07) CGC FORWARD FY26 AA - BLANK Schedule B w Over and Above Growth Work Added.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- CGC FORWARD AA DS FY26 Federal contract opportunity
- Solicitation number
- 70Z08026QMECP0002
About this file
This document is a detailed pricing schedule for the USCGC FORWARD (WMEC-270B) Dockside Availability in FY2026, issued by the US Coast Guard. The schedule outlines specific maintenance and service tasks including aviation fuel tank cleaning and inspection, power supply load testing, helicopter deck preservation, watertight door replacement, and various equipment renewals. The pricing document includes definite line items (D-001 through D-015) and optional line items (O-009 through O-016), with a comprehensive labor rate and potential for additional growth work.
The solicitation covers maintenance work to be performed in Portsmouth, VA from April 1, 2026 to June 30, 2026, with a provision for over and above/growth work. The document includes a composite labor rate and allows for contract modification if additional scope is required. Contractors are expected to fill in the over and above/growth labor rate and material markup/handling fee, with an estimated material handling fee of $32,346.00. The pricing structure is designed to provide flexibility for potential expanded work through contract modifications, with unit prices established for evaluation purposes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 70Z08026QMECP00020001_US signed.pdf | ||
| Solicitation 70Z08026QMECP0002 for USCGC FORWARD FY26.pdf | ||
| 05) FORWARD FY26 AA - Rev 0 Specification.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: |
| USCGC FORWARD (WMEC-270B) DOCKSIDE AVAILABILITY FY2026 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Tanks, Aviation Fuel Service, Clean And Inspect | JOB | 1 | ||
| D-002 | Tanks (Aviation Fuel Stowage And Overflow), Clean And Inspect | JOB | 1 | ||
| D-003 | Tanks, Ballast, Clean and Inspect | JOB | 1 | ||
| D-004 | 28 Volt DC Helo Power Supply, Load Test | JOB | 1 | ||
| D-005 | 400 Hz Power Supply (FCX Systems Inc), Load Test | JOB | 1 | ||
| D-006 | Windspeed Transmitter, Anemometer, Remove and Reinstall | JOB | 1 | ||
| D-007 | Flow Meter (Aviation Fuel), Calibrate | JOB | 1 | ||
| D-008 | Helo Talon Grids, Inspect and Test | JOB | 1 | ||
| O-009 | Tanks, Aviation Fuel Service, Preserve, Partial (OPTIONAL) | JOB | 1 | ||
| O-010 | Tanks, Aviation Fuel Storage, Preserve, Partial (OPTIONAL) | JOB | 1 | ||
| D-011 | Decks, Helicopter Operating Areas, Preserve | JOB | 1 | ||
| D-012 | Watertight Doors and Scuttles, External, Renew | JOB | 1 | ||
| D-013 | JP-5 Fueling Station Watertight Door, Replace | JOB | 1 | ||
| D-014 | Flight Deck Line Up Light Components, Renew | JOB | 1 | ||
| D-015 | Countermeasure Washdown Nozzles and Piping, Renew | JOB | 1 | ||
| O-016 | Tanks, Ballast, Preserve, Partial (OPTIONAL) | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 839 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | 1 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
| Over and Above/Growth Work | ||||
| The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | ||||
| **Fill in the sections highlighted below: | ||||
| OA/G-001 | Over and Above/Growth Labor Rate________ | Hour | 839 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee___________ | $32,346.00 | % | |
| Total Evaluated Price of Over and Above/Growth |
(7/21/2025)_x000D_ Rev-0 - Page &P of &N