07_Exhibit_B-1_Rate_Sheet.xlsx
XLSX spreadsheet 191 KB Posted
- Solicitation number
- 0000039972
- Issued by
- California
About this file
This is an Exhibit B-1 Rate Sheet for a Master Agreement solicitation (Bid C5613296-D) issued by the California Department of Corrections and Rehabilitation (CDCR) for Crane Rental and Operator Services across 31 participating locations. The rate sheet details estimated service requirements for five crane categories (14.5-ton, 40-ton, 50-ton, 80-ton, 100-ton, and 120-ton cranes with hydraulic booms) plus rigging charges across multiple facilities including state prisons, correctional institutions, medical facilities, and training centers. Services include hourly crane operations, overtime rates at 150% of normal rates, mobilization/demobilization fees, and rigging charges. Bidders may elect to bid on individual locations or grouped locations but must provide complete pricing for all items within selected locations or groups. The rate sheet encompasses 31 groups across the state, with estimated total hours ranging from minimal services at some locations to over 1,500 hours for major projects at facilities such as Pleasant Valley State Prison and California Men's Colony. An additional 25% allowance is built into each location's basis of award to cover as-needed, unforeseeable services at the applicable service rates.
All compensation shall include labor, personnel, transportation with travel and per diem, materials, supplies, tools, equipment, permits, licenses, taxes, fees, and shipping charges necessary to provide services. Hourly rates must comply with prevailing wage determinations established by the California Department of Industrial Relations. Bidders may offer payment discounts of at least one percent with a minimum of $50.00 for invoices paid within 30 days of receipt, with discount offers used as a tiebreaker in award decisions. Blank cells on any rate item may result in rejection of the entire bid for that location or group, while zero dollar entries ($0.00) indicate the bidder will perform those services at no cost to the state. The state reserves the right to increase or omit portions of work as deemed necessary and does not guarantee any minimum service volume under this agreement. Bidders are required to download and complete the Excel version of the rate sheet and submit rates in U.S. currency with all prices printed in ink or typewritten.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
CRANE RENTAL AND OPERATOR SERVICES
Electronic bid packages include an Excel version of this Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete ALL highlighted cells.
The Contractor will be compensated for services performed in accordance with the rates specified on the Exhibit B-1, Rate Sheet which shall include all labor, personnel, transportation (including travel and per diem), materials, supplies, tools, any necessary equipment, permits, licenses, taxes, fees, shipping/freight charges, and every other item of expense necessary (unless otherwise specified herein) to provide the identified services.
Bidders may bid on one or more locations and/or Groups. Bidders are not required to bid on all locations; however, bidders must include a rate for all items within that location. For Grouped locations, bidders must bid on all locations and items within that Group. Failure to indicate a dollar amount (blank cell) on any item may be grounds to reject the entire bid for that location and/or Group. A zero dollar amount ($0.00 or $ -) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder will perform any such services at NO COST to the State.
Any and all services performed outside the scope of this Agreement shall be at the sole risk and expense of the Contractor. All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall encompass every item of expense necessary to perform the services.
Quantities and services listed on the Exhibit B-1, Rate Sheet are the State's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to increase/omit portions of the work as may be deemed necessary or advisable by the State.
Each participating location’s total basis of award includes a Rate Sheet line item totaling 25% of the sum of the bidder’s service rate(s) to allow for additional as-needed, unforeseeable services. As-needed services will be payable at the applicable service rate(s) on the Exhibit B-1, Rate Sheet.
All CDCR estimated quantities and Contractor provided rates are for the entire term of this Agreement.
| Hourly rates must meet minimum prevailing wage determination made by the Director of the California Department of Industrial Relations. |
| Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00. |
| Discount offered on invoices paid within 30 days of receipt = |
| *In the event of tie bids, CDCR reserves the right to determine the bidder entitled to the contract award based on the percentage of discount. If not applicable or a discount tie, a coin toss or lot drawing will be used in accordance with the Invitation for Bid, Basis for Award. |
| *Rate per Hour excludes Mobilization/Demobilization. |
**Overtime services will be paid at 150% of normal hourly rate.
***Mobilization/Demobilization fee includes all portal to portal fees, travel time, set-up, breakdown, excludes rigger charges. Total IN and OUT.
****Rigging Charges excludes Mobilization/Demobilization
There are no guarantees that any services will be requested from this agreement.
&"Arial,Regular" California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5613296-D Exhibit B-1
&"Arial,Regular"Page &P of &N
DVI
| DEUEL VOCATIONAL INSTITUTION (DVI) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 32 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 32 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 16 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 16 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 36 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
DVI TOTAL BASIS OF AWARD (A+B) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
ASP & ASP-CCM
GROUP 1 - AVENAL STATE PRISON (ASP) & AVENAL STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (ASP-CCM)
| AVENAL STATE PRISON (ASP) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 8 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 36 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
ASP TOTAL BASIS OF AWARD (A+B) $ - 0
| AVENAL STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (ASP-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 300 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 300 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 280 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 200 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 80 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 100 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
ASP-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 1 (ASP & ASP-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
CAL & CAL-CCM
GROUP 2 - CALIPATRIA STATE PRISON (CAL) & CALIPATRIA STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CAL-CCM)
| CALIPATRIA STATE PRISON (CAL) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 50 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 50 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 10 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 10 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 5 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 70 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CAL TOTAL BASIS OF AWARD (A+B) $ - 0
| CALIPATRIA STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CAL-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 42 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 45 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 42 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 43 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 43 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 30 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CAL-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 2 (CAL & CAL-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
CCI & CCI-CCM
GROUP 3 - CALIFORNIA CORRECTIONAL INSTITUTION (CCI) & CALIFORNIA CORRECTIONAL INSTITUTION - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CCI-CCM)
| CALIFORNIA CORRECTIONAL INSTITUTION (CCI) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 16 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 16 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 15 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CCI TOTAL BASIS OF AWARD (A+B) $ - 0
| CALIFORNIA CORRECTIONAL INSTITUTION - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CCI-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 100 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 80 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 72 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 80 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CCI-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 3 (CCI & CCI-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
CCWF & CCWF-CCM
GROUP 4 - CENTRAL CALIFORNIA WOMEN'S FACILITY (CCWF) & CENTRAL CALIFORNIA WOMEN'S FACILITY (CCWF-CCM)
| CENTRAL CALIFORNIA WOMEN'S FACILITY (CCWF) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 56 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 36 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CCWF TOTAL BASIS OF AWARD (A+B) $ - 0
| CENTRAL CALIFORNIA WOMEN'S FACILITY (CCWF) - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CCWF-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 250 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 280 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 270 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 190 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 80 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 100 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CCWF-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 4 (CCWF & CCWF-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
CEN & CEN-CCM
GROUP 5 - CENTINELA STATE PRISON (CEN) & CENTINELA STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CEN-CCM)
| CENTINELA STATE PRISON (CEN) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 60 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 60 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 10 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 10 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 36 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CEN TOTAL BASIS OF AWARD (A+B) $ - 0
| CENTINELA STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CEN-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 42 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 45 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 42 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 43 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 43 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 30 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CEN-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 5 (CEN & CEN-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
CHCF & NCYCC
GROUP 6 - CALIFORNIA HEALTH CARE FACILITY (CHCF) & NORTHERN CALIFORNIA YOUTH CORRECTIONAL CENTER (NCYCC)
| CALIFORNIA HEALTH CARE FACILITY (CHCF) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 48 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 44 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 44 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 60 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CHCF TOTAL BASIS OF AWARD (A+B) $ - 0
| NORTHERN CALIFORNIA YOUTH CORRECTIONAL CENTER (NCYCC) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 22 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 22 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 30 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
NCYCC TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 6 (CHCF+NCYCC) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
CIM & CIM-CCM
GROUP 7 - CALIFORNIA INSTITUTION FOR MEN (CIM) & CALIFORNIA INSTITUTION FOR MEN - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CIM-CCM)
| CALIFORNIA INSTITUTION FOR MEN (CIM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 75 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CIM TOTAL BASIS OF AWARD (A+B) $ - 0
| CALIFORNIA INSTITUTION FOR MEN - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CIM-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 8 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 8 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 10 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 10 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 10 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 9 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CIM-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 7 (CIM & CIM-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
CIW & CIW-CCM
GROUP 8 - CALIFORNIA INSTITUTION FOR WOMEN (CIW) & CALIFORNIA INSTITUTION FOR WOMEN - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CIW-CCM)
| CALIFORNIA INSTITUTION FOR WOMEN (CIW) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 75 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CIW TOTAL BASIS OF AWARD (A+B) $ - 0
| CALIFORNIA INSTITUTION FOR WOMEN - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CIW-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 8 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 8 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 10 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 10 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 10 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 9 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CIW-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 8 (CIW & CIW-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
CMC & CMC-CCM
GROUP 9 - CALIFORNIA MEN'S COLONY (CMC) & CALIFORNIA MEN'S COLONY - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CMC-CCM)
| CALIFORNIA MEN'S COLONY (CMC) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 21 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 21 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 9 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 36 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CMC TOTAL BASIS OF AWARD (A+B) $ - 0
| CALIFORNIA MEN'S COLONY - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CMC-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 400 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 400 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 400 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 200 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 120 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 150 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CMC-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 9 (CMC & CMC-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
CMF & CMF-CCM
GROUP 10 - CALIFORNIA MEDICAL FACILITY (CMF) & CALIFORNIA MEDICAL FACILITY - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CMF-CCM)
| CALIFORNIA MEDICAL FACILITY (CMF) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 96 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CMF TOTAL BASIS OF AWARD (A+B) $ - 0
| CALIFORNIA MEDICAL FACILITY - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CMF-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 38 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 100 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CMF-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 10 (CMF & CMF-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
COR & COR-CCM
GROUP 11 - CALIFORNIA STATE PRISON - CORCORAN (COR) & CALIFORNIA STATE PRISON - CORCORAN - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (COR-CCM)
| CALIFORNIA STATE PRISON - CORCORAN (COR) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 30 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 30 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 25 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 25 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 12 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 45 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
COR TOTAL BASIS OF AWARD (A+B) $ - 0
| CALIFORNIA STATE PRISON - CORCORAN - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (COR-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 200 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 380 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 380 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 380 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 380 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 500 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
COR-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 11 (COR & COR-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
CRBTC & CTC
GROUP 12 - CALIFORNIA REALITY BASED TRAINING CENTER (CRBTC) & RICHARD A. MCGEE CORRECTIONAL TRAINING CENTER (CTC)
| CALIFORNIA REALITY BASED TRAINING CENTER (CRBTC) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 20 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CRBTC TOTAL BASIS OF AWARD (A+B) $ - 0
| RICHARD A. MCGEE CORRECTIONAL TRAINING CENTER (CTC) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 40 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CTC TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 12 (CRBTC & CTC) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
CTF & CTF-CMC
GROUP 13 - CORRECTIONAL TRAINING FACILITY (CTF) & CORRECTIONAL TRAINING FACILITY - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CTF-CCM)
| CORRECTIONAL TRAINING FACILITY (CTF) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 10 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 8 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 36 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CTF TOTAL BASIS OF AWARD (A+B) $ - 0
| CORRECTIONAL TRAINING FACILITY - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CTF-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 150 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 150 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 250 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 200 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 150 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 100 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CTF-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 13 (CTF & CTF-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
CVSP, ISP & ISP CCM
GROUP 14 - CHUCKAWALLA STATE PRISON (CVSP), IRONWOOD STATE PRISON (ISP) & CHUCKAWALLA STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (ISP-CCM)
| CHUCKAWALLA STATE PRISON (CVSP) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 8 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 4 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 2 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 4 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 2 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 4 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
CVSP TOTAL BASIS OF AWARD (A+B) $ - 0
| IRONWOOD STATE PRISON (ISP) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 6 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 12 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 20 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
ISP TOTAL BASIS OF AWARD (A+B) $ - 0
| IRONWOOD STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (ISP-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 18 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 16 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 16 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 16 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 16 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 16 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
ISP-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 14 (CVSP, ISP & ISP-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
FSP & FSP-CCM
GROUP 15 - FOLSOM STATE PRISON (FSP) & FOLSOM STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (FSP-CCM)
| FOLSOM STATE PRISON (FSP) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 28 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 28 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 36 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 100 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 54 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 200 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
FSP TOTAL BASIS OF AWARD (A+B) $ - 0
| FOLSOM STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (FSP-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 19 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 19 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 19 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 19 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 15 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 125 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
FSP-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 15 (FSP & FSP-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
HDSP & HDSP-CCM
GROUP 16 - HIGH DESERT STATE PRISON (HDSP) & HIGH DESERT STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (HDSP-CCM)
| HIGH DESERT STATE PRISON (HDSP) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 8 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 36 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
HDSP TOTAL BASIS OF AWARD (A+B) $ - 0
| HIGH DESERT STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (HDSP-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 15 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 15 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 15 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 15 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 125 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
HDSP-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 16 (HDSP & HDSP-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
KVSP & KVSP-CCM
GROUP 17 - KERN VALLEY STATE PRISON (KVSP) & KERN VALLEY STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (KVSP-CCM)
| KERN VALLEY STATE PRISON (KVSP) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 40 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 40 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
KVSP TOTAL BASIS OF AWARD (A+B) $ - 0
| KERN VALLEY STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (KVSP-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 40 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 1 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
KVSP-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 17 (KVSP & KVSP-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
LAC & LAC-CCM
GROUP 18 - CALIFORNIA STATE PRISON - LOS ANGELES COUNTY (LAC) & CALIFORNIA STATE PRISON - LOS ANGELES COUNTY - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (LAC-CCM)
| CALIFORNIA STATE PRISON - LOS ANGELES COUNTY (LAC) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 20 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 8 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 36 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
LAC TOTAL BASIS OF AWARD (A+B) $ - 0
| CALIFORNIA STATE PRISON - LOS ANGELES COUNTY - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (LAC-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 100 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 80 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 75 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 72 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 80 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
LAC-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 18 (LAC & LAC-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
MCSP & MCSP-CCM
GROUP 19 - MULE CREEK STATE PRISON (MCSP) & MULE CREEK STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (MCSP-CCM)
| MULE CREEK STATE PRISON (MCSP) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 12 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 12 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 12 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 60 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 32 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 144 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
MCSP TOTAL BASIS OF AWARD (A+B) $ - 0
| MULE CREEK STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (MCSP-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 55 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 55 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 55 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 55 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 50 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 20 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
MCSP-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 19 (MCSP & MCSP-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
NKSP & NKSP-CCM
GROUP 20 - NORTH KERN STATE PRISON (NKSP) & NORTH KERN STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (NKSP-CCM)
| NORTH KERN STATE PRISON (NKSP) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 24 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 15 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
NKSP TOTAL BASIS OF AWARD (A+B) $ - 0
| NORTH KERN STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (NKSP-CCM) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 40 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 100 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 120 Ton Crane or equivalent (with hydraulic boom) | 1 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| ****Rigging Charges | 1 | X | = | $ - 0 | |
| TOTAL A | = | $ - 0 | |||
| B. Other | |||||
| As-Needed Services (25%) | = | $ - 0 | |||
| TOTAL B | $ - 0 |
NKSP-CCM TOTAL BASIS OF AWARD (A+B) $ - 0
TOTAL BASIS FOR GROUP 20 (NKSP & NKSP-CCM) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613296-D
&"Arial,Regular"Page &P of &N
PBSP & PBSP-CCM
GROUP 21 - PELICAN BAY STATE PRISON (PBSP) & PELICAN BAY STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (PBSP-CCM)
| PELICAN BAY STATE PRISON (PBSP) | |||||
| A. Description | Estimated Number of Hours | X | *Rate per Hour | = | Total |
| 14 1/2 Ton Crane or equivalent (with hydraulic boom) | 40 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 50 Ton Crane or equivalent (with hydraulic boom) | 8 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = | ||||
| 80 Ton Crane or equivalent (with hydraulic boom) | 8 | X | = | $ - 0 | |
| **Overtime Rate per Hour | = | ||||
| ***Mobilization/ Demobilization Fee | = |
This is the start of the file's text. The full file is on GovTribe.