07.07.2025 Addendum 2 RFI Clarifications for RFP #25-0502A Tree Trimming by Circuit - Public Utilities Electric Department.docx.pdf

PDF 1 MB Posted

Attached to
Re-Advertisement City of Elizabeth City Request for Proposals: Tree Trimming by Circuit - Public Utilities Electric Department
Solicitation number
498-25-0502A
Issued by
Person County, North Carolina

About this file

The document is an Addendum 2 to Request for Proposal (RFP) #25-0502A for Tree Trimming by Circuit, issued by the City of Elizabeth City, North Carolina's Public Utilities Electric Department. The RFP seeks an hourly contract for an arborist to prune, trim, and cut away dead or excess branches from trees and shrubs to clear utility lines, roads, and sidewalks, predominantly focusing on utility poles. The contract is for the city's fiscal year from July 1, 2025, through June 30, 2026, with options to renew for two consecutive years pending funding availability. Proposals are due by 2:00 PM Eastern Standard Time on July 17, 2025, and must be submitted via courier or hand delivery, with a hard copy and USB flash drive.

The total contract budget is $200,000, approved by the City Council for line trimming, with the Electric Director having discretion over budget expenditure. Historically, the trimming contractor has used a three-man crew with a bucket truck and chipper, and traffic control is typically included in the scope. Tipping fees will be paid by the city, and the contractor can charge these fees on the city's landfill account. The contract does not guarantee the contractor will gross the full $200,000 due to tipping fees and ancillary expenses. The most recent tree trimming contract was with Best Brothers Tree Service, and the upcoming project follows a previous capital project for 34kV Distribution Line Improvements for Sentara Healthcare.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

RFP # 25-0502A

Tree Trimming by Circuit- Public Utilities Electric Department

410 Pritchard Street, Elizabeth City, NC 27909 Addendum 1 Issued: June 13, 2025 Addendum 2 Issued: July 07,2025

Addendum 2

Due to not meeting the 3 bid minimum requirement at 2:00PM on June 24, 2025. No bids were opened.

Sealed proposals will be received via courier (UPS is suggested) or by hand delivery only no later than 2:00 PM Eastern Standard Time, on July 17, 2025. Hard copy Proposals should be prepared on two-sided 8-1/2 x 11 paper using minimum 10-point font, placed in a manila envelope with the words, “RFP # 25-0502A, Tree Trimming by Circuit- Public Utilities Electric Department”, C/o, Dwan A. Bell, Public Utilities Director clearly visible including a copy stored on a USB flash drive. The city will not consider mailed proposals that do not arrive prior to the proposal deadline. Do not email or send proposals electronically.

Addendum 1

Clarifications:

1. Clarification of the Scope of Work.

This is an hourly agreement for the Arborist to prune, trim, and cut away dead or excess branches from trees or shrubs to clear utility lines, roads, and sidewalks and predominately utility poles. Tree felling would be as needed and considered incidental. The Electric Director or designee will huddle with trimming crew deployed and will advise the trimming crew what vicinity, neighborhood, or street to trim on a daily/weekly basis. Completed work will be inspected and invoices can be submitted weekly for payment processing.

Tipping fees will be paid by the City. The trimming contractor can charge tipping fees on the City’s account at the landfill citing a unique identifier, number, or name as directed. Historically the trimming contractor has a (3) man crew, with bucket truck, and chipper. Traffic Control usually includes the setting of signs ahead of the work site notifying pedestrians and motorist that utility work is ahead with traffic cones set around the work area crew, and equipment. This can also include flasher or strobe lights. Situationally, and as needed a flagger may be needed to manage traffic flow safely by the trimming crew. If additional traffic control is needed due to an atypical confined area; the Electric Director can provide additional staffing for traffic control and safety.

2. Is there a budget for this contract?

Answer: Yes. $200,000 was approved by City Council for line trimming. The Electric Director will expend and monitor the line item budget in his best judgement. Incremental purchase orders or a blanket purchase order are likely to be issued. This agreement does not guarantee the trimming contractor to gross $200k due to tipping fees paid by the City and other ancillary expenses; however, it is expected that the vast majority of the line item budget is allotted to the contracted tree trimmer.

3. What is the name of the contractor most recently awarded this scope of work?

Answer: Best Brothers Tree Service prior to the 34K Distribution Line Improvements for Sentara as described in Clarification Number 6.

4. What is the contract term (start and end dates)?

Answer: The City’s fiscal year is from July 1, 2025 through June 30, 2026. This agreement is for (1) fiscal year with the option to renew for (2) consecutive years pending funding availability. While the City’s fiscal year is from July 1, 2025 through June 30, 2026; the first year duration of work will be determined on funding available, along with seasonal considerations and the Electric Director’s discretion.

2 | P a g e

5. What is the total contract value or annual expenditure associated with the services?

Answer: $200,000 was approved by City Council for line trimming. The Electric Director will expend and monitor the line item budget in his best judgement. Incremental purchase or blanket purchase orders are likely to be issued. This agreement does not guarantee the trimming contractor to gross $200k due to tipping fees paid by the City and other ancillary expenses; however, it is expected that the vast majority of the line item budget is allotted to the contracted tree trimmer.

**Intentionally Blank***

**Clarifications Continue on Page 3**

3 | P a g e

6. Any available scope of work or award documentation from the most recent contract?

Answer: Historic and annual operational tree trimming as cited in this addendum’s Scope of Work was postponed until now per a particular capital project as outlined in the following City Council memo:

4 | P a g e

7. Are there any maps of the primary and secondary circuits?

Answer: Circuit Maps may be available after award. In the interim (and to contract with an arborist for pole trimming) bidders can review the City’s GIS maps online using the following web address:

https://data-ecity.opendata.arcgis.com/apps/8d9c1bd7400442c8ab92929fb64d01d7/explore

Title: City of Elizabeth City, City Overview, City Limits, Parcels, Addresses, Alleys, & Various City Data

Online GIS data can also be found by going to the City’s homepage https://elizabethcitync.gov/ and then clicking on Departments, then GIS, then Elizabeth City's Interactive GIS Map.

8. Will you clarify how you want us to bid the hourly circuit work?

Answer: This is an hourly agreement for the Arborist to prune, trim, and cut away dead or excess branches from trees or shrubs to clear utility lines, roads, and sidewalks and predominately utility poles. Tree felling would be as needed and considered incidental. The Electric Director or designee will huddle with trimming crew deployed and will advise the trimming crew what vicinity, neighborhood, or street to trim on a daily/weekly basis. Completed work will be inspected and invoices can be submitted weekly for payment processing. Tipping fees will be paid by the City. The trimming contractor can charge tipping fees on the City’s account at the landfill citing a unique identifier, number, or name as directed. Historically the trimming contractor has a (3) man crew, with bucket truck, and chipper. Traffic Control usually includes the setting of signs ahead of the work site notifying pedestrians and motorist that utility work is ahead with traffic cones set around the work area crew and equipment. This can also include flasher or strobe lights. Situationally, and as needed a flagger may be needed to manage traffic flow safely by the trimming crew. If additional traffic control is needed due to an atypical confined area; the Electric Director can provide additional staffing for traffic control and safety.

$200,000 was approved by City Council for line trimming. The Electric Director will expend and monitor the line item budget in his best judgement. Incremental purchase or blanket purchase orders are likely to be issued. This agreement does not guarantee the trimming contractor to gross $200k due to tipping fees paid by the City and other ancillary expenses; however, it is expected that the vast majority of the line item budget is allotted to the contracted tree trimmer. (Cont’d) https://elizabethcitync.gov/ http://data-ecity.opendata.arcgis.com/

5 | P a g e

The City’s fiscal year is from July 1, 2025 through June 30, 2026. This agreement is for (1) fiscal year with the option to renew for (2) consecutive years pending funding availability. While the City’s fiscal year is from July 1, 2025 through June 30, 2026; the first year duration of work will be determined on funding available along with seasonal considerations and the Electric Director’s discretion.

9. Do you have a crew and equipment composition you’d like us to price?

Answer: Historically the trimming contractor has a (3) man crew, with bucket truck, and chipper.

10. Are there any maps of the primary and secondary circuits?

Answer: Circuit Maps may be available after award. In the interim (and to contract with an arborist for pole trimming) bidders can review the City’s GIS maps online using the following web address:

Title: City of Elizabeth City, City Overview, City Limits, Parcels, Addresses, Alleys, & Various City Data

11. Will you clarify how you want us to bid the hourly circuit work? Do you have a crew and equipment composition you’d like us to price?

Answer: This is an hourly agreement for the Arborist to prune, trim, and cut away dead or excess branches from trees or shrubs to clear utility lines, roads, and sidewalks and predominately utility poles. Tree felling would be as needed and considered incidental. The Electric Director or designee will huddle with trimming crew deployed and will advise the trimming crew what vicinity, neighborhood, or street to trim on a daily/weekly basis. Completed work will be inspected and invoices can be submitted weekly for payment processing. Tipping fees will be paid by the City. The trimming contractor can charge tipping fees on the City’s account at the landfill citing a unique identifier, number, or name as directed. Historically the trimming contractor has a (3) man crew, with bucket truck, and chipper. Traffic Control usually includes the setting of signs ahead of the work site notifying pedestrians and motorist that utility work is ahead with traffic cones set around the work area crew and equipment. This can also include flasher or strobe lights. Situationally, and as needed a flagger may be needed to manage traffic flow safely by the trimming crew. (Cont’d) https://data-ecity.opendata.arcgis.com/apps/8d9c1bd7400442c8ab92929fb64d01d7/explore https://data-ecity.opendata.arcgis.com/apps/8d9c1bd7400442c8ab92929fb64d01d7/explore

6 | P a g e

If additional traffic control is needed due to an atypical confined area; the Electric Director can provide additional staffing for traffic control and safety.

$200,000 was approved by City Council for line trimming. The Electric Director will expend and monitor the line item budget in his best judgement. Incremental purchase or blanket purchase orders are likely to be issued. This agreement does not guarantee the trimming contractor to gross $200k due to tipping fees paid by the City and other ancillary expenses; however, it is expected that the vast majority of the line item budget is allotted to the contracted tree trimmer.

The City’s fiscal year is from July 1, 2025 through June 30, 2026. This agreement is for (1) fiscal year with the option to renew for (2) consecutive years pending funding availability. While the City’s fiscal year is from July 1, 2025 through June 30, 2026; the first year duration of work will be determined on funding available

12. Are you only accepting submissions via UPS?

Answer: No. Any courier is acceptable along with hand delivery. UPS is recommended.

Only sealed proposals will be received electronically, mailed via courier (UPS is suggested) or by hand delivered no later than 2:00 PM Eastern Standard Time, on Tuesday, June 17, 2025 June 24, 2025. Hard copy Proposals should be prepared on two-sided 8-1/2 x 11 paper using minimum 10-point font, placed in a manila envelope with the words, “RFP # 25-0502, Tree Trimming by Circuit- Public Utilities Electric Department”, C/o, Dwan A. Bell, Public Utilities Director clearly visible including a copy stored on a USB flash drive. The city will not consider mailed proposals that do not arrive prior to the proposal deadline. Do not email or send proposals electronically.

13. Are there maps available that show all circuits included in this RFP?

Answer: Circuit Maps may be available after award. In the interim (and to contract with an arborist for pole

Title: City of Elizabeth City, City Overview, City Limits, Parcels, Addresses, Alleys, & Various City Data https://data-ecity.opendata.arcgis.com/apps/8d9c1bd7400442c8ab92929fb64d01d7/explore https://data-ecity.opendata.arcgis.com/apps/8d9c1bd7400442c8ab92929fb64d01d7/explore

7 | P a g e

14. What are the total line miles of trimming included in this RFP?

Non-Applicable. Answer: This is an hourly agreement for the Arborist to prune, trim, and cut away dead or excess branches from trees or shrubs to clear utility lines, roads, and sidewalks and predominately utility poles. Tree felling would be as needed and considered incidental. The Electric Director or designee will huddle with trimming crew deployed and will advise the trimming crew what vicinity, neighborhood, or street to trim on a daily/weekly basis. Completed work will be inspected and invoices can be submitted weekly for payment processing. Tipping fees will be paid by the City. The trimming contractor can charge tipping fees on the City’s account at the landfill citing a unique identifier, number, or name as directed. Historically the trimming contractor has a (3) man crew, with bucket truck, and chipper. Traffic Control usually includes the setting of signs ahead of the work site notifying pedestrians and motorist that utility work is ahead with traffic cones set around the work area crew and equipment. This can also include flasher or strobe lights.

Situationally, and as needed a flagger may be needed to manage traffic flow safely by the trimming crew. If additional traffic control is needed due to an atypical confined area; the Electric Director can provide additional staffing for traffic control and safety.

$200,000 was approved by City Council for line trimming. The Electric Director will expend and monitor the line item budget in his best judgement. Incremental purchase or blanket purchase orders are likely to be issued. This agreement does not guarantee the trimming contractor to gross $200k due to tipping fees paid by the City and other ancillary expenses; however, it is expected that the vast majority of the line item budget is allotted to the contracted tree trimmer.

The City’s fiscal year is from July 1, 2025 through June 30, 2026. This agreement is for (1) fiscal year with the option to renew for (2) consecutive years pending funding availability. While the City’s fiscal year is from July 1, 2025 through June 30, 2026; the first year duration of work will be determined on funding available

15. Do you have a crew and equipment composition you’d like us to price?

**Intentionally Blank***

**Clarifications Continue on Page 8**

8 | P a g e

16. Are there any maps of the primary and secondary circuits?

Answer: Circuit Maps may be available after award. In the interim (and to contract with an arborist for pole

Title: City of Elizabeth City, City Overview, City Limits, Parcels, Addresses, Alleys, & Various City Data

17. Will you clarify how you want us to bid the hourly circuit work? Do you have a crew and equipment composition you’d like us to price?

Answer: This is an hourly agreement for the Arborist to prune, trim, and cut away dead or excess branches from trees or shrubs to clear utility lines, roads, and sidewalks and predominately utility poles. Tree felling would be as needed and considered incidental. The Electric Director or designee will huddle with trimming crew deployed and will advise the trimming crew what vicinity, neighborhood, or street to trim on a daily/weekly basis. Completed work will be inspected and invoices can be submitted weekly for payment processing. Tipping fees will be paid by the City. The trimming contractor can charge tipping fees on the City’s account at the landfill citing a unique identifier, number, or name as directed. Historically the trimming contractor has a (3) man crew, with bucket truck, and chipper. Traffic Control usually includes the setting of signs ahead of the work site notifying pedestrians and motorist that utility work is ahead with traffic cones set around the work area crew and equipment. This can also include flasher or strobe lights. Situationally, and as needed a flagger may be needed to manage traffic flow safely by the trimming crew.

If additional traffic control is needed due to an atypical confined area; the Electric Director can provide additional staffing for traffic control and safety.

$200,000 was approved by City Council for line trimming. The Electric Director will expend and monitor the line item budget in his best judgement. Incremental purchase or blanket purchase orders are likely to be issued. This agreement does not guarantee the trimming contractor to gross $200k due to tipping fees paid by the City and other ancillary expenses; however, it is expected that the vast majority of the line item budget is allotted to the contracted tree trimmer.

https://data-ecity.opendata.arcgis.com/apps/8d9c1bd7400442c8ab92929fb64d01d7/explore https://data-ecity.opendata.arcgis.com/apps/8d9c1bd7400442c8ab92929fb64d01d7/explore

9 | P a g e

The City’s fiscal year is from July 1, 2025 through June 30, 2026. This agreement is for (1) fiscal year with the option to renew for (2) consecutive years pending funding availability. While the City’s fiscal year is from July 1, 2025 through June 30, 2026; the first year duration of work will be determined on funding available

18. How will tipping fees be paid?

Answer: The trimming contractor can charge tipping fees on the City’s account at the landfill citing a unique identifier, number, or name as directed.

19. The RFP references liquidated damages of $500/day and states the work must be completed within 6 months. Could you please clarify what this 6-month timeframe is tied to? Is it associated with a specific phase of the contract, or does the City anticipate allocating 6 months of active work annually over the three-year agreement? We're unclear on how this timeline applies and would appreciate any maps or scopes that correspond to the period covered.

Answer: Liquidated Damages are non-applicable, included due to being a boilerplate condition in this RFP template and not removed.

20. Traffic control is noted as incidental to the scope. Could you please provide circuit maps or a list of areas planned for each year to help assess the level of traffic control effort that may be required?

Answer: Traffic Control usually includes the setting of signs ahead of the work site notifying pedestrians and motorist that utility work is ahead with traffic cones set around the work area crew, and equipment. This can also include flasher or strobe lights. Situationally, and as needed a flagger may be needed to manage traffic flow safely by the trimming crew. If additional traffic control is needed due to an atypical confined area; the Electric Director can provide additional staffing for traffic control and safety.

21. For the Tree Trimming hourly rate, can you clarify what crew size and equipment composition the City expects to be included? This will help ensure consistent and comparable pricing across proposals.

22. How many crews or FTEs have been deployed under the most recent contract to perform this scope of work?

23. Provide clarification needed regarded 6-month completion timeline.

Answer: Non-applicable, 6-month timeline was included due to being a boilerplate condition in this RFP template and not removed. The City’s fiscal year is from July 1, 2025 through June 30, 2026. This agreement is for (1) fiscal year with the option to renew for (2) consecutive years pending funding availability. While the City’s fiscal year is from July 1, 2025 through June 30, 2026; the first year duration of work will be determined on funding available along with seasonal considerations and the Electric Director’s discretion.

24. Provide clarification needed regarded traffic control expectations.

Answer: Traffic Control usually includes the setting of signs ahead of the work site notifying pedestrians and motorist that utility work is ahead with traffic cones set around the work area crew, and equipment. This can also include flasher or strobe lights. Situationally, and as needed a flagger may be needed to manage traffic flow safely by the trimming crew. If additional traffic control is needed due to an atypical confined area; the Electric Director can provide additional staffing for traffic control and safety.

10 | P a g e

25. Provide clarification needed regarded crew composition.

26. Provide copies of any proposals submitted in response to previous RFPs related to tree trimming or line clearance services, including but not limited to prior versions of RFP #25-0502, if available.

Answer: At present, proposals submitted in response to previous RFPs related to tree trimming or line clearance services, including but not limited to prior versions of RFP #25-0502 are unavailable.

End.