLOOR - DEMOLITION PLAN - 9

AD-102 SECOND FLOOR - DEMOLITION PLAN - 9

AD-103 OVERALL DEMOLITION PLAN - 247

AD-104 ENLARGED DEMOLITION PLAN - POOL - 247

AE-100 BASEMENT - NEW WORK PLAN - 9

AE-101 FIRST FLOOR - NEW WORK PLAN - 9

AE-102 SECOND FLOOR - NEW WORK PLAN - 9

AE-103 NEW WORK AND FINISH PLAN - 247

AE-201 EXTERIOR ELEVATIONS - 9

AE-202 EXTERIOR ELEVATIONS - 9

AE-701 DOOR SCHEDULES, WINDOW SCHEDULES, AND DETAILS

PLUMBING

P-001 PLUMBING LEGEND SHEET

PD-101 PLUMBING DEMOLITION PLAN - 9

PD-102 PLUMBING DEMOLITION PLAN - 247

PL-101 PLUMBING NEW WORK PLAN - 9

PL-102 PLUMBING NEW WORK PLAN - 247

PL-501 PLUMBING DETAILS & DIAGRAMS - 247

PL-601 PLUMBING SCHEDULES

MECHANICAL

M-001 MECHANICAL LEGEND SHEET - 9

MD-101 MECHANICAL BASEMENT DEMOLITION PLAN - 9

MD-102 MECHANICAL FIRST FLOOR DEMOLITION PLAN - 9

MD-103 MECHANICAL SECOND FLOOR DEMOLITION PLAN - 9

MH-101 MECHANICAL HVAC BASEMENT - 9

MH-102 MECHANICAL HVAC FIRST FLOOR - 9

MH-103 MECHANICAL HVAC SECOND FLOOR - 9

MH-104 FIRST FLOOR MECHANICAL NEW WORK - 247

MH-601 MECHANICAL SCHEDULES - 9

ELECTRICAL

E-100 LEGEND AND ABBREVIATIONS

EP-100 BASEMENT POWER PLAN - 9

EP-101 FIRST FLOOR POWER PLAN - 9

EP-102 SECOND FLOOR POWER PLAN - 9

E-600 PANEL SCHEDULES AND DETAILS - 9

ED-100 BASEMENT DEMO PLAN - 247

EL-100 BASEMENT LIGHTING PLAN - 247

EP-103 BASEMENT POWER PLAN - 247

E-600 PANEL SCHEDULES AND DETAILS - 247

1. UNLESS OTHERWISE NOTED, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING

SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.

2. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF

THE VA C.O.R.

3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING

DEMOLITION AND CONSTRUCTION.

4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF THE

PROJECT.

6. MAINTAIN THE BUILDING IN A WEATHER TIGHT CONDITION AT ALL TIMES.

7. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE

DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED AREAS.

8. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS

SHALL BE PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED SPACES.

9. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO ADJACENT DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES WITH C.O.R. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR

UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.

10. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE V.A.'S OCCUPIED AREAS ADJACENT TO NEW CONSTRUCTION OR OCCUPIED AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF

ALL CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.

11. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.

12. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE PROTECTION AT REMOVALS, AT ANY EXISTING LOCATIONS WHICH ARE VOID OF PROTECTION WITHIN THE AREA OF WORK AND AT NEW CONSTRUCTION WHICH DISTURBS EXISTING FIRE PROTECTION. FIREPROOFING MUST BE CONTINUOUS AND

UNOBSTRUCTED.

13. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL

STRUCTURAL FRAMING MEMBERS AND SYSTEMS AT ALL TIMES.

14. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE ARCHITECT OR THE C.O.R.

FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.

15. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND PLUMBING.

16. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS

REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL CONSTRUCTION.

17. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING

FINISH.

18. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE EXISTING SURFACES AS

NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.

P H A S I N G N O T E S

1. BUILDINGS WILL BE OCCUPIED DURING CONSTRUCTION. ALL CONSTRUCTION SHALL BE SEPARATED FROM BUILDING OCCUPANTS WITH DUST AND DEBRIS CONTROL AS WELL AS 1-HR FIRE RATED BARRIERS (EXISTING OR

TEMPORARY).

2. OCCUPANTS WILL BE RELOCATED FROM THE IMMEDIATE AREA OF THE CONSTRUCTION ACTIVITY.

3. WORK SHALL BE CONDUCTED DURING BUSINESS HOURS, NIGHTS, OR WEEKENDS, AT THE MUTUAL AGREEMENT OF THE CONTRACTOR AND VA COR. COORDINATE ALL PROPOSED SCHEDULE AND SEQUENCE OF WORK WITH

THE VA COR.

Revisions: Date:

CONSTRUCTION DRAWINGS 03/30/2022

DN

DN DN

UP

DN

UP

UP

UP

UP

UP

UP

DN

UP

DN

UP

DN

M

M

UP

UP UP

UP

UP

UP

UP

UP

UP

DN

86<300'

100'<300'

44'<300'

KITCHEN

LOBBY

AUDITORIUM

ELEVATOR

LOBBY

VOLUNTEER

WORK

ROOM

AMERICAN

LEGION

AUX

ACTIVITIES

AIDE

ACTIVITIES

AIDE

CORRIDOR

4M

CLOSET

STAIR

S2-1

Storage

105A

Storage

105B

LOBBY

CHAIR

STORAGE

VESTIBULE

101A

H.A.C.

STAIR

S1

MEN'S

TOILET

WOMEN'S

TOILET

103A

H.A.C.

CORRIDOR

101B

ASSEMBLY: 5,609 SF

BUSINESS: 2,900 SF

STORAGE: 217 SF

EX

EX

EX

EX

EX

EX

42'<300'

AE-201

AE-202

AE-201

EXIT SIGN

FIRE

EXTINGUISHER

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

EX EXIT

EXIT STAIR OR PASSAGEWAY

PROJECT LIMITS

30 MINUTE SMOKE BARRIER

PATH OF TRAVEL

L I F E S A F E T Y L E G E N D

Control Room

4E

Storage

4A

Corridor

4C Storage

4B

Lobby

4D

Elec.

CLOTHES

STORE

Changing

4G

Changing

4F

Storage

Storage

3A

Storage

2A

Storage

Stair

S1-0

Storage

1A

Storage

1B

Mechanical Equipment

1C

Mechanical Equipment

8A

Female Toilet

8B Female

Dressing Room

Mechanical Equipment

Entry

10A

Men Toilet

9A

Men Dressing

Room

Chase

9C

Storage

9B

48'<300'

53'<300'

BUSINESS: 2,687 SF

STORAGE: 1,417 SF

UTILITY: 1,534 SF - 6 OCCUPANTS

Staff Assistant

A. Chief Voluntary

Svc

Chief Voluntary

Secretary

Storage

Stair

S2

Clos.

Recreation

Therapist

Recreation

Recreation

Secretary

Activity Asst.

Toilet

Clos.

Clos.

206A

Clos.

205A

Closet

204A Closet

203A

Projection Room

Balcony

37'<300'

57'<300'

BUSINESS: 2,449 SF

STORAGE: 193 SF

OPEN TO BELOW

CORRIDOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e

\D o c u m e n ts

\C h ill ic o th e B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:2

P

M

GI-002

LIFE SAFETY PLAN - BUILDING 9

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/16" = 1'-0"

FIRST FLOOR - LIFE SAFETY PLAN

1/16" = 1'-0"

BASEMENT - LIFE SAFETY PLAN

1/16" = 1'-0"

SECOND FLOOR - LIFE SAFETY PLAN

2021 NFPA 101

2021 NFPA 5000

ABAAS WITH VA BARRIER FREE DESIGN STANDARD

EXISTING CONSTRUCTION TYPE PER NFPA 220 = TYPE II (111)

EXISTING EGRESS ROUTES ARE UNAFFECTED BY NEW WORK IN BUILDING 9. MINOR ACCESSIBILITY UPGRADES WILL BE MADE TO THE FIRST FLOOR GANG RESTROOMS. MINIMAL PATCHING WILL OCCUR AT ADJACENT FINISHES.

ALL FINISHES SHALL COMPLY WITH 2021 NFPA 101 - CHAPTER 10.2 INTERIOR FINISHES

10.2.3.3. TESTED IN ACCORDANCE WITH ASTM E84

- CLASS A: FLAME SPREAD INDEX 0-25; SMOKE DEVELOPED INDEX 0-450

- CLASS B: FLAME SPREAD INDEX 26-75; SMOKE DEVELOPED INDEX 0-450

- CLASS C: FLAME SPREAD INDEX 76-200; SMOKE DEVELOPED INDEX 0-450

L I F E S A F T E Y S U M M A R Y:

FD

FD

FD

FD

D W

FD FD

FD

FD

FD

DN

a

FOYER

CORRIDOR

MEN'S

LOCKER

ROOM

ENTRY

DIRTY

LINEN

STORAGE

MEN'S

LOCKER

ROOM

MEN'S

SHOWER

WOMEN'S

LOCKER

ROOM

WOMEN'S

SHOWER

BREAK

ROOM

ISSUE

ROOM

WEIGHT

ROOM

GYMNASIUM

SWIMMING

POOL

H.A.C.

ENTRY

112A

ENTRY

112B

STAIRS

EXISTING EGRESS ROUTE

88'<300'

EXISTING EGRESS ROUTE

88'<300'

EXISTING EGRESS ROUTE

83'<300'

ASSEMBLY: 8,538 SF

POOL: 4,675 SF

BUSINESS: 2,900 SF

STORAGE: 217 SF

E X

IS

T

IN

G

E G

R E

S S

R O

U T

E

EXIT SIGN

FIRE

EXTINGUISHER

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

EX EXIT

EXIT STAIR OR PASSAGEWAY

PROJECT LIMITS

30 MINUTE SMOKE BARRIER

PATH OF TRAVEL

L I F E S A F E T Y L E G E N D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e \D o c u m e n ts

\C h ill ic o th e

B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:3

P

M

GI-003

LIFE SAFETY PLAN - BUILDING 247

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/8" = 1'-0"

FIRST FLOOR - LIFE SAFETY PLAN

2021 NFPA 101

2021 NFPA 5000

ABAAS WITH VA BARRIER FREE DESIGN STANDARD

EXISTING CONSTRUCTION TYPE PER NFPA 220 = TYPE II (111)

EXISTING EGRESS ROUTE, EMERGENCY EXITS, AND EXIT LIGHTING IS UNAFFECTED BY NEW WORK IN

BUILDING 247.

ARCHITECTURE WORK IS LIMITED TO INSIDE POOL AREA AND COSMETIC FINISHES.

ALL FINISHES SHALL COMPLY WITH 2021 NFPA 101 - CHAPTER 10.2 INTERIOR FINISHES

10.2.3.3. TESTED IN ACCORDANCE WITH ASTM E84

- CLASS A: FLAME SPREAD INDEX 0-25; SMOKE DEVELOPED INDEX 0-450

- CLASS B: FLAME SPREAD INDEX 26-75; SMOKE DEVELOPED INDEX 0-450

- CLASS C: FLAME SPREAD INDEX 76-200; SMOKE DEVELOPED INDEX 0-450

L I F E S A F T E Y S U M M A R Y :

O P

E R

A T

IN

G

M E

C H

A N

IS

M

M A

X T

O

ACCESSIBLE URINALPAPER TOWEL

DISPENSER WALL MTD

SOAP

DISPENSER

T O

C O

IN

S

L O

T

SANITARY NAPKIN

DISPENSER

(WOMEN'S ONLY)

U F

C G

U

ID

E L

IN

E

DIAPER CHANGING

STATION

M

A X

M

IN

M A

X A

F F

A

B O

V E

S

IN

K T

O B

/O R

E F

L S

U R

F A

C E

MIRROR TOILET PAPER

DISPENSER

M

A X

M

IN

1' - 3 1/4"

"3

M

A X

M

IN

C1

10'-0"AFF

A101

SIM

A101

SIM

A101

SIM

A101

SIM

A B B R E V I A T I O N S

LEVEL NAME W/ ELEVATION

GRID HEAD

CALL OUT HEAD W/ SHEET NUMBER

ROOM NAME W/ ROOM NUMBER, AREA & OCCUPANCY

BUILDING SECTION NUMBER W/ SHEET NUMBER

WALL SECTION NUMBER W/ SHEET NUMBER

DOOR NUMBER

WALL TAG

KEYNOTE

REVISION TAG

CEILING TAG WITH HEIGHT

DETAIL SECTION NUMBER W/ SHEET NUMBER

NORTH ARROW

A.D.

A.C.T.

ACOUS.

A/C

A.C.P.

A.B.

AREA DRAIN

ACOUSTICAL CEILING TILE

ACOUSTIC

AIR CONDITIONING

ASPHALT CONCRETE

ANCHOR BOLT

PAVING

POUND OR NUMBER

PROPERTY LINE

FLOOR LINE

ANGLE

DIAMETER

CENTERLINE

AT

AND

BD.

APPROX.

ARCH.

ASPH.

ALT.

AL.

AGG.

BLDG.

BLK.

BLKG.

BM.

BRG.

BRK.

BOT.

BITUM.

CEM.

C.B.

CARP.

CAB.

B.U.R.

BTWN.

CLKG.

CLG.J.

CLG.

C.J.

CIR.

C.I.

CER.T.

CER.

BRZ.

COMB.

COL.

C.O.

CNTR.

CMU

CLS.

CLR.

C.W.

CTR.

CONV.O.

CONT.

CONST.

CONN.

CONC.

COMP.

DF.

D.F.

DIAG.

DIA.

DIM.

DISP.

DET.

DN.

D.O.

DR.

D.S.

D.T.

D.W.

DWR.

DIV.

CLO.

DOUGLAS FIR

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIMENSION

DISPOSAL

DIVISION

DOWN

DOOR OPENING

DOOR

DOWN SPOUT

DRAIN TILE

DISHWASHER

DRAWER

DETAIL

COLD WATER

CENTER

CONVECTION OVEN

CONTINUOUS

CONSTRUCTION

CONNECTION

CONCRETE

COMPOSITION

BENCH MARK or BEAM

BOARD

BITUMINOUS

BUILDING

BLOCK

BLOCKING

APPROXIMATE

ARCHITECT

ASPHALT

CONCRETE MASONRY

COMBINATION

COLUMN

CLEAN OUT

COUNTER

CLOSURE

CLEAR

CLOSET

CAULKING

CEILING JOIST

UNIT

CEILING

BRICK

BEARING

CONSTRUCTION JOINT

CIRCLE

CAST IRON

CERAMIC TILE

CERAMIC

CEMENT

CATCH BASIN

CARPET

CABINET

BUILT-UP ROOFING

BETWEEN

BRONZE

BOTTOM

ALTERNATE

ALUMINUM

AGGREGATE

EA.

E.E.

E.F.

E.J.

ELEC.

ELEV.

E.N.

EXISTING

EACH

EACH END

EXHAUST FAN

EXPANSION JOINT

ELECTRICAL

ELEVATION

EDGE NAIL

(E)

ADJUSTABLEADJ.

LP

LC

LF

Ø

ABOVE FINISH FLOORAFF

CONTRACTOR FURNISH/

OWNER INSTALL

C.F.O.I.

C.F.C.I. CONTRACTOR FURNISH/

CONTRACTOR INSTALL

E.C. ELECTRICAL CONTRACTOR

C.HK. COAT HOOK

C.B.B. CEMENTITIOUS BACKER

BOARD

A.C.M. ASBESTOS CONTAINING

MATERIALS

CW. CURTAINWALL

DWG(S). DRAWING(S)

FACE OF BUILDINGF.O.B.

FIXTURE

FACE OF CONCRETE

FLOOR

FLOOR JOIST

FLOOR LINE

FLASHING

FACE NAIL

GAUGE

FOOTING

FUTURE

FACE OF STUD

FIRE RETARDANT

TREATED WOOD

FACE OF MASONRY

FACE OF FINISH

F.O.S.

F.R.T.W.

FTG.

FUT.

GA.

FIXT.

F.J.

F.L.

FLASH.

FLR.

F.N.

F.O.C.

F.O.F.

F.O.M.

BEAM

GLASS

GLUE LAMINATED

GALVANIZED IRON

GRATE ELEVATION

GRAB BAR

GARBAGE DISPOSAL

GRADE

HOSE BIB

SHEET METAL

GYPSUM BOARD

HANDICAPPED

GALVANIZED

GROUND

HC.

GYP.BD.

H.B.

G.B.

G.D.

G.S.M.

GR.

GND.

GLB.

GL.

G.I.

G.E.

HEIGHT

HOUR

HEATING

HIGH POINT

HORIZONTAL

HOLLOW METAL

HARDWARE

HARDWOOD

INTERIOR

INVERT

HOT WATER

INSULATION

INSIDE DIAMETER

& AIR CONDITIONING

HEATING, VENTILATION

H.W.

INV.

INT.

INSUL.

I.D.

HDWE.

HDWD.

H.V.A.C.

HTG.

HR.

H.P.

HORIZ.

H.M.

HGT.

HDR. HEADER

JOIST

JANITOR

KITCHEN

JOINT

LABORATORY

JOIST HANGER

LAG BOLT

LAVATORY

LAMINATE

J.H.

JAN.

L.B.

LAV.

LAM.

LAB.

KIT.

JT.

JST.

EQUIV.

E.S.

E.W.

EXP.

EXP.B.

EXPO.

EXT.

F.

ENCL.

F.B.

F.BD.

F.BELL

F.B.O.

F.D.

FDN.

F.E.

FH.M.S.

F.HORN

F.F.

F.G.

FGL.

F.H.

F.E.C.

F.A.

FH.W.S.

FIN.

F.H.S.

ENCLOSURE

EQUIVALENT

EACH SIDE

EACH WAY

EXPANSION

EXPANSION BOLT

EXPOSURE

EXTERIOR

FLAT HEAD MACHINE

SCREW

SCREW

FIRE HORN

FIRE HOSE STATION

FLAT HEAD WOOD

FINISH

FLOOR DRAIN

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER

FINISH FLOOR

FINISH GRADE

FIBERGLASS

FIRE HYDRANT

CABINET

FIRE ALARM

FACE BRICK

FIREBOARD

FIRE BELL

FURNISHED BY OTHERS

FACE

GALV. GALVANIZED

HOLLOW STRUC. STL.H.S.S.

FLUORESCENTFLOUR.

GENERAL CONTRACTORG.C.

E.W.C. ELECTRIC WATER CLOSET

FIRE VALVE CABINETF.V.C.

FOOD SERVICE EQUIPMENT

CONTRACTOR

F.S.E.C.

H.V.A.C. CONTRACTORH.C.

FIRE SUPPRESSION

CONTRACTOR

F.S.C.

PLASTIC LAMINATEP.LAM.

O.H.W.S.

SCREW

OVAL HEAD WOOD

APPROVAL)

PAPER TOWEL DISPENSER

PAPER TOWEL

PARTITION

DOUGLAS FIR

PRESSURE TREATED

REFLECTED CEILING

RADIUS

RUBBER BASE

QUARRY TILE

POLYVINYL-CHLORIDE

RECEPTACLE

R.C.P.

Q.T.

RAD.

R.B.

P.T.D.

PTN.

P.T.R.

P.V.C.

P.T.D.F.

REDWOOD

REFERENCE

REINFORCING

ROOF HATCH

ROUND HEAD METAL

RESILIENT

REFRIGERATOR

ROOF DRAIN

SCREW

ROOM

RAIN WATER LEADER

ROUGH OPENING

ROUND HEAD WOOD

SCREW

RDWD.

R.H.W.S.

R.W.L.

R.O.

RM.

R.H.M.S.

R.H.

RESIL.

REINF.

REFR.

REF.

R.D.

LIGHT

MATERIAL

LOW POINT

LIVE LOAD

LEFT HAND

MAT.

LT.

L.P.

L.L.

L.H.

MANHOLE

MINIMUM

MEDIUM

MANUFACTURER

MEMBRANE

MECHANICAL

MEDICINE CABINET

MACHINE BOLT

METAL

MASONRY OPENING

METAL THRESHOLD

MISCELLANEOUS

MODULAR

MOISTURE RESISTANT

MIRROR

M.C.

M.B.

MIN.

MH.

MFG.

MEMB.

MED.

MECH.

MIR.

MISC.

M.O.

MOD.

M.R.

M.T.

MTL.

MAX. MAXIMUM

NORTH

NATURAL

OVER

NUMBER

NOMINAL

NOT TO SCALE

NOT IN CONTRACT

OBSCURE

OUTSIDE DIAMETER

STUD

OFFICE

OUTSIDE FACE OF

ON CENTER

OVERFLOW

OVERALL

N.T.S.

O/ O.A.

OBS.

O.C.

O.D.

O.F.

OFF.

O.F.S.

(NOT PART OF OSA

N.

NAT.

N.I.C.

NO.

NOM.

PAINT

PLATE

PERFORATED

FOOT

POUNDS PER CUBIC

PANEL EDGE NAILING

PRESSED METAL

PAIR

FRAME

FOOT

POUNDS PER LINEAR

PLYWOOD

POUNDS PER SQUARE

PROPERTY

PLASTER

P.

P.C.F.

P.E.N.

PERF.

PL.

PLAS.

P.L.F.

PLYWD.

P.M.F.

PR.

P.S.F.

PROP.

OPP. OPPOSITE

POINT

PULL STATION

POUNDS PER SQUARE

INCH

P.STA.

PT.

P.S.I.

FOOT

(N) NEW

PLAN

REQUIREDREQD.

NON-COMBUSTIBLENON/COM

PLUMBING CONTRACTORP.C.

MECHANICAL, ELECTRICAL,

PLUMBING

M.E.P.

FRAMED MIRRORMR.

ROBE HOOKR.HK.

MOP HOLDERMP.H.

MOUNTEDMTD.

PAINTEDPTD.

TONGUE AND GROOVE

DRAWINGS

SOUTH

SEE CIVIL DRAWINGS

STORM DRAIN

SOLID CORE WOOD DOOR

DRAWINGS

SHEET

SIMILAR

SLIDING

SHEATHING

SHOWER

SECTION

SEALANT

SEE ELECTRICAL

SOLID BLOCKING

SOAP DISPENSER

SEE ARCHITECTURAL

S.E.D.

SHR.

SHT.

SIM.

SL.

SHTG.

S.BLKG.

S.A.D.

S.

SECT.

SEAL.

S.DISP.

S.D.

S.C.D.

SCWD

SQUARE

DRAWINGS

SPECIFICATION

SOUNDPROOF

DRAWINGS

STATION

STEEL

STORAGE

STANDARD

SUSPENDED

STRUCTURAL

DRAWINGS

STAINLESS STEEL

SEE MECHANICAL

SANITARY SEWER

SEE STRUCTURAL

SQUARE FOOT (FEET)

THICK

TEMPERED

TELEPHONE

TERRAZZO

TACKBOARD

TOP OF CURB

TRANSOM

TOP OF PLATE

TOP OF WALL

TOILET PAPER DISPENSER

TOE NAIL

TOOL JOINT

TOP OF PAVEMENT

TOP AND BOTTOM

T.O.C.

T.O.P.

T.O.PL.

T.O.W.

T.P.D.

TRN.

S.M.D.

SPEC.

S.P.

SQ.

S.S.D.

S. STL.

STO.

STL.

STD.

STA.

S.S.

SQ. FT.

T.B.

T&B.

TEL.

TEMP.

TER.

T&G.

SUSP.

T.J.

T.N.

THK.

STRUC.

S.L.D. SEE LANDSCAPE

TYPICAL

UNLESS NOTED OTHERWISE

URINAL

UNFINISHED

TELEVISION

VENT TO ROOF

VERTICAL

VESTIBULE

VERIFY IN FIELD

VINYL TILE

VINYL COMPOSITION

TILE

VERTICAL GRAIN

WEST

WITH

WINDOW

WOOD

WATER CLOSET

VINYL WALL COVERING

WITHOUT

WEIGHT

YARD

WATER PROOF

WATER HEATER

WATER COOLER

WELDED WIRE FABRIC

WATER RESISTANT

W/O

W.W.F.

W.P.

W.R.

WT.

YD.

T.V.

TYP.

UNF.

U.N.O.

V.C.T.

VERT.

VEST.

V.G.

V.I.F.

UR.

V.W.C.

W.

W/

W.C.

V.T.R.

W.F.

W.H

WDW.

WD.

V.T.

T.S. TUBE STEEL

SELF ADHERED SHEET

MEMBRANE

S.A.S.M.

SELF ADHERED FLEXIBLE

FLASHING

S.A.F.F.

WITHINW/IN

UNDERSIDEU/S

SANITARY NAPKIN

DISPOSAL

S.N.D.

T.S.C.D. TOILET SEAT COVER

DISPENSER

SANITARY NAPKIN

DISPENSER

S.N.V.

TOP OF SEATT.O.S.

SOUND ATTENUATION

BATT

S.A.B.

Name

Elevation

Room name

150 SF

S Y M B O L S

V.A. FURNISHED / CONTRACTOR

INSTALLED

(VC)

V.A. FURNISHED AND INSTALLED(VV)

MIN

1'-3"

C L R

K N

E E

S P

A C

E

'-3

M

IN

M A

X T

O R

IM

'-1

R E

F L E

C T

E D

S U

R F

A C

E O

F M

IR

R

O R

'-4

M

A X

T O

B O

MIRROR - VERIFY SIZE

WITH PLANS AND

ELEVATIONS

MIN

8" DEEP

T O

R

IM

'-1

M A

X

2'-1" MAX

1'-5" MIN

M

IN

M

IN

SIDE VIEW FRONT VIEW

CLEARANCE

6" MAX TOE

1'-5" MIN

LAVATORY

PLUMBING LINES

WITHIN HATCHED

AREA REQUIRED

TO BE INSULATED

LINES OF REQUIRED

CLEARANCE

FINISH FLOOR

4'-0" MIN CLR

'-5

M

IN

'-3

M

IN

CLEAR SPACE

ALLOWABLE FOR

ACCESSIBILITY

MIRROR

'-5

M

IN

LINES OF REQUIRED

CLEARANCE

MAX

1'-0" 3'-6" MIN

'-7

M

A X

T O

S E

A T

'-5

M

IN

T O

O U

T L E

T O

F D

IS

P

E N

S E

R

'-3

M

IN

T

O

'-0

M A

X A

F F

'-0

M

A X

T O

B A

R

'-9

M

IN

9" MAX

7" MIN

GRAB BAR

1"

SANITARY NAPKIN

DISPOSAL AT WOMEN

OR UNISEX, SUGGESTED

LOCATION

GRAB BAR

'-0

M

A X

T O

B A

R

'-9

M

IN

1'-6" MAX

1'-4" MIN

SANITARY NAPKIN

DISPOSAL AT WOMEN OR

UNISEX, SUGGESTED

LOCATION

1 1/2"

3'-0" MIN

6" MAX

2'-0" MIN 1'-0" MIN.

3'-0" MAX

'-5

M

A X

'-3

M

IN

'-6

M

IN

3'-5" MAX

3'-3" MIN VERTICAL GRAB BAR

TOILET PAPER

DISPENSER

4'-6" MIN

'-5

M

A X

'-3

M

IN

'-6

M

IN

SIDE WALL REAR WALL

VERTICAL GRAB BAR

FLOOR CLEARANCE

5'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e

\D o c u m e n ts

\C h ill ic o th e B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:2

P

M

GI-004

ACCESSIBILITY DETAILS AND

NOTES

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/2" = 1'-0"

RESTROOM FIXTURES AND ACCESSORIES

1/2" = 1'-0"

TYP. ACCESSIBLE LAVATORY CLEARANCE

1/2" = 1'-0"

ACCESSIBLE TOILET CLEARANCE

VHACLLShankA Text Box 03/31/2022

UP

UP UP

UP

UP

UP

UP

UP

UP

2 1 1

CONTROL

ROOM

4E

STORAGE

4A

CORRIDOR

4C

STORAGE

4B

Lobby

4D

Elec.

CLOTHES

STORE

Storage

CHANGING

4G

CHANGING

4F

STORAGE

STORAGE

3A

STORAGE

2A

STORAGE

STAIR

S1-0

STORAGE

1A

STORAGE

1B

MECHANICAL

EQUIPMENT

1C

MECHANICAL

EQUIPMENT

8A

WOMEN'S

TOILET

8B

WOMEN'S

DRESSING

ROOM

MECHANICAL

EQUIPMENT

ENTRY

10A

MEN'S

TOILET

9A

MEN'S

DRESSING

ROOM

CHASE

9C

STORAGE

9B

Vestibule

1 1

AE-201

A. REFER TO SHEET AE-701 FOR DOOR AND WINDOW TYPES AND SCHEDULES.

B. ALL EXISTING CONSTRUCTION IS TO REMAIN UNLESS NOTED OTHERWISE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e

\D o c u m e n ts

\C h ill ic o th e B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:5

P

M

AD-100

BASEMENT DEMOLITION PLAN - 9

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/8" = 1'-0"

BASEMENT - DEMOLITION PLAN

D E M O L I T I O N K E Y N O T E S

1 REMOVE EXISTING WINDOW, FRAME, GLAZING AND ASSOCIATED CONSTRUCTION. PREPARE EXISTING OPENING FOR NEW WINDOW CONSTRUCTION - EXISTING SECURITY BARS TO REMAIN - SEE ASBESTOS SPECIFICATIONS FOR ASBESTOS

RELATED SCOPE.

2 PULLY ACTUATED LOUVER AND FRAME TO REMAIN.

3 EXISTING BACKFLOW PREVENTER - SEE PLUMBING SHEETS FOR EXTENT OF WORK.

4 EXISTING VENT OPENING TO REMAIN.

5 EXISTING TRANSFORMER AND CONCRETE PAD TO REMAIN.

G E N E R A L N O T E S

UP

DN

UP

UP

UP

UP

UP

UP

DN

DN

UP

DN

11 1

KITCHEN

LOBBY

AUDITORIUM

ELEVATOR

LOBBY

VOLUNTEER

WORK

ROOM

AMERICAN

LEGION

AUX

ACTIVITIES

AIDE

ACTIVITIES

AIDE

CORRIDOR

4M

CLOSET

STAIR

S2-1

Storage

105A

Storage

105B

LOBBY

CHAIR

STORAGE

VESTIBULE

101A

STAIR

S1 MEN'S

TOILET

WOMEN'S

TOILET

103A

H.A.C.

CORRIDOR

101B

AD-101

AE-202

6 6

DN

DN DN

AE-201

A. REFER TO SHEET AE-701 FOR DOOR AND WINDOW TYPES AND SCHEDULES.

B. ALL EXISTING CONSTRUCTION IS TO REMAIN UNLESS NOTED OTHERWISE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e

\D o c u m e n ts

\C h ill ic o th e B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:0

P

M

AD-101

FIRST FLOOR - DEMOLITION PLAN

- 9 9

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/8" = 1'-0"

FIRST FLOOR DEMOLITION PLAN

D E M O L I T I O N K E Y N O T E S

1 REMOVE EXISTING WINDOW, FRAME, GLAZING AND ASSOCIATED CONSTRUCTION. PREPARE EXISTING OPENING FOR NEW WINDOW CONSTRUCTION - EXISTING SECURITY BARS TO REMAIN - SEE ASBESTOS SPECIFICATIONS FOR ASBESTOS

RELATED SCOPE.

2 REMOVE EXISTING WINDOW, FRAME, GLAZING AND ASSOCIATED CONSTRUCTION. REMOVE EXISTING WINDOW FAN.

PREPARE EXISTING OPENING FOR NEW WINDOW CONSTRUCTION.

3 REMOVE AND STORE URINAL SHOWN AS DASHED - REFER TO NEW WORK PLAN FOR INSTALLATION AT NEW HEIGHT.

4 EXISTING TRANSFORMER AND CONCRETE PAD TO REMAIN.

5 REMOVE EXISTING FABRIC CANOPY - CLEAN EXISTING METAL FRAME - PREPARE FOR INSTALLATION OF NEW FABRIC

CANOPY.

6 REMOVE EXISTING WINDOW AIR CONDITIONING UNIT AND STORE FOR REUSE. COORDINATE STORAGE WITH OWNER.

7 EXISTING DOOR AND FRAME TO REMAIN

1/4" = 1'-0"

ENLARGED RESTROOM DEMOLITION PLAN

G E N E R A L N O T E S

2 1 1 1

STAFF

ASSISTANT

A. CHIEF

VOLUNTARY

SVC

CHIEF

VOLUNTARY

SECRETARY

STORAGE

CLOSET

RECREATION

THERAPIST

RECATION

RECREATION

SECRETARY

ACTIVITY

ASST.

TOILET

PROJECTION

ROOM

BALCONY

OPEN TO BELOW

AE-202

3 3 3 3 3

CORRIDOR

STORAGE

AE-201

A. REFER TO SHEET AE-701 FOR DOOR AND WINDOW TYPES AND SCHEDULES.

B. ALL EXISTING CONSTRUCTION IS TO REMAIN UNLESS NOTED OTHERWISE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e

\D o c u m e n ts

\C h ill ic o th e B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:0

P

M

AD-102

SECOND FLOOR - DEMOLITION

PLAN - 9 9

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/8" = 1'-0"

SECOND FLOOR - DEMOLITION PLAN

D E M O L I T I O N K E Y N O T E S

1 REMOVE EXISTING WINDOW, FRAME, GLAZING AND ASSOCIATED CONSTRUCTION. PREPARE

EXISTING OPENING FOR NEW WINDOW CONSTRUCTION - EXISTING SECURITY BARS TO

REMAIN - SEE ASBESTOS SPECIFICATIONS FOR ASBESTOS RELATED SCOPE.

2 EXISTING WINDOW TO REMAIN. PROTECT DURING ALL PHASES OF CONSTRUCTION.

3 REMOVE EXISTING WINDOW AIR CONDITIONING UNIT AND STORE FOR REUSE. COORDINATE

STORAGE WITH OWNER.

G E N E R A L N O T E S

FD

FD

FD

FD

D W

FD FD

FD

FD

FD

DN

jj kk nn

AD-104

WOMEN'S

LOCKER

ROOM

MEN'S

LOCKER

ROOM

WOMEN'S

SHOWER

MEN'S

SHOWER

DIRY LINEN

STORAGE

BREAK

ROOM

FOYER

CORRIDOR

H.A.C.

STAIRS

ISSUE

ROOM

WEIGHT

ROOM

GYMNASIUM

SWIMMING

POOL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e \D o c u m e n ts

\C h ill ic o th e

B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:2

P

M

AD-103

OVERALL DEMOLITION PLAN - 247

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/8" = 1'-0"

FIRST FLOOR - DEMOLITION PLAN

G E N E R A L N O T E S

A. SEE SHEET AD-104 FOR DEMOLITION WORK ASSOCIATED WITH THIS BUILDING.

D E M O L I T I O N N O T E S

1 REMOVE WINDOW AND METAL MESH.

FD

1' - 0" 2' - 0"

SWIMMING

POOL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e \D o c u m e n ts

\C h ill ic o th e

B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:2

P

M

AD-104

ENLARGED DEMOLITION PLAN -

POOL - 247 247

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/4" = 1'-0"

FIRST FLOOR - DEMOLITION PLAN

D E M O L I T I O N N O T E S

1 REMOVE EXISTING RED CERAMIC TILE TRENCH DRAIN COVER, AND 1 FOOT OF TILE OUTSIDE OVERFLOW AROUND ENTIRE POOL. PREPARE EXISTING SLAB FOR NEW FINISH. EXISTING BULLNOSE COVER AND VERTICAL

CERAMIC TILE TO REMAIN. (DIAGONAL HATCH AREA)

2 REMOVE EXISTING RAILING, MOUNTING BRACKETS AND ASSOCIATED HARDWARE. PREPARE SLAB TO RECEIVE

NEW HARDWARE AND BRACKET.

3 EXISTING POOL CHAIR LIFT TO BE REMOVED AND STORED DURING DEMOLITION. PREPARE SLAB FOR

REMOUNTING.

4 EXISTING RAILING TO REMAIN.

G E N E R A L N O T E S

A. SEE SHEET AD-104 FOR DEMOLITION WORK ASSOCIATED WITH THIS BUILDING.

B. OMIT ALL WORK SHOWN ON THIS SHEET AS A PART OF DEDUCT ALTERNATE #1.

UP

UP

UP

UP

UP

UP

UP

UP

M

AE-202 1

AE-2012

CONTROL

ROOM

4E

STORAGE

4A

CORRIDOR

4C

STORAGE

4B

Lobby

4D

Elec.

CLOTHES

STORE

Storage

CHANGING

4G

CHANGING

4F

STORAGE

STORAGE

3A

STORAGE

2A

STORAGE

STAIR

S1-0

STORAGE

1A

STORAGE

1B

MECHANICAL

EQUIPMENT

1C

MECHANICAL

EQUIPMENT

8A

WOMEN'S

TOILET

8B WOMEN'S

DRESSING

ROOM

MECHANICAL

EQUIPMENT

ENTRY

10A

MEN'S

TOILET

9A

MEN'S

DRESSING

ROOM

CHASE

9C

STORAGE

9B

Vestibule

1 1

AE-201

F1

F1

F1

F1

F1

A1 A

A

F2

A1A1AA1A1

DF1

AE-202

AE-201

A. REFER TO SHEET AE-701 FOR DOOR AND WINDOW TYPES AND SCHEDULES.

B. ALL EXISTING CONSTRUCTION IS TO REMAIN UNLESS NOTED OTHERWISE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e

\D o c u m e n ts

\C h ill ic o th e B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:1

P

M

AE-100

BASEMENT - NEW WORK PLAN - 9

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/8" = 1'-0"

BASEMENT - NEW WORK PLAN

N E W W O R K K E Y N O T E S

1 ALUMINUM HOPPER WINDOW - REFER TO DETAILS ON 9-AE701 FOR MORE INFORMATION.

G E N E R A L N O T E S

UP

DN

UP

UP

UP

UP

UP

UP

DN

DN

UP

DN

M

M

AE-202 1

AE-2012

103B104

105B

105D

101E

111112113

KITCHEN

AUDITORIUM

105 LOBBY

CHAIR

STORAGE

CORRIDOR

101B

MEN'S

TOILET

WOMEN'S

TOILET

103A

ACTIVITIES

AIDE

ACTIVITIES

AIDE

AMERICAN

LEGION

AUX

VOLUNTEER

WORK

ROOM

CLOSET

ELEVATOR

LOBBY

CORRIDOR

4M

LOBBY

VESTIBULE

101A

STAIR

S2-1

STAIR

S1

11111

AE-101

11 111

2 2 2

9' - 2"4

V.I.F.

9' - 10"

V .I

.F

AE-201

B5 B5 B2 B6 B5

C

B4

B

C

B1B1B1B1

B8

B1

B8

B7 B7

B1

AE-202

H.A.C.

H.A.C.

CHASE

103B107

C1

AE-201

T-1

AE-101

AE-101

T-1

T-1

MEN'S

TOILET

H.A.C.

WOMEN'S

TOILET

103A

T-2

T-2

T-1

T-3T-3

T-3T-3

T-2

T-2 T-4

T-4

T-3

T-2

T-3

T-1 T-1

T-1

T-2 T-1

T-3T-3

A. REFER TO SHEET AE-701 FOR DOOR AND WINDOW TYPES AND SCHEDULES.

B. ALL EXISTING CONSTRUCTION IS TO REMAIN UNLESS NOTED OTHERWISE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e

\D o c u m e n ts

\C h ill ic o th e B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:1

P

M

AE-101

FIRST FLOOR - NEW WORK PLAN -

9 9

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/8" = 1'-0"

FIRST FLOOR PLAN

N E W W O R K K E Y N O T E S

1 ALUMINUM DOUBLE HUNG WINDOW - REFER TO DETAILS ON AE-701 FOR MORE INFORMATION.

2 NO WORK IN THIS AREA.

3 NEW FABRIC AWNING ON EXISTING FRAME - CONTRACTOR SHALL VERIFY DIMENSIONS OF EXISTING

FRAMING PRIOR TO AWNING FABRICATION.

4 9'-2" X 16'-0" FABRIC AWNING ON ALUMINUM FRAME - SUPPORT AT EXISTING BRICK WALL AND

CONCRETE SIDEWALK PER MANUFACTURER'S RECOMMENDATIONS.

5 LOWER URINAL TO MEET ACCESSIBILITY CODE - REFER TO SHEET GI-004. PATCH AND REPAIR WALL.

6 RELOCATE TOILET ACCESSORIES PER MOUNTING DETAILS ON 1/GI004

7 PATCH AND REPAIR WALL TILE TO MATCH ADJACENT CONSTRUCTION.

8 REMOVE EXISTING DOOR FROM HINGES AND CLOSER - UNDERCUT 1/2" AT DOOR BOTTOM -

REINSTALL DOOR.

1/4" = 1'-0"

ENLARGED TOILET PLAN

1/4" = 1'-0"

WOMEN'S ELEVATION - EAST

1/4" = 1'-0"

MEN'S ELEVATION - SOUTH

TOILET ACCESSORY SCHEDULE

MARK DESCRIPTION COUNT COMMENTS

T-1 TOILET PAPER DISPENSER 4 VC

T-2 NEW VERTICAL GRAB BAR 4 CC

T-3 GRAB BAR 42" LENGTH 4 CC

T-4 SANITARY NAPKIN DISPENSER 2 CC

G E N E R A L N O T E S

1. TOILET ACCESSORIES SHALL BE MOUNTED/ REMOUNTED PER ACCESSIBILITY

STANDARDS. REFER TO GI-004 FOR WALL MOUNTING HEIGHTS.

2. PATCH AND REPAIR AS NEEDED FOR REMOUNTED OR NEW ITEMS.

T O I L E T A C C E S O R Y N O T E S:

M

AE-202 1

AE-2012

STAFF

ASSISTANT

STORAGE

SECRETARY

CHIEF

VOLUNTARY

A. CHIEF

VOLUNTARY

SVC

CLOSET

BALCONY

PROJECTION

ROOM

RECREATION

THERAPIST

RECATION

RECREATION

SECRETARY

ACTIVITY

ASST.

TOILET

208D

208A

206A205A204AS1C203A202

OPEN TO BELOW

AE-201

E

E

E

E

E

B5B6B6B2B5B5 B2

B1 B1 B1

AE-202

B3

CORRIDOR

STORAGE

DN

1 1 1

1111 1 1

4B4

STAIR

208B

CORRIDOR

208C

AE-201

A. REFER TO SHEET AE-701 FOR DOOR AND WINDOW TYPES AND SCHEDULES.

B. ALL EXISTING CONSTRUCTION IS TO REMAIN UNLESS NOTED OTHERWISE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e

\D o c u m e n ts

\C h ill ic o th e B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:2

P

M

AE-102

SECOND FLOOR - NEW WORK

PLAN - 9 9

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/8" = 1'-0"

SECOND FLOOR - NEW WORK PLAN

N E W W O R K K E Y N O T E S

1 ALUMINUM DOUBLE HUNG WINDOW - REFER TO DETAILS ON AE-701 FOR MORE INFORMATION.

2 ALUMINUM ARCHED WINDOW. REFER TO DETAILS ON 9-AE701 FOR MORE INFORMATION.

3 9'-2" X 16'-0" FABRIC AWNING ON ALUMINUM FRAME - SUPPORT AT EXISTING BRICK WALL AND

CONCRETE SIDEWALK PER MANUFACTURER'S RECOMMENDATIONS.

4 NO WORK IN THIS AREA.

G E N E R A L N O T E S

FD

FD

FD

FD

D W

FD FD

FD

FD

FD

DN

a a

DN

FOYER

CORRIDOR

Men's Locker Room Entry

DIRY LINEN

STORAGE

MEN'S

LOCKER

ROOM

MEN'S

SHOWER

WOMEN'S

LOCKER

ROOM

WOMEN'S

SHOWER

BREAK

ROOM

ISSUE

ROOM

WEIGHT

ROOM

GYMNASIUM

SWIMMING

POOL

H.A.C.

Entry

112A

Entry

112B

STAIRS

11 11

NO WORK IN THIS AREA

NOT IN SCOPE

NO WORK IN THIS AREA

NOT IN SCOPE

NO WORK IN THIS AREA

NOT IN SCOPE

1' - 0"

1' - 0"

1' - 0"

TYP.

TYP.

STAIRS

NEW STEEL CATCH PLATE - CONTINUOUS

WELD TO EXISTING STEEL PIPE POST.

NEW 30" WIDE SPRING-LOADED STEEL

GATE TO 42" ABOVE TREAD. MOUNT

TO EXISTING CMU WALL.

VIF

NEW STEEL STOP WELDED TO GATE

ANCHOR TO EXISTING CMU WALL

EXISTING PIPE RAIL

NEW SPRING-LOADED HINGES

NEW 30" WIDE STEEL GATE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e \D o c u m e n ts

\C h ill ic o th e

B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:3

P

M

AE-103

NEW WORK AND FINISH PLAN -

247 247

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/8" = 1'-0"

FIRST FLOOR - NEW WORK AND FINISH PLAN

N E W W O R K K E Y N O T E S

1 NEW RAILING AND HARDWARE MOUNTED TO EXISTING CONCRETE SLAB.

2 NEW RED CERAMIC TILE BORDER ON EACH SIDE OF OVERFLOW COVER TO MATCH EXISTING ADJACENT.

3 POOL LIFT TO BE REINSTALLED AND BROUGHT TO WORKING ORDER.

4 NEW METAL TRENCH DRAIN COVER AT PERIMETER OF EXISTING POOL.

5 EXISTING HANDRAIL TO REMAIN.

6 SPRING LOADED GATE FROM STAIR TO 42" AFF. MOUNT FROM EXISTING CMU WALL - REFER TO DETAIL ON THIS

SHEET.

G E N E R A L N O T E S

A. OMIT ALL WORK SHOWN ON THIS SHEET AS A PART OF DEDUCT ALTERNATE #1.

1/4" = 1'-0"

SPRING LOADED GATE

Revisions: Date:

CONSTRUCTION DRAWINGS 03/30/2022

1/2" = 1'-0"

GATE ELEVATION

09-FIRST FLOOR

694' - 0"

09-SECOND

FLOOR B

706' - 3"

09-ROOF

722' - 7 1/2"

09-BASEMENT B

686' - 5"

C

E E E E E

B

A

7 15

11 1

C

C

C

F2

09-FIRST FLOOR

694' - 0"

09-SECOND

FLOOR

705' - 8"

09-BASEMENT

683' - 0"

09-ROOF

722' - 7 1/2"

B1

B1

B1

B1 B1

B1B1B1

B1

D

F1

A A1

C1

A. REFER TO SHEET AE-701 FOR DOOR AND WINDOW TYPES AND SCHEDULES.

B. ALL EXISTING CONSTRUCTION IS TO REMAIN UNLESS NOTED OTHERWISE.

09-FIRST FLOOR

694' - 0"

09-SECOND

FLOOR

705' - 8"

09-BASEMENT

683' - 0"

09-ROOF

722' - 7 1/2"

B4

B4

B3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e

\D o c u m e n ts

\C h ill ic o th e B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:2

P

M

AE-201

EXTERIOR ELEVATIONS - 9

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/8" = 1'-0"

EXTERIOR ELEVATION - EAST

N E W W O R K K E Y N O T E S

1 ALUMINUM WINDOW - REFER TO DETAILS ON AE-701 FOR MORE INFORMATION.

2 ALUMINUM DOUBLE HUNG WINDOW - REFER TO DETAILS ON AE-701 FOR MORE

INFORMATION.

3 ALUMINUM WINDOW. REFER TO DETAILS ON 9-AE701 FOR MORE INFORMATION.

4 9'-2" X 16'-0" FABRIC AWNING ON ALUMINUM FRAME - SUPPORT AT EXISTING BRICK WALL AND

CONCRETE SIDEWALK PER MANUFACTURER'S RECOMMENDATIONS.

5 NEW FABRIC AWNING ON EXISTING FRAME - CONTRACTOR SHALL VERIFY DIMENSIONS OF

EXISTING FRAMING PRIOR TO AWNING FABRICATION.

6 EXISTING WINDOW AIR CONDITIONING UNIT - SEE MECHANICAL DRAWINGS

7 NEW MECHANICAL LOUVER SEE - MECHANICAL DRAWINGS.

8 DOOR NOT IN SCOPE - EXISTING TO REMAIN

9 EXTERIOR WINDOW BARS TO REMAIN.

1/8" = 1'-0"

EXTERIOR ELEVATION - NORTH

G E N E R A L N O T E S

1/8" = 1'-0"

EXTERIOR ELEVATION - NORTH PORCH

09-FIRST FLOOR

694' - 0"

09-SECOND

FLOOR

705' - 8"

09-BASEMENT

683' - 0"

09-ROOF

722' - 7 1/2"

B8 B8

F1F1F1F1

C

C

8 8

B3

09-FIRST FLOOR

694' - 0"

09-SECOND

FLOOR

705' - 8"

09-BASEMENT

683' - 0"

09-ROOF

722' - 7 1/2"

B5 B5 B2 B2 B6 B6 B5

B5B2B5B5

A1 A1 A A1 A1

B7B7

C1

F1

2 11 11 11

22 2 2 2

B6

55 5 55

77 7 77 7

D

F

A1

F

D1

A. REFER TO SHEET AE-701 FOR DOOR AND WINDOW TYPES AND SCHEDULES.

B. ALL EXISTING CONSTRUCTION IS TO REMAIN UNLESS NOTED OTHERWISE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e

\D o c u m e n ts

\C h ill ic o th e B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:3

P

M

AE-202

EXTERIOR ELEVATIONS - 9

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

1/8" = 1'-0"

EXTERIOR ELEVATION - WEST

N E W W O R K K E Y N O T E S

1 ALUMINUM DOUBLE HUNG WINDOW - REFER TO DETAILS ON AE-701 FOR MORE

INFORMATION.

2 ALUMINUM WINDOW. REFER TO DETAILS ON 9-AE701 FOR MORE INFORMATION.

3 9'-2" X 16'-0" FABRIC AWNING ON ALUMINUM FRAME - SUPPORT AT EXISTING BRICK WALL AND

CONCRETE SIDEWALK PER MANUFACTURER'S RECOMMENDATIONS.

4 ALUMINUM HOPPER WINDOW - REFER TO DETAILS ON 9-AE701 FOR MORE INFORMATION.

5 EXISTING WINDOW AIR CONDITIONING UNIT - SEE MECHANICAL DRAWINGS

6 NEW FABRIC AWNING ON EXISTING FRAME - CONTRACTOR SHALL VERIFY DIMENSIONS OF

EXISTING FRAMING PRIOR TO AWNING FABRICATION.

7 EXTERIOR WINDOW BARS TO REMAIN.

8 REMOVE LOOSE AND CHIPPING PAINT. MAKE SMOOTH AND PAINT.

9 EXISTING SUSPENDED CONCRETE WALKWAY.

10 EXISTING CANOPY.

1/8" = 1'-0"

EXTERIOR ELEVATION - SOUTH

G E N E R A L N O T E S

DOOR & HARDWARE GENERAL NOTES

DOOR SCHEDULE ABBREVIATIONS:

AL = ALUMINUM

EX = EXISTING

F = FLUSH

FG = FULL GLASS

HG = HALF GLASS

HM = HOLLOW METAL

OH = OVERHEAD COILING DOOR

PF = PRE-FINISHED

PL = PLASTIC LAMINATE

PT = PAINT

ST = STAINED

SS = STAINLESS STEEL

VG = VISION GLASS

WD = WOOD, SOLID CORE

1. EXISTING DOOR AND HINGES TO REMAIN. HARDWARE SHALL BE REPLACED PER HARDWARE SET SPECIFIED.

SEE SPECIFICATION 08 71 00 DOOR HARDWARE.

2. CONTRACTOR SHALL REUSE ALL EXISTING LFIC WITH LOCKSET REPLACEMENT.

EXISTING BRICK

VENEER TO REMAIN

EXISTING WALL

CONSTRUCTION

TO REMAIN

PATCH AND REPAIR OR

REPLACE ALL DAMAGED

GYPSUM BOARD

EXISTING STEEL

LINTELTO REMAIN

EXISTING THRU-WALL

FLASHING. TO REMAIN

EXISTING

NEW INTERIOR WOOD

TRIM; PAINT TO MATCH

GYPSUM BOARD

NEW DOUBLE-HUNG

ALUMINUM WINDOW 1" INSULATED GLAZING

JOINT SEALANT

INSPECT EXISTING

WEEP SYSTEM.

CONTACT ARCH. IF

DAMAGED

INSTALL NEW 1X BLOCKING FOR WINDOW

INSTALLATION

EXISTING STONE SILL TO

REMAIN

EXISTING WALL CONSTRUCTION

TO REMAIN

PATCH AND REPAIR OR REPLACE

ALL DAMAGED GYPSUM BOARD

NEW INTERIOR WOOD TRIM; PAINT

TO MATCH GYPSUM BOARD

EXISTING

EXISTING BRICK TO REMAIN

NEW DOUBLE-HUNG

ALUMINUM WINDOW

1" INSULATED GLAZING

SILL FLASHING WITH END

DAM

SEALANT

SEALANT AND BACKER

ROD

INSTALL NEW 1X BLOCKING FOR WINDOW

INSTALLATION

EXISTING BRICK TO

REMAIN

EXISTING WALL

CONSTRUCTION TO

REMAIN

PATCH AND REPAIR OR

REPLACE

ALL DAMAGED GYPSUM

BOARD

EXISTING METAL

THRU-WALL FLASHING

TO REMAIN

NEW INTERIOR WOOD

TRIM; PAINT TO MATCH

GYPSUM BOARD

NEW DOUBLE-HUNG

ALUMINUM WINDOW

1" INSULATED GLAZING

EXISTING STONE SILL

SEALANT AND BACK ROD

SEALANT AND BACKER ROD

INSTALL NEW 1X BLOCKING FOR WINDOW

INSTALLATION

EXISTING BRICK

VENEER TO REMAIN

EXISTING WALL CONSTRUCTION

TO REMAIN

PATCH AND REPAIR OR

REPLACE ALL DAMAGED

GYPSUM BOARD

EXISTING STEEL

LINTELTO REMAIN

EXISTING THRU-

WALL FLASHING TO

REMAIN

EXISTING

NEW INTERIOR WOOD TRIM;

PAINT TO MATCH GYP. BD.

NEW DOUBLE-HUNG

ALUMINUM WINDOW

1" INSULATED GLAZING

INSPECT EXISTING

WEEP SYSTEM.

CONTACT ARCH. IF

DAMAGED

INSTALL NEW 1X BLOCKING FOR WINDOW

INSTALLATION

EXISTING BRICK TO

REMAIN

EXISTING WALL

CONSTRUCTION

TO REMAIN

PATCH AND REPAIR OR

REPLACE ALL DAMAGED

GYPSUM BOARD

EXISTING METAL

THRU-WALL

FLASHING TO REMAIN

NEW INTERIOR WOOD

TRIM; PAINT TO MATCH

GYPSUM BOARD

NEW DOUBLE-HUNG

ALUMINUM WINDOW

1" INSULATED GLAZING

EXISTING STONE SILL

SEALANT AND BACKER ROD

SEALANT AND BACKER

ROD

INSTALL NEW 1X BLOCKING FOR WINDOW

INSTALLATION

EXISTING STONE SILL TO

REMAIN

EXISTING WALL CONSTRUCTION

TO REMAIN

PATCH AND REPAIR OR REPLACE

ALL DAMAGED GYPSUM BOARD

NEW INTERIOR WOOD

TRIM; PAINT TO MATCH GYP. BD.

EXISTING BRICK TO REMAIN

NEW FIXED ALUMINUM

WINDOW

1" INSULATED GLAZING

SILL FLASHING WITH

END DAMN

SEALANT

SEALANT AND BACKER

ROD

INSTALL NEW 1X BLOCKING FOR WINDOW

INSTALLATION

EXISTING BRICK

VENEER TO REMAIN

EXISTING WALL CONSTRUCTION

TO REMAIN

PATCH AND REPAIR ALL EXISITING

DAMAGED WALL FINISH. AND

MATCH ADJACENT CONSTRUCTION

EXISTING STEEL

LINTEL TO REMAIN

EXISTING METAL

THRU-WALL

FLASHING TO REMAIN

EXISTING

NEW INTERIOR WOOD TRIM;

PAINT TO MATCH GYPUM BOARD

TRANSOM, GLAZING,

& FRAME

SEALANT & BACKER ROD

SEALANT AND BACKER ROD

INSTALL NEW 1X BLOCKING FOR WINDOW

INSTALLATION

EXISTING BRICK TO

REMAIN

EXISTING WALL

CONSTRUCTION

TO REMAIN

PATCH AND REPAIR OR

REPLACE ALL DAMAGED

GYPSUM BOARD

NEW INTERIOR WOOD TRIM;

PAINT TO MATCH GYPSUM

BOARD

WINDOW AND FRAME

EXISTNG METAL THRU

WALL FLASHING TO

REMAIN

SEALANT AND BACKER ROD

SEALANT AND BACKER ROD

INSTALL NEW 1X BLOCKING FOR WINDOW

INSTALLATION

EXISTING BRICK TO

REMAIN

EXISTING WALL

CONSTRUCTION

TO REMAIN

PATCH AND REPAIR OR

REPLACE ALL DAMAGED

GYPSUM BOARDNEW INTERIOR WOOD

TRIM; PAINT TO MATCH

GYPSUM BOARD

DOOR AND FRAME

2 1/4"

/8

EXISTING METAL THRU

WALL FLASHING TO

REMAIN

SEALANT

SEALANT AND BACKER

ROD

R E

F E

R T

O S

C H

E D

U L E

DOUBLE HUNG - SINGLE

(B)

HOPPER

(A)

R E

F E

R T

O S

C H

E D

U L E

SCHEDULE

REFER TO

S C

H E

D U

L E

R E

F E

R T

O

SCHEDULE

REFER TO

ARCHED - FIXED

(E)

S C

H E

D U

L E

R E

F E

R T

O

SCHEDULE

REFER TO

FIXED - TRIPLE

(F)

R E

F E

R T

O S

C H

E D

U L E

REFER TO SCHEDULE

FIXED - LOUVER

(F2)

APPLIED

MUNTINS

APPLIED

MUNTINS

APPLIED

MUNTINS

FIXED - BASEMENT

(F1)

S C

H E

D U

L E

R E

F E

R T

O

SCHEDULE

REFER TO

APPLIED

MUNTINS

DOUBLE HUNG - DOUBLE

(C)

R E

F E

R T

O S

C H

E D

U L E

(2) EQUAL SIZES

REFER TO SCHEDULE

APPLIED

MUNTINS

6"

DOUBLE HUNG - TRIPLE

(D)

R E

F E

R T

O S

C H

E D

U L E

(3) EQUAL SIZES

REFER TO SCHEDULE

APPLIED

MUNTINS

6" 6"

APPLIED

MUNTINS

6" 6"

S=SIDE M=MIDDLE

TYPE D1 HAS MIDDLE FRAME WITH BLANK TO SUPPORT

VENT - SEE SOUTH ELEVATION, SHEET AE-202

REFER TO SCHEDULE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE THERAPEUTIC POOL &

RECREATION HALL

C U s e rs

\n a te m \O n e D ri v e

\D o c u m e n ts

\C h ill ic o th e B u ild in g n a te

.m o u ld s .r v t

/3

/2

:1

:3

P

M

AE-701

DOOR SCHEDULES, WINDOW

SCHEDULES, AND DETAILS 9

Ryan Jeter

3/30/2022 PQ NM

CHILLICOTHE, OHIO

538-20-201

STATION

DOOR SCHEDULE - LEVEL 1

DOOR #

BETWEEN

QUANTITY

DOOR

MATERIAL WIDTH HEIGHT

FRAME

MATERIAL

HARDWARE

SETRM RM

101E 102 101 2 SCW 3' - 0" 7' - 0" WD HW-5

103B 103B 103A 1 SCW 1' - 8" 7' - 0" HM HW-5

104 104 101B 1 SCW 2' - 8" 7' - 0" HM HW-5

105B 105B 105 1 SCW 3' - 0" 7' - 0" WD HW-1

105D 105 105A 1 SCW 3' - 0" 7' - 0" WD HW-1

106 105 106 2 SCW 3' - 0" 7' - 0" WD HW-1F

107 107 106 1 SCW 3' - 0" 7' - 0" WD HW-5

109 109 S2-1 1 SCW 3' - 0" 7' - 0" HM HW-5

110 S2-1 110 1 SCW 3' - 0" 7' - 0" HM HW-1F

111 4M 111 1 SCW 3' - 0" 7' - 0" HM HW-1F

112 4M 112 1 SCW 3' - 0" 7' - 0" HM HW-1F

113 4M 113 1 SCW 3' - 0" 7' - 0" HM HW-1F

114 4M 114 1 SCW 3' - 0" 7' - 0" HM HW-1

DOOR SCHEDULE - LEVEL 2

DOOR #

BETWEEN

QUANTITY

DOOR

MATERIAL WIDTH HEIGHT

FRAME

MATERIAL

HARDWARE

SETRM RM

200 200 218 1 SCW 2' - 6" 7' - 0" HM HW-5

201 202 201 1 SCW 2' - 6" 7' - 0" HM HW-1F

202 218 202 1 SCW 2' - 6" 7' - 0" HM HW-1F

203A 218 203 1 SCW 2' - 8" 7' - 0" HM HW-1F

204A 218 204 1 SCW 2' - 8" 7' - 0" HM HW-1F

205A 218 205 1 SCW 2' - 6" 7' - 0" HM HW-1F

206A 218 206 1 SCW 2' - 4" 7' - 0" HM HW-1F

207 218 207 1 SCW 3' - 0" 7' - 0" HM HW-1F

208A 208 218 1 SCW 3' - 0" 7' - 0" HM HW-1

208D 1 SCW 3' - 6" 7' - 0" HM HW-1

210 210 1 SCW 3' - 0" 7' - 0" HM HW-5

213 213 1 SCW 3' - 0" 7' - 0" HM HW-1F

214 213 214 1 SCW 3' - 0" 7' - 0" HM HW-1F

215 215 1 SCW 3' - 0" 7' - 0" HM HW-5

S1C 218 S2-3 1 SCW 3' - 6" 7' - 0" HM HW-1

WINDOW SCHEDULE - LEVEL 1

Type Mark Description Width Height Head Detail

Sill Detail

Jamb Detail

Glazing Type

B DOUBLE HUNG 4' - 4" 6' - 1 1/2" A3/AE701 B3/AE701 D3/AE701 G1

B1 DOUBLE HUNG 3' - 0" 5' - 4" A3/AE701 B3/AE701 D3/AE701 G1

B2 DOUBLE HUNG 3' - 4" 6' - 1 1/2" A3/AE701 B3/AE701 D3/AE701 G1

B4 DOUBLE HUNG 3' - 0" 6' - 1 1/2" A3/AE701 B3/AE701 D3/AE701 G1

B5 DOUBLE HUNG 3' - 8" 6' - 1 1/2" A3/AE701 B3/AE701 D3/AE701 G1

B6 DOUBLE HUNG 4' - 0" 6' - 1 1/2" A3/AE701 B3/AE701 D3/AE701 G1

B7 DOUBLE HUNG 3' - 6" 6' - 1 1/2" A3/AE701 B3/AE701 D3/AE701 G1

B8 DOUBLE HUNG 4' - 0" 7' - 0" A3/AE701 B3/AE701 D3/AE701 G1

C DOUBLE HUNG, DOUBLE 6' - 0" 6' - 1" A3/AE701 B3/AE701 D3/AE701 G1

C1 DOUBLE HUNG, DOUBLE 6' - 0" 7' - 0" A3/AE701 B3/AE701 D3/AE701 G1

WINDOW SCHEDULE - LEVEL 2

Type Mark Description Width Height Head Detail

Sill Detail

Jamb Detail

Glazing Type

B1 DOUBLE HUNG 3' - 0" 5' - 4" A3/AE701 B3/AE701 D3/AE701 G1

B2 DOUBLE HUNG 3' - 4" 6' - 1 1/2" A3/AE701 B3/AE701 D3/AE701 G1

B3 DOUBLE HUNG 2' - 5 1/2" 4' - 7 1/2" A3/AE701 B3/AE701 D3/AE701 G1

B4 DOUBLE HUNG 3' - 0" 6' - 1 1/2" A3/AE701 B3/AE701 D3/AE701 G1

B5 DOUBLE HUNG 3' - 8" 6' - 1 1/2" A3/AE701 B3/AE701 D3/AE701 G1

B6 DOUBLE HUNG 4' - 0" 6' - 1 1/2" A3/AE701 B3/AE701 D3/AE701 G1

C DOUBLE HUNG, DOUBLE 6' - 0" 6' - 1" A3/AE701 B3/AE701 D3/AE701 G1

E FIXED - ARCHED 7' - 0" 4' - 11" A1/AE701 B1/AE701 D1/AE701 G1

F FIXED - TRIPLE 8' - 0" 5' - 0" A1/AE701 B1/AE701 D1/AE701 G1

WINDOW SCHEDULE - BASEMENT

Type Mark Description Width Height Head Detail

Sill Detail

Jamb Detail

Glazing Type

A HOPPER 3' - 4" 2' - 0" A1/AE701 B1/AE701 D1/AE701 G1

A1 HOPPER 3' - 8" 2' - 0" A1/AE701 B1/AE701 D1/AE701 G1

D DOUBLE HUNG, TRIPLE 8' - 0" 6' - 0" A1/AE701 B1/AE701 D1/AE701 G1

F1 FIXED - BASEMENT 3' - 0" 2' - 6" A1/AE701 B1/AE701 D1/AE701 G1

F2 FIXED - LOUVER 3' - 4" 2' - 0" A1/AE701 B1/AE701 D1/AE701

1 1/2" = 1'-0" A3

DOUBLE HUNG - HEAD DETAIL

1 1/2" = 1'-0" B3

DOUBLE HUNG - SILL DETAIL

1 1/2" = 1'-0" D3

DOUBLE HUNG - JAMB DETAIL

1 1/2" = 1'-0" A1

FIXED - HEAD DETAIL

1 1/2" = 1'-0" D1

FIXED - JAMB DETAIL

1 1/2" = 1'-0" B1

FIXED - SILL DETAIL

1 1/2" = 1'-0" E1

TRANSOM - HEAD DETAIL

1 1/2" = 1'-0"

E3

TRANSOM - JAMB DETAIL

1 1/2" = 1'-0" F3

DOOR - JAMB DETAIL

3/8" = 1'-0"

WINDOW TYPES

NOTES:

1. ALL WINDOW DIMENSIONS ARE APPROXIMATE. CONTRACTOR TO VERIFY EXISTING OPENING DIMENSIONS

PRIOR TO FABRICATION AND CONSTRUCTION OF NEW WINDOWS.

2. ALL WINDOWS ARE TO BE ONE INCH INSULATED, LAMINATED GLAZING WITH BEAD OF STRUCTURAL SILICONE ADHESIVE ATTACHED

TO INNER LITE AND FRAME PER PSRDM 3.1.22.

*(1) TYPE D1 HAS MIDDLE FRAME WITH BLANK TO SUPPORT VENT - SEE SOUTH ELEVATION - SHEET AE-202

PLUMBING VALVE SYMBOLS

BALL VALVE

GATE VALVE WITH 3/4 " HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC FLOW CONTROL VALVE

PRESSURE SAFETY VALVE

GATE VALVE

MANUAL AIR VENT

TEST PLUG (PRESSURE/TEMPERATURE)

GLOBE VALVE

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

AUTOMATIC AIR VENTAV

GENERAL PLUMBING SYMBOLS

LIMIT OF DEMOLITION

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

POINT OF CONNECTION BETWEEN

NEW AND EXISTING WORK

PRESSURE GAGE

THERMOMETER

STRAINER

FLOW ELEMENT

FLOAT & THERMOSTATIC TRAP SET

INCLUDING PIPING ACCESSORIES

INVERTED BUCKET TRAP SET

INCLUDING PIPING ACCESSORIES

FE

PIPE UP

PIPE DOWN

CO CLEAN OUT

HOSE BIB

DRAWING SYMBOLS

PL101

A

26-P 3

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

PUMP NO.3 IN BUILDING NO.26

EQUIPMENT ABBREVIATION (PUMP)

DRAWING NUMBER WHERE DRAWN

PL105

PIPING CONTINUATION

PLUMBING ABBREVIATIONS

REVISION NUMBER

PIPING SYMBOLS

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

VENT

DCW

DHW

DHWR

SANITARY SEWER

SAN

SANITARY SEWER, BELOW GRADE

UG SAN

STORM WATER

SW

STORM WATER, BELOW…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .