About this file

This is an Invitation for Price Quote (IFPQ #07A6030) issued by the California Department of Transportation (Caltrans) seeking a contractor to provide removal and replacement services of one pressure washer (VHG4-2200 Landa 6.2 horsepower 230V 1ph NG) and associated hose reels, hoses, hardware, and adjacent electrical and plumbing systems at the Heliotrope Maintenance Station in Los Angeles County. The work includes replacing all plumbing components from supply line to new pressure washer unit and all electrical components from electrical panel to new pressure washer system. Written questions are due by March 4, 2025 at 10:00 AM PT, with quotes due March 11, 2025 at 2:00 PM PT. The proposed award date is March 18, 2025, with work to commence March 24, 2025 and complete by March 23, 2026.

This solicitation is set aside for Small Business (SB), including Micro Business (MB), Small Business for Public Works (SB-PW), or Disabled Veteran Business Enterprise (DVBE) contractors. The maximum contract value cannot exceed $461,000, with bids over this amount being rejected as non-responsive. Prevailing wages apply if the total bid amount exceeds $15,000. A payment bond for 100% of the contract amount is required for bids exceeding $25,000. Caltrans must receive at least two price quotes from certified SB/MBs or DVBEs before making an award. The contractor must maintain DIR registration throughout the contract term and no subcontracting is permitted under this agreement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR

ADMINISTRATION

DIVISION OF PROCUREMENT AND CONTRACTS

1727 30TH STREET, MS 65

SACRAMENTO, CA 95816-7006

PHONE (916) 227-6000

TTY 711

https://dot.ca.gov/programs/procurement-and-contracts/

February 25, 2025

Invitation for Price Quote (IFPQ)

IFPQ # 07A6030

Notice to Prospective Contractors

You are invited to review and respond to this Small Business (SB) Invitation for Price Quote (IFPQ), IFPQ 07A6030 entitled Replacement Services of Pressure Washer and Associated Electrical and Plumbing Systems in Los Angeles County. In submitting your quote, you must comply with the instructions found herein.

“This solicitation is authorized pursuant to Government Code Section 14838.7, which provides for the award of contracts for the acquisition of construction, including the erection, construction, alteration, repair, or improvement of any State structure, building, road, or other State improvement of any kind, that has an estimated value of greater than $5,000.00, but not more than $461,000.00 to a certified SB, including a micro business (MB), SB for the purpose of public works (SB-PW), or a disabled veteran business enterprise (DVBE). A bid over $461,000.00 will result in rejection of your bid due to non-responsiveness.”

This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 4, Proposed Form of Agreement, for requirement details.

In the opinion of the Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is:

Sean Grant California Department of Transportation (Caltrans) Email address: sean.grant@dot.ca.gov Phone: (916) 276-8913

Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.

*Technical questions regarding this solicitation will be addressed, in writing, in accordance with the Questions and Answers portion of this IFPQ. See Section C1, Time Schedule, for more details.

ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENTS 1 & 2) OR THE

DOCUMENT LINK IS PROVIDED ON ATTACHMENT 3, REQUIRED DOCUMENTS.

Sincerely, Sean Grant Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/ mailto:sean.grant@dot.ca.gov

Invitation for Price Quote IFPQ Number 07A6030

A) Purpose and Description of Services

1. Contractor agrees to provide to the California Department of Transportation (Caltrans) all labor, tools, materials, equipment, travel, and incidentals necessary to provide removal and replacement services of one (1) pressure washer (VHG4-2200 Landa 6.2 horsepower [hp] 230 V 1ph NG) and associated hose reels, hoses, and hardware, and adjacent electrical and plumbing systems at the Heliotrope Maintenance Station in Los Angeles County.

2. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.

B) Bidder’s Minimum Qualifications

1. Bidder shall possess at the time of quote submittal, and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR).

2. Failure of Bidder to sufficiently provide any or all the minimum qualifications, in the opinion of

Caltrans, will result in the Bidder’s bid deemed non-responsive.

C) Price Quotation Requirements and Information

1. Time Schedule It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.

Event Date Time (Pacific Time)

IFPQ available to prospective bidders 02/25/2025 Written Question Submittal 03/04/2025 10:00 a.m.

Final Date for Quote Submission 03/11/2025 2:00 p.m.

Proposed Award Date (estimate) 03/18/2025

2. Questions and Answers A. Questions regarding this IFPQ must be submitted in writing. Bidders are encouraged to submit their written questions by 03/04/2025.

B. Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 07A6030. Questions must be sent to the following email:

Email: sean.grant@dot.ca.gov

C. Written responses to all questions will be collectively compiled and posted as an Addendum to the Cal eProcure website (https://caleprocure.com/pages/index.aspx). It is the responsibility of the Bidder to access the website for any changes or addenda that may be posted. Refer to Section C1, Time Schedule, for the schedule of events and dates/times. Bidder can contact the Contract Analyst named above.

3. ADM-1412 – Price Quote Proposal The total price quote proposal for this Agreement must not exceed $461,000.00. A bid amount more than $461,000.00 will be deemed non-responsive and will be rejected.

4. Costs Included in Bid Rates Quotation prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including, but not mailto:sean.grant@dot.ca.gov limited to, sales and use taxes required by law or otherwise and no additional allowance will be made thereof unless separate payment provisions in the Agreement should specifically so provide.

5. Employment of Undocumented Workers No State agency or department, as defined in Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works contract, who has, in the preceding five (5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).

6. State Prevailing Wages State General Prevailing Wage Rates will apply for the County of Los Angeles as described in the attached Proposed Form of Agreement. The predetermined general prevailing wage rates published by the Director of Industrial Relations (DIR) may be obtained via the Internet at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm or by contacting the Contract Analyst listed on the first page of this solicitation. It is the bidder's responsibility to use the correct classification determination published by the DIR. By signing the attached Bid/Bidder Certification Sheet, the Bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the Bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.

7. Mandatory Organic Waste Recycling Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate the Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Section 42649.8 et seq. When applicable, Contractor must comply with these provisions.

8. Motor Carrier Permit Requirements A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and

34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement any such required MCP(s).

B. MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager or their designee, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.

9. Contractor Registration Program A. No Contractor or Subcontractor may be listed on a price quote proposal for a contract with prevailing wages unless registered with the DIR, pursuant to Labor Code Section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)).

https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm

B. No Contractor or Subcontractor may be awarded a contract with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5.

C. Caltrans will verify each of the registration numbers provided by the bidder prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.

10. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A) Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

11. Non-Collusion Declaration for Public Works Bidder must submit a non-collusion declaration for Public Works. The Non-Collusion Declaration for Public Works is provided as a link in Attachment 3, Required Documents..

12. Bonds Payment Bond Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.

13. Insurance A. The bidder who receives the Agreement award must provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.

B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:

Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.

C. The additional insured endorsement must accompany the certificate of insurance.

D. Satisfying a Self-Insured Retention (SIR)

All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.

E. Available Coverages/Limits

In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.

14. California Civil Rights Laws Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew an Agreement with, a State agency with respect to any Agreement in the amount of one hundred thousand dollars ($100,000) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the Agreement is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the California Civil Rights Laws Certification (DOT ADM-0076), provided as a link in Attachment 3, Required Documents, completed, signed, and returned with its bid or proposal.

15. Darfur Contracting Act A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM-0077), provided as a link in Attachment 3, Required Documents, and submit with the proposal.

B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the ADM-0077.

C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot, bid on or submit a proposal for an Agreement with a State agency for goods or services (Pub. Cont. Code Section 10477(a)).

D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had) business activities or other operations outside of the United States to certify that it is not a “scrutinized” company, during the Agreement award process with a State agency.

E. A scrutinized company may still, however, submit a bid or proposal for a Contract with a State agency for goods or services if the company first obtains permission from the Department of General Services (DGS) according to the criteria set forth in Public Contract Code Section 10477(b).

16. Price Quote Submittal A. The price quote should be emailed as described below. The price quote must be received by the Caltrans, Division of Procurement and Contracts (DPAC), by dates and times shown in Section C, Price Quotation Requirements and Information.

B. The price quote email should be clearly marked with the IFPQ number, title, and ‘PRICE QUOTATION SUBMITTAL’, as shown in the following example:

IFPQ Number: 07A6030

PRICE QUOTATION SUBMITTAL–DO NOT OPEN

C. All quotes shall include the documents identified in the IFPQ; see Attachment 3, Required Documents. Quotes not including the required documents may be deemed non-responsive. A non-responsive price quote is one that does not meet the basic quote requirements.

D. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.

E. Email to: sean.grant@dot.ca.gov F. Pursuant to Government Code Section 14838.7, Caltrans must receive at least two (2) price quotes from certified SB/MBs or at least two (2) price quotes from DVBEs before it can make an Agreement award. Therefore, at Caltrans’ discretion, if only one price quote is received, the timeframe for receipt of price quotes may be extended in order to receive the minimum number of quotes required by the Government Code. All prospective bidders will be notified via email or telephone of any extensions.

G. Price quotes must include the performance of all the services described herein. Any attempt to modify the Price Quote Proposal document to deviate from the work specifications will not be considered and will cause a price quote to be rejected.

H. A price quote may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any price quote on the basis that it is not responsive or from responsible bidder and may waive any immaterial deviation in a quote.

Caltrans’ waiver of an immaterial defect shall in no way modify the IFPQ document or excuse the bidder from full compliance with all requirements if awarded the Agreement.

I. Costs for developing price quotes and in anticipation of award of the Agreement are entirely the responsibility of the bidder and shall not be charged to Caltrans.

J. A bidder may modify a price quote after its submission by first withdrawing the original price quote and then by resubmitting a new price quote prior to the price quote submittal deadline.

Bidder modifications offered in any other manner, oral or written, will not be considered.

K. A bidder may withdraw a price quote by, prior to price quote submission deadline, submitting a written withdrawal request to Caltrans, at sean.grant@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section L, below. A bidder may thereafter submit a new price quote prior to the price quote submittal deadline. Price quotes may not be withdrawn without cause subsequent to the price quote submittal deadline.

L. Only an individual who is authorized to bind the bidding firm contractually shall sign the attached Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. An unsigned price quote may be cause for bid rejection.

M. Caltrans may modify the IFPQ prior to the date fixed for submission of price quotations by the issuance of an addendum sent to all parties who received an IFPQ package.

N. Caltrans reserves the right to reject all price quotes for reasonable cause.

O. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFPQ requirements.

P. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.

Q. Caltrans does not accept alternate Agreement language from a bidder. A price quote with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC 04/2017) are not negotiable. The GTC 04/2017 may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language.

mailto:sean.grant@dot.ca.gov mailto:sean.grant@dot.ca.gov https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language

17. Evaluation and Selection

A. At the time of quote opening, each price quote will be checked for the presence or absence of required information in conformance with the submission requirements of this IFPQ.

B. Caltrans will check the price quote submittal package to verify it received all required documents. Positive verification of required documents will be performed to determine its responsiveness to the State’s needs.

C. Price quotes that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.

D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest price quote and meets all the specifications. A price quote meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie quote, Caltrans will draw lots to determine the successful bidder. Only one (1) price quote may be submitted by an entity:

individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one (1) price quote from an entity will result in all quotes from that entity being rejected and returned to the bidder.

18. Standard Conditions of Service A. Service shall not begin before the start date set forth in the Agreement. After all approvals have been obtained, and the Agreement is executed should Contractor fail to commence work at the agreed upon time, Caltrans, upon five (5) days written notice to contractor, reserves the right to terminate the Agreement. In addition, contractor shall be liable to Caltrans for the difference between contractor’s quote price and the actual cost of performing the work by the second low bidder or by another contractor.

B. All performance under the Agreement shall be completed on or before the expiration date of the Agreement.

C. Antitrust Provisions

1) Bidder offers and agrees, and will require all of his other Subcontractors and suppliers to agree, that if the bid is accepted to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works Agreement or subcontract. The assignment made by Contractor and all additional assignments made by Subcontractors and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.

2) If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the price quote, less the expenses incurred in obtaining that portion of the recovery.

3) Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (See Government Code Section 4554).

D. If bidder is awarded Agreement and refuses to sign Agreement presented for signature within time and manner required, bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount quoted, whichever is less.

E. Loss Leader usage is prohibited in this Solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.

F. No oral understanding or agreement shall be binding on either party.

2. Executive Order N-6-22 – Russia Sanctions

On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e. there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.

3. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.

B. Bidder / Offeror must notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance. For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.

C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.

D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.

E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.

https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf

STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 07A6030

PRICE QUOTE PROPOSAL

ADM-1412 (REV. 10/2024) Attachment 1

Contractor’s Name (Please Print):

Item Number

Estimated Quantity

Unit of Measure Item

Unit Price (Price Per Unit of

Measure)

Total (Estimated Quantity X

Unit Price)

1 1 Lump Sum

All labor, tools, materials, equipment, travel, and incidentals necessary to provide removal and replacement services of one (1) pressure washer (VHG4-2200 Landa 6.2 horsepower 230 V 1ph NG) and associated hose reels, hoses, and hardware, and adjacent electrical and plumbing systems. per STD 213, Exhibit A, Scope of Work

1) The above quantities are estimates only and are given as a basis for comparison of quotes. No guarantee is made or implied as to the exact quantity that will be needed.

2) In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail.

3) Please do not alter, modify, or change this quote proposal sheet. Any alterations, modifications, or changes to this quote proposal sheet will be grounds to reject the quote.

4) Each line item must be quoted. Please do not leave any unit price column blank or this quote proposal sheet will be deemed non-responsive.

Total Proposal $

Attachment 2

Bid/Bidder Certification Sheet

Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must indicate the title or position that the individual holds in the firm.

This Bid/Bidder Certification Sheet must be signed and returned along with all "required attachments" as an entire package. The price quote must be transmitted in accordance with IFPQ instructions.

A. Our all-inclusive price quote is submitted and marked “Price Quotation Submittal–Do Not Open”.

B. All required attachments are included with this certification sheet.

C. The signature affixed hereon and dated certifies compliance with all the requirements of this proposal document. The signature below authorizes the verification of this certification.

D. The signature and date affixed hereon certifies that this proposal is a firm offer for a 90-day period.

An Unsigned Bid/Bidder Certification Sheet May Be Cause for Bid Rejection

1. Company Name 2. Telephone Number 2a. Fax Number

2b. Email Address

3. Address

Indicate your organization type:

4. Sole Proprietorship 5. Partnership 6. Corporation Indicate the applicable employee and/or corporation number:

7. Federal Employee ID No. (FEIN) 8. California Corporation No.

Indicate the Department of Industrial Relations information:

9. Contractor Registration Number Indicate applicable license and/or certification information:

10. Contractors State License Board

Number

11. PUC License Number

CAL-T-

12. Required

Licenses/Certifications

13.Proposer’s Name (Print) 14. Title

15. Signature 16. Date

17. Are you certified with the Department of General Services, Office of Small Business and Disabled Veteran Business Enterprise Services (OSDS) as:

a. Small Business Enterprise Yes No If yes, enter certification number:

b. Disabled Veteran Business Enterprise Yes No If yes, enter your service code below:

Note: A copy of your Certification is required to be included if either of the above items is checked “Yes”.

Date application was submitted to OSDS, if an application is pending: _________________

Attachment 2

Bid/Bidder Certification Sheet

Completion Instructions for Bid/Bidder Certification Sheet

Complete the numbered items on the Bid/Bidder Certification Sheet by following the instructions below.

Item Numbers Instructions

1, 2, 2a, 2b, 3 Must be completed. These items are self-explanatory.

Check if your firm is a sole proprietorship. A sole proprietorship is a form of business in which one person owns all the assets of the business in contrast to a partnership and corporation. The sole proprietor is solely liable for all the debts of the business.

Check if your firm is a partnership. A partnership is a voluntary agreement between two or more competent persons to place their money, effects, labor, and skill, or some or all of them in lawful commerce or business, with the understanding that there shall be a proportional sharing of the profits and losses between them. An association of two or more persons to carry on, as co-owners, a business for profit.

Check if your firm is a corporation. A corporation is an artificial person or legal entity created by or under the authority of the laws of a state or nation, composed, in some rare instances, of a single person and his successors, being the incumbents of a particular office, but ordinarily consisting of an association of numerous individuals.

7 Enter your Federal employee tax identification number.

Enter your corporation number assigned by the California Secretary of State. This information is used to verify if a corporation is in good standing and qualified to conduct business in California.

Enter your Contractor Registration Number assigned by the Department of Industrial Relations (DIR). This Information will be used to determine if you are registered with DIR.

Complete if your firm holds a California contractor’s license. This information will be used to verify possession of a contractor’s license for public works agreements.

11 Complete if your firm holds a PUC license. This information will be used to verify possession of a PUC license for public works agreements.

12 Complete, if applicable, by indicating the type of license and/or certification that your firm possesses and that is required for the type of services being procured.

13, 14, 15, 16 Must be completed. These items are self-explanatory.

If certified as a Small Business Enterprise, place a check in the “Yes” box, and enter your certification number on the line. If certified as a Disabled Veteran Business Enterprise, place a check in the “Yes” box and enter your service code on the line. If you are not certified to one or both, place a check in the “No” box. If your certification is pending, enter the date your application was submitted to the Department of General Services, Office Small Business and DVBE Services. To get certified, go to https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch- Intro-Accordion-List/Office-of-Small-Business-and-Disabled-Veteran-Business- Enterprise/Certification-Program.

https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/Office-of-Small-Business-and-Disabled-Veteran-Business-Enterprise/Certification-Program https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/Office-of-Small-Business-and-Disabled-Veteran-Business-Enterprise/Certification-Program https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/Office-of-Small-Business-and-Disabled-Veteran-Business-Enterprise/Certification-Program

Attachment 3

Required Documents

The following documents should be submitted, or your bid may be considered non-responsive.

Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.

☐ Attachment 1 – Price Quote Proposal (ADM-1412)

☐ Attachment 2 – Bid/Bidder Certification Sheet

☐ Non-Collusion Declaration Non-Collusion Declaration

☐ California Civil Rights Laws Certification (DOT ADM-0076) California Civil Rights Laws Certification

☐ Darfur Contracting Act Certification

The following documents will be requested of the WINNING BIDDER at time of contract award;

they are NOT required at time of bid submittal:

☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses

☐ Payment BondPayment Bond

☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)

☐ Payee Data Record (STD 204) Payee Data Record https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1418 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf

Attachment 4

Proposed Form of Agreement

Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFPQ. Please review it carefully and present any questions in writing to the contact identified for this IFPQ.

2. The term of this Agreement is:

Contractor’s Name TBD Agreement Number 07A6030

Exhibit A

Public Works (State)

Scope of Work

1. Contractor agrees to provide to the California Department of Transportation (Caltrans) all labor, tools, materials, equipment, travel, and incidentals necessary to provide removal and replacement services of one (1) pressure washer (VHG4-2200 Landa 6.2 horsepower [hp] 230 V 1ph NG) and associated hose reels, hoses, and hardware, and adjacent electrical and plumbing systems.

2. Subcontracting is not permitted under this Agreement. All references to subcontracting or Subcontractors as found herein are not applicable to this Agreement.

3. The services shall be performed at Caltrans Heliotrope Maintenance Station, 609 North Heliotrope, Los Angeles, CA 90004.

4. Any reference to Caltrans Contract Manager shall also include designee.

5. This Agreement will commence on March 24, 2025 (estimate), or upon approval by

Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on March 23, 2026 (estimate). The services shall be provided during normal business hours Monday through Friday 6:00 a.m.

to 2:30 p.m., excluding State holidays. The parties may amend this Agreement as permitted by law.

6. This Agreement cites specific portions of the most current version of the Caltrans 2024 Standard Specifications and the revised 2024 Standard Specifications (herein collectively referred to as the “Standard Specifications”). The Standard Specifications can be accessed via the Internet at: https://dot.ca.gov/programs/design/october-2024-ccs-standard-plans-and-standard-specifications. Only the sections of the Standard Specifications cited in this Agreement are requirements and are hereby incorporated by this reference as if attached to this Agreement. All other portions of the Standards Specification are not applicable to this Agreement.

7. All inquiries during the term of this Agreement will be directed to the project representatives listed below:

California Department of Transportation (Caltrans)

Contractor: TBD

Section/Unit: District 7 Metro Region Project Manager:

Caltrans Contract Manager: TBD

Address:

1740 East 15th Los Angeles, CA 90004

Address:

Business Phone Number: Business Phone Number:

Email: Email:

https://dot.ca.gov/programs/design/october-2024-ccs-standard-plans-and-standard-specifications https://dot.ca.gov/programs/design/october-2024-ccs-standard-plans-and-standard-specifications

8. Description of Work A. Contractor shall remove and replace the pressure washer (VHG4-2200 Landa 6.2 hp 230 V

1 ph NG), and associated hose reels, hoses, and hardware.

B. If contractor chooses to use a different product than those identified in this Exhibit A, Scope of Work, product(s) shall be like-items or equivalent and Contractor shall receive prior approval from Caltrans Contract Manager.

C. Contractor shall replace all plumbing components from supply line to new pressure washer unit i.e., hardware, pipes, valves, couplers, and accessories associated with system (Attachment 1, Price Quote Proposal, Item 1).

D. Contractor shall replace all electrical components from electrical panel to new pressure washer system i.e., electrical lines, wires, hardware, and any other accessories associated with system (Attachment 1, Price Quote Proposal, Item 1).

E. Contractor shall submit to Caltrans Contract Manager working drawings for the plumbing/electrical system and no work shall begin before Caltrans Contract Manager approves of the working drawings in writing. The working drawings submitted by Contractor shall detail plumbing/electrical attachment to new VHG4-2200 Landa 6.2 hp 230 V 1 ph pressure washer and/or required appurtenances.

F. Contractor shall investigate and verify the existence and location of underground utilities and other construction before beginning site work, included in the price quote for Item 1 on Attachment 1, Price Quote Proposal. Any damage caused by Contractor to the utilities or property during the project duration shall be replaced at Contractor’s sole expense and to the satisfaction of Caltrans Contract Manager.

G. Contractor shall notify Caltrans Contract Manager and the appropriate regional notification center for operators of subsurface installations at least five (5) working days prior to performing any excavation or other work close to any underground pipeline, conduit, duct, wire, or other structure. Regional notification centers include, but are not limited to the following:

Underground Service Alert Southern California (USA) Telephone: 800-422-4133 South Shore Utility Coordinating Council (DIGS) Telephone: 800-541-3447 Western Utilities Underground Alert, Inc.

Telephone: 800-424-3447

H. Contractor shall be responsible for following Caltrans Storm Water Pollution Prevention Plan (SWPPP) and Best Management Practices (BMP) guidelines. (https://dot.ca.gov/- /media/dot-media/programs/construction/documents/environmental-compliance/stormwater/october2016-swppp-manual-a11y.pdf)

1) If necessary, Contractor shall follow the Caltrans SWPPP to control water pollution effectively during work. Details and requirements pertaining to water pollution control https://dot.ca.gov/-/media/dot-media/programs/construction/documents/environmental-compliance/stormwater/october2016-swppp-manual-a11y.pdf https://dot.ca.gov/-/media/dot-media/programs/construction/documents/environmental-compliance/stormwater/october2016-swppp-manual-a11y.pdf https://dot.ca.gov/-/media/dot-media/programs/construction/documents/environmental-compliance/stormwater/october2016-swppp-manual-a11y.pdf and what an acceptable program entails shall be found in Section 13-2 of the 2024 Standard Specifications.

2) Nothing in the terms of the Agreement or in the SWPPP shall relieve Contractor of the responsibility for compliance with Sections 5650 and 12015 of the Fish and Game Code, or other applicable statutes relating to prevention or abatement of water pollution.

(https://fgc.ca.gov/Regulations/Current)

9. Special Provisions A. No move-in/move-out of equipment, per diem, travel time to and from job site, or specialized equipment will be paid for by Caltrans to Contractor.

B. All permits required by local ordinances are to be secured and paid for by Contractor at no additional costs to Caltrans.

10. Safety and Health Provisions

Contractor shall conform to all applicable occupational safety and health standards, rules, regulations and orders established by the State of California.

11. Disposal of Material A. Full compensation for all costs involved in disposing of materials, including all costs of hauling, shall be considered as included in the Item #1 of Attachment 1, Price Quote Proposal. Agreement’s unit price to be paid and no additional compensation will be allowed.

B. Disposal of materials shall be done in a legal manner and at a licensed disposal site.

12. Final Clean Up

Before final inspection of work site, Contractor shall clean the material sites and all ground occupied by him in connection with the work of all rubbish, excess materials, temporary structures and equipment prior to acceptance of work and final invoicing. All parts of the work shall be left in a neat and presentable condition.

13. Acceptance of Work The finished product is subject to the inspection and acceptance by Caltrans Contract Manager. Any work that needs to be corrected shall be done at Contractor’s sole expense.

14. Areas for Contractor Use A. No area where the work is to be performed is for the exclusive use of Contractor.

B. Contractor shall arrange with Caltrans Contract Manager for areas to store equipment and materials within the work area.

15. Cooperation

A. Contractor shall comply with all Caltrans security policies and only work during Caltrans operational hours of the Heliotrope MS.

B. Contractor shall plan its work to minimize interference with Caltrans employees, the public, and public traffic.

https://fgc.ca.gov/Regulations/Current

16. Preservation of Property A. Contractor’s operations shall be conducted in such a manner that existing facilities, surfacing, installations, and utilities, which are to remain in place, will not be damaged.

Contractor shall protect facilities, utilities, and installations until the work is complete.

Contractor shall protect all access areas, including lawn and concrete sidewalks, from its materials and equipment.

B. Contractor shall exercise every reasonable precaution to protect streams, lakes, reservoirs, bays, and coastal waters from pollution with fuels, oils, bituminous.

17. Temporary Utilities A. Contractor may obtain electrical power and water from existing Caltrans outlets within the work area free of charge for contract operations where such utilities exist, if such utility services are in service and are not required by Caltrans for other purposes.

B. Contractor, at its own expense, shall obtain any additional electrical power and water or other utilities required for its operations and shall make and maintain the necessary service connections.

18. Sanitary Facilities A. When operational, Caltrans-owned sanitary facilities will be available for use by

Contractor’s employees, during normal Caltrans working hours. Tools shall not be cleaned nor shall cleaning liquids be disposed of in the Caltrans sanitary facilities or sewers.

B. When Caltrans-owned sanitary facilities are not operational, Contractor shall provide wash facilities, drinking water fixtures, and temporary toilet units for its personnel at Contractor’s sole expense. Facilities shall include the periodic flushing, waste removal, and cleaning of such facilities. Units shall be maintained in a clean and sanitary condition, including a supply of toilet tissue, toilet seat covers, paper towels, soap, and paper cups. Waste material shall be disposed of offsite in a lawful manner. Temporary toilet units shall be single occupant units of the chemical, aerated recirculation or combustion type, properly vented, and fully enclosed with a glass fiber reinforced polyester shell or similar nonabsorbent material.

19. Guarantee A. Contractor hereby unconditionally guarantees the work to remain free of defects in workmanship and materials for a period of one (1) year from the date of acceptance of the work by Caltrans Contract Manager.

B. Contractor shall repair or replace any work, together with any other adjacent work which may be displaced in so doing, that the requirements of the Agreement or defects in workmanship or material within the guarantee period specified, at no cost to Caltrans.

C. Contractor further agrees, that within 10 calendar days after being notified in writing by Caltrans Contract Manager of any work that does not comply with the Agreement requirements or Caltrans any defects in the work or materials, Contractor shall commence and prosecute with due diligence all work necessary to fulfill the terms of this guarantee. Contractor shall complete the work within a reasonable period of time, (not to exceed the Agreement term). In the event Contractor fails to honor the guarantee, Contractor hereby authorizes Caltrans to proceed to have such work done at

Contractor’s sole expense. Contractor shall honor and pay the cost and charges therefore upon demand. Caltrans shall be entitled to all costs and expenses, including reasonable attorney’s fees, necessarily incurred upon Contractor’s refusal to honor and pay the above costs and charges.

20. Waste Disposal Prior to the commencement of waste disposal, Contractor must adhere to the provisions highlighted in Senate Bill 1383 (Lara) of 2016 Title 14, CCR, General Provisions section 18981.2, Public Resources Code sections 42652 et. Seq.

Exhibit B

Public Works–State

Budget Detail and Payment Provisions

1. Invoicing and Payment

A. For services satisfactorily rendered and approved by Caltrans Contract Manager, and upon receipt and approval of the invoices, Caltrans agrees to compensate Contractor in accordance with the Price Quote Proposal, Attachment 1, and this Exhibit B.

Incomplete or disputed invoice(s) shall be returned to Contractor, unpaid, for correction.

B. Contractor will be paid a lump sum of TBD, in arrears, in full payment for all work and services performed under this Agreement.

C. Each invoice shall include:

1) Agreement Number 07A6030

2) Dates of Service

3) Location of Service

D. Each invoice shall be submitted in triplicate to:

California Department of Transportation (Caltrans) District 7Metro Region Attention: TBD 1740 East 15th Los Angeles, California 90004

E. Contractor shall submit a certified copy of all payroll records for verification by Caltrans Contract Manager with each invoice. Delinquent or inadequate certified payrolls or other required documents will result in the withholding of payment until such documents are submitted by Contractor.

2. Budget Contingency Clause A. It is mutually understood between the parties that this Agreement may have been written before ascertaining the availability of congressional or legislative appropriation of funds, for the mutual benefit of both parties in order to avoid program and fiscal delays that would occur if the Agreement were executed after that determination was made.

B. This Agreement is valid and enforceable only if sufficient funds are made available to Caltrans by United States Government or California State Legislature for the purpose of this program.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .