07_JDP_HVAC_Upgrades_60_reviewed_Dwgs_Mechanical Piping.pdf

PDF 7 MB Posted

Attached to
John Day Dam Powerhouse HVAC Upgrade Industry Day
Solicitation number
W9127N25R0001
Issued by

About this file

This document is a Special Notice for an Industry Day and Sources Sought regarding a forthcoming federal contract opportunity for the HVAC Upgrade at the John Day Dam Powerhouse.

The project involves the complete replacement of the primary and installation of secondary chilled water systems, modification of the HVAC system into a comprehensive smoke removal system, and installation of small-scale HVAC units. Key objectives include future-proofing the system against refrigerant phase-outs, integrating the HVAC controls with the building's fire protection system, and providing temporary cooling during construction. The government is seeking responses from a range of small and large businesses to gauge industry interest and capabilities. Responses are due by October 16, 2024, and the contract is expected to be awarded in May 2025 with an estimated value between $25-100 million. The acquisition will likely be a Firm Fixed Price contract awarded through a Best Value Trade-Off source selection process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

90% SUBMITTAL

SHEET 88 OF 177

A

IR

-C

O N

D

IT

IO

N

IN

G

H V

A C

R E

P A

IR

S

J O

H N D

A Y D

A M R

U F

U S

O R

H E

A T

IN

G

V E

N T

IL

A T

IN

G

A N

D

HUNTSVILLE CENTER

OF ENGINEERS

US ARMY CORPS

A N

S I F

N O

T F

O R C

O N

S T

R U

C T

IO

N

DS: JDP_Mech.dscriptPD: AEC_pdf.pltcfg9:13:38 AM 1/12/2022

P:\HVAC_Renov_John_Day_Powerhouse\30DA0 - Plans & Specs\CAD_BIM\_Sheets\JDP_MP001.dgn

F

IL

E N

A M

E

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

J D

P -1 .1

H U

N T S

V

IL

L E

A L

Q

U A

L

IT

Y C

IR

C L E

C E

N T

E R

H U

N T S

V

IL

L E

E N

G

IN

E E

R

IN

G A

N D S

U P

P O

R T

U S A

R M

Y C

O R

P S O

F E

N G

IN

E E

R S

P R

O J E

C T D

R A

W

IN

G N

O

GENERAL NOTESMECHANICAL ABBREVIATIONS

1.

INSTALL FLEXIBLE CONNECTORS BETWEEN EQUIPMENT AND CONNECTING DUCT/PIPING.

2.

3.

4.

5.

MEASUREMENTS SHOWN THROUGHOUT ARE IN FEET AND INCHES (NOMINAL) UNLESS OTHERWISE NOTED.

VOLUME DAMPER, MANUAL

UNION (SCREWED)

UNION (FLANGED)

FLOW- IN DIRECTION OF ARROW

GLOBE VALVE/ BALANCING VALVE

CHECK VALVE DIRECTION. THIS REQUIREMENT IS SEPARATE FROM OTHER MOUNTING REQUIREMENTS FOR SEISMIC OR OTHER FORCES.

WEIGHT OF THE EQUIPMENT IN ANY HORIZONTAL DIRECTION AND 1.5 TIMES THE EQUIPMENT WEIGHT IN THE DOWNWARD

OVERHEAD EQUIPMENT WEIGHING OVER 30 POUNDS: DESIGN ALL EQUIPMENT MOUNTINGS TO RESIST A FORCE 0.5 TIMES THE

A N

D G

E N

E R

A L N

O T

E S

MP001

-J

A N -2

J

P

M P .d g n

P L

M

S L

W

S L

W

GENERAL SYMBOLS

EXISTING SIDE

POINT BETWEEN EXISTING AND DEMO/NEW ITEMS

EQUIPMENT NAMING CONVENTION

EXAMPLE EQUIPMENT CALLOUT

EF-06-03-01

BAY

FACILITY

SEQUENCE NO

EQUIPMENT

ABBREVIATION

EQUIPMENT TYPE

PROVIDE A COMPLETE AND OPERABLE SYSTEM SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES AND STANDARDS.

EQUIPMENT, APPURTENANCES, CONTROLS, AND ELECTRICAL CONNECTIONS. MATERIAL AND LABOR REQUIRED TO

LOCATIONS OR DIMENSIONS. PROVIDE A COMPLETE AND OPERABLE HVAC SYSTEM THAT INCLUDES ALL NECESSARY

DRAWINGS ARE SCHEMATIC AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. DO NOT SCALE DRAWINGS FOR DEMO SIDE

ETC

SS

AB

B4

B3

B2

B1

08 **

-9

FLOOR *

FACILITY

** ALL EXTERIOR EXQUIPMENT LABELED WITH FLOOR 08

* REFER TO SHT G-005 FOR FLOOR DESCRIPTIONS

ISOLATION, SHUTOFF VALVE (BALL)

P

IP

IN

G A

B B

R E

V

IA

T

IO

N S S

Y M

B O

L S

EQUIPMENT / DUCTWORK COLORING

COLOR RELATED PIPING

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

RIVER WATER SUPPLY

RIVER WATER RETURN

FIELD VERIFY SITE CONDITIONS, CLEARANCES, AND DIMENSIONS BEFORE BEGINNING FABRICATION AND INSTALLATION

ETC

XD - SMOKE/FIRE/CONTROL DAMPER

PS - PUMP, SOURCE WATER

PD - PUMP, DUAL TEMP SUPPLY WATER

CF - CHEMICAL FEED

CV - CONTROL VALVE

CH - LIQUID CHILLER

AS - AIR SEPARATOR

ET - EXPANSION TANK

LV - LOUVER

HX - HEAT EXCHANGER

EF - EXHAUST FAN

TF - TRANSFER FAN

RF - RETURN FAN

SF - SUPPLY FAN

HP - HEAT PUMP

HC - HEATING COIL

CC - COOLING COIL

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

90% SUBMITTAL

SHEET 89 OF 177

A

IR

-C

O N

D

IT

IO

N

IN

G

H V

A C

R E

P A

IR

S

J O

H N D

A Y D

A M R

U F

U S

O R

H E

A T

IN

G

V E

N T

IL

A T

IN

G

A N

D

HUNTSVILLE CENTER

OF ENGINEERS

US ARMY CORPS

A N

S I F

N O

T F

O R C

O N

S T

R U

C T

IO

N

DS: JDP_Mech.dscriptPD: AEC_pdf.pltcfg9:45:02 AM 1/12/2022

P:\HVAC_Renov_John_Day_Powerhouse\30DA0 - Plans & Specs\CAD_BIM\_Sheets\JDP_MP002.dgn

F

IL

E N

A M

E

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

J D

P -1 .1

N T S

V

IL

L E

A L

Q

U A

L

IT

Y C

IR

C L E

C E

N T

E R

H U

N T S

V

IL

L E

E N

G

IN

E E

R

IN

G A

N D S

U P

P O

R T

U S A

R M

Y C

O R

P S O

F E

N G

IN

E E

R S

P R

O J E

C T D

R A

W

IN

G N

O

-J

A N -2

P

M P .d g n

S L

W

S L

W

P L

M

MP002

1.

GENERAL NOTES

SCHEMATIC. REFER TO THE MP PLANS AND DETAIL SHEETS FOR DETAILED REQUIREMENTS.

GENERAL VALVING (EG ISOLATION, BALANCING, ETC), STRAINERS, ETC ARE NOT SHOWN ON THIS2.

CONDENSER PIPING AND CHILLED WATER PIPING TO BE INSTALLED IN THE GENERATOR BAYS.

THE SCHEMATIC SHOWN HERE PROVIDES A GENERAL LAYOUT OF THE NEW RIVER WATER PIPING, P

IP

IN

G S

C H

E M

A T

IC

G E

N E

R A

T O

R B

A Y

S -9

SCHEMATIC SCALE: NTS

GENERATOR BAYS - HVAC PIPING

1234567891011121314151617181920 S.S.A.B.

E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

90% SUBMITTAL

SHEET 104 OF 178

A

IR

-C

O N

D

IT

IO

N

IN

G

H V

A C

R E

P A

IR

S

J O

H N D

A Y D

A M R

U F

U S

O R

H E

A T

IN

G

V E

N T

IL

A T

IN

G

A N

D

HUNTSVILLE CENTER

OF ENGINEERS

US ARMY CORPS

A N

S I F

N O

T F

O R C

O N

S T

R U

C T

IO

N

DS: JDP_Mech.dscriptPD: AEC_pdf.pltcfg8:26:33 PM 1/11/2022

P:\HVAC_Renov_John_Day_Powerhouse\30DA0 - Plans & Specs\CAD_BIM\_Sheets\JDP_MP112.dgn

F

IL

E N

A M

E

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

J D

P -1 .1

N T S

V

IL

L E

A L

Q

U A

L

IT

Y C

IR

C L E

C E

N T

E R

H U

N T S

V

IL

L E

E N

G

IN

E E

R

IN

G A

N D S

U P

P O

R T

U S A

R M

Y C

O R

P S O

F E

N G

IN

E E

R S

P R

O J E

C T D

R A

W

IN

G N

O

-J

A N -2

MP112

D

P

M P .d g n

S L

W

S L

W

P

N

SCALE: 1/4" - 1' 0"

STATION SERVICE BAY - AIR COMPRESSOR ROOM

COMPRESSOR

AIR

COMPRESSOR

AIR

COMPRESSOR

AIR

COMPRESSOR

AIR

COMPRESSOR

AIR

ELEC EQUIP

ELEC EQUIP

SUMP PUMP

SUMP PUMP

SUMP PUMP

EQUIPMENT

EXISTING

EQUIPMENT

EXISTING

EQUIPMENT

EXISTING

COLUMN (TYP)

STRUCTURAL

STAIRS TO LOWER LEVELS

ELEVATOR

FREIGHT

HALLWAY

ELEC EQUIP

STATION SERVICE BAY

SCALE: 1/4" = 1'-0"

0 4' 8'2'

PUMP RM

ENTRY TO HEAT

IN GENERATOR BAYS

ENTRY TO PIPE GALLERY

GRAPHIC SCALE

KEY PLAN

8" RWD

8" RWD

ROOM

AIR COMPRESSOR

TO LOWER FLOORS

OPEN HATCH KEY NOTES

GENERAL NOTES

STATION SERVICE BAY ASSEMBLY BAY

SECTIONA

SECTION SCALE: 1/4" - 1' 0"

SCALE: 1/4" - 1' 0"

MH112

MH112

B

HP-01-SS-03

2" CNWR

2" CNWS

2" CNWS

4" CNWR

3" CNWR

COMPRESSOR

AIR

COMPRESSOR

AIR

8" RWD

8" RWD

2" CNWS

4" CNWR

3" CNWR

2" CNWR

2" CNWS

HP-01-SS-02

1.25" CNWR

1.25" CNWS

3" CNWS

3" CNWS

4" CNWR

3" CNWR

4" CNWR

2.5" CNWS

2.5" CNWR

4" CNWR

4" CNWS

2.5" CNWR

B

MP112

A

MP112

4" CNWS

4" CNWR

HP-01-SS-02

8" RWD

2" CNWS

2" CNWR

HP-01-SS-01

HP-01-SS-01

8" RWD

COLUMN (TYP)

STRUCTURAL

FISH TURBINE RM

STAIRS DOWN TO

ROOM

PUMP

HEAT

SEE MH SHTS

DUCTWORK;

4" CNWR

4" CNWR

FISH TURBINE RM

STAIRS DOWN TO

INSTALL PIPE THROUGH EXISTING OPENING. SEE MH SHTS FOR DETAILS ON FILLING OPENING.

NEW SLEEVED PIPE WALL PENETRATIONS

8" RWD

4" CNWR

4" CNWS

2.5" CNWS

2.5" CNWR

1.25" CNWR

1.25" CNWS

8" RWS

8" RWS8" RWS

8" RWS

CONTROL GALLERY

8" RWD UP TO FISHWAY

DISCHARGE

COOLING

GENERATOR

8" RWS FROM

CAP EXISTING PIPING AT POINT OF DEMOLITION COMPLETION P

IP

IN

G M

O D

S

-9

FOR HVAC EQUIPMENT AND DUCTWORK SEE MH SHTS

FOR REFRIGERANT AND CONDENSATE DRAIN PIPING SEE MH SHTS2.

PLAN - EL 154.0

AIR COMPRESSOR ROOM, EL 154.0

EL 154.0

EL 154.0

FISH TURBINE AND HEAT PUMP ROOM, EL 154.0

FOR CONTINUATION SEE PLAN EL 154.0 ON SHT MP113

FOR CONTINUATION UP TO HP 02-SS-01 SEE PLAN EL 168.5 ON SHT MH111

S S

B E

L

.0

1234567891011121314151617181920 S.S.A.B.

E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

90% SUBMITTAL

SHEET 104 OF 177

A

IR

-C

O N

D

IT

IO

N

IN

G

H V

A C

R E

P A

IR

S

J O

H N D

A Y D

A M R

U F

U S

O R

H E

A T

IN

G

V E

N T

IL

A T

IN

G

A N

D

HUNTSVILLE CENTER

OF ENGINEERS

US ARMY CORPS

A N

S I F

N O

T F

O R C

O N

S T

R U

C T

IO

N

DS: JDP_Mech.dscriptPD: AEC_pdf.pltcfg10:08:25 AM 1/12/2022

P:\HVAC_Renov_John_Day_Powerhouse\30DA0 - Plans & Specs\CAD_BIM\_Sheets\JDP_MP113.dgn

F

IL

E N

A M

E

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

J D

P -1 .1

N T S

V

IL

L E

A L

Q

U A

L

IT

Y C

IR

C L E

C E

N T

E R

H U

N T S

V

IL

L E

E N

G

IN

E E

R

IN

G A

N D S

U P

P O

R T

U S A

R M

Y C

O R

P S O

F E

N G

IN

E E

R S

P R

O J E

C T D

R A

W

IN

G N

O

-J

A N -2

MP113

D

P

M P .d g n

S L

W

S L

W

P

KEY PLAN

PIPE SHAFT

AIR SHAFT

STAIRWELL

1 2 3 4 5 6 7 8

ELEVATOR

N

COLUMN (TYP)

STRUCTURAL

ASSEMBLY BAY

SCALE: 3/8" - 1' 0"

EQUIPMENT

ELECTRICAL

EQUIPMENT

ELECTRICAL

8" RWS

8" RWD

4" CNWS

4" CNWR

4" CNWS

4" CNWR

HX-01-AB-01

PM-01-AB-04

PM-01-AB-03

PM-01-AB-01

PM-01-AB-02

6" CNWS

8" CNWS

CV-01-AB-07 5" CWR5" CWR

5" CWR

5" CWR

CV-01-AB-09

CV-01-AB-10

CV-01-AB-08

CV-01-AB-01

CH-01-AB-01

CV-01-AB-02

CV-01-AB-06

CV-01-AB-03CV-01-AB-04

8" RWD

8" RWD 8" RWS

8" CNWR 8" CNWS

8" CNWR

8" CNWS

8" CNWR

8" RWS

8" RWS

4" CNWR

4" CNWS

8" CNWR

8" CNWS

A

MP113

5" CWS

5" CWR

5" CWS 5" CWS 6" CNWS

6" CNWR

5" CNWR

5" CWS

5" CWR

5" CWR

CV-01-AB-05

8" RWS

8" RWS

PM-01-AB-05

KEY NOTES

GENERAL NOTES

NEW SLEEVED PIPE WALL PENETRATIONS

SECTIONA

MH113

SCALE: 3/8" - 1' 0"

CHASE; EL 160'-0"

BOTTOM OF PIPE

ROOM

PUMP

HEAT

SEE MH SHTS

DUCTWORK;

EXHAUST

EXISTING

SHAFT

AIR

VALVE (TYP)

ISOLOTION

8" CNWR

8" CNWR

8" RWS

5" CWS8" RWS5" CWS

5" CWR

5" CWR

6" CNWS

6" CNWR

5" CWS

4" CNWR

4" CNWS

5" CWR & CWS UP

PANEL

CONTROL

CHILLER

PANEL

CONTROL

CHILLER

5" CNWR

4'0 2' 8'

SCALE: 3/8" = 1'-0"

GRAPHIC SCALES

NEW PIPE AND INSULATION

INSTALL PIPE THROUGH EXISTING OPENINGS; ENLARGE EXISTING OPENINGS TO ACCOMIDATE

ISOLATION VALVE WITH CHAIN OPERATOR; EXTEND CHAIN TO WITHIN 5'-0" AFF

PULL AREA

CHILLER TUBE

PULL AREA

CHILLER TUBE

ROOM

PUMP

HEAT

P

IP

IN

G M

O D

S

-9

FOR HVAC EQUIPMENT AND DUCTWORK SEE MH SHTS

FOR REFRIGERANT AND CONDENSATE DRAIN PIPING SEE MH SHTS2.

STRAINER

EXISTING

PIPING

EMBEDDED

EXISTING

SEE MH SHTS

DUCTWORK;

EXHAUST

EXISTING

8" CNWR

8" CNWS

OPENING

AIRSHAFT

BASE

CONCRETE

EXISTING

STRAINER

EXISTING

PENSTOCK

RWS FROM

WALL

AIR SHAFT

WALL

AIR SHAFT

PLAN - EL 154.0

EL 154.0

HEAT PUMP ROOM, EL 154.0

FOR CONTINUATION SEE PLAN EL 154.0 ON SHT MP112

FOR CONTINUATION UP SEE PLAN EL 168.5 ON SHT MH111

A B E

L

.0

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

90% SUBMITTAL

SHEET 105 OF 177

A

IR

-C

O N

D

IT

IO

N

IN

G

H V

A C

R E

P A

IR

S

J O

H N D

A Y D

A M R

U F

U S

O R

H E

A T

IN

G

V E

N T

IL

A T

IN

G

A N

D

HUNTSVILLE CENTER

OF ENGINEERS

US ARMY CORPS

A N

S I F

N O

T F

O R C

O N

S T

R U

C T

IO

N

DS: JDP_Mech.dscriptPD: AEC_pdf.pltcfg10:25:27 AM 1/12/2022

P:\HVAC_Renov_John_Day_Powerhouse\30DA0 - Plans & Specs\CAD_BIM\_Sheets\JDP_MP501.dgn

F

IL

E N

A M

E

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

J D

P -1 .1

N T S

V

IL

L E

A L

Q

U A

L

IT

Y C

IR

C L E

C E

N T

E R

H U

N T S

V

IL

L E

E N

G

IN

E E

R

IN

G A

N D S

U P

P O

R T

U S A

R M

Y C

O R

P S O

F E

N G

IN

E E

R S

P R

O J E

C T D

R A

W

IN

G N

O

-J

A N -2

MP501

D

P

M P .d g n

S L

W

S L

W

P

-9

P

IP

IN

G D

E T

A

IL

S

SCALE: NTS1 DETAIL - TYP

PUMP CONCRETE INERTIA BASE

SCALE: NTSDETAIL - TYP2

STRAINER INSTALLATION DIAGRAM

SCALE: NTSDETAIL - TYP3

STRAINER INSTALLATION DIAGRAM - ANGLED VIEW

SCALE: NTSDETAIL - TYP4

PIPE PRESSURE GAGE

SCALE: NTSDETAIL - TYP5

SCALE: NTSDETAIL - TYP9

HYDRONIC FLOW METER INSTALLATION

SCALE: NTSDETAIL - TYP6

PIPE RISER SUPPORT DETAIL

SCALE: NTSDETAIL - TYP7

PIPING PRESSURE/TEMPERATURE TEST FITTING

SCALE: NTSDETAIL - TYP8

AIR VENTS

DRAING VALVE CONNECTIONS

SCALE: NTSDETAIL - TYP10

PIPE SLEEVES THROUGH NON-RATED WALLS

SCALE: NTSDETAIL - TYP11

PIPE SLEEVES THROUGH RATED WALLS

INSULATION

CLEARS PIPE

ENSURE NIPPLE

FULL PORT BALL VALVE

a0edmslw Callout

FULL PORT BALL VALVE

a0edmslw Callout

ENSURE NIPPLE CLEARS PIPE INSULATION

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

90% SUBMITTAL

SHEET 107 OF 178

A

IR

-C

O N

D

IT

IO

N

IN

G

H V

A C

R E

P A

IR

S

J O

H N D

A Y D

A M R

U F

U S

O R

H E

A T

IN

G

V E

N T

IL

A T

IN

G

A N

D

HUNTSVILLE CENTER

OF ENGINEERS

US ARMY CORPS

A N

S I F

N O

T F

O R C

O N

S T

R U

C T

IO

N

DS: JDP_Mech.dscriptPD: AEC_pdf.pltcfg8:26:48 PM 1/11/2022

P:\HVAC_Renov_John_Day_Powerhouse\30DA0 - Plans & Specs\CAD_BIM\_Sheets\JDP_MP502.dgn

F

IL

E N

A M

E

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

J D

P -1 .1

N T S

V

IL

L E

A L

Q

U A

L

IT

Y C

IR

C L E

C E

N T

E R

H U

N T S

V

IL

L E

E N

G

IN

E E

R

IN

G A

N D S

U P

P O

R T

U S A

R M

Y C

O R

P S O

F E

N G

IN

E E

R S

P R

O J E

C T D

R A

W

IN

G N

O

THERMOMETER

(TYP.)

1/2'' MANUAL

AIR VENT

COIL

COOLING

VALVE

BALL

(TYP.)

(TYP.)

FLANGE

2-WAY

VALVE

PRESSURE

GAUGE

(TYP.)

3/4'' DRAIN VALVE

W/HOSE CONNECTION

(TYP.)

VALVE

BUTTERFLY

VALVE

BALANCING

CALIBRATED (TYP.)

UNION

NEAREST SANITARY DRAIN

RELIEF VALVE - ROUTE TO

PRESSURE/TEMPERATURE

CONNECTION W/CAP

THREADED HOSE

FLOOR

FINISH

UNION (TYP)

BALL VALVE (TYP)

STRAINER (TYP)

SETTER

CIRCUIT

M

2-1/2" CW

WATER PUMP

CONTROLLER, AND POTABLE

PANEL, PROGRAMMABLE LOGIC

PROVIDE UNIT WITH CONTROL

2-1/2" DHW

PORT (TYP)

PRESSURE/TEMP

MAY BE SUBSTITUTED)

ISOLATION (SPRING MOUNTS

NEOPRENE PAD FOR VIBRATION

STANDARD RUBBER OR

PROVIDE MANUFACTURER'S

BALL VALVE

MOTORIZED

(TYP)

CONNECTOR

FLEXIBLE

HEAT PUMP

WATER-SOURCE

3" GLR

3" GLS

-J

A N -2

MP502

D

P

M P .d g n

S L

W

S L

W

P

-9

IN

G D

E T

A

IL

S

SCALE: NTS1 DETAIL - TYP

VERTICAL SPLIT-CASE PUMP

SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP2

END SUCTION PUMP

SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP3

WATER-SOURCE HEAT PUMP

SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP4

EXPANSION TANK, AIR SEPARATOR AND MAKE-UP WATER

SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP5

COOLING COIL PIPING CONNECTIONS

SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP SCALE: NTSDETAIL - TYP6

CHEMICAL FEEDER PIPING CONNECTIONS

SCALE: NTSDETAIL - TYP7

MANUAL BALANCING VALVE

SCALE: NTSDETAIL - TYP8

BASE PLATE FOR PIPE STANCHION

KEY NOTES

COCKS ON EACH LEG.

STRAINER) AND DOWNSTREAM OF STRAINER. USE ISOLATION

PRESSURE READING ENTERING PUMP, LEAVING PUMP (PRIOR TO

PROVIDE SINGLE PRESSURE GAUGE PER PUMP PIPED TO ALLOW

PUMP.

PROVIDE TEMPERATURE GAUGE AND ISOLATION COCK PER EACH

PUMP BASE

CONCRETE INERTIA

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

90% SUBMITTAL

SHEET 110 OF 177

A

IR

-C

O N

D

IT

IO

N

IN

G

H V

A C

R E

P A

IR

S

J O

H N D

A Y D

A M R

U F

U S

O R

H E

A T

IN

G

V E

N T

IL

A T

IN

G

A N

D

HUNTSVILLE CENTER

OF ENGINEERS

US ARMY CORPS

A N

S I F

N O

T F

O R C

O N

S T

R U

C T

IO

N

DS: JDP_Mech.dscriptPD: AEC_pdf.pltcfg10:17:26 AM 1/12/2022

P:\HVAC_Renov_John_Day_Powerhouse\30DA0 - Plans & Specs\CAD_BIM\_Sheets\JDP_MP604.dgn

F

IL

E N

A M

E

C O

N T

R A

C T N

O

S O

L

IC

IT

A T

IO

N N

O

J D

P -1 .1

N T S

V

IL

L E

A L

Q

U A

L

IT

Y C

IR

C L E

C E

N T

E R

H U

N T S

V

IL

L E

E N

G

IN

E E

R

IN

G A

N D S

U P

P O

R T

U S A

R M

Y C

O R

P S O

F E

N G

IN

E E

R S

P R

O J E

C T D

R A

W

IN

G N

O

-J

A N -2

MP604

D

P

M P .d g n

S L

W

S L

W

P

IN

G S

C H

E D

U L E

S

-9

JDP_MP001
JDP_MP002
JDP_MP003
JDP_MP004
JDP_MP101
JDP_MP102
JDP_MP103
JDP_MP104
JDP_MP105
JDP_MP106
JDP_MP107
JDP_MP108
JDP_MP109
JDP_MP110
JDP_MP111
JDP_MP112
JDP_MP113
JDP_MP501
JDP_MP502
JDP_MP601
JDP_MP602
JDP_MP603
JDP_MP604

File details come from the government source that posted it. Updated .