07-375404 Replace Drainage Systems.pdf
PDF 2 MB Posted
- Attached to
- 07-375404 Replace Drainage Systems
- Solicitation number
- 07-375404, Fed #IM-4053(082)
- Issued by
- Los Angeles County, California
About this file
This is a Notice to Bidders and Special Provisions for Construction document issued by the California Department of Transportation (Caltrans) District 07 for a drainage systems replacement project on State Route 405 in Los Angeles County. The project, identified as Contract No. 07-375404 and Federal-Aid Project IM-4053(082), involves replacing existing drainage facilities at various locations from 0.1 mile east of Normandie Avenue to the Route 10/405 separation. Bids are scheduled to open on Wednesday, December 9, 2026, with the bid book dated October 19, 2026. The project incorporates 2025 Standard Specifications and Standard Plans, with project plans approved on June 30, 2026. The work encompasses multiple construction divisions including earthwork, landscape, asphalt concrete surfacings, existing structure management, drainage facilities, concrete curbs and sidewalks, fencing, traffic control devices, railings and barriers, markings, and electrical work.
The special provisions outline specific requirements including contractors' registration, potential claim record submission through the Department's Internet system, DVBE quotes and Non-Small Business Subcontractor Preference submissions, local material work plan requirements, electronic certified payroll record submission using LCPtracker Pro, revised flagging and temporary traffic control requirements, off-road diesel-fueled vehicle compliance certificates, treated wood waste management protocols, Tier 4 equipment requirements, and Buy America/Build America compliance for manufactured products. Environmental product declarations for hot mix asphalt and concrete materials are required. The project incorporates comprehensive standard plans for traffic control systems, drainage details, excavation and backfill procedures, landscape specifications, and various temporary construction measures. Funding is provided through federal-aid, as indicated by the IM project designation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bids open Wednesday, December 9, 2026 Dated October 19, 2026 OSD
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NOTICE TO BIDDERS
AND
SPECIAL PROVISIONS
FOR CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY IN
LOS ANGELES AT VARIOUS LOCATIONS FROM 0.1 MILE EAST OF
NORMANDIE AVENUE TO ROUTE 10/405 SEPARATION
In District 07 On Route 405 Under
Bid book dated October 19, 2026 Standard Specifications dated 2025
Project plans approved June 30, 2026 Standard Plans dated 2025
Identified by Contract No. 07-375404
07-LA-405-13.6/29.5
Project ID 0721000067
Federal-Aid Project
IM-4053(082)
SPECIAL NOTICES
• See sections 2 and 3 for contractors' registration requirements.
• The Department advises bidders that potential claim records must be submitted by the contractor using the Department's Internet potential claim system.
• See section 2 for submittal requirements for DVBE quotes and Non–Small Business
Subcontractor Preference.
• For work plan for local material from (1) a noncommercial source or (2) a source not regulated under California jurisdiction, see section 6-1.03B(2).
• See section 7-1.02K(3) for the requirements for electronic submittal of certified payroll records using LCPtracker Pro.
• The flagging and temporary traffic control requirements have been revised. See sections 7-
1.03, 7-1.04, and 12.
• See sections 2-1.11 and 2-1.33B for in-use off-road diesel-fueled vehicle requirements regarding Certificate of Reported Compliance submittals.
• See section 14-11.14 for changes to the management of treated wood waste.
• See sections 5-1.33 and 7-1.02C for using tier 4 interim or tier 4 final off-road diesel-fueled equipment requirements.
• See section 6-1.01 and 6-1.04 of these Special Provisions for the requirements of Buy
America/Build America for manufactured products.
• See section 6-1.08 for the requirements for environmental product declarations for hot mix asphalt and concrete materials and products.
Contract No. 07-375404 i
TABLE OF CONTENTS
NOTICE TO BIDDERS
BID ITEM LIST
SPECIAL PROVISIONS
ORGANIZATION
DIVISION I GENERAL PROVISIONS
1 GENERAL
2 BIDDING
5 CONTROL OF WORK
6 CONTROL OF MATERIALS
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
8 PROSECUTION AND PROGRESS
9 PAYMENT
DIVISION II GENERAL CONSTRUCTION
11 WELDING
12 TEMPORARY TRAFFIC CONTROL
13 WATER POLLUTION CONTROL
14 ENVIRONMENTAL STEWARDSHIP
DIVISION III EARTHWORK AND LANDSCAPE
20 LANDSCAPE
DIVISION V SURFACINGS AND PAVEMENTS
39 ASPHALT CONCRETE
DIVISION VI STRUCTURES
60 EXISTING STRUCTURES
DIVISION VII DRAINAGE FACILITIES
71 EXISTING DRAINAGE FACILITIES
DIVISION VIII MISCELLANEOUS CONSTRUCTION
73 CONCRETE CURBS AND SIDEWALKS
80 FENCES
DIVISION IX TRAFFIC CONTROL DEVICES
83 RAILINGS AND BARRIERS
84 MARKINGS
DIVISION X ELECTRICAL WORK
90 CONCRETE
ii
STANDARD PLANS LIST
The standard plan sheets applicable to this Contract include those listed below. The applicable revised standard plans (RSPs) listed below are included in the project plans.
RSP A3A Abbreviations (Sheet 1 of 3)
RSP A3B Abbreviations (Sheet 2 of 3)
RSP A3C Abbreviations (Sheet 3 of 3)
A10A Legend - Lines and Symbols (Sheet 1 of 5)
A10B Legend - Lines and Symbols (Sheet 2 of 5)
A10C Legend - Lines and Symbols (Sheet 3 of 5)
A10D Legend - Lines and Symbols (Sheet 4 of 5)
A10E Legend - Lines and Symbols (Sheet 5 of 5)
A10F Legend - Soil (Sheet 1 of 2)
A10G Legend - Soil (Sheet 2 of 2)
A20A Pavement Markers and Traffic Lines - Typical Details
A20B Pavement Markers and Traffic Lines - Typical Details
A20C Pavement Markers and Traffic Lines - Typical Details
A20D Pavement Markers and Traffic Lines - Typical Details
A20E Traffic Lines - Typical Details for Contrast Striping
A62A Excavation and Backfill - Miscellaneous Details
A62B Limits of Payment for Excavation and Backfill - Bridge Surcharge and Wall
A62C Limits of Payment for Excavation and Backfill - Bridge
A62D Excavation and Backfill - Concrete Pipe Culverts
A62DA Excavation and Backfill - Concrete Pipe Culverts - Indirect Design Method
A73A Object Markers
A73B Markers
A73C Delineators, Channelizers and Barricades
A76AC Concrete Barrier Type 60M Transition to Concrete Barrier Type 50
A76BP Concrete Barrier Type 60MC with Small Pole
A85 Chain Link Fence
A85A Chain Link Fence Details
A85B Chain Link Fence Details
A87A Curbs and Driveways
A87B Hot Mix Asphalt Dikes
RSP A88A Curb Ramp Details iii
A88B Curb Ramp and Island Passageway Details
RSP P8A Individual Slab Replacement with Rapid Strength Concrete
RSP P8B Individual Slab Replacement - Dowel Bar Basket Details
P10 Concrete Pavement - Dowel Bar Details
P12 Concrete Pavement - Dowel Bar Basket Details
P50 Pavement Structure - Drainage System Details
P51 Edge Drain Outlet and Vent Details
P52 Edge Drain Cleanout and Vent Details
P53 Cross Drain Interceptor Details
D94A Metal and Plastic Flared End Sections
D97A Corrugated Metal Pipe Coupling Details No. 1 - Annular Coupling Band, Bar and Strap, and Angle Connections
D97C Corrugated Metal Pipe Coupling Details No. 3 - Helical and Universal Couplers
D97E Corrugated Metal Pipe Coupling Details No. 5 - Standard Joint
D97F Corrugated Metal Pipe Coupling Details No. 6 - Positive Joint
D97G Corrugated Metal Pipe Coupling Details No. 7 - Downdrain
D139A Gross Solids Removal Device - Inclined Screen Legend
D139B Gross Solids Removal Device - Inclined Screen Layout
RSP D139C Gross Solids Removal Device - Inclined Screen Details No. 1
D139D Gross Solids Removal Device - Inclined Screen Details No. 2
D139E Gross Solids Removal Device - Inclined Screen Details No. 3 - Wall Opening Details
RSP D139F1 Gross Solids Removal Device - Inclined Screen Details No. 4 - Wedge-Wire Screen
D139F2 Gross Solids Removal Device - Inclined Screen Details No. 5 - Wedge-Wire Screen
RSP D139G1 Gross Solids Removal Device - Inclined Screen Details No. 6 - Pultruded FRP Screen
D139G2 Gross Solids Removal Device - Inclined Screen Details No. 7 - Pultruded FRP Screen
H1 Landscape and Erosion Control Symbols
H2 Landscape Details
H3 Landscape Details
H4 Landscape Details (Sprinkler Assembly)
H5 Landscape Details (Swing Joint and Protector)
H6 Landscape Details
H9 Landscape Details
T1A Temporary Crash Cushion - Sand Filled (Unidirectional)
T1A1 Temporary Crash Cushion - Sand Filled (Unidirectional)
T1B Temporary Crash Cushion - Sand Filled (Bidirectional) iv
T2 Temporary Crash Cushion - Sand Filled (Shoulder Installations)
T3C Temporary Barrier System (Cross Bolt)
T3D Temporary Barrier System (Cross Bolt)
T3E Temporary Barrier System (Cross Bolt)
T3F Temporary Barrier System (Cal F-23)
T3F2 Temporary Barrier System (Cal F-23)
T3G Temporary Barrier System (Staking or Anchoring)
T3G2 Temporary Barrier System (Staking or Anchoring)
T9 Traffic Control System Tables for Lane and Ramp Closures
T10 Traffic Control System for Lane Closure on Freeways and Expressways
T14 Traffic Control System for Ramp Closure
T15 Traffic Control System for Moving Lane Closure on Multilane Highways
T16 Traffic Control System for Moving Lane Closure on Multilane Highways
T18 Traffic Control System - Construction Work Zone Speed Limit Reduction on Freeways and Expressways
T26 Temporary Automated End of Queue Warning System Type 1 (Queue <= 3.5 Miles)
T30 Temporary Pedestrian Access Routes - Typical Sidewalk Closure and Pedestrian Detour
T32 Temporary Pedestrian Access Routes - Typical Sidewalk/Crosswalk Closure and Pedestrian Detour
T51 Temporary Water Pollution Control Details (Temporary Silt Fence)
T53 Temporary Water Pollution Control Details (Temporary Cover)
T56 Temporary Water Pollution Control Details (Temporary Fiber Roll)
T57 Temporary Water Pollution Control Details (Temporary Check Dam)
T59 Temporary Water Pollution Control Details (Temporary Concrete Washout Facility)
T60 Temporary Water Pollution Control Details (Temporary Reinforced Silt Fence)
T61 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T62 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T63 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T64 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
B3-4A Retaining Wall Type 5 (Case 1)
B11-47 Cable Railing
RS1 Roadside Signs - Typical Installation Details No. 1
RS2 Roadside Signs - Wood Post - Typical Installation Details No. 2
RS4 Roadside Signs - Typical Installation Details No. 4
S93 Framing Details for Framed Single Sheet Aluminum Signs, Rectangular Shape
S94 Roadside Framed Single Sheet Aluminum Signs, Rectangular Shape v
S95 Roadside Single Sheet Aluminum Signs, Diamond Shape
CANCELED STANDARD PLANS LIST
The 2025 standard plan sheets listed below are canceled and not applicable to this contract.
Plan No. Date Canceled Plan No. Date
Canceled Plan No. Date Canceled
P8 04-20-26
NOTICE TO BIDDERS
Bids open Wednesday, December 9, 2026
Dated October 19, 2026
General work description: Replace drainage systems.
The Department will receive electronically sealed bids for the following work: CONSTRUCTION ON
STATE HIGHWAY IN LOS ANGELES COUNTY IN LOS ANGELES AT VARIOUS LOCATIONS FROM
0.1 MILE EAST OF NORMANDIE AVENUE TO ROUTE 10/405 SEPARATION.
District-County-Route-Post Mile: 07-LA-405-13.6/29.5
Contract No. 07-375404
The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-42, C-13.
Federal-aid project no.:
IM-4053(082)
For the Federal training program, the number of trainees or apprentices is 4.
Bids must be on a unit price basis.
Complete the work, excluding plant establishment work, within 320 working days.
Complete the work, including plant establishment work, within 570 working days.
Complete the plant establishment work within 250 working days.
The estimated cost of the project is $10,300,000.
The Department will receive bids until 2:00 p.m. on the bid open date via Bid Express website. Bids received after this time will not be accepted. For more information refer to the Electronic Bidding Guide at the Office Engineer's website.
The Department will open and publicly read the bids through webcast/teleconference services immediately after the specified closing time.
For bid results go to:
https://ppmoe.dot.ca.gov/cc
Select Electronic Bidding under the Bidding tab.
District office addresses are provided in the Standard Specifications.
Present bidders' inquiries to the Department and view the Department's responses at:
https://ppmoe.dot.ca.gov/cc?id=cc_bidinquiries
Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests.
Submit your bid with bidder's security equal to at least 10 percent of the bid.
Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located.
The federal minimum wage rates for this Contract as determined by the United States Secretary of Labor are available at https://sam.gov/content/home.
If the minimum wage rates as determined by the United States Secretary of Labor differs from the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors must not pay less than the higher wage rate. The Department does not accept lower State wage rates not specifically included in the federal minimum wage determinations. This includes helper, or other classifications based on hours of experience, or any other classification not appearing in the federal wage determinations. Where federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors must not pay less than the federal minimum wage rate that most closely approximates the duties of the employees in question.
The Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to https://www.dir.ca.gov/dlse/debar.html.
Additional information is provided in the Excluded Parties List System at https://sam.gov/content/home.
Caltrans and the Construction Industry are committed to making partnering the way we do business. For more information, go to https://dot.ca.gov/programs/construction/partnering.
Department of Transportation
BID ITEM LIST
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM
0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 320
0003 090205 DISPUTE RESOLUTION BOARD ON-SITE
MEETING
EA 7
0004 090210 HOURLY OFF-SITE DISPUTE-RESOLUTION-
BOARD-RELATED TASKS
HR 40
0005 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM
0006 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM
0007 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 880
0008 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1,540
0009 120165 CHANNELIZER (SURFACE MOUNTED) EA 70
0010 120207 PORTABLE RADAR SPEED FEEDBACK SIGN
SYSTEM
DAY 10
0011 120300 TEMPORARY PAVEMENT MARKER EA 40
0012 120320 TEMPORARY BARRIER SYSTEM LF 4,580
0013 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM
0014 128655 TEMPORARY AUTOMATED END OF QUEUE
WARNING SYSTEM (TYPE 1)
DAY 5
0015 128659 END OF QUEUE MONITORING AND WARNING
WITH TRUCK MOUNTED CHANGEABLE
MESSAGE SIGN
DAY 5
0016 129108 TEMPORARY CRASH CUSHION TL-3 EA 11
0017 130100 JOB SITE MANAGEMENT LS LUMP SUM
0018 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM
0019 130520 TEMPORARY HYDRAULIC MULCH SQYD 2,600
0020 130570 TEMPORARY COVER SQYD 1,000
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0021 130610 TEMPORARY CHECK DAM LF 100
0022 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 60
0023 130640 TEMPORARY FIBER ROLL LF 2,450
0024 130680 TEMPORARY SILT FENCE LF 1,600
0025 130730 STREET SWEEPING LS LUMP SUM
0026 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM
0027 141103 REMOVE YELLOW THERMOPLASTIC TRAFFIC
STRIPE (HAZARDOUS WASTE)
LF 1,140
0028 141120 TREATED WOOD WASTE LB 5,000
0029 153121 REMOVE CONCRETE (CY) CY 330
0030 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM
0031 190101 ROADWAY EXCAVATION CY 400
0032 190105 ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY
DEPOSITED LEAD)
CY 120
0033 192037 (F) - STRUCTURE EXCAVATION (RETAINING
WALL)
CY 516
0034 193013 (F) - STRUCTURE BACKFILL (RETAINING WALL) CY 426
0035 200002 ROADSIDE CLEARING LS LUMP SUM
0036 200052 PRUNE EXISTING PLANTS LS LUMP SUM
0037 202038 PACKET FERTILIZER EA 30
0038 202039 SLOW-RELEASE FERTILIZER LB 350
0039 204008 PLANT (GROUP H) EA 15,200
0040 204038 PLANT (GROUP U) EA 3
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0041 204096 MAINTAIN EXISTING PLANTED AREAS LS LUMP SUM
0042 204099 PLANT ESTABLISHMENT WORK LS LUMP SUM
0043 205033 GRAVEL MULCH SQFT 13,200
0044 205035 WOOD MULCH CY 860
0045 206400 CHECK AND TEST EXISTING IRRIGATION
FACILITIES
LS LUMP SUM
0046 206402 OPERATE EXISTING IRRIGATION FACILITIES LS LUMP SUM
0047 206405 REMOVE IRRIGATION FACILITY LS LUMP SUM
0048 206560 CONTROL AND NEUTRAL CONDUCTORS LS LUMP SUM
0049 206564 1 1/2" REMOTE CONTROL VALVE EA 8
0050 208446 RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 51
0051 208448 RISER SPRINKLER ASSEMBLY EA 16
0052 208575 2" GATE VALVE EA 1
0053 208595 (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY
LINE)
LF 2,130
0054 208597 (F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40)
(SUPPLY LINE)
LF 1,420
0055 208605 (F) - 2" PLASTIC PIPE (CLASS 315) (SUPPLY
LINE)
LF 200
0056 208685 1 1/2" BALL VALVE EA 2
0057 280015 LEAN CONCRETE BASE RAPID SETTING CY 120
0058 360200 BASE BOND BREAKER SQYD 250
0059 390132 HOT MIX ASPHALT (TYPE A) TON 340
0060 394074 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 30
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0061 394077 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 490
0062 397005 TACK COAT TON 2
0063 398100 REMOVE ASPHALT CONCRETE DIKE LF 670
0064 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 390
0065 410096 DRILL AND BOND (DOWEL BAR) EA 460
0066 411105 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 74
0067 510060 (F) - STRUCTURAL CONCRETE, RETAINING
WALL
CY 152
0068 510502 (F) - MINOR CONCRETE (MINOR STRUCTURE) CY 4
0069 511111 DRILL AND BOND DOWEL (CHEMICAL
ADHESIVE) (LF)
LF 137
0070 520103 (F) - BAR REINFORCING STEEL (RETAINING
WALL)
LB 16,300
0071 600025 REMOVE RETAINING WALL (PORTION) (LF) LF 171
0072 621208 GROSS SOLIDS REMOVAL DEVICE INCLINED
SCREEN TYPE A (FRP SCREEN)
EA 1
0073 621211 GROSS SOLIDS REMOVAL DEVICE INCLINED
SCREEN TYPE D (FRP SCREEN)
EA 1
0074 650014 18" REINFORCED CONCRETE PIPE LF 290
0075 650018 24" REINFORCED CONCRETE PIPE LF 330
0076 665018 18" CORRUGATED STEEL PIPE (.109" THICK) LF 380
0077 705011 18" STEEL FLARED END SECTION EA 2
0078 710102 ABANDON CULVERT (LF) LF 90
0079 710136 REMOVE PIPE (LF) LF 930
0080 710150 REMOVE INLET EA 1
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0081 710167 REMOVE FLARED END SECTION (EA) EA 1
0082 710360 CLEANING, INSPECTING, AND PREPARING
CULVERT (LF)
LF 2,440
0083 710362 CULVERT CONTACT GROUTING CY 10
0084 710368 CULVERT SLURRY-CEMENT BACKFILL CY 620
0085 710370 SAND BACKFILL CY 10
0086 710380 18" CURED-IN-PLACE PIPELINER LF 1,320
0087 710384 24" CURED-IN-PLACE PIPELINER LF 1,120
0088 723070 ROCK SLOPE PROTECTION (150 LB, CLASS III,
METHOD B) (CY)
CY 2.3
0089 729011 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 9
0090 731504 MINOR CONCRETE (CURB AND GUTTER) CY 4
0091 731840 REMOVE CONCRETE (CURB AND GUTTER) LF 120
0092 800360 CHAIN LINK FENCE (TYPE CL-6) LF 40
0093 016108 WROUGHT IRON FENCE (8' HIGH) LF 2,020
0094 802620 16' CHAIN LINK GATE (TYPE CL-6) EA 1
0095 018742 WROUGHT IRON GATE, 8' HIGH, 12' WIDE EA 4
0096 018743 WROUGHT IRON GATE, 8' HIGH, 16' WIDE EA 2
0097 803050 REMOVE CHAIN LINK FENCE LF 2,060
0098 803060 REMOVE GATE EA 7
0099 810120 REMOVE PAVEMENT MARKER EA 110
0100 810230 PAVEMENT MARKER (RETROREFLECTIVE) EA 170
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0101 820113 TREATMENT BEST MANAGEMENT PRACTICE
MARKER
EA 2
0102 820270 REMOVE ROADSIDE SIGN (WOOD POST) EA 1
0103 820750 FURNISH SINGLE SHEET ALUMINUM SIGN
(0.063"-UNFRAMED)
SQFT 64
0104 820840 ROADSIDE SIGN - ONE POST EA 5
0105 839521 (F) - CABLE RAILING LF 170
0106 015019 ALTERNATIVE CRASH CUSHION TL-3 EA 1
0107 018744 CONCRETE BARRIER (TYPE 50W WATER
CARRYING)
LF 20
0108 839742 (F) - CONCRETE BARRIER (TYPE 836A) LF 100
0109 839743 (F) - CONCRETE BARRIER (TYPE 836B) LF 280
0110 839752 REMOVE GUARDRAIL LF 380
0111 839774 REMOVE CONCRETE BARRIER LF 20
0112 840515 THERMOPLASTIC PAVEMENT MARKING SQFT 880
0113 846007 6" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY)
LF 3,290
0114 846020 REMOVE PAINTED TRAFFIC STRIPE LF 1,480
0115 846025 REMOVE PAINTED PAVEMENT MARKING SQFT 760
0116 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2,500
0117 846035 REMOVE THERMOPLASTIC PAVEMENT
MARKING
SQFT 770
0118 847213 6" TRAFFIC STRIPE TAPE (WARRANTY)
(BROKEN 17-7)
LF 350
0119 999990 MOBILIZATION LS LUMP SUM
SPECIAL PROVISIONS
ORGANIZATION
Special provisions are under headings that correspond with the main-section headings of the Standard Specifications. A main-section heading is a heading shown in the table of contents of the Standard Specifications.
Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications.
Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Standard Specifications for any other reference to a paragraph of the Standard Specifications.
DIVISION I GENERAL PROVISIONS
1 GENERAL
Add to section 1-1.01:
Bid Items and Applicable Sections Item code
Item description Applicable section
090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING 5
090210 HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED
TASKS
016108 WROUGHT IRON FENCE (8’ HIGH) 80
018742 WROUGHT IRON GATE 8’ HIGH, 12’ WIDE 80
018743 WROUGHT IRON GATE, 8’ HIGH, 16’ WIDE 80
015019 ALTERNATIVE CRASH CUSHION TL-3 83
018744 CONCRETE BARRIER (TYPE 50W WATER CARRYING) 83
2 BIDDING
Add between the 1st and 2nd paragraphs of section 2-1.06B:
The Department makes the following supplemental project information available:
Supplemental Project Information Means Description
Included in the Information Handout 1. Site Assessment Report for Collapsed Channel
2. Geotechnical Design Report
3. As-built drawings
Delete section 2-1.20.
Delete section 2-1.33B(2)(b).
5 CONTROL OF WORK
Delete section 5-1.13B.
Replace section 5-1.13E with:
5-1.13E Prompt Payment Section 5-1.13E applies to all contracts.
Pay your subcontractors within 7 days of receipt of each progress payment under Pub Cont Code §§ 10262 and 10262.5. Pay duly authorized motor carriers of property in dump trucks for transportation charges under Bus & Prof Code § 7108.6. Pay other entities, such as material suppliers, within 30 days of receipt of each progress payment.
Each month, after the 15th and prior to 20th, submit the following payment information through the Department’s prompt payment monitoring system at https://caltrans.dbesystem.com:
1. Subcontractor’s or entity’s business name
2. Description of work performed
2.1. Bid item numbers or change order numbers
2.2. Written narrative of work performed
3. Value of work performed
4. Amount paid to subcontractor or entity
5. Withhold amount, if applicable
6. Explanation of withhold reasoning, if applicable
Your subcontractors and other entities may validate payments received using the prompt payment monitoring system.
If a subcontractor’s or other entity’s work is in dispute, provide a written withhold notification to the subcontractor or entity and the Engineer no later than 7 days after receipt of the corresponding progress payment that includes the following:
1. Value of the disputed work
2. Amount of the withhold being taken
3. Bid item numbers or change order numbers associated with the disputed work
4. Explanation of the deficiencies of the disputed work and how the corresponding value was calculated
5. Corrective actions to be taken for release of withheld amount
The Department may request additional documentation from you to evaluate whether you applied the withhold in good faith. Submit requested documents within 10 days of receipt of request.
The Department may withhold the same amount of your withhold from a future progress pay estimate if the Department determines any of the following has occurred:
1. Withhold was not applied in good faith
2. Requested additional withhold documentation records were not provided
3. Payment information was not submitted through the prompt payment monitoring system
4. Required withhold notification was not provided
The Department may also apply a 2 percent penalty on the withhold amount for every month payment is not made.
Replace section 5-1.15 with:
5-1.15 SAFETY REPRESENTATIVE
5-1.15A General Designate an on-site safety representative to superintend project safety for the duration of this Contract.
The safety representative may perform other non-safety related work if safety responsibilities are fulfilled.
The safety representative must be available after work hours as needed. The safety representative is not required to be on-site during plant establishment period, erosion control establishment period, or temporary suspensions when no other Contract work is being performed.
Develop a written site-specific safety program (SSSP) that incorporates known hazards associated with the project.
5-1.15B Submittals Submit a resume of the safety representative before starting work on the project, including education, completed safety training, and safety experience in heavy construction, heavy industrial, or oil and energy industry.
Submit a copy of the safety representative's certificate for the Cal/OSHA 30-hour – Cal/OSHA Standards for the Construction Industry or OSHA 510 - OSHA Standards for the Construction Industry training course as an informational submittal. The certificate must include:
1. Name of the entity providing certification
2. Name of the individual receiving certification
3. Date when the certification was provided
4. Expiration date, if applicable
Submit a copy of the SSSP as an informational submittal:
1. At least 15 days before starting work
2. At least 48 hours before starting work whenever a revision is made to the SSSP
5-1.15C Certifications The safety representative must have completed training and received a certificate of completion for the Cal/OSHA 30-hour - Cal/OSHA Standards for the Construction Industry or OSHA 510 – OSHA Standards for the Construction Industry training course.
The safety representative must have one of the following certifications:
1. Certified Safety Professional from the Board of Certified Safety Professionals
2. Construction Health and Safety Technician from the Board of Certified Safety Professionals
3. Occupational Hygiene and Safety Technician from the Board of Certified Safety Professionals
4. Safety Trained Supervisor from the Board of Certified Safety Professionals
5. Safety Trained Supervisor Construction from the Board of Certified Safety Professionals
6. Associate Safety Professional from the Board of Certified Safety Professionals
7. Master Safety Professional from the National Association of Safety Professionals
8. Certified Safety Director from the National Association of Safety Professionals
5-1.15D Qualifications The safety representative must be a competent and qualified person, as defined by Cal/OSHA, and must provide safety oversight on the project. The safety representative must have:
1. At least 3 years of safety experience in heavy construction, heavy industrial, or oil and energy industry
2. Knowledge in the area of safety procedure for all types of work being performed on this project
3. Knowledge of Department specifications and plans, Cal/OSHA policy and procedures, and 8 CA
Code of Regs safety requirements
The safety representative must have completed safety training and maintain valid certifications for:
1. First aid
2. Cardiopulmonary resuscitation
5-1.15E Duties and Responsibilities The safety representative must be available by:
1. Cellular telephone
2. Two-way radio
3. Mobile internet access
The safety representative must:
1. Develop the SSSP
2. Conduct the on-site new project orientation for each worker assigned to the project
3. Review the construction work plans for each subcontractor before starting work
4. Conduct or attend pre-planning sessions for high hazard work such as excavations, demolition, confined space entry, falsework, crane hoisting, high-risk utilities such as high-pressure pipelines with fuel or natural gas, and tunneling or boring
5. Conduct weekly job site safety meetings
6. Review work schedules, including subcontractors' work schedules, to ensure adequacy of job hazard analyses and address all safety concerns and issues
7. Ensure safety data sheets are available on-site for all materials and have a hazard communication program for informing workers of material hazards
8. Verify compliance with hazardous waste requirements under section 14-11, including spill prevention and control measures
9. Conduct daily safety inspections of the job site for hazards and compliance with safety requirements in the specifications and 8 CA Code of Regs
10. Report all incidents to the Engineer immediately, including the investigation of any close calls
When monitoring the job site, including work zones with certified flaggers or traffic control technicians, take immediate corrective action and notify the Engineer if an imminent danger is identified.
If the Engineer determines the safety representative is not meeting the intended duties and responsibilities, you must replace the safety representative within 30 days of written notice from the Engineer. If you need to replace the safety representative, notify the Engineer and provide replacement safety representative resume and required certifications at least 15 days before the replacement.
You may submit a secondary safety representative to act on behalf of the designated safety representative during extended shifts, continuous operations, or short-term absences that will not exceed 14 days in duration. The secondary safety representative must meet the same required qualifications and certifications as the designated safety representative.
Add to the end of section 5-1.20A:
During the progress of the work under this Contract, work under the following contracts may be in progress at or near the job site of this Contract:
Coincident or Adjacent Contracts
Contract no. County–Route–Post Mile Location Type of work 07-354324 LA-405-0/29.5 Orange/LA County
Line Convert HOV to HOT Express Lane
07-350704 LA-405-19.2/26 In Los Angeles near
LAX
Replace Traffic Management Systems and Communication Systems
07-357104 LA 405-12.4/14.6 In Los Angeles County in Carson and Los Angeles
Construct aux lane & widen connectors
07-353104 LA-405-16.4/R21.2 In Los Angeles in Torrance, Redondo Beach, Lawndale and Hawthorne
Add Auxiliary Lanes
Coordinate lane closures and traffic handling with the Engineer and with contractors of coincident or adjacent projects. Potential conflicts may not be limited to the contracts listed above.
Add to the end of section 5-1.33:
You must use tier 4 interim or tier 4 final engines for off-road diesel-fueled vehicles subject to 13 CA Code of Regs § 2449 instead of the use of lowered tiered engines. However, the requirement to use tier 4 interim or tier 4 final engines does not apply to vehicles registered to operate on public roads when those vehicles are used solely to deliver materials or supplies to the job site.
For off-road diesel-fueled vehicles subject to 13 CA Code of Regs§ 2449:
1. At least 15 days before use of vehicles submit an inventory list to the Engineer and tier4@dot.ca.gov for authorization. The list must include the following information for each vehicle:
1.1. Diesel off-road on-line reporting system (DOORS) identification number issued to the vehicle owner by the California Air Resources Board
1.2. Company or agency name associated with the DOORS identification number
1.3. California Air Resources Board issued equipment identification number for the vehicle
1.4. Vehicle product identification number as listed in DOORS
1.5. Corresponding identifying number required in this section
1.6. Serial number
1.7. Vehicle type
1.8. Vehicle manufacturer, model number and model year
1.9. Number of engines as indicated in DOORS
1.10. For each engine:
1.10.1. Serial number
1.10.2. Manufacturer name, model, and model year
1.10.3. Maximum horsepower
1.10.4. EPA issued engine family name
1.10.5. Engine displacement in liters
1.10.6. California Air Resources Board issue executive order for the engine family from the off-road certification database. For the database go to the California Air Resources Board website: https://www.arb.ca.gov/msprog/offroad/cert/cert.php
1.10.7. Emission standard category for the engine family, such as tier 4 interim or tier 4 final
1.10.8. Photograph of the engine label
2. Submit an updated inventory list at least 5 business days before using a vehicle not on the list or replacing a vehicle on the list for authorization. Allow 5 business days for review.
Flexibility engines certified under the California Air Resources Board’s flexibility program provisions are noncompliant engines unless a previously issued executive order for that engine family indicates the emission standard category is tier 4 interim. You may access these executive orders at the California Air Resources Board website: https://www.arb.ca.gov/msprog/offroad/cert/cert.php For example:
Executive Order U-R-002-0747 was issued on March 16, 2020, for Flexibility Program Engine Family Name “DCEXL15.0AAK,” a Cummins Inc. 2020 model engine. Executive Order U-R-002-0592-2 issued On December 30, 2013, for Engine Family DCEXL15.0AAK indicates the “Emission Standard Category” is tier 4 interim. Use of Engine Family “DCEXL 15.0AAK is compliant.
If you operate a vehicle that is noncompliant with these requirements, the Department deducts a $2000 penalty for each noncompliant engine for each day of operation.
Replace section 5-1.36C(2) with:
5-1.36C(2) Nonhighway Facility Protection
The utility information shown is incomplete. Utility location activities must be concurrent with construction activities. Make arrangements with the utility owners to coordinate activities. At least 48 hours before you disturb soil, request that the Department mark the location of Department-owned underground facilities.
Failure to submit the request prohibits soil disturbance.
Add between the 6th and 7th paragraph of section 5-1.43E(1)(a):
DRA and DRB meetings may be held either virtually or on-site at the job location upon mutual agreement by the Contractor, the Department, and the DRA or DRB.
DRA and DRB meetings include:
1. Initial project meeting
2. Progress meetings
3. Dispute meetings
On-site meetings are held at a physical location and include on-site time, travel time, transportation, lodging, and incidentals for each day or portion thereof.
Virtual meeting includes virtual meeting time, equipment, and incidentals for each hour or portion thereof, either all or part of the DRA and DRB members, with the following requirements:
1. Obtain authorization for virtual meeting 14 days before the meeting
2. Use of Webex, Zoom or MS Teams virtual platforms
Obtain authorization for DRA or DRB members before spending any time on DRA- or DRB- related tasks.
Hourly off-site DRA and DRB related tasks include reviewing the plans, specifications, evaluating positions, preparing recommendations, completing forms, or performing any other off-site DRA- or DRB-related tasks.
Replace section 5-1.43E(1)(i) with:
5-1.43E(1)(i) Payment Pay the DRA or each DRB member for meeting participation as follows:
1. $250 per hour for agreed hourly off-site DRA- or DRB-related tasks
2. For attending a virtual off-site meeting with a limit of $1,000 per meeting at hourly off-site DRA-or
DRB-related tasks rate
3. $2,500 per day for each on-site meeting
Department does not pay for (1) DRA- or DRB-work performed after Contract acceptance or (2) cost of preparing for or attending ADR meetings.
The Department pays:
1. $250 per hour for agreed off-site DRA- or DRB-related tasks
2. For each DRA or DRB member attending a virtual off-site meeting with a limit of $1,000 per meeting at hourly off-site DRA-or DRB-related tasks rate
3. $2,500 per DRA on-site meeting
4. Up to $7,500 per DRB on-site meeting
Payment is full compensation for each meeting and off-site DRA- or DRB-related tasks.
The Department does not adjust the unit price for an increase or decrease in the quantity of:
1. DRA on site meeting
2. DRB on site meeting
3. Hourly off-site DRA- or DRB-related task
Within 60 days of receipt of Department's payment, submit copies of associated invoices and supporting documents in the form of a canceled check or bank statement for DRA- or DRB-payment verification.
6 CONTROL OF MATERIALS
Add to end of section 6-1.01:
If you fail to submit the form for materials subject to Buy America, the Department may:
1. Withhold from the next progress payment
2. Reject your request for a De Minimis Costs waiver for non-compliant construction materials or manufactured products
Replace section 6-1.03B with:
6-1.03B Submittals 6-1.03B(1) General Not Used
6-1.03B(2) Work Plan For local material, such as rock, gravel, earth, structure backfill, pervious backfill, imported borrow, and culvert bedding, obtained from a (1) noncommercial source, or (2) source not regulated under California jurisdiction, submit a local material plan for each material at least 60 days before placing the material. The local material plan must include:
1. Certification signed by you and an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:
I am aware local material from a noncommercial source or a source not regulated under CA jurisdiction must be sampled and analyzed for pH and lead and may require sampling and analysis under section 6-1.03B(3) for other constituents of concern based on the land use history. I am aware that local material sources must not contain ADL at concentrations greater than 80 mg/kg total lead or equal to or greater than 5 mg/L soluble lead as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II. I am aware that a maximum quantity of material may be excavated at the site based on the minimum number of samples taken before excavating at the site under section 6-1.03B(3).
2. Land use history of the local material location and surrounding property
3. Sampling protocol
4. Number of samples per volume of local material
5. QA and QC requirements and procedures
6. Qualifications of sampling personnel
7. Stockpile history
8. Name and address of the analytical laboratory that will perform the chemical analyses
9. Analyses that will be performed for lead and pH
10. Other analyses that will be performed for possible hazardous constituents based on:
10.1. Source property history
10.2. Land use adjacent to source property
10.3. Constituents of concern in the ground water basin where the job site is located
The plan must be sealed and signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State.
If the plan requires revisions, the Engineer provides comments. Submit a revised plan within 7 days of receiving comments. Allow 7 days for the review.
6-1.03B(3) Analytical Test Results At least 15 days before placing local material, submit analytical test results for each local material obtained from a noncommercial source or a source not regulated under CA jurisdiction. The analytical test results must include:
1. Certification signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:
The analytical testing described in the local material plan has been performed. I performed a statistical analysis of the test results using the US EPA's ProUCL software with the applicable 95 percent upper confidence limit. I certify that the material from the local material source is suitable for unrestricted use at the job site, it has a pH above 5.0, does not contain soluble lead in concentrations equal to or greater than 5mg/l as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II, does not contain lead in concentrations above 80 mg/kg total lead, is free from all other contaminants identified in the local material plan, and will comply with the job site's basin plan and water quality objectives of the RWQCB.
2. Chain of custody of samples
3. Analytical results no older than 1 year
4. Statistical analysis of the data using US EPA’s ProUCL software with a 95 percent upper confidence limit
5. Comparison of sample results to hazardous waste concentration thresholds and the RWQCB's basin plan requirements and water quality objectives for the job site location
6-1.03B(4) Sample and Analysis Sample and analyze local material from a (1) noncommercial source or (2) a source not regulated under CA jurisdiction:
1. Before bringing the local material to the job site
2. As described in the local material plan
3. Under US EPA Test Methods for Evaluating Solid Waste, Physical/Chemical Methods (SW-846)
The sample collection must be designed to generate a data set representative of the entire volume of proposed local material.
Before excavating at the (1) noncommercial material source or (2) a source not regulated under CA jurisdiction, collect the minimum number of samples and perform the minimum number of analytical tests for the corresponding maximum volume of local material as shown in the following table:
Minimum Number of Samples and Analytical Tests for Local Material Maximum volume of imported borrow
(cu yd) Minimum number of samples and analytical tests
< 5,000 8
5,000–10,000 12 for the first 5,000 cu yd plus 1 for each additional 1,000 cu yd or portion thereof
10,000–20,000 17 for the first 10,000 cu yd plus 1 for each additional 2,500 cu yd or portion thereof
20,000-40,000 21 for the first 20,000 cu yd plus 1 for each additional 5,000 cu yd or portion thereof
40,000–80,000 25 for the first 40,000 cu yd plus 1 for each additional 10,000 cu yd or portion thereof
> 80,000 29 for the first 80,000 cu yd plus 1 for each additional 20,000 cu yd or portion thereof
Do not collect composite samples or mix individual samples to form a composite sample.
Analyze the samples using the US EPA's ProUCL software with a 95 percent upper confidence limit. All chemical analysis must be performed by a laboratory certified by the SWRCB's Environmental Laboratory Accreditation Program (ELAP).
The analytical test results must demonstrate that the local material:
1. Is not a hazardous waste
2. Has a pH above 5.0
3. Has an average total lead concentration, based upon the 95 percent upper confidence limit, at or below 80 mg/kg
4. Is free of possible contaminants identified in the local material plan
5. Complies with the RWQCB's basin plan for the job site location 6 Complies with the RWQCB's water quality objectives for the job site location
6-1.03C Local Material Management Do not place local material until authorized.
If the Engineer determines the appearance, odor, or texture of any delivered local material suggests possible contamination, sample and analyze the material. The sampling and analysis is change order work unless (1) hazardous waste is discovered or (2) the analytical test results indicate the material does not comply with section 6-1.03B(3).
Dispose of noncompliant local material at an appropriately permitted CA Class I, CA Class II or CA Class III facility. You are the generator of noncompliant local materials.
Replace section 6-1.04 with:
6-1.04 BUY AMERICA
6-1.04A General Buy America requirements do not apply to the following:
1. Tools and construction equipment used in performing the work.
2. Temporary work that is not incorporated into the finished project.
An article, material, or supply to be permanently incorporated in the project should only be classified into one of the following categories:
1. Iron or steel products
2. Manufactured products
3. Construction materials
4. Excluded materials
Excluded materials means cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives.
6-1.04B Crumb Rubber (Pub Res Code § 42703(d)) Furnish crumb rubber with a certificate of compliance. Crumb rubber must be:
1. Produced in the United States
2. Derived from waste tires taken from vehicles owned and operated in the United States
6-1.04C Iron or Steel Products Iron or steel products must be melted and manufactured in the United States except:
1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials
2. If the total combined cost of the materials produced outside the United States does not exceed the greater of 0.1 percent of the total bid or $2,500, the material may be used if authorized
Furnish iron or steel products to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the steel and iron were melted and manufactured.
All melting and manufacturing processes for these materials, including an application of a coating, must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating is applied.
6-1.04D Manufactured Products Manufactured products mean articles, materials, or supplies that have been:
1. Processed into a specific form and shape; or
2. Combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies
Per 23 CFR 635.410, these products must be manufactured in the United States.
Manufacturer, in the case of manufactured products, means the entity that performs the final manufacturing process by bringing individual elements together that produces a manufactured product.
If an item is classified as an iron or steel product, a construction material, or an excluded material under the definitions set forth under this Buy America section, then it is not a manufactured product. However, an article, material, or supply classified as a manufactured product under this Buy America section may include components that are construction materials, iron or steel products, or excluded materials.
Iron or steel used in precast concrete manufactured products or enclosures for Intelligent Transportation Systems (ITS) must meet the requirements of section 6-1.04C regardless of the amount used.
Iron or steel used in other manufactured products must meet the requirements of section 6-1.04C if the cost of steel and iron components is 50 percent or more of the total cost of the manufactured product.
Furnish manufactured products to be incorporated into the work with certificates of compliance with each project delivery. The manufacturer's certificate of compliance must identify where the manufacturing occurred and attest specifically to compliance with the 23 CFR 635.410 standard.
6-1.04E Construction Materials The following construction materials must be produced in the United States under standards in 2 CFR 184.6:
1. Non-ferrous metals
2. Plastic and polymer-based products such as:
2.1. Polyvinylchloride
2.2. Composite building materials
3. Glass
4. Fiber optic cable including drop cable
5. Optical fiber
6. Lumber
7. Engineered wood
8. Drywall
All manufacturing processes for these materials as defined in 2 CFR 184.6 must occur in the United States.
Furnish construction materials to be incorporated into the work with certificates of compliance with each project delivery. Manufacturer’s certificate of compliance must identify where the construction material was manufactured and attest specifically to compliance with the 2 CFR 184.6 standard.
Minor additions of articles, materials, supplies, or binding agents to these construction materials do not change the categorization of the construction material.
6-1.04F Buy America Waiver for the De Minimis Costs for Manufactured Products and Construction Materials A De Minimis Costs waiver can waive the application of FHWA's Buy America requirements for manufactured products and construction materials under a single project when the total cost of non-compliant manufactured products and construction materials is no more than the lesser of $1,000,000 or 5 percent of the total applicable costs for the project.
The percentage threshold is calculated based on the following formula:
X = NC / TA
where:
X = percent threshold NC = total cost of non-compliant construction materials and manufactured products TA = total applicable project costs (steel, iron, construction materials and manufactured products;
does not include excluded materials)
This threshold is based on the actual cost of the steel, iron, construction materials, and manufactured products, not the anticipated cost of those materials. The contractor must account for compliant and non-compliant Department-Furnished Materials for the project in the De Minimis Costs Waiver Worksheet calculation if provided by the Department as supplemental project information.
See further instructions for the De Minimis Costs waiver request in the Notice of Materials to be Used form.
Add to section 6-1:
6-1.08 ENVIRONMENTAL PRODUCT DECLARATIONS FOR HOT MIX ASPHALT AND CONCRETE
Section 6-1.08 includes specifications for environmental product declarations for hot mix asphalt and concrete materials and products.
See section 6-1.06B for definitions.
For projects with bid opening dates after February 1, 2025, with a total bid over $1 million and 175 or more original working days, materials or products specified in the following table require facility-specific, product stage, environmental product declarations as informational submittals:
Material or product Material specifications Hot mix asphalta Section 39-2, "Hot Mix Asphalt"
Excludes RHMA, OGFC, and BWC materials.
Concreteb Section 28-2, "Lean Concrete Bases," Section 28-3, "Rapid
Strength Concrete Base," Section 28-4, "Lean Concrete Base Rapid Setting," Section 28-5, "Concrete Base," Section 40, "Concrete Pavement," Section 47-5, "Type 6 Retaining Walls," Section 49-3, "Cast-In-Place Concrete Piling," Section 49-4, "Steel Soldier Piling," Section 51, "Concrete Structures," Section 58-2, "Masonry Block," Section 73, "Concrete Curbs and Sidewalks," Section 83, "Railings and Barriers," and Section 99, "Building Construction."
Excludes volumetric-proportioned rapid strength concrete and Section 90-4 PC concrete members.
aFor each hot mix asphalt plant providing 2,250 tons or more on the project by job mix formula.
bFor each concrete plant providing 250 cubic yards or more on the project by mix design.
The requirements in section 6-1.08 do not apply to seasonal plants operating fewer than 6 months per year.
The requirements in section 6-1.08 do not apply to informal-bid contracts.
For product category rules for hot mix asphalt or concrete, go to the METS website. Use the product category rule in effect on the date of bid opening unless otherwise authorized. An environmental product declaration for hot mix asphalt or concrete is not required for either of the following conditions:
1. Applicable product category rule has expired without replacement as of the bid opening date.
2. Applicable product category rule was issued less than 50 days before the bid opening date.
Immediately notify the Engineer if a program operator has determined their product category rule does not allow for development of a facility-specific environmental product declaration. Include written correspondence from the program operator with your notification to the Engineer. If the Engineer determines the development of a facility-specific environmental product declaration cannot be achieved, an environmental product declaration will not be required for that material or product.
You must register on the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .